Which I alae
of functions control procedures?
a. production planning and control is
located apart from the work centers
Wael
c. cost accounting has custody of and
makes entries on cost records
d. work centers record direct labor on
job tickets
B
* 4+)
Firms TL el
approach to:
a
b. determine the optimum inventory
level using the EOQ model
c. camouflage production problems
d. ensure overproduction of inventory
rN6:05 PM ¥ @ Pr
NCSC Ken eae |
* +)
Teena eae ac eee er
the following except:
a. cost of rework
b. warranty claims
c. scheduling delays
eee Ce Re icere
D
* %)
Rec meena
groups all of the following technologies
a. robotics
c. automated storage and retrieval
systems
d. computer aided design
3)6:05 PM ¥ @ Pr
NCSC Ken eae |
*
a. Computer Aided Engineering
b, Automated Storage and Retrieval
RNa)
d. Computer Numerical control
(o)
> a)
Characteristics of Just-In-Time
manufacturing include all of the
following cee
b. zero defects
c. reduced setup time and small lot sizes
d. reliable vendors
A6:05 PM ¥ @ Pe
NCSC Ken eae |
* *)
A manufacturing process that is
organized into group technology cells
eed
a. islands of technology
b. process simplification
Ree Cee eet
d. traditional manufacturing
ie
=—_
a. Computer Aided Engineering
b. Automated Storage and Retrieval
SD)
RAS laa hs
c. Computer Numerical Control
d. robotics
rN6:05 PM ¥ @ Pa
NCSC Ken eae |
*
Mien Rem at-aiollC\v inte anor
(ee
Se
a. demand for the product is known with
oX-Tar lang
|
d
c. lead time is known and is constant
d. there are no quantity discounts
lve)
*
If the daily demand is 40 units and the
lead time is 12 days, the reorder point is:
a. 52 units
b. 48 units 9
d. none of the above
ie6:05 PM ¥ @ all & GD
NCSC Ken eae |
* 4)
ensniconal sau ean
following tasks except it
a. provides production planning and
control with the inventory status report
of finished goods
b. updates the raw material inventory
records
E
ccc ce
d. records the completed production as
an increase to finished goods inventory
iS
rear
Which of the following is not an
—-
a. demand for the product is known with
Targa6:05 PM ¥ @ Pra
NCSC Ken eae |
a
a. is the formal plan and authority to
begin production
b. specifies the materials and production
required for each batch
G
d. authorizes the storekeeper to release
materials to workcenters
Cc
*
Deen
following tasks Erte a
a. provides production planning and
control with the inventory status report
of finished goods
b. updates the raw material inventory
records
eu ug
each production batch6:05 PM ¥ @ Pra
NCSC Ken eae |
*
The productions schedule is:
a. the expected demand for the firm's
finished goods for a given year
c. a description of the type and quantity
of raw materials and subassemblies used
to produce a single unit of finished
product.
d. the sequence of operations during
manufacturing
wD
ae)
A move ticket
a. is the formal plan and authority to
begin production
b. specifies the materials and production
required for each batch
c. records the work done in each work
(ene6:05 PM ¥ @ Pe
NCSC Ken eae |
aD)
The two subsystems of a traditional
conversion cycle are the production
system and the delivery system.
a
an)
All of the following are characteristics of
batch processing except:
a. each item in the batch is similar
b. batches are produced in accordance
with detailed customer specifications
c. batches are produced to replenish
depleted inventory levels
d. setting up and retooling is required
for different batches
SD)
The productions schedule is:
a. the expected demand for the firm's6:05PM ¥ @ “
NCSC Ken eae |
dae le tal el ld] iS 1aie lat | iia
»)
* *)
The objective of the Economic Order
Quantity model is to reduce total
inventory costs by minimizing carry costs
and ordering costs.
T
* 4)
Move tickets authorize the storekeeper
to release materials to work centers.
a
*
Computer Integrated Manufacturing
focuses on reducing the complexity of
the physical manufacturing layout of the
shop floor.