MAY 2023
1
Revisions History
Road Repair Program
2
Executive Summary
Road Repair Program
3
Road Repair Program
4
Road Repair Program
Contents
1. Summary of the Work
2. Cost assumptions and Contingencies
3. Phasing and Contracting
5
Road Repair Program
1.
Summary of the Work
6
1. Road Works Required, Damaged Pavement to be Repaired
Complete details with damage maps in Appendix 1 Road Repair Program
Raveling
7
1. Road Works Required
Expansion Joints to be changed, Details in Appendix 2 Road Repair Program
Urgent Works
8
1. Road Works Required
General Plan for Manhole and Gullies to be changed, Details in Appendix 3 Road Repair Program
Var – Insert MH
Covers plan here,
9
1. Road Works Required
General Plan for Lane Marking Gaps to be Corrected, Details in Appendix 4 Road Repair Program
Subiya Road guard rail repair required Concrete Barrier, 5th RR Crash attenuator, 4th RR
2.
Assumptions and
Contingencies
13
2. Summary Repairs Required
Asphalt Maintenance Cost Estimate Based on Previous Maintenance Projects Road Repair Program
m2 cost Total
Quantities Contract Value Commencement
Contract # Cost/m2 (with (With
(m2) (Asphalt only) date
escalation) Escalation)
Total 7,098,000 49,841,123 7.02 7.59 55,009,636 The unit rate above are all inclusive (milling, tack coat, asphalt work,
Estimated Cost for asphalt Maintenance = 7.590 KD per m2 lane marking, etc.)
Estimated Cost for Road marking = 0.133 KD per m2
Estimate Total Cost = 7.750 KD per m2
14
2.0 Considerations for Contingency
Road Repair Program
1. All the work plan is based on visual inspection and assessment of the work is based on experience – details
investigation and testing will be required to confirm the repair method and may result in difference repair method
selected
2. Maintenance of traffic can require traffic detour, installation of concrete barriers, signaling, etc., that may result in
additional cost
3. Extent of damage may increase from now to the time of the work
4. The region is experiencing a rapid growth in construction which will affect the availability of raw material and its
cost
5. Current asphalt damage on roads under guaranty is not necessarily covered by the guaranty as the root cause of
the damage my be below the work of the Contractor – area to be repaired under the future contract may have to be
increased to encompass this work
15
Road Repair Program
3.
Phasing and Contracting
16
3.0 Road Repair Work Phasing and contracting
Road Repair Program
Attachment 1
Details of Road Repair Required
18
Road Repair Program
Appendix 1.
Pavement Repair Works
19
Road Repair Program
20
Appendix 1: Urgent Repair Areas
Summary of Urgent Repairs Areas Road Repair Program
1
Raveling and Cracks
2 4
Potholes and Raveling
3
2
3 4
Longitudinal near bridge Expansion joint Longitudinal and Transverse Cracks
potholes 22
Appendix 1: Urgent Repair Areas, 1st Ring Road
Plan of Damages and Repairs Based On Visual Assessment Road Repair Program
1
Longitudinal cracks and transverse cracks
2
Longitudinal cracks in the lane markings,
transverse cracks, near bridge Expansion
joint potholes
3 4
Longitudinal cracks in all lanes, transverse
2
cracks, near bridge Expansion joint Potholes
1
4
Longitudinal cracks, transverse cracks,
potholes and near bridge Expansion joint
potholes
24
Appendix 1: Urgent Repair Areas, 4Th Ring Road
Plan of Damages and Repairs Based On Visual Assessment Road Repair Program
1
Raveling, Cracks & Rutting
2
1
2
Raveling and Cracks
Appendix 1: Urgent Repair Areas, 5th Ring Road
Plan of Damages and Repairs Based On Visual Assessment Road Repair Program
1
Cracks
6
4 3 2 1
2
Damaged Expansion joint and damaged surface
3
Cracks and Depressed Pavement
4 5 6
Cracks and Potholes Raveling and Potholes Raveling
28
Appendix 1: Urgent Repair Areas, 6Th Ring Road
Plan of Damages and Repairs Based On Visual Assessment Road Repair Program
MS/R/324 MS/R/324
1
Potholes
2
Raveling and Cracks
5
3
Raveling, Cracks, Rutting and Potholes
4
2
1
5
4
Existing Milled Areas Bleeding 30
Appendix 1: Urgent Repair Areas, 7Th Ring Road
Plan of Damages and Repairs Based On Visual Assessment Road Repair Program
2 4
32
Appendix 1: Urgent Repair Areas, Fahaheel Expressway (30)
Plan of Damages and Repairs Based On Visual Assessment Road Repair Program
Completed Works
By MS/R/398
URGENT/REGULAR
1
5
1
Longitudinal Joint Cracks
2
Longitudinal joint cracks, Raveling, Potholes,
