Professional Documents
Culture Documents
PP-12 Progress Daily Report (Civil - 131022)
PP-12 Progress Daily Report (Civil - 131022)
UNIT
UNIT
DESCRIPTION DESCRIPTION
NO. Q'ty Last Today Accum. Progress Remarks NO. Q'ty Last Today Accum. Progress Remarks
1. CIVIL WORK
1.01 GTG #1 FDN (Incl. Auxiliary) M3 702 653 - 653 93.0%
GTG #2 FDN (Incl. Auxiliary) M3 702 590 - 590 84.0%
GTG #3 FDN (Incl. Auxiliary) M3 702 594 - 594 84.6%
GTG #4 FDN (Incl. Auxiliary) M3 702 580 - 580 82.6%
GTG #5 FDN (Incl. Auxiliary) M3 702 580 - 580 82.6%
GTG #6 FDN (Incl. Auxiliary) M3 702 580 - 580 82.6%
GTG #7 FDN (Incl. Auxiliary) M3 702 580 - 580 82.6%
GTG #8 FDN (Incl. Auxiliary) M3 702 580 - 580 82.6%
1.02 HRSG #1 FDN (Incl. Stack) M3 370 362 - 362 97.8%
HRSG #2 FDN (Incl. Stack) M3 370 360 - 360 97.3%
HRSG #3 FDN (Incl. Stack) M3 370 368 - 368 99.5%
HRSG #4 FDN (Incl. Stack) M3 370 372 - 372 100.5%
HRSG #5 FDN (Incl. Stack) M3 370 305 - 305 82.4%
HRSG #6 FDN (Incl. Stack) M3 370 332 - 332 89.7%
HRSG #7 FDN (Incl. Stack) M3 370 - - - 0.0%
HRSG #8 FDN (Incl. Stack) M3 370 - - - 0.0%
1.03 STG #1 FDN (Incl. Auxiliary) M3 1,750 1,012 - 1,012 57.8%
STG #2 FDN (Incl. Auxiliary) M3 1,750 65 - 65 3.7%
1.04 ACC #1 FDN (Incl. Condensate Tank) M3 280 253 - 253 90.4%
ACC #2 FDN (Incl. Condensate Tank) M3 280 250 - 250 89.3%
1.05 TURBINE BLDG #1 (Incl. Ground Slab) M3 2,945 468 - 468 15.9%
TURBINE BLDG #2 (Incl. Ground Slab) M3 2,945 441 - 441 15.0%
1.06 CENTRAL CONTROL BLDG M3 2,269 219 - 219 9.7%
1.07 LOCAL ELEC BLDG #1 M3 1,048 830 - 830 79.2%
LOCAL ELEC BLDG #2 M3 1,048 674 - 674 64.3%
1.08 GSUT & UAT #1 FDN AND FIREWALL M3 550 480 - 480 87.3%
GSUT & UAT #2 FDN AND FIREWALL M3 550 489 - 489 88.9%
GSUT & UAT #3 FDN AND FIREWALL M3 550 378 22 400 72.7% STEP UP
GSUT & UAT #4 FDN AND FIREWALL M3 550 389 - 389 70.7%
1.09 HRSG Elec. Room #1 M3 480 178 - 178 37.1%
HRSG Elec. Room #2 M3 480 - - - 0.0%
1.10 PIPE TRENCHS FDN M3 1,125 94 - 94 8.4%
1.11 WATER TANK FDN (INCL. DIKE) M3 520 520 - 520 100.0%
1.12 OIL TANK FDN (INCL. DIKE) M3 4,250 3,249 - 3,249 76.4%
1.13 COMPRESSED AIR BLDG M3 654 25 - 25 3.8%
1.14 CO2 / N2 STORAGE M3 120 18 - 18 15.0%
1.15 HYDROGEN PLANT M3 394 - - - 0.0%
1.16 FUEL UNLOADING FACILITIES FDN M3 565 - - - 0.0%
1.17 FUEL FORWARDING FACILITIES FDN M3 295 32 - 32 10.8%
