This document is a hydraulic calculation report for a residential building sprinkler system project in Ashare j.Al Ain, UAE. It contains project details, design parameters, specifications for 11 sprinkler heads, and calculations for the pipe network supplying the system. The source pressure is 4.567 bar and supplies 945.1 L/min to the 29 pipes in the network ranging in size from 25-100mm. Head pressures meet or exceed minimum requirements.
Original Description:
Original Title
Pressure drop and hydraulic calculation for sprinkler
This document is a hydraulic calculation report for a residential building sprinkler system project in Ashare j.Al Ain, UAE. It contains project details, design parameters, specifications for 11 sprinkler heads, and calculations for the pipe network supplying the system. The source pressure is 4.567 bar and supplies 945.1 L/min to the 29 pipes in the network ranging in size from 25-100mm. Head pressures meet or exceed minimum requirements.
This document is a hydraulic calculation report for a residential building sprinkler system project in Ashare j.Al Ain, UAE. It contains project details, design parameters, specifications for 11 sprinkler heads, and calculations for the pipe network supplying the system. The source pressure is 4.567 bar and supplies 945.1 L/min to the 29 pipes in the network ranging in size from 25-100mm. Head pressures meet or exceed minimum requirements.
Submitted by FHC user number: 0761 Project: RESIDENTIAL BUILDING
CORODEX-BRISTOL - CONCORDE GROUP Project Ref --- P.O. Box: 74582 Area Ref: REMOTEST Dubai Inst. Number: 11 NOS SPR HEADS UAE
Tel: 00 9714 - 3472426
Fax: 00 9714 - 3472363
Project Data and Design Parameters
Project name : RESIDENTIAL BUILDING Area reference : REMOTEST Address / location : Ashare j.Al Ain.UAE Project number : --- Installation number(s) : 11 NOS SPR HEADS Drawing number(s) : --- Issue no / date : 08.08.2022 Designers reference : CAL-SPK-100 Project Data File : SPK.FHC Hazard classification : LIGHT HAZARD Design authority : National Fire Protection Association Insurance company : --- Specified density of discharge : 4.10 mm/min (l/min/m2) Assumed maximum area of operation : 0.00 m2 Number of operating sprinkler heads : 11 Maximum area covered per head : 0.00 m2 Highest head / nozzle above source : 18.90 m Number of pipes in system : 29 from 25 to 100 mm Pressure loss equation used : Hazen-Williams Fluid : WATER Pipe Data Table : STD_PIPE.PDT Maximum fluid velocity : 5.25 m/s in pipe 16 17 Volume of pipework and fittings : 0.42 m3 Elbows are welded for : 0 mm and above Comment : --- Checked by & Date :
Source duty = 945.1 l/min @ 4.567 bar at node no 1
Canute FHC Ver: 1.8.6 Monday, 8 August 2022 - 09:56
www.canutesoft.com Page: 1/3 FHC - Hydraulic Calculation Report Submitted by user number: 0761 Project: RESIDENTIAL BUILDING CORODEX-BRISTOL - CONCORDE GROUP Project Ref --- Tel: 00 9714 - 3472426 Area Ref: REMOTEST Fax: 00 9714 - 3472363 Inst. Number: 11 NOS SPR HEADS