Professional Documents
Culture Documents
CT - For Switchayrd
CT - For Switchayrd
CT - For Switchayrd
CLIENT : M/s.
PROJECT : Sheet No 1 of 12
2. Equipment Details :
LOA No :
Make :
Type :
Sl. No. : Rph : Y ph : B ph :
Mfg Year :
1 Equipment is cleaned and free from Dust / Dirt foreign materials etc.
2 Equipment is free from all visible defects on physical inspection
3 Check CT tank has been provided with earthing (Dead Tank CT’s)
4 Check that CT junction box is earthed
5 All Nuts and Bolts are tightened correctly as per specified torque
6 Check tightness of terminal connector
7 All fittings as per out line general arrangement drawing
8 Check primary polarity of CT’s erected as per relevant drawing
9 Check hermetically sealing is intact
10 Check the oil level and leakage through any joints / sec. terminals
11 Check oil drain valve is properly closed and locked
12 Oil level on top chamber gauge glass
13 Ensure interpole cabling is completed and check the continuity
14 Check the IR value of secondary cable
15 Check external cabling from junction box to relay / control panel completed
16 Ensure unused secondary cores if any has been shorted
17 Check start point has been formed properly and grounded at one end only
CLIENT : M/s.
PROJECT : Sheet No 2 of 12
Core R ph Y ph B ph
Primary to Earth
Primary to Sec. Core – 1
Primary to Sec. Core – 2
Primary to Sec. Core – 3
Primary to Sec. Core – 4
Primary to Sec. Core – 5
Core R ph Y ph B ph
Sec. Core – 1 to Earth
Sec. Core – 2 to Earth
Sec. Core – 3 to Earth
Sec. Core – 4 to Earth
Sec. Core – 5 to Earth
Sec. Core – 1 to Sec. Core-2
Sec. Core – 1 to Sec. Core-3
Sec. Core – 1 to Sec. Core-4
Sec. Core – 1 to Sec. Core-5
Sec. Core – 2 to Sec. Core-3
Sec. Core – 2 to Sec. Core-4
Sec. Core – 2 to Sec. Core-5
Sec. Core – 3 to Sec. Core-4
Sec. Core – 3 to Sec. Core-5
Sec. Core – 4 to Sec. Core-5
CLIENT : M/s.
PROJECT : Sheet No 3 of 12
6. Continuity Test :
Continuity checks between terminal : OK / Not OK
Core Between R ph Y ph B ph
Terminal
Core – 1 1S1-1S2
1S1-1S3
1S1-1S4
Core – 2 2S1-2S2
2S1-2S3
2S1-2S4
Core – 3 3S1-3S2
3S1-3S3
3S1-3S4
Core – 4 4S1-4S2
4S1-4S3
4S1-4S4
Core – 5 5S1-5S2
5S1-5S3
5S1-5S4
Note : incase of terminal are not provided please write “NA” (Not Applicable)
Using ______ Megger Make : Range : Sl. No. Calib due date :
R ph Y ph B ph
CLIENT : M/s.
PROJECT : Sheet No 4 of 12
CLIENT : M/s.
PROJECT : Sheet No 5 of 12
CLIENT : M/s.
PROJECT : Sheet No 6 of 12
Core – 1 20%
1S1-1S3 40%
80%
Core – 2 20%
2S1-2S3 40%
80%
Core – 3 20%
3S1-3S3 40%
80%
Core – 4 20%
4S1-4S3 40%
80%
Core – 5 20%
5S1-5S3 40%
80%
CLIENT : M/s.
PROJECT : Sheet No 7 of 12
Y ph – Ratio Test
CLIENT : M/s.
PROJECT : Sheet No 8 of 12
80%
Core – 1 20%
1S1-1S4 40%
80%
Core – 2 20%
2S1-2S4 40%
80%
Core – 3 20%
3S1-3S4 40%
80%
Core – 4 20%
4S1-4S4 40%
80%
Core – 5 20%
5S1-5S4 40%
80%
B ph – Ratio Test
CLIENT : M/s.
PROJECT : Sheet No 9 of 12
Core – 1 20%
1S1-1S3 40%
80%
Core – 2 20%
2S1-2S3 40%
80%
Core – 3 20%
3S1-3S3 40%
80%
Core – 4 20%
4S1-4S3 40%
80%
Core – 5 20%
5S1-5S3 40%
80%
CLIENT : M/s.
PROJECT : Sheet No 10 of 12
12. Magnetising Curves Performance : Knee Point Voltage (KVP) ________ Volts
CLIENT : M/s.
PROJECT : Sheet No 11 of 12
1.10 x Kvp
CLIENT : M/s.
PROJECT : Sheet No 12 of 12
13. Remarks :