Foundation Explanation of HGT51 Tower Placing Concrete Boom

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

HGT51塔式布料杆基础说明

Foundation Explanation of HGT51 Tower Placing Concrete Boom L

Top second main layer of rebar45-φ25 L-80


Base data in different soil bearing capacity 上层第二层主筋42×Φ25

不 同 地耐力下的基础数据 40 Top first main layer of rebar45-φ25


上层第一层主筋42×Φ25
L-80
40
Bearing rod
Soil bearing capacity Top layer rebar Lower layer rebar Bearing rod Soil bearing capacity
3
地 耐 力/MP a L/mm 上 层主 筋 下 层主 筋 架 立筋 混凝 土/m

1545
40
立筋
≥0 . 1 8 7500 纵 横 各 向Vertical
45-φ&25horizontal
纵横 各 向45-φ25 529-φ12 90.0

1600
45-φ25 2 0×2 0×Φ12

≥0 . 1 4 8000 纵 横 各 向Vertical
45-φ&25horizontal
纵横 各 向45-φ25
45-φ25 529-φ12 102.4

100
L-80 Backfill cobblestone layer

40
下层第一层主筋42×Φ25 回填鹅卵石层
L L-80
Lower first main layer of rebar45-φ25 Lower second main layer of
下层第二层主筋42×Φ25
rebar45-φ25

Diagram of concrete foundation reinforcement layout


混凝土基础钢 筋布置示意
axis pin
销轴
Embedded landing leg
Base section (or install the mould + 预埋支腿
standard section)
基础节(或安装模具+标准节)
2000 插销 latch
销 pin

+1 0
150 0
混 凝 土 基 础 foundation
Concrete
2000

1774
L

450
450

10
18

50
00
1600

50
00

10
18
1774
5 0°
5 0°
5 0° 5 0°

拉 筋1 拉 筋2 16×M48调节块(用户自备) 回填鹅卵石层

Tie bar 2 Adjustable block (user-supplied) Backfill cobblestone layer


Tie bar 1
Layout of landing leg
支 腿平 面布置图 支腿预埋示意图
Sketch of embedded landing leg

Technical
技术要求: Requirements:
1. The foundation is made of C35 concrete, and second class rebar is adopted. The rebar should be M
1.基础采用C35砼,钢筋采用二级钢筋,钢筋之间用铁丝扎牢固。
firmly tied with iron wire. Fv
2.在固定支腿附近,钢筋与支腿捆扎牢固,绝不能切割强化钢筋也不能减少所给的数量。 Fh Base loading
2. In the vicinity of the fixed landing leg, the rebar and the landing leg should be firmly fastened, and
3.安装固定支腿时,用支腿安装模具或者基础节将四个支腿组装后放进坑内的钢筋笼中,
the reinforced rebar must not be cut or reduced.
基础载 荷
Working condition Non-working
并在支腿下设置一可调垫块。严格保证尺寸150。
3. When installing the fixed landing legs, assembly the four legs into the steel cage with the basic T Crane free Loading type
塔身高度(m) 载荷种类 工作工况 condition
非工作工况
4.四个固定支腿角钢上平面度误差:标准横截面的1/400。
section or installation mould then put them in the pit. And an adjustable pad shall be put under the standing height
landing leg. Guarantee the size 150 strictly.
5.固定支腿周围砼填充率大于95%。 (m) Fv(t) 63.68 60.68
4. Flatness error of Angle steel of four fixed landing legs: 1/400 of standard cross section.
6.基础周围地面低于混凝土表面100左右以利于排水。
5. The filling rate of concrete around the fixed landing legs: ≥95%. 45.2
Fh(t) 4.17 15.0
7.基础土质要求坚固牢实,且承压力与混凝土尺寸符合下表要求。 72.2
6. The ground around the foundation shall be about 100mm lower than the concrete foundation to M(t.m) 290.51 550.9
facilitate drainage.
7. The foundation soil shall be firm, and the bearing pressure and concrete type shall meet the
requirements in the following table.