2. Source Control field visit Dock Visual Observation, there are level sensors recording
Street Yard the data on the sanitary and storm side
3. Source Control field visit MH Measure the distance from the water level to the rim.
6772632 (Puyallup Ave & East Document in report log.
K St)
4. Source Control field visit MH Measure the distance from the water level to the rim.
6772168 (East 26th St East J St, Document in report log.
670 ft west)
5. Repeat Steps 2-4 in order to
document levels every 10
minutes at indicated locations.
6. Next day get all reports to Asset
Management Group
Standards
Operational Information
“Document Uncontrolled after printing”
No
Change level of
Storm event Monitor level gate
imminent or reading for High Level Alarm
Operations
Go to WW MH
Field Verify Level at
6772632 per map Document time and
Dock Street Overflow
attached water level
(Visual Observation)
(Greyhound)
Yes
Go to WW MH
Source Control
No
Downward Trend Document time and
Requirement Met water level
Yes
Document time and water levels using logs in SOP Damaging Property or Health & Safety - Contact
Submit logs to Maintenance Supervisor (Chris Roberts @
Follow SOP for documenting and reporting SSO(s). Engineering 253.820.0185) to lower gate.
Engineering
Review data to
Notify Staff of Adjustment of
determine if gate level
Findings* Gate Required
needs to change
No
* O&M DM and ADMs
S&E DM and ADMs End
MH 6772168 (E 26th St E J St, 670 ft west) Log