Professional Documents
Culture Documents
X0231 PDW Eut DG 20007 Aa
X0231 PDW Eut DG 20007 Aa
27
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
68
REUSE OF DOCUM ENTS:
20
0
00
A
E
31
44
L.
O. A
W. FC
N
27
7R
67
319
80
0
P2
CT
RA
11+
900
NT
6R 31
48
00
CO
E
JACOBS AND I
THI
c JACOBS 2018. ALL RI
N
27
S DOCUM ENT,AND THE I
68
40
0
00
B E
31
46
5R B
N
S NOT TO BE USED,I
27
68
00
0
4R
GHTS RESERVED.
00
50
31
E
N W HOLE OR I
N
27
11+
68
800
60
0
00
48
31
GNS I
C E C
N
27
N PART,FOR ANY OTHER PROJECT W I
NCORPORATED HEREI
68
3R
319
20
L.
0
O. 00
P2
W. E
31
46
CT
N
2R
RA
27
67
NT
80
0
CO
216
N,AS AN I
P2
00
CT
50
31
E
RA
D D
11+
N
NT
NSTRUM ENT OF PROFESSI
700
27
68
CO
40
0
THOUT THE W RI
00
48
31
E
N
27
68
00
0
00
46
31
E
TTEN AUTHORI
N
27
67
ONAL SERVI
CO
60
0
NT
E E
RA
W.
W.
.
CT
O
.
ZATI
L
O.
P2
CE,I
00
50
319
31
ON OF JACOBS.
L.
E
11+
S THE PROPERTY OF
600
N
27
CO
68
NT
20
RA
0
CT
P2 00
216 48
31
E
N
27
67
80
F 0 F
00
52
31
E
N
27
68
40
0
11+ 00
50
500 31
E
N
27
68
00
0
00
48
31
G E G
N
27
67
60
0
1R
319
00
52
PDW E
31
P2
D=4680
.00
N
CLL
CT
=30.
000 D=4342
.56
27
68
RA
L=39.772
20
11+ R= L=39.772
0
300 .
000
400
NT
R=300 .
000
00
50
31
CO
E
H H
L.
O.
N
27
W.
67
12+157.
80
0
12+000
00
48
L.
31
E
11+
651
11+750
O.
N
27
67
W.
00
40
54
500
31
0
19
N
P23
ACT
27
R
68
T
CON
40
0
16
P22 00
RACT 31
52
NT E
CO
J J
N
27
68
11+
300
00
0
00
50
31
E
N
E:EXISTING
27
67
B:BURIED
NOTE: EASTING NORTHING
A:ABANDONED
1. MITIGATION MEASURES MENTIONED SHALL BE CONFIRMED DURING DETAILED DESIGN STAGE IN
1R IRRIGATION DM ROAD PROPOSED 1400mm DIA IRRIGATION PIPE B P 314852 2767658 CONCRETE PROTECTION/AUTHORITY COORDINATION
ACCORDANCE WITH ETIHAD RAIL, AREMA AND RESPECTIVE AUTHORITY REQUIREMENTS 00
2R IRRIGATION DM ROAD 300mm DIA IRRIGATION PIPE B E 314625 2767903 EXTEND + CONCRETE PROTECTION 54
31
E
AND SPECIFICATIONS. REQUIREMENT AND LOCATION OF UTILITY CORRIDOR SHOULD BE
3R IRRIGATION DM ROAD 150mm DIA IRRIGATION PIPE B E 314622 2767906 EXTEND + CONCRETE PROTECTION
N
K K
27
COORDINATED BETWEEN ALL THE STAKEHOLDERS DURING DETAILED DESIGN STAGE.
68
20
4R IRRIGATION DM ROAD 2 x 150mm DIA IRRIGATION PIPE B E 314552 2767985 EXTEND + CONCRETE PROTECTION
0
00
52
5R IRRIGATION DM 31 ROAD 300mm DIA IRRIGATION PIPE B E 314550 2767987 EXTEND + CONCRETE PROTECTION
2. IT IS THE SCOPE AND RESPONSIBILITY OF THE CONTRACTOR TO PROVIDE TEMPORARY SUPPORT E
11
+2 STRUCTURES.
N
6R IRRIGATION DM ROAD 500mm DIA IRRIGATION PIPE B E 314548 2767989 EXTEND + CONCRETE PROTECTION
50
TO ALL THE EXISTING UTILITIES WHICH MAY ALSO REQUIRE TEMPORARY TRESTLE-TYPE
27
67
80
CONTRACTOR SCOPE AND RESPONSIBILITY ALSO INCLUDE TEMPORARY STRUCTURE CROSSINGS 7R IRRIGATION DM ROAD ABANDONED 800mm DIA IRRIGATION PIPE B A 314532 2767996 AUTHORITY COORDINATION
0
00
50
OVER THE UTILITIES FOR THE 31
VEHICULAR/CONSTRUCTION EQUIPMENT/PILING RIGS. IT IS THE SCOPE
E
N
AND RESPONSIBILITY OF THE CONTRACTOR TO PREPARE THE DESIGN SCHEMES, AND DESIGN
27
67
CALCULATIONS AND RECEIVE THE APPROVAL OF ALL THE TEMPORARY WORKS FROM THE ENGINEER,
0
RAILWAY ALIGNMENT
1. ALL DIMENSIONS ARE IN METERS UNLESS STATED UTILITY INFORMATION AND VERIFY
THIS DRAWING
DP ETIHAD RAIL NETWORK DUBAI EXPO STATION FORECOURT CIVILS -
DM IRRIGATION - UTILITY INTERFACE LOCATIONS
OTHERWISE. CONFLICTS WITH THE RAILWAY. AA 22/03/23 ISSUED FOR REVIEW DP AM AMR
DATE 22/03/23 CLIENT SHEET No SCALE ORIGINAL SIZE
RAIL RIGHT OF WAY
2. THE DRAWING IS BASED ON WGS 1984 UTM 40N.
PDW CHECKED
DM IRRIGATION EXISTING 3. UTILITY ROUTES ARE SHOWN INDICATIVELY, REFER 1 OF 1 1 : 1500 A1
TO TABLE FOR DETAILS OF CROSSINGS. AM
DM IRRIGATION PROPOSED PROJECT STAGE DOCUMENT STATUS
4. INFORMATION REGARDING EXISTING AND
DATE 22/03/23
PROPOSED ROAD AT GRADE PRELIMINARY ENGINEERING DRAFT
PROPOSED UTILITY ROUTES HAS BEEN INFERRED
APPROVED CONSULTANT
ROUTE LINECODE FROM STAKEHOLDER RECORDS RECEIVED IN 2021-22.
DRAWING No REVISION
THE CONTRACTOR SHALL UNDERTAKE ALL AMR
M M
NECESSARY INVESTIGATIONS TO OBTAIN CURRENT
DATE 22/03/23
X0231-PDW-EUT-DG-20007 AA
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16