1. GENERAL DESCRIPTION
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 4
1.1Scope
This document presents design calculation of Building Structure and Roof Analysis for steel structure
will be perform and calculate by SAP 2000 Structure Spesification:
a. Length = 30 m
b. Width = 18 m
c. Hright = 20.36m
d. Upper structure material = Steel Structure
e. Sub –Structure Material = Concrete Structure
b. SNI 1726: 2012 Tata Cara Perencanaan Ketahanan Gempa Untuk Struktur Bangunan Gedung dan non
Gedung
c. SNI 1727: 2013 Beban Minimum Untuk Perancangan Bangunan Gedung dan
Struktur Lain
d. PPIUG 1983.
2. LOADING DESIGEN
He following loads and forces are considered in the design of steel structurer
2.1 Load Type
a. Dead Load (DL)
- Selfweight of steel structure
- Wall and Floor cladding Weight
- MEP
b. Live Load (LL)
- Load at slab
- Load at roof construction
c. Wind Load (WL)
- Wind load from left side of the building = 25 kg
- Wind load from right side of the building = 25 kg
d. Sejsmic (QL)
The structure is to be designed to resist Seismic Force induced as lateral static equivalentthe lateral
seismic force will be calculated base on indonesian code SNI.
S1 = 1.733 g
SS = 0.626 g
Fa =1
Fy = 1.5
Sms = 1.733 X 1 = 1.733
SM1 = 0.626 X 1.5 = 0.939
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 10
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 11
R=8
Ct = 0.0466
X = 0.9
Ta = Ct X hnx
= 0.0466 X 0.9
= 0.04194 X
6.60.9
= 0.25
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 12
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 13
\
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 14
b. Roof truss
The structure below are calculated by SAP 2000 (computer program for civil structure)
and these are the result for stress ratio. The structure will meet therequirement if the value
of stress ratio < 1.
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 20
400 Messages
63 KOLOM 400 X Column Check No 2 DCON4
400 Messages
63 KOLOM 400 X Column Check No 4 DCON1
400 Messages
64 KOLOM 400 X Column Check No 0 DCON6
400 Messages
64 KOLOM 400 X Column Check No 2 DCON1
400 Messages
64 KOLOM 400 X Column Check No 4 DCON6
400 Messages
65 KOLOM 400 X Column Check No 0 DCON6
400 Messages
65 KOLOM 400 X Column Check No 2 DCON1
400 Messages
65 KOLOM 400 X Column Check No 4 DCON6
400 Messages
67 KILOM1050 X Column Check No 0 DCON18
500 Messages
67 KILOM1050 X Column Check No 2 DCON6
500 Messages
67 KILOM1050 X Column Check No 4 DCON6
500 Messages
68 KILOM1050 X Column Check No 0 DCON6
500 Messages
68 KILOM1050 X Column Check No 2 DCON6
500 Messages
68 KILOM1050 X Column Check No 4 DCON6
500 Messages
69 KILOM1050 X Column Check No 0 DCON6
500 Messages
69 KILOM1050 X Column Check No 2 DCON5
500 Messages
69 KILOM1050 X Column Check No 4 DCON3
500 Messages
70 KILOM1050 X Column Check No 0 DCON5
500 Messages
70 KILOM1050 X Column Check No 3.00001 DCON3
500 Messages
70 KILOM1050 X Column Check No 3.00001 DCON3
500 Messages
70 KILOM1050 X Column Check No 4.2 DCON3
500 Messages
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 22
