Professional Documents
Culture Documents
Revision Plan - 2023-24 - JP
Revision Plan - 2023-24 - JP
ELECTROCHEMISTRY RELATION
MEC AB SIR FUNCTION RS SIR
22 Nov. p-BLOCK (N+O)
MODERN-1 ITF
to VR SIR
PHASE-2 NLM BINOMIAL
27 Nov. GOC
FRICTION AS SIR P&C ST SIR
HYDROCARBON
FOM-I
29-11-23 PT-2 (Mains Pattern)
CHEMICAL BONDING
STRAIGHT LINE
OPTICS D AND F BLOCK AB SIR RS SIR
30 Nov. CIRCLES
EMI PREODIC TABLE
to SM SIR
PHASE-3
05 Dec.
A.C.
ALKYL HALIDE L.C.D.
WPE AS ST SIR
ARYL HALIDE A.O.D.
07-12-23 PT-3 (Mains Pattern)
08 Dec.
to EQUIVALENT CONCEPT TITRATION,
11 Dec. CAPACITOR ATOMIC STRUCTURE Pblock AB SIR INDEFINITE INTEGRATION
& MODERN-2 (13,14,17,18) DEFINITE INTEGRATION
24 Dec. to 25 Dec. HEAT & THERMODYNAMICS VR SIR AREA ST SIR
PHASE-4 HEAT TRANSFER DIFFERENTIAL EQUATION
GENERAL PHYSICS ALCOHOL
ETHER AS SIR
PHENOL
14 Dec. to 23 Dec. PRE-BOARD
27-12-23 PT-4 (Mains Pattern)
WAVE OPTICS CONIC SECTION
CHEMICAL EQUILIBRIUM, IONIC
SHM AB SIR STATISTICS RS SIR
EQUILIBRIUM
28 Dec. STRING WAVE
to SEMICONDUCTOR SJ SIR
PHASE-5 02 Jan. SOUND WAVE CARBONYL COMPOUND
AS SIR TRIGONOMETRY ST SIR
GRAVITATION CARBOXILIC ACID & ITS DERIVATIVES
CIRCULAR MOTION
04-01-24 PT-5 (Mains Pattern)