Peeled and Damaged Rough surface
3 4 5
Big cracks, Raveling , Peeled and Longitudinal Joint Cracks, Raveling and Lane / shoulder longitudinal cracks,
Depressed surface Highly Damaged Surface Potholes, patches, rough surface 34
Appendix 1: Urgent Repair Areas, King Fahad Expressway (40)
Plan of Damages and Repairs Based On Visual Assessment Road Repair Program
RA/240
URGENT/REGULAR
36
Appendix 1: Urgent Repair Areas, Salmi Road (70)
Existing Conditions, Damage Types and Locations Road Repair Program
1
Cracks, Raveling and Potholes
2
Existing Milled Area
4
3
Cracks, Raveling and Potholes
1 3
2
4
Cracks and Raveling
37
Appendix 1: Urgent Repair Areas, Salmi Road (70)
Plan of Damages and Repairs Based On Visual Assessment Road Repair Program
URGENT/REGULAR
1
Cracks, Raveling and Potholes
2
Cracks, Raveling and Potholes 2
39
Appendix 1: Urgent Repair Areas, Jahra Expressway (80)
Plan of Damages and Repairs Based On Visual Assessment Road Repair Program
MS/R/403
0+000 to 18+000
RA-211 & RA-166
(Under Warranty)
URGENT/REGULAR
1
2
1
Cracks and Raveling
2
Cracks, Raveling and Potholes
41
Appendix 1: Urgent Repair Areas, Abdaly Road (80)
Plan of Damages and Repairs Based On Visual Assessment Road Repair Program
URGENT/REGULAR
1
Longitudinal cracks in all the lanes, lane markings, 4
transverse cracks and potholes
2
Longitudinal cracks in all the lanes, lane markings,
2
transverse cracks, pot potholes, lane 3 settlement
3 1
Longitudinal cracks in all the lanes, lane markings,
transverse cracks, pot potholes, lane 3 settlement and
pothole (concrete with Reinforcement steel exposed)
4
Longitudinal cracks, transverse cracks, slow lane settlement
and potholes 43
Appendix 1: Urgent Repair Areas, Subiya Road (801)
Plan of Damages and Repairs Based On Visual Assessment Road Repair Program
URGENT/REGULAR
2
1 3
Joint Cracks and Potholes
2
Joint Cracks and Potholes
3
Mid Lane Cracks and Potholes
45
Appendix 1: Urgent Repair Areas, Link Between Subiya Road (801) and Buhayth Gate Road
Plan of Damages and Repairs Based On Visual Assessment Road Repair Program
URGENT/REGULAR
Appendix 2.
Urgent Expansion Joint
Works & Other Bridge Repair
47
Appendix 2: Expansion Joints to
be Changed on Urgent Basis Road Repair Program
Road 30 85 1404
Road 40 89 1621
48
Appendix 2: Other Urgent Bridge Repair Work
(Excluding Urgent Expansion Joints Replacement) Road Repair Program
Appendix 3.
Urgent SWD system and
Underpass Pump Stations
Works
50
Appendix 3: General Plan for Manhole and Gullies to be changed
Road Repair Program
Var – Insert MH
Covers plan here,
51
Appendix 3: Manholes Covers and Grating Gullies to be Changed
Road Repair Program
Total
52
Road Repair Program
Appendix 4.
Modification of
Lane Marking
53
Appendix 4: General Plan for Lane Marking Gaps to be Corrected
Road Repair Program
54
Appendix 4: Lane marking to be Corrected
Road Repair Program
55
Road Repair Program
Appendix 5.
Concrete Barriers, Steel
Guardrails, Fences, Crash
Barriers and Attenuators
56
Appendix 5: Containment/Safety Equipment to be Repaired
Road Repair Program
57
Appendix 5: Containment/Safety Equipment to be Repaired
Road Repair Program
58
Appendix 5: Containment/Safety Equipment to be Repaired
Road Repair Program
Energy
Concrete Steel
Fence Absorption
Barrier Guardrail
Terminals
Road Length (m) Length (m) Length (m) Number
59
Road Repair Program
Appendix 6.
General
Maintenance
60
Appendix 6: General Maintenance
Road Repair Program
The work described in previous sections is related to major repair work. In addition, and as per work orders to be
provided, the maintenance contractor is expected to perform:
1. Cleaning of the road due to accidents, etc.,
2. Cleaning of the drainage system to remove debris, dust and sand, make sure the system works fine and repairs
any minor defects and provide additional equipment during heavy rain to prevent flooding of the road
3. Cleaning the bridge for dust and debris
4. Repair local damage to concrete barriers, steel guardrail, fence, attenuator, resulting from accidents or local
deterioration
5. Repair local damage in asphalts such as potholes, local cracks, etc.,
6. Repair/replace of road furniture, signs, signals, gantries
7. Repair locally fence, curb, etc.,
8. Execute urgent work to stabilize a critical situation such as soil settlement before a permanent solution is
defined
9. Inspect regularly as per Engineer’s request
61