BOQ Unit Grade/Type of quantity Unit rate Total qty Type Type of Quantity

5.02 cu.m Replacement of loose soil 700.00 125 Structure Granular (cu.m)
5.03 cu.m M-15 PCC for bed levelling course 4965.00 1047 Structure Concrete Qty (cu.m)
5.06 cu.m 1st class bedding under hume pipe 1000.00 4169 Structure Granular (cu.m)
5.09 cu.m M-15 PCC encasing/curtain wall 4965.00 623 Structure Concrete Qty (cu.m)
5.11 cu.m M-20 PCC head wall 5425.00 3591 Structure Concrete Qty (cu.m)
5.12(ii) cu.m M-25 in foundation 5700.00 1420.2 Structure Concrete Qty (cu.m)
5.13(ii) cu.m M-25 in substructure 6230.00 1597 Structure Concrete Qty (cu.m)
5.14(i) cu.m M-25 in superstructure 7700.00 847 Structure Concrete Qty (cu.m)
5.14(ii) cu.m M-30 in superstructure 8100.00 120 Structure Concrete Qty (cu.m)
5.15 MT Steel fixing work 64000.00 262.4 Structure Steel fixing Qty (MT)
5.19 Nos Weep holes fixing 200.00 434 Structure Weep Holes (Nos)
5.22 cu.m Pitching work over slopes 1300.00 1185 Structure Pitching (Cu.m)
5.23 cu.m Boulder apron 1700.00 1843 Structure Pitching (Cu.m)
5.24 cu.m 300 mm thk stone apron 3888.00 244 Structure Pitching
5.27 Rmt Precast RCC Railing (M-30) 3064.00 237 Structure RCC Railing
5.29 Nos Drainage spout fixing 2400.00 64 Structure Drainage spout (nos)
7.02 cu.m M-15 PCC for bed levelling course 4865.00 2244 Drain Concrete Qty (cu.m)
7.03 cu.m M-20 RCC foundation 5481.25 3094 Drain Concrete Qty (cu.m)
7.04 cu.m M-20 RCC substructure 6170.00 4126 Drain Concrete Qty (cu.m)
7.05 cu.m M-20 RCC superstructure 6300.00 3094 Drain Concrete Qty (cu.m)
7.06 MT Steel fixing work 64000.00 517 Drain Steel fixing Qty (MT)
7.07 Kg Fixing of cast iron grating 150.00 2475.7 Drain Fixing of cast iron grating
7.16 cu.m M-15 PCC bed levelling course 4865.00 1531 Reta..wall Concrete Qty (cu.m)
7.18 cu.m M-25 in foundation 5700.00 1422 Reta..wall Concrete Qty (cu.m)
7.19 cu.m M-25 in substructure 6230.00 2309 Reta..wall Concrete Qty (cu.m)
7.20 MT Steel fixing work 64000.00 336 Reta..wall Steel fixing Qty (MT)
7.22 Nos Weep holes fixing 200.00 3034 Reta..wall Weep Holes (Nos)
7.23 cu.m Gabion work 2000.00 6630 Reta..wall Pitching
8.02 cu.m Replacement of loose soil 700.00 1000 New bridge Granular (cu.m)
8.03 cu.m M-15 PCC bed levelling course 4865.00 6668 New bridge Concrete Qty (cu.m)
8.12 MT Steel fixing work 64000.00 2652 New bridge Steel fixing Qty (MT)
8.13 MT HT Strands 150000.00 120 New bridge HT Strands
8.14 Nos weep holes fixing 250.00 3435 New bridge Weep Holes (Nos)
8.17 Nos Drainage spout fixing 2400.00 232 New bridge Drainage spout (nos)
8.18 cu.m Boulder apron 1700.00 1596 New bridge Pitching (Cu.m)
8.19 cu.m 300 mm thk stone apron 3888.00 1278 New bridge Pitching (Cu.m)
8.20 Sqm Tar paper bearing 70.00 141 New bridge Tar paper bearing
8.21 cu.cm Elastomeric Bearing 1.24 1.24 Elastomeric Bearing
8.23 cu.m M-30 in approach slab 10450.00 1026.8 New bridge Concrete Qty (cu.m)
8.24 Rmt Precast RCC Railing (M-30) 3064.00 1277 New bridge RCC Railing
8.25 Rmt Crash barrier (M-40) 4800.00 2437 New bridge Crash barrier (M-40)
8.30 cu.m Coursed rubble stone masonry 1875.00 96 New bridge Pitching (Cu.m)
8.31 Rmt Bored cast-in-situ M-35 RCC in pile 13500.00 1066 New bridge Piling
5.01(i) cu.m Soil excavation 160.00 13509 Structure Soil Excavation (cu.m)
5.01(ii) cu.m Soft rock excavation 450.00 279 Structure Soft rock (cu.m)
5.01(iii) cu.m Hard rock Control blasting 650.00 139 Structure Hard rock (cu.m)
5.01(iv) cu.m Hard rock Control blasting 700.00 139 Structure Hard rock (cu.m)
5.05(iii) Rmt 0.900 m dia pipe laying 6500.00 235 Structure 900 mm dia pipe (Rmt)
5.05(iv) Rmt 1.000 m dia pipe laying 7500.00 102 Structure 1000 mm dia pipe (Rmt)
5.05(v) Rmt 1.200 m dia pipe laying 8500.00 2648 Structure 1200 mm dia pipe (Rmt)
5.10(i) cu.m M-20 PCC Toe wall foundation 5025.00 60.4 Structure Concrete Qty (cu.m)
