Factory List: 1. 4 Stitch Knit Composite Ltd.
A
p
p
l
i
Inspected by c : Jahidur Rahman
Report Generated by a : Jahidur Rahman
t
i
Inspected on: July
o 21, 2019
n
.
S
c
r
e
e
n
U
p
d
a
t
i
n
g
=
F
SUMMARY
The Factory was surveyed for electrical safety by Stichting Bangladesh Accord
Foundation. The purpose of the survey was to identify significant electrical safety issues
and to provide recommendations for remediation based on applicable standards
specified by the Accord.
The findings and recommendations in this report are not intended to imply, guarantee,
ensure or warrant compliance with any government regulations. Additionally, the results
do not imply in any way that compliance with the findings or recommendations as stated
in this report will eliminate all risks or exposures not referred to in this report do not exist.
Compliance with the findings and recommendations stated in this report does not relieve
the factory owner from obligation to comply with specific project requirements, industry
standards, or the provisions of any local government regulations.
4 Stitch Knit Composite Ltd. factory is established in its 3 story (G +M+2) main production
building (proposed 6 story) with three single story ancillary building. The building is
owned by the factory themselves; as reported by the Factory Management, the building
was constructed in between November 2016 to October 2018 and the production began
in February 2019. During the time of the Inspection, the factory accommodated a total
of approx. 80 (single shift) workers working on regular basis.
The table below summarizes the major electrical hazards identified during the walk-
through inspection. Recommendations have been provided to each finding.
RECOMMENDATION:
Draw as built electrical SLD mentioning all
required information by qualified engineer and
get it reviewed by Accord. Electrical SLD must
be updated properly when electrical system is
modified.
PRIORITY: P2
REMEDIATION TIME FRAME: 3 MONTHS
RECOMMENDATION:
Insulation resistance test of all the cables (you
can avoid less than 25 sq.mm) must be
performed once in every 2 years’ cycle and
recorded (this must require a complete power
shut off).
PRIORITY: P2
REMEDIATION TIME FRAME: 2 MONTHS
RECOMMENDATION:
PRIORITY: P2
REMEDIATION TIME FRAME: 2 MONTHS
RECOMMENDATION:
Electrical safety training and awareness
program for the electrical personnel must be
conducted by qualified engineer. It is a
periodic task which factory shall continue to
improve the overall electrical safety situation
for the staffs.
PRIORITY: P2
REMEDIATION TIME FRAME: 2 MONTHS
RECOMMENDATION:
PRIORITY: P2
REMEDIATION TIME FRAME: 2 MONTHS
RECOMMENDATION:
Factory must provide proper PPE.
For maintenance purposes, all the electrical
tools shall be properly insulated, and these
insulations shall be checked periodically.
PRIORITY: P2
REMEDIATION TIME FRAME: 1 MONTH
RECOMMENDATION:
PRIORITY: P3
REMEDIATION TIME FRAME: 1 MONTH
RECOMMENDATION:
PRIORITY: P2
REMEDIATION TIME FRAME: 3 MONTHS
FINDING NO: E - 10
CATEGORY: SUBSTATION ROOM
FINDING:
No working separation between LT (Low
Tension) panel/s and HT (High Tension) unit/s
(Transformer, HT switchgear)
RECOMMENDATION:
A working separation between LT and HT
must be ensured. A brick wall will do it; and
adequate working clearance (1.07m) and
ventilation must be ensured.
PRIORITY: P2
REMEDIATION TIME FRAME: 3 MONTHS
FINDING NO: E - 11
CATEGORY: SUBSTATION ROOM
FINDING:
Transformer breather wrapped by plastic
cover.
Silica gel is discolored, and breather oil cup is
empty.
RECOMMENDATION:
Plastic cover must be removed from breather.
Silica gel shall be changed; or reuse can be
done, if color regains after sundry.
Transformer breather oil cup must be filled up
to the oil mark on the cup.
PRIORITY: P2
REMEDIATION TIME FRAME: 1 MONTH
RECOMMENDATION:
Equipment earthing cable size must be
increased. The earth cable size shall be
determined according to BNBC or Adiabatic
method (if possible). Number of earth pits
shall be determined by the size of connected
earth cable.
