UNITECH PHILIPPINES INDUSTRIAL MACHINERY INC.

11/F Ri-Rance Corporate Center 1, Block 2, Lot 16, Aseana City, Tambo, Paranaque City, Philippines 1701

MEMORANDUM

February 25, 2023


To: Ricardo Brito, MBA
CEO/President
From: Engr Beng Rosales, MSc.M.E.
Cc: RynaB/MikeeV/SusanAY/LorelaE/ChesterL/KevinK/ManuelB
Subject: Consultant’s Report for the Week of Feb 20 to 25, 2023

Hi Sir/s,
Good day!
Sharing Consultant’s Report for the Week

Feb 20
Unitop Roxas Palawan – Smoke Evacuation Proposal
1. Submission from four different suppliers
a. Niagara
b. Nicotra
c. Tork
d. Filgen

Unitop Legazpi
1. Discussion with Engr Jericho on the following
a. Compliance of MCC design main ECB shall be at 88% usage factor
b. Discussion on sequence of operation. Sizing of individual ECB shall be based on
actual load performance of chillers and pumps

1|Page
UNITECH PHILIPPINES INDUSTRIAL MACHINERY INC.
11/F Ri-Rance Corporate Center 1, Block 2, Lot 16, Aseana City, Tambo, Paranaque City, Philippines 1701

Unitop Lapu-lapu
1. Request for permit works based on installation of new chillers
2. Engr Jericho to complete plans for the electrical and sequence of operations of chillers

Feb 21
UDMC Project
1. Completion of TCR works
2. T&C shall be conducted by Unitech After Sales Team.
3. As recommended by Engr Beng, all computer log and simulation report shall be
submitted to UDMC Team for documentation that all units installed are completely
operating and complying to standards
4. Issue on the moisture on piping and resolutions as follows:
a. Re-insulation of all piping based on 48k/cum density,50 mm thick insulating
material
b. Stress test of all unit
c. Previous moisture was based on the inquiry of UDMC team to operate the system
even though the whole system is not yet completely connected as per design
intent.
d. UDMC team was educated regarding the moisture infiltration were due to
combine wind pressure and stack effect pressure coming from the elevator
operation.
i. The recommended measure as discussed; to provide design and system
that will pressurize the whole area and adjacent spaces with pre-cooled air
to minimize moisture and condensation on surfaces
ii. Installation of air curtain on entrances will minimize air infiltration but
will not be eliminated as mentioned to the UDMC team

Feb 22
1. Follow through on the submitted request from Gree for Glycol Chiller
2. Follow thorugh on the Masagan Supermart

2|Page
UNITECH PHILIPPINES INDUSTRIAL MACHINERY INC.
11/F Ri-Rance Corporate Center 1, Block 2, Lot 16, Aseana City, Tambo, Paranaque City, Philippines 1701

Feb 23
1. Updates on SETIR Villa projects, dicussion with Engr Manuel and Kyle Maniquis
a. Ductwork installations
b. Unit installation
2.

Feb 24
Unitop Dasmarinas - Paliparan
1. Submitted completed design
2. For quotations from suppliers

Feb 25
1. ASHRAE Journal – February issuance Discussion with Engineers
2. M&E Forum – T&C Standards – Duct Design Methods and Piping Design Methods

Submitted for documentations and future references

Thank you.

ENGR. ROBERTO G. ROSALES, MScME


ASHRAE – IOR - PSME
HVAC CONSULTANT
UNITECH PHILIPPINES INDUSTRIAL MACHINERY INC.,
A: 11/F Ri-Rance Corporate Center 1
Aseana Ave., Parañaque City 1701
Email: bengr.untiech@unitopph.com
T: +632-657-1677 / M: +639175764804
/REC/File

3|Page

You might also like