Professional Documents
Culture Documents
Hitungan Volume Air Dan Lumpur Aap
Hitungan Volume Air Dan Lumpur Aap
Lokasi
Air Lumpur Air Lumpur
Pit Kungkilan 26.31 30.39 11,700.00 21,200.00
Lumpur di air :
Lumpur di area lumpur kering
pumping (jam) pumping (hari)
PM6 PM6 loading lumpur (hari)
18.00 4 11.78
PM10 469.00
PM8 350.00
kemapuan perhari 14,742.00
BULAN JULI
JAM HUJAN 27.10 0.87
AIR MASUK 1,363,314.87
282,000.41
### 3.412396
material pumping (jam) pumping (hari)
lokasi air lumpur PM10 PM8 PM10 PM8 gabungan
Kolam 1 82,346.95 141,000.21 175.58 235.28 9.75 13.07 5.59
kolam 2 13,733.07 68,638.48 29.28 39.24 1.63 2.18 0.93
Kolam 3 50,292.00 5,820.00 107.23 143.69 5.96 7.98 3.41
Kolam 4 103,950.51 110,466.93 221.64 297.00 12.31 16.50 7.05
250,322.53 325,925.61 16.98
PM10 469.00
PM8 350.00
kemapuan perhari 14,742.00
BULAN JULI
JAM HUJAN 27.10 0.87
AIR MASUK 1,363,314.87
### 3.412396
Label Baris BARAT TIMUR BARAT TIMUR
M-015 30,531.80
M-016 15,808.30 29,136.23 112,933.33 223,347.16
M-017 14,753.49 27,564.16 97,125.03 194,210.93
M-018 13,733.07 25,646.56 82,371.55 166,646.76
M-019 12,481.19 24,004.75 68,638.48 141,000.21
M-020 10,959.20 22,791.27 56,157.29 116,995.46
M-021 10,146.60 21,645.82 45,198.09 94,204.18
M-022 9,472.16 19,351.37 35,051.49 72,558.36
M-023 8,635.19 15,494.88 25,579.33 53,206.99
M-024 6,683.20 11,987.46 16,944.14 37,712.11
M-025 5,431.78 7,864.04 10,260.95 25,724.65
M-026 3,393.67 5,251.45 4,829.17 17,860.61
M-027 1,330.46 3,695.12 1,435.49 12,609.16
M-028 105.03 3,141.54 105.03 8,914.04
M-029 2,586.74 - 5,772.50
M-030 2,129.27 - 3,185.76
M-031 1,056.49 - 1,056.49
(kosong)
Total Keseluruhan 112,933.33 253,878.96
- - -
Elevasi Air
Lokasi Sump
Air Dasar
Pit Kungkilan 26.31 24.30
2304
Estimasi Volume (m3)
Area Lumpur 1 Area Lumpur 2 Total
10,400 10,800 32,900