Elevasi Volume (m3)

Lokasi
Air Lumpur Air Lumpur
Pit Kungkilan 26.31 30.39 11,700.00 21,200.00

Lumpur di air :
Lumpur di area lumpur kering
pumping (jam) pumping (hari)
PM6 PM6 loading lumpur (hari)
18.00 4 11.78

1.04 Ha 10000 1 meter 10400


0.54 Ha 10000 2 meter 10800
21200
Elevasi Volume (m3) pumping (jam)
Lokasi
Air Lumpur Air Lumpur PM10 PM8
Sump Timur -15.87 -19 82,346.95 141,000.21 175.58 235.28
Sump Barat -16.615 -19 13,733.07 68,638.48 29.28 39.24
250,322.53 325,925.61

PM10 469.00
PM8 350.00
kemapuan perhari 14,742.00

BULAN JULI
JAM HUJAN 27.10 0.87
AIR MASUK 1,363,314.87

TOTAL AIR 1,467,265.38 m


3
/jam
TOTAL PUMPING 99.53 jam
pumping (hari)
PM10 PM8 gabungan loading lumpur (hari)
9.75 13.07 5.59 53.71
1.63 2.18 0.93 26.15
16.98

282,000.41

### 3.412396
material pumping (jam) pumping (hari)
lokasi air lumpur PM10 PM8 PM10 PM8 gabungan
Kolam 1 82,346.95 141,000.21 175.58 235.28 9.75 13.07 5.59
kolam 2 13,733.07 68,638.48 29.28 39.24 1.63 2.18 0.93
Kolam 3 50,292.00 5,820.00 107.23 143.69 5.96 7.98 3.41
Kolam 4 103,950.51 110,466.93 221.64 297.00 12.31 16.50 7.05
250,322.53 325,925.61 16.98

PM10 469.00
PM8 350.00
kemapuan perhari 14,742.00

BULAN JULI
JAM HUJAN 27.10 0.87
AIR MASUK 1,363,314.87

TOTAL AIR 1,467,265.38 m


3
/jam
TOTAL PUMPING 99.53 jam
loading lumpur (hari)
53.71
26.15
2.22
42.08

### 3.412396
Label Baris BARAT TIMUR BARAT TIMUR
M-015 30,531.80
M-016 15,808.30 29,136.23 112,933.33 223,347.16
M-017 14,753.49 27,564.16 97,125.03 194,210.93
M-018 13,733.07 25,646.56 82,371.55 166,646.76
M-019 12,481.19 24,004.75 68,638.48 141,000.21
M-020 10,959.20 22,791.27 56,157.29 116,995.46
M-021 10,146.60 21,645.82 45,198.09 94,204.18
M-022 9,472.16 19,351.37 35,051.49 72,558.36
M-023 8,635.19 15,494.88 25,579.33 53,206.99
M-024 6,683.20 11,987.46 16,944.14 37,712.11
M-025 5,431.78 7,864.04 10,260.95 25,724.65
M-026 3,393.67 5,251.45 4,829.17 17,860.61
M-027 1,330.46 3,695.12 1,435.49 12,609.16
M-028 105.03 3,141.54 105.03 8,914.04
M-029 2,586.74 - 5,772.50
M-030 2,129.27 - 3,185.76
M-031 1,056.49 - 1,056.49
(kosong)
Total Keseluruhan 112,933.33 253,878.96

air 13,733.07 82,346.95


lumpur 68,638.48 141,000.21
Jul 23 Aug 23 Sep 23
jam hujan 0.87 0.98 1.03
139,738 volume tambahan 7,294,303.33 8,216,571.57 8,635,784.40
139,738 27.10 30.49 31.04
139,738 1,363,315 1,533,786 1,561,597

asumsi 729,430.33 821,657.16 863,578.44

volume air tambahan 1,363,315 1,533,786 1,561,597


108.20 121.73 123.94
50,305.54
1,363,314.87 - -
1,664.61 92.48
Oct 23 Nov 23 Dec 23
2.68 2.02 3.31
22,469,807.96 16,936,198.53 27,751,889.68
83.07 60.51 102.75
4,179,060 3,044,205 5,168,893

2,246,980.80 1,693,619.85 2,775,188.97

4,179,060 3,044,205 5,168,893


331.67 241.60 410.23

- - -
Elevasi Air
Lokasi Sump
Air Dasar
Pit Kungkilan 26.31 24.30

Volume Air (m3)


Lokasi Sump
Tersedia Masuk Hujan Rencana
Pit Kungkilan 11,700 10,200

Vol. Lumpur (bcm) Vol. Lumpur + Blending (bcm)


Lokasi Sump
Area Lumpur 1 Area Lumpur 2 Area Lumpur 1 Area Lumpur 2 Total
Pit Kungkilan 10,400 10,800 20,800 21,600 42,400
Elevasi Lumpur
Kedalaman (m) Estimasi Vol
Area Lumpur 1 Area Lumpur 2
Lumpur Dasar Lumpur Dasar Air Area Lumpur 1 Area Lumpur 2 Air
24.30 23.30 30.39 28.00 2.01 1.00 2.39 11,700
Lama
Air (m3) Debit Pompa Pemompa
Total (m3/hari) an (hari)
21,900 3,600 6

Produktifitas EWH Lama Loading lumpur (hari)


(bcm/jam) (jam) Area Lumpur 1 Area Lumpur 2 Total
144 16 9 9 18

2304
Estimasi Volume (m3)
Area Lumpur 1 Area Lumpur 2 Total
10,400 10,800 32,900