500 Messages
80 KILOM1050 X Column Check No 0 DCON18
500 Messages
80 KILOM1050 X Column Check No 2 DCON6
500 Messages
80 KILOM1050 X Column Check No 4 DCON5
500 Messages
81 KILOM1050 X Column Check No 0 DCON5
500 Messages
81 KILOM1050 X Column Check No 2 DCON5
500 Messages
81 KILOM1050 X Column Check No 4 DCON3
500 Messages
82 KILOM1050 X Column Check No 0 DCON5
500 Messages
82 KILOM1050 X Column Check No 3 DCON3
500 Messages
82 KILOM1050 X Column Check No 3 DCON3
500 Messages
82 KILOM1050 X Column Check No 4.2 DCON3
500 Messages
82 KILOM1050 X Column Check No 8.4 DCON3
500 Messages
83 KILOM1050 X Column Check No 0 DCON17
500 Messages
83 KILOM1050 X Column Check No 2 DCON17
500 Messages
83 KILOM1050 X Column Check No 4 DCON5
500 Messages
84 KILOM1050 X Column Check No 0 DCON5
500 Messages
84 KILOM1050 X Column Check No 2 DCON5
500 Messages
84 KILOM1050 X Column Check No 4 DCON6
500 Messages
85 KILOM1050 X Column Check No 0 DCON6
500 Messages
85 KILOM1050 X Column Check No 2 DCON6
500 Messages
85 KILOM1050 X Column Check No 4 DCON3
500 Messages
87 KILOM1050 X Column Check No 0 DCON18
500 Messages
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 24
500 Messages
95 KILOM1050 X Column Check No 0 DCON6
500 Messages
95 KILOM1050 X Column Check No 2 DCON6
500 Messages
95 KILOM1050 X Column Check No 4 DCON6
500 Messages
97 KILOM1050 X Column Check No 0 DCON6
500 Messages
97 KILOM1050 X Column Check No 2 DCON5
500 Messages
97 KILOM1050 X Column Check No 4 DCON3
500 Messages
98 KILOM1050 X Column Check No 0 DCON3
500 Messages
98 KILOM1050 X Column Check No 3 DCON3
500 Messages
98 KILOM1050 X Column Check No 3 DCON3
500 Messages
98 KILOM1050 X Column Check No 4.2 DCON3
500 Messages
98 KILOM1050 X Column Check No 8.4 DCON3
500 Messages
582 KILOM1050 X Column Check No 0 DCON5
500 Messages
582 KILOM1050 X Column Check No 0.88 DCON5
500 Messages
582 KILOM1050 X Column Check No 1.76 DCON6
500 Messages
583 KILOM1050 X Column Check No 0 DCON6
500 Messages
583 KILOM1050 X Column Check No 0.88 DCON6
500 Messages
583 KILOM1050 X Column Check No 1.76 DCON3
500 Messages
584 KILOM1050 X Column Check No 0 DCON5
500 Messages
584 KILOM1050 X Column Check No 0.88 DCON6
500 Messages
584 KILOM1050 X Column Check No 1.76 DCON6
500 Messages
585 KILOM1050 X Column Check No 0 DCON17
500 Messages
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 26
500 Messages
592 KILOM1050 X Column Check No 1.76 DCON3
500 Messages
593 KILOM1050 X Column Check No 0 DCON4
500 Messages
593 KILOM1050 X Column Check No 0.88 DCON5
500 Messages
593 KILOM1050 X Column Check No 1.76 DCON5
500 Messages
541 KILOM1050 X Column Check No 0 DCON6
500 Messages
541 KILOM1050 X Column Check No 2 DCON6
500 Messages
541 KILOM1050 X Column Check No 4 DCON6
500 Messages
542 KILOM1050 X Column Check No 0 DCON1
500 Messages
542 KILOM1050 X Column Check No 1.5 DCON1
500 Messages
542 KILOM1050 X Column Check No 3 DCON3
500 Messages
543 KILOM1050 X Column Check No 0 DCON1
500 Messages
543 KILOM1050 X Column Check No 2.7 DCON6
500 Messages