1.18 WATER TREATMENT FACILITIES FDN M3 264 - - - 0.0%
1.19 WASTE WATER POND FDN (EVA, STORM) M3 1,250 - - - 0.0%
1.20 WATER PUMP HOUSE M3 252 195 - 195 77.4%
1.21 ROAD AND PAVING M3 95,357 15,000 - 15,000 15.7%
1.22 STORM WATER DRAINAGE M3 2,800 - - - 0.0%
1.23 PLANT WASTE WATER DRAINAGE M3 3,300 - - - 0.0%
1.24 SEWAGE WORKS M3 1,200 - - - 0.0%
1.25 FENCING, GATE AND LIGHTING M3 3,000 650 - 650 21.7%
1.26 PIPE SLEEPER FDN ea 331 26 - 26 7.9%
1.27 LUBE OIL BULK SHELTER M3 230 177 - 177 77.0%
1.28 STG FIN FAN COOLER M3 252 210 - 210 83.3%
1.29 CABLE TRENCH M3 5,913 486 26 512 8.7% 4TH PART 1ST STAGE
1.30 LIQUID FUEL ATOMIZING AIR MODULE SKID M3 124 2 - 2 1.6%
1.31 GTG & STG TURBINE BUILDING GRADE BEAM M3 530 38 - 38 7.2%
1.32 ANNEX BUILDING BLOCK #1 M3 109 34 - 34 31.2%
1.33 ANNEX BUILDING BLOCK #2 M3 109 - - - 0.0%
1.34 ACCESSORY MODULE SKID #11-#14 & #21-#24 M3 119 3 12 15 12.6% FOUNDATION
1.35 FUEL GAS SHELTER ELECTRICAL ROOM M3 900 30 - 30 3.3%
1.36 BLEED HEATING PIPING SUPPORT FDN GT 11-24 M3 40 1 1 2.5% LEAN CONCRETE
1.37 DISTILLATE FORWARDING PUMP SHELTER M3 20 13 - 13 65.0%
2. STEEL STRUCTURE WORK
2.01 TURBINE BLDG STEEL STRUCTURE #1 Ton 1,850 - - - 0.0%
2.02 TURBINE BLDG STEEL STRUCTURE #2 Ton 1,850 - - - 0.0%
2.03 MAIN PIPE RACK STRUCTURE #1 Ton 534 112 4 116 21.7%
2.04 MAIN PIPE RACK STRUCTURE #2 Ton 508 - - - 0.0%
2.05 SECONDARY PIPE RACK TO BOP Ton 54 - - - 0.0%
2.06 SECONDARY PIPE RACK TO FUEL GAS Ton 36 - - - 0.0%
2.07 SUB PIPE RACK FOR HRSG Ton 264 - - - 0.0%
2.08 SHELTER STRUCTURE Ton 1,679
3. MECHANICAL WORK
3.01 GTG #1 & AUX EQUIPMENT Ton
GTG #2 & AUX EQUIPMENT Ton
GTG #3 & AUX EQUIPMENT Ton
GTG #4 & AUX EQUIPMENT Ton
GTG #5 & AUX EQUIPMENT Ton
GTG #6 & AUX EQUIPMENT Ton
GTG #7 & AUX EQUIPMENT Ton
GTG #8 & AUX EQUIPMENT Ton
3.02 HRSG #1 & AUX EQUIPMENT (Incl. Stack) Ton
HRSG #2 & AUX EQUIPMENT (Incl. Stack) Ton
HRSG #3 & AUX EQUIPMENT (Incl. Stack) Ton
HRSG #4 & AUX EQUIPMENT (Incl. Stack) Ton
HRSG #5 & AUX EQUIPMENT (Incl. Stack) Ton
HRSG #6 & AUX EQUIPMENT (Incl. Stack) Ton
HRSG #7 & AUX EQUIPMENT (Incl. Stack) Ton
HRSG #8 & AUX EQUIPMENT (Incl. Stack) Ton
3.03 STG #1 & AUX EQUIPMENT Ton
STG #2 & AUX EQUIPMENT Ton
3.04 ACC #1 EQUIPMENT (Incl. Condensate Tank) Ton
ACC #2 EQUIPMENT (Incl. Condensate Tank) Ton
3.05 OIL SYSTEM EQUIPMENT Ton
3.06 GAS SYSTEM EQUIPMENT Ton