PRIORITY: P2
REMEDIATION TIME FRAME: 2 MONTHS
FINDING NO: E - 13
CATEGORY: CABLE & CABLE SUPPORTS
FINDING:
RECOMMENDATION:
PRIORITY: P2
REMEDIATION TIME FRAME: 2 MONTHS
FINDING NO: E - 14
CATEGORY: CABLE RACEWAY & TRENCH
FINDING:
Maintenance movement is obstacle due to
improper cable trench cover in the utility area
(Generator/Substation/Boiler/Compressor)
RECOMMENDATION:
PRIORITY: P2
REMEDIATION TIME FRAME: 3 MONTHS
RECOMMENDATION:
PRIORITY: P2
REMEDIATION TIME FRAME: 3 MONTHS
FINDING NO: E - 16
CATEGORY: GENERATOR ROOM
FINDING:
RECOMMENDATION:
PRIORITY: P2
REMEDIATION TIME FRAME: 3 MONTHS
FINDING NO: E - 17
CATEGORY: GENERATOR ROOM
FINDING:
RECOMMENDATION:
At least two separate earth pits shall be
ensured for generator body; The earth cable
size shall be determined according to BNBC
or Adiabatic method (considering related
factors). Number of earth pits shall be
determined by the size of connected earth
cable.
PRIORITY: P2
REMEDIATION TIME FRAME: 2 MONTHS
RECOMMENDATION:
PRIORITY: P2
REMEDIATION TIME FRAME: 2 MONTHS
FINDING NO: E - 19
CATEGORY: GENERATOR ROOM
FINDING:
RECOMMENDATION:
Heat shields/blankets must be installed to
shield hot surface to protect component and
operator from excessive heat. Proper guards
shall be provided after shielding hot surface.
Blankets on exhaust manifold, turbocharger
housing and other engine components is not
necessary. Suggested to consult with the
generator supplier/service provider/expert
before doing the job.
PRIORITY: P2
REMEDIATION TIME FRAME: 2 MONTHS
FINDING NO: E - 20
DISTRIBUTION
CATEGORY:
BOARD/PANEL
FINDING:
RECOMMENDATION:
PRIORITY: P2
REMEDIATION TIME FRAME: 2 MONTHS
RECOMMENDATION:
PRIORITY: P2
REMEDIATION TIME FRAME: 2 MONTHS
FINDING NO: E - 22
DISTRIBUTION
CATEGORY:
BOARD/PANEL
FINDING:
RECOMMENDATION:
PRIORITY: P2
REMEDIATION TIME FRAME: 3 MONTHS
FINDING NO: E - 23
DISTRIBUTION
CATEGORY:
BOARD/PANEL
FINDING:
RECOMMENDATION:
PRIORITY: P2
REMEDIATION TIME FRAME: 2 MONTHS
RECOMMENDATION:
PRIORITY: P2
REMEDIATION TIME FRAME: 2 MONTHS
FINDING NO: E - 25
DISTRIBUTION
CATEGORY:
BOARD/PANEL
FINDING:
RECOMMENDATION:
All the MCCBs/MCBs must be
adjusted/selected per connected load current;
if adjustment is not possible, replacement will
be the only way.
PRIORITY: P2
REMEDIATION TIME FRAME: 2 MONTHS
RECOMMENDATION:
Earth lead cable/ Earth Continuity Conductor
(ECC) shall be determined according to BNBC
or Adiabatic method (considering CB's
response time, fault current & type of earth
conductor other factors).
PRIORITY: P2
REMEDIATION TIME FRAME: 2 MONTHS
FINDING NO: E - 27
DISTRIBUTION
CATEGORY:
BOARD/PANEL
FINDING:
RECOMMENDATION:
PRIORITY: P2
REMEDIATION TIME FRAME: 2 MONTHS
RECOMMENDATION:
PRIORITY: P2
REMEDIATION TIME FRAME: 2 MONTHS
FINDING NO: E - 29
DISTRIBUTION
CATEGORY:
BOARD/PANEL
FINDING:
RECOMMENDATION:
Each electrical distribution board/panel must
be properly sealed to avoid ingression of fluffs;
but an adequate ventilation system must also
be ensured. Gland shall be used, where
required.
PRIORITY: P2
REMEDIATION TIME FRAME: 2 MONTHS
FINDING NO: E - 30
DISTRIBUTION
CATEGORY:
BOARD/PANEL
FINDING:
RECOMMENDATION:
PRIORITY: P2
REMEDIATION TIME FRAME: 1 MONTH
RECOMMENDATION:
PRIORITY: P2
REMEDIATION TIME FRAME: 1 MONTH
FINDING NO: E - 32
CATEGORY: WIRING SYSTEM
FINDING:
RECOMMENDATION:
PRIORITY: P2
REMEDIATION TIME FRAME: 2 MONTHS
FINDING NO: E - 33
CATEGORY: EARTHING SYSTEM
FINDING:
RECOMMENDATION:
PRIORITY: P2
REMEDIATION TIME FRAME: 2 MONTHS
RECOMMENDATION:
PRIORITY: P2
REMEDIATION TIME FRAME: 2 MONTHS
FINDING NO: E - 35
CATEGORY: WIRING SYSTEM
FINDING:
RECOMMENDATION:
PRIORITY: P2
REMEDIATION TIME FRAME: 2 MONTHS