543 KILOM1050 X Column Check No 5.4 DCON6
500 Messages
544 KILOM1050 X Column Check No 0 DCON6
500 Messages
544 KILOM1050 X Column Check No 2 DCON6
500 Messages
544 KILOM1050 X Column Check No 4 DCON1
500 Messages
545 KILOM1050 X Column Check No 0 DCON6
500 Messages
545 KILOM1050 X Column Check No 2 DCON1
500 Messages
545 KILOM1050 X Column Check No 4 DCON1
500 Messages
546 KILOM1050 X Column Check No 0 DCON1
500 Messages
546 KILOM1050 X Column Check No 2 DCON1
500 Messages
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 28
400 Messages
559 KOLOM 400 X Column Check No 0 DCON5
400 Messages
559 KOLOM 400 X Column Check No 2.70001 DCON5
400 Messages
559 KOLOM 400 X Column Check No 5.40002 DCON17
400 Messages
561 KOLOM 400 X Column Check No 0 DCON5
400 Messages
561 KOLOM 400 X Column Check No 1.5 DCON1
400 Messages
561 KOLOM 400 X Column Check No 3 DCON5
400 Messages
562 KOLOM 400 X Column Check No 0 DCON6
400 Messages
562 KOLOM 400 X Column Check No 2.7 DCON6
400 Messages
562 KOLOM 400 X Column Check No 5.4 DCON18
400 Messages
564 KILOM1050 X Column Check No 0 DCON6
500 Messages
564 KILOM1050 X Column Check No 1.60086 DCON6
500 Messages
564 KILOM1050 X Column Check No 3.20173 DCON6
500 Messages
565 KILOM1050 X Column Check No 0 DCON6
500 Messages
565 KILOM1050 X Column Check No 2.59914 DCON3
500 Messages
565 KILOM1050 X Column Check No 5.19828 DCON3
500 Messages
566 KILOM1050 X Column Check No 0 DCON18
500 Messages
566 KILOM1050 X Column Check No 1.5775 DCON6
500 Messages
566 KILOM1050 X Column Check No 3.15499 DCON6
500 Messages
567 KILOM1050 X Column Check No 0 DCON6
500 Messages
567 KILOM1050 X Column Check No 2.62251 DCON3
500 Messages
567 KILOM1050 X Column Check No 5.24501 DCON3
500 Messages
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 30
500 Messages
580 KILOM1050 X Column Check No 2.7 DCON1
500 Messages
580 KILOM1050 X Column Check No 5.4 DCON6
500 Messages
581 KOLOM 400 X Column Check No 0 DCON15
400 Messages
581 KOLOM 400 X Column Check No 2 DCON3
400 Messages
581 KOLOM 400 X Column Check No 4 DCON3
400 Messages
594 KOLOM 400 X Column Check No 0 DCON3
400 Messages
594 KOLOM 400 X Column Check No 2 DCON1
400 Messages
594 KOLOM 400 X Column Check No 4 DCON6
400 Messages
598 KOLOM 400 X Column Check No 0 DCON5
400 Messages
598 KOLOM 400 X Column Check No 2 DCON1
400 Messages
598 KOLOM 400 X Column Check No 4 DCON5
400 Messages
600 KOLOM 400 X Column Check No 0 DCON5
400 Messages
600 KOLOM 400 X Column Check No 1.5 DCON1
400 Messages
600 KOLOM 400 X Column Check No 3 DCON5
400 Messages
601 KOLOM 400 X Column Check No 0 DCON5
400 Messages
601 KOLOM 400 X Column Check No 2.7 DCON6
400 Messages
601 KOLOM 400 X Column Check No 5.4 DCON17
400 Messages
603 KOLOM 400 X Column Check No 0 DCON15
400 Messages
603 KOLOM 400 X Column Check No 2 DCON3
400 Messages
603 KOLOM 400 X Column Check No 4 DCON3
400 Messages
605 KOLOM 400 X Column Check No 0 DCON3
400 Messages
CALCULATION OF BUILDING STRUCTURE ANALYSIS
PT SEMEN JAWA – WHG BUILDING, SUKABUMI
Document No. Rev. Contract No. Page
0 32