Professional Documents
Culture Documents
TRAFFO-Model Merged
TRAFFO-Model Merged
SHOP DRAWING
3000 4600
B
4 433
500 500
3
C
1000 TRAFO 850
PANEL 850 1000
+0.30 +0.30
2700 3450 2488 2700
2
375
1200 1125
375 ±0.00 375 375 ±0.00 ±0.00 1200
A B C D E F G H
DENAH
CONTRACTOR
PERTAMINA EP
ATAP SENG PJLS 7 KAKI
KAKI KUDA-KUDA CT.75
SKOR CT.75
800
572
2100
700
PAS.BATU GUNUNG
PASIR URUG
Tebal 5 cm
TANAH DASAR
2700
POTOONGAN A-A
CONTRACTOR
PERTAMINA EP
9040
2800
DIDNING KALSIBORD
2000
KEDUDUKAN TRAFO +0.30
SLOOF 150 X 200
RAB BETON K-300
Tulangan Ganda ∅12-150
PASIR URUG
300
URUGAN TANAH
150
891
PAS.BATU GUNUNG
PASIR URUG
Tebal 5 cm
TANAH DASAR
PANCANG PIPA 8"
1600 1600 1600
3000 4600
DENAH
CONTRACTOR
PERTAMINA EP
9040
2800
DIDNING KALSIBORD
2000
KEDUDUKAN TRAFO +0.30
SLOOF 150 X 200
RAB BETON K-300
Tulangan Ganda ∅12-150
PASIR URUG
300
URUGAN TANAH
150
891
PAS.BATU GUNUNG
PASIR URUG
Tebal 5 cm
TANAH DASAR
PANCANG PIPA 8"
1600 1600 1600
3000 4600
POTONGAN C-C
CONTRACTOR
PERTAMINA EP
TAMPAK KANAN
TAMPAK KIRI
CONTRACTOR
PERTAMINA EP
TAMPAK DEPAN
Skala 1:100
TAMPAK DEPAN
Skala 1:100
CONTRACTOR
PERTAMINA EP