Professional Documents
Culture Documents
Ena Micro 9 One Touch
Ena Micro 9 One Touch
Ena Micro 9 One Touch
Table of contents:
Revision:
A: Remove hose of BU, remove inner distributing collar
Important:
When exchanging components, it is very important to put back the cable wiring the same way
as it was before !
Remove water tank, grounds container, aroma preservation lid, powder funnel
5. Push with a small screw driver (no. 0) or alike 6. Remove cover of the service plug
simultaneous in both immersions of the interlock
(between both lateral- and front parts)
7. Insert e.g. a plastic ruler in between the bottom 8. On the same, upper side, pull outside the lateral
and lateral part to release the barb part with your thumb (or similar aid).
(approx. 7 cm of distance) Pull backwards the whole lateral part.
9. Position of the lower barb of the lateral part 10. Position of the upper barb of the lateral part
11. Remove with a screw driver the cover of the 12. View:
brewing unit Brewing unit cover removed.
13. Unscrew 3x TORX 15 to remove the brewing unit 14. Remove hose
17. Unscrew 4x TORX 15 18. Remove the 2x supports of the front shield
19. Remove coffee spout 20. Release 3x snap-locks of the bottom of the
(Press interlocks on both sides) coffee spout and remove the lid
21. Unscrew 2x TORX 10 of the top of the coffee 22. Release snap-lock and safety guide.
spout Swing the coffee spout.
23. Release 2x snap-locks of the interlock angel 24. Unscrew 2x TORX 10 of the fluid system support
25. Unscrew TORX 15 of the hose shield 26. Remove hose shield.
Hose connection to brewing unit.
27. Pull out the fluid system support. 28. Remove the shield upwards
Detach the shield of the fluid system support.
29. Release snap-lock of the air cover 30. Remove the air cover.
Unscrew 1x TORX 15.
35. Remove the upper and sideward 36. Unscrew TORX 15 of the multi-valve
cable-connectors (bottom of the appliance)
37. Pull down carefully the snap-lock of the multi- 38. Pull out the pump of the pump support
valve support and remove the multi-valve
39. Pull with a small screw driver into the slot to 40. Remove the transformer
release the lateral interlock and remove it
41. Variation when print and pump is removed: 42. Turn at the same time the tank base
Release snap-lock of the tank base. (bayonet lock).
49. Press snap-lock and slide the Zero Energy Switch 50. Pull down the 2x snap-locks and slide down the
(ZES) ZES to remove
51. Unscrew 2x TORX 15 and press snap-lock to 52. Check the position of the grinder finesse
remove the thermoblock adjustment when re-inserting the grinder
Grinder
ZES
(Zero Energy Switch
Membrane controller
Pump
Power-Logic print
Multi-valve
Drain motor
Flowmeter
Service-plug
Control panel
Suppression filter
6 View power-logic print, cable wiring (example ENA Micro 9 One Touch):
TM5A to ZES
CP4A to mult-valve
CP2B to BU motor
CP4C to grinder/pump
1. Direction to
Fluid terminal outlet (Hot water)
2. Direction to
Fluid terminal outlet (Steam)
3. Direction to
Fluid connector Check valve
4. Direction to
Fluid connector Thermoblock
1
5. Direction to
2 Condesation box