3.07 BOP EQUIPMENT Ton
3.08 DISTILLATE OIL TANK Ton
3.09 ASL TREATED TANK #A Ton
ASL TREATED TANK #B Ton
3.10 ASL UNTREATED TANK Ton
3.11 FIRE WATER TANK #A Ton
FIRE WATER TANK #B Ton
3.12 DEMI WATER TANK #A Ton
DEMI WATER TANK #B Ton
3.13 OTHER WATER TANKS Ton
3.14 MISCELLANUOUS Ton
4. ELECTRICAL & INSTRUMENT WORK
4.01 DUCT BANK STATUS
GTG #1 AREA M 3666 3506 3,506 95.6%
GTG #2 AREA M 3691 2182 2,182 59.1%
GTG #3 AREA M 4029 2468 2,468 61.3%
GTG #4 AREA M 5232 2367 2,367 45.2%
GTG #5 AREA M 3048 650 650 21.3%
GTG #6 AREA M 4441 1294 1,294 29.1%
GTG #7 AREA M 3667 0 - 0.0%
GTG #8 AREA M 4398 494 494 11.2%
HRSG #1 AREA M
HRSG #2 AREA M
HRSG #3 AREA M
HRSG #4 AREA M
HRSG #5 AREA M
HRSG #6 AREA M
DUCT
HRSG #7 AREA M
BANK
HRSG #8 AREA M
STG #1 AREA M
STG #2 AREA M
ACC #1 AREA M
ACC #2 AREA M
FUEL GAS COMPRESSOR AREA M
HYDROGENT STORAGE AREA M
ASL TREATMENT BLDG AREA M
FUEL AREA (INCL. TANKS) M
WATER TREATMENT BLDG AREA M
FUEL UNLOADING AREA M
TRANSFORMERS AREA M
COMPRESSED AIR BLDG AREA M
FENCE & ROAD LIGHTING M
PP-12 PROJECT
DAILY PROGRESS REPORT
9/28/2013
Progress
SL. Total
UNIT
DESCRIPTION Daily
NO. Q'ty Last Today Accum. Progress Taget Date
Manpower
1. CIVIL WORK
1.01 GTG #1 FDN (Incl. Auxiliary) M3
GTG #2 FDN (Incl. Auxiliary) M3
GTG #3 FDN (Incl. Auxiliary) M3
GTG #4 FDN (Incl. Auxiliary) M3
GTG #5 FDN (Incl. Auxiliary) M3
GTG #6 FDN (Incl. Auxiliary) M3
GTG #7 FDN (Incl. Auxiliary) M3
GTG #8 FDN (Incl. Auxiliary) M3
1.02 HRSG #1 FDN (Incl. Stack) M3
HRSG #2 FDN (Incl. Stack) M3
HRSG #3 FDN (Incl. Stack) M3
HRSG #4 FDN (Incl. Stack) M3
HRSG #5 FDN (Incl. Stack) M3
HRSG #6 FDN (Incl. Stack) M3
HRSG #7 FDN (Incl. Stack) M3
HRSG #8 FDN (Incl. Stack) M3
1.03 STG #1 FDN (Incl. Auxiliary) M3
STG #2 FDN (Incl. Auxiliary) M3
1.04 ACC #1 FDN (Incl. Condensate Tank) M3
ACC #2 FDN (Incl. Condensate Tank) M3
1.05 TURBINE BLDG M3
1.06 CENTRAL CONTROL BLDG M3
1.07 LOCAL ELEC BLDG M3
1.08 TR FDN AND FIREWALL M3
1.09 PIPE TRENCHS FDN M3
1.10 WATER TANK FDN (INCL. DIKE) M3
1.11 OIL TANK FDN (INCL. DIKE) M3
1.12 COMPRESSED AIR BLDG M3
1.13 CO2 / N2 STORAGE M3
1.14 HYDROGEN PLANT M3
1.15 PIPE SLEEPER FDN ea
1.16 FUEL UNLOADING FACILITIES FDN M3
1.17 FUEL FORWARDING FACILITIES FDN M3
1.18 WATER TREATMENT FACILITIES FDN M3
1.19 WASTE WATER POND FDN (EVA, STORM) M3
1.20 WATER PUMP HOUSE M3
