DR - 031123 - Project Fujimaki - EDK
DR - 031123 - Project Fujimaki - EDK
Setting
Sub Total I 4 I. Setting
II. DIRECT 1. Continue Adjsting Soleplate 2 unit 100%
Construction : II. Installation
Abdul Kasib M. 1 1. Repair Rail Track 2 unit 50%
Al. Amin 1 2. Repair Fujimaki Part 4 unit 100%
Aryanto 1
Ahmad Rizki 1
Sukardi 1
Dwi Bagus S. 1
Sabidun 1
Heri Sumanto 1
Randik Yulianto 1
Adi Winarto 1
Edi Hari W. 1
PROBLEM
---
SOLUTION
---
Sub Total II 11
Total Man Power 15
Material Unit Qty Tools Unit Qty Tool Unit Qty
Oxygen Cylinder Unit 1 Cutter Grinding Set 1 Autolevel Set 1
Gas Cylinder Unit 1 Cutting Torch set 1
Wrench set 1
Welding Machine Set 1
Apar Unit 1
Rai Note :
Referensi (Drawing/Information) : Weather Bright Cloudy
n Material for Support and Anchor isnt ready yet
Morning ✔
Midday ✔
Afternoon ✔
Night
Prepared By, Approved By,
2. Setting
3. Moving
4. Installing
MASTER SCHEDULE (03-11-23)
PROJECT : Installation Equipment Machine Cutter Fujimaki
P/O No. : -
VENDOR : PT. ERATAMA DAYA KONSTRUKSI
October 2023 until December 2023
PROGRESS Oct-23 Nov-23 Dec-23
NO DESCRIPTION QTY UNIT Weight
ACTIVITIES (%) W01 W02 W03 W04 W05 W06 W07 W08 W09 W10 W11 W12 W12
2-8 9-15 16-22 23-28 30-5 6-12 13-19 20-26 27-03 4-10 11-17 18-24 25-31
1,0
1 Installation
1 lot 0,256 Actual 28,00 0,014 0,014 0,014 0,014 0,014
1.1 Installation All Equipment Machine Cutter Fujimaki
Plan 12,50 0,032 0,032 0,032 0,032 0,032 0,032 0,032 0,032
Relocate Broke Trik C/w Installation Ductiong Blower 1 lot 0,281 Actual 33,00 0,019 0,019 0,019 0,019 0,019
1.11
Cutter Plan 47,50 0,028 0,028 0,028 0,028 0,021 0,021 0,021 0,021 0,021 0,021 0,021 0,021
CUM. PLAN 5,33 10,67 16,00 21,34 30,50 39,66 48,82 57,98 66,90 75,83 84,75 97,95 100,00
VARIANCE 0,28 0,56 0,84 1,63 -1,83 -39,66 -48,82 -57,98 -66,90 -75,83 -84,75 -97,95 -100,0
Diperiksa Oleh,
PT. ERATAMA DAYA KONSTRUKSI