5.10(ii) cu.m M-20 PCC Toe wall substructure 5025.00 90.6 Structure Concrete Qty (cu.m)
7.01(i) cu.m Soil excavation 160.00 123544 Drain Soil Excavation (cu.m)
7.01(ii) cu.m Soft rock excavation 450.00 623 Drain Soft rock (cu.m)
7.01(iv) cu.m Hard rock blasting 700.00 248 Drain Hard rock (cu.m)
7.15(i) cu.m Soil excavation 150.00 11538 Reta..wall Soil Excavation (cu.m)
7.15(ii) cu.m Soft rock excavation 450.00 80 Reta..wall Soft rock (cu.m)
7.15(iii) cu.m Hard rock blasting controlled 700.00 80 Reta..wall Hard rock (cu.m)
7.15(iv) cu.m Hard rock blasting prohibited 700.00 117 Reta..wall Hard rock (cu.m)
7.17(i) cu.m M-20 PCC Toe wall foundation 5025.00 2115 Reta..wall Concrete Qty (cu.m)
7.17(ii) cu.m M-20 PCC Toe wall substructure 5025.00 2749 Reta..wall Concrete Qty (cu.m)
8.01(i) cu.m Soil excavation 150.00 30989 New bridge Soil Excavation (cu.m)
8.01(ii) cu.m Soft rock excavation 450.00 2969 New bridge Soft rock (cu.m)
8.01(iv) cu.m Hard rock blasting prohibited 900.00 1762 New bridge Hard rock (cu.m)
8.05(i) cu.m M-20 PCC Toe wall foundation 5025.00 19.8 New bridge Concrete Qty (cu.m)
8.05(ii) cu.m M-20 PCC Toe wall substructure 5025.00 29.5 New bridge Concrete Qty (cu.m)
8.06(iii) cu.m M-30 RCC foundation 5950.00 7738 New bridge Concrete Qty (cu.m)
8.06(iv) cu.m M-35 RCC foundation 6350.00 287 New bridge Concrete Qty (cu.m)
8.07(i) cu.m M-35 RCC foundation for pile cap 5875.00 4462 New bridge Concrete Qty (cu.m)
8.08(i) cu.m M-20 RCC substructure 5025.00 349 New bridge Concrete Qty (cu.m)
8.08(iii) cu.m M-30 RCC substructure 6700.00 5038 New bridge Concrete Qty (cu.m)
8.08(iv) cu.m M-35 RCC substructure 6900.00 723 New bridge Concrete Qty (cu.m)
8.08(v) cu.m M-40 RCC substructure 6990.00 200 New bridge Concrete Qty (cu.m)
8.08(vi) cu.m M-45 RCC substructure 7290.00 200 New bridge Concrete Qty (cu.m)
8.08(vii) cu.m M-50 RCC substructure 7500.00 200 New bridge Concrete Qty (cu.m)
8.09(ii) cu.m M-30 RCC superstructure 8100.00 4881 New bridge Concrete Qty (cu.m)
8.09(iii) cu.m M-35 RCC superstructure 9240.00 1794 New bridge Concrete Qty (cu.m)
8.09(iv) cu.m M-40 RCC superstructure 9465.00 2474 New bridge Concrete Qty (cu.m)
8.10(i) cu.m M-40 PSC superstructure 11760.00 80 New bridge Concrete Qty (cu.m)
8.10(ii) cu.m M-45 PSC superstructure 13000.00 2411 New bridge Concrete Qty (cu.m)
8.10(iii) cu.m M-50 PSC superstructure 16258.00 2411 New bridge Concrete Qty (cu.m)
8.22(i) MT POT-PTFE Bearing free type 300.00 22667 New bridge POT Bearing
8.22(ii) MT POT-PTFE Bearing fixed type 270.00 11333 New bridge POT Bearing
8.28(II) Rmt Down take PVC Pipe (150 dia) 700.00 603 New bridge Down take PVC Pipe (150 dia)
8.29(i) Rmt Strip seal expansion joint upto 70 mm 10000.00 492 New bridge Strip seal
8.29(ii) Rmt Strip seal expansion joint above 70 mm 49000.00 36 New bridge Strip seal
8.29(iii) Sqm Compressible fibre board 1000.00 926 New bridge Shallitax board (Sq.m)
8.29(A) Sqm Compressible fibre board 1000.00 926 R/WALL Shallitax board (Sq.m)
8.34(i) Nos Initial load test 175000.00 4 New bridge Load test
8.34(ii) Nos Routine load test 85000.00 12 New bridge Load test
8A.01 Sqm Removal of existing wearing coat 250.00 7407 Reconstruction Dismantling (cu.m)
8A.02 Rmt Dismantling of RCC Crash barrier 300.00 793 Reconstruction Dismantling (cu.m)
8A.05 cu.m Dismantling of pitching 300.00 311 Reconstruction Dismantling (cu.m)
8A.06 cu.m Filter media under pitching 1875.00 156 Reconstruction Granular (cu.m)
8A.09 cu.m Dismantling of solid slab 1500.00 68 Reconstruction Dismantling (cu.m)
1.03(ii) cu.m Dismantling of RCC 696.50 300 Reconstruction Dismantling (cu.m)
1.03(iii) cu.m Dismantling (stone masonry) 350.00 400 Reconstruction Dismantling (cu.m)
1.04(i) cu.m Dismantling (bitumen road) 550.00 700 Structure Dismantling (cu.m)
5.01(iv) cu.m Hard rock blasting prohibited 700.00 100 Structure Hard rock (cu.m)