1.21 ROAD AND PAVING M3
1.22 STORM WATER DRAINAGE M3
1.23 PLANT WASTE WATER DRAINAGE M3
1.24 SEWAGE WORKS M3
1.25 FENCING, GATE AND LIGHTING M3
2. Steel Structure Work
2.01 TURBINE BLDG STEEL STRUCTURE #1 Ton
2.02 TURBINE BLDG STEEL STRUCTURE #2 Ton
2.03 MAIN PIPE RACK STRUCTURE #1 Ton
2.04 MAIN PIPE RACK STRUCTURE #2 Ton
2.05 SECONDARY PIPE RACK TO BOP Ton
2.06 SECONDARY PIPE RACK TO FUEL GAS Ton
2.07 SUB PIPE RACK FOR HRSG Ton
2.08 SHELTER STRUCTURE Ton
3. Mechanical Work
3.01 GTG #1 & AUX EQUIPMENT Ton
GTG #2 & AUX EQUIPMENT Ton
GTG #3 & AUX EQUIPMENT Ton
GTG #4 & AUX EQUIPMENT Ton
GTG #5 & AUX EQUIPMENT Ton
GTG #6 & AUX EQUIPMENT Ton
GTG #7 & AUX EQUIPMENT Ton
GTG #8 & AUX EQUIPMENT Ton
3.02 HRSG #1 & AUX EQUIPMENT (Incl. Stack) Ton
HRSG #2 & AUX EQUIPMENT (Incl. Stack) Ton
HRSG #3 & AUX EQUIPMENT (Incl. Stack) Ton
HRSG #4 & AUX EQUIPMENT (Incl. Stack) Ton
HRSG #5 & AUX EQUIPMENT (Incl. Stack) Ton
HRSG #6 & AUX EQUIPMENT (Incl. Stack) Ton
HRSG #7 & AUX EQUIPMENT (Incl. Stack) Ton
HRSG #8 & AUX EQUIPMENT (Incl. Stack) Ton
3.03 STG #1 & AUX EQUIPMENT Ton
STG #2 & AUX EQUIPMENT Ton
3.04 ACC #1 EQUIPMENT (Incl. Condensate Tank) Ton
ACC #2 EQUIPMENT Ton
3.05 OIL SYSTEM EQUIPMENT Ton
3.06 GAS SYSTEM EQUIPMENT Ton
3.07 BOP EQUIPMENT Ton
3.08 MISCELLANUOUS Ton
3.09 OIL TANK Ton
3.10 WATER TANK Ton
4. Elec. & Instrument work
4.01 DUCT BANK STATUS
GTG #1 AREA M
GTG #2 AREA M
GTG #3 AREA M
GTG #4 AREA M
GTG #5 AREA M
GTG #6 AREA M
GTG #7 AREA M
GTG #8 AREA M
HRSG #1 AREA M
HRSG #2 AREA M
HRSG #3 AREA M
HRSG #4 AREA M
HRSG #5 AREA M
HRSG #6 AREA M
DUCT
HRSG #7 AREA M
BANK
HRSG #8 AREA M
STG #1 AREA M
STG #2 AREA M
ACC #1 AREA M
ACC #2 AREA M
FUEL GAS COMPRESSOR AREA M
HYDROGENT STORAGE AREA M
ASL TREATMENT BLDG AREA M
FUEL AREA (INCL. TANKS) M
WATER TREATMENT BLDG AREA M
FUEL UNLOADING AREA M
TRANSFORMERS AREA M
COMPRESSED AIR BLDG AREA M
FENCE & ROAD LIGHTING M
1. 현장 주요 진행사항
Date: Sep 27, 2009, Sunny
1. G/T Fuel Block Install
G/T Equrizing Section Install
2. 사진대장
Description Nationalty PIPING WORK MECH. WORK ELEC. WORK INSTR. WORK INSUL. (AR-AR) PAINTING (AR-AR) OTHERS CIVIL, ARCH. 110KV TL HVAC DUCT Today
Day Night Day Night Day Night Day Night Day Night Day Night Day Night Day Night Day Night Day Night Day Night Day Night
MANAGER KOREAN 15 3 - 3 - 7 - 1 - 3 - 1 1 - 34 -
ENGINEER KOREAN 41 2 - 1 - 3 - 2 49 -
VENDOR SPECIALIST - 19 - - - - - 19 -
KOREAN - 4 - 4 - 9 - 1 - 1 - 1 - - 4 24 -
FOREMAN IRANIAN 6 - 4 - 1 - 1 - - 12 -
ARMENIAN - - - - 1 2 2 - 5 -
KOREAN - 6 - 10 - - 16 -
ARMENIAN - - - - - - - 9 9 -
KOREAN - - 2 - 2 -
ARMENIAN - - 4 - 4 -
KOREAN 17 - - - 17 -
ARMENIAN - - - - - 3 - 3 -
KOREAN - - - - - - - -
PHILIPPINE - - - - - -
ARMENIAN - - 1 - 3 - 1 - - 2 7 -
KOREAN - - - - - -
PHILIPPINE - - 2 - 2 -
ARMENIAN - - - - - - -
KOREAN 3 - 6 - 9 -
ARMENIAN - - - - - - -
KOREAN - - - - 3 - 3 -
ARMENIAN - - - - - -
KOREAN - - - - - -
TINSMITH IRANIAN - - - - - -
ARMENIAN - - - - - -
KOREAN - - - - - -
INSULATION IRANIAN - - - - - -
ARMENIAN - - - - - -
KOREAN - - - - - -
PAINTER IRANIAN - - - - 3 - 3 -
ARMENIAN - - - - 5 5 -
KOREAN - - - - - - 2 - 2 -
PHILIPPINE - - - - 7 - 3 - 10 -
ARMENIAN - - - - - - 20 - 2 - 10 32 -
KOREAN - - - - - -
CARPENTER IRANIAN - - - - - -
ARMENIAN - - - - 10 10 -
KOREAN - - - - - -
ARMENIAN - - - - 10 10 -
KOREAN - - - - - -
ARMENIAN - - - - - - -
KOREAN - - - - - -
ARMENIAN - - - - - - -
KOREAN - - - - - -
ARMENIAN - - - - - - -
KOREAN 3 - - - - - 3 -
ARMENIAN - - - - - - - -
KOREAN 2 - - - - 2 -
ARMENIAN - - - - - - - -
KOREAN - - - - - -
HELPER IRANIAN - - - - - -
ARMENIAN 8 - 33 - 49 - 77 - 5 - - - 2 - 5 7 2 188 -
KOREAN 1 - 5 - 6 -
RIGGER IRANIAN 11 - 10 - 21 -
ARMENIAN - - - - 5 - - 5 -
KOREAN - - - - - -
ARMENIAN 9 - - - - 2 4 - - 15 -
KOREAN 5 - 31 - 27 - 9 - 1 - 1 - 1 - 5 - - - - - 4 - 84 -
PHILIPPINE - - - - 2 - 7 - 3 - - - - - - - - - - - - - 12 -
- - - - - - - - - - - - - - - - - - - - - - - - -
Capacity PIPING WORK MECH. WORK ELEC. WORK INSTR. WORK INSUL. PAINTING OTHERS CIVIL, ARCH. 110KV TL HVAC DUCT Today
Day Night Day Night Day Night Day Night Day Night Day Night Day Night Day Night Day Night Day Night Day Night Day Night
DIESEL GENERATOR 50 KW - -
WELDING MACHINE CO 2 - - - - -
COMPRESSOR 20 Ton - -
COMPRESSOR 18 Ton - -
COMPRESSOR 11 Ton - - -
HYDRA TORQUE - -
SANDING MACHINE - -
BENDING MACHINE 10 10 20 -
THREADING MACHINE 10 10 -
WATER TURCK - - -
COMPACTING ROLLER - - -
COMPACTOR - - -
DEWATERING PUMP - - -
VIBRATOR - - -
Trailer(Mechanical) 7Axial - - - - -
CRANE 40Ton - -
CRANE 16Ton 10 10
CRANE 10Ton 10 - 10
TRUCK 10Ton - 40 40
EXCAVATOR 0.75~1m3 - 20 20
Pump Machine - -