Key Plan:-

Ministires Car Park


PERI UP VARIO GT 24 - Double SIDED WALL H = 5.0 m STATE OF KUWAIT

A
VARIO Wall Formwork General,Tie Rod & Filler Arrangement Plan
Scale 1:50

Steel Waler Srz 178


Box out by Site Box out by Site
Wedge Tension proof KZ 600
1230
1
106
VARIO Coupling VKZ 99 103

VKZ 99

VKZ 99

VKZ 99

VKZ 99
F1-A VSRZ-390 VSRZ-390 F1-C
VKZ 99
GP-183-390
VKZ 99
GP-122-390
VKZ 99 VKZ 99
VP-366-390 VKZ 99
GP-244-390
VKZ 99
VSRZ-390 VSRZ-390
VKZ 99
GP-244-390
VKZ 99
GP-183-390
VKZ 99

150
150
150
1230

VKZ 99 GP-183-510 VKZ 99 GP-183-510 VKZ 99 GP-244-510 VKZ 99 VP-366-510 VKZ 99 GP-244-510 VKZ 99 VP-366-510 VKZ 99 GP-244-510 VKZ 99 GP-183-510 VKZ 99
PE-01 F1-B PE-02 PE-03 PE-05 F1-D PE-07 PE-08
PE-04 PE-06
122
97 120
500 1030 1013 910 784 495 810 455 750 1180 530 900 1050 1340 870 840 670 895 835 770 690 650 850 1030 500

A
Planking and safety rails
The following cross-sections are to be used for platform deckings,
toprail, midrail and toeboards (if there is no statical calculation for
other cross-sections):

150
Permissible spans in m (load class 1, 2, 3)
Boards and planks shall be of grade S10

300
correspond to the current DIN 4074-1.
755

755

1050
150
300
Platform decking

150
888

888

888
Board or Permissible spans
plank width m

GT 24 l= 3,00m
2950
cm Board or plank thickness
3.0 cm 3.5 cm 4.0 cm 4.5 cm 5.0 cm

888

888
888

20 1.25 1.50 1.75 2.25 2.50


600
24 and 28 1.25 1.75 2.25 2.50 2.75 Revision D
GT 24 l= 5,10m

GT 24 l= 5,10m
Revision C
Revision B
Revision A

531
Handrail boards R
PERI Kuwait W.L.L
888

888
Khalid Ibn Al-Waleed Street Phone: +965 222 500 52

25
Mazaya Tower 1, 5th Floor, Sharq Fax: +956 222 500 53
Board Permissible The maximum allowable width of load carried P.O.Box 23910, Safat 13100 Kuwait eMail: info@peri.com.kw

dimensions spans by the brackets may not exceed 1.25m. Company Combiend Group
by Date

PUSH PULL PROP RS650 in cm in m Boards and planks have to correspond to the Project Ministires Car Park
drawn 24/01/2017

3 x 15 2.00 guidelines set in the current DIN EN 12811-1 for checked A.Z 24/01/2017
GT 24 l= 2,10m

Double sided Wall


1183

1183

1183

4 x 20 3.00 construction, width, thickness and strengh.


2000

Subject Copyright of this drawing and associated


PUSH PULL PROP RS450 documents are property of PERI.
PUSH PULL PROP RS210 They may not be reproduced or made
available to third persons, especially com-
PERI UPVario GT 24 petitors, without our consent
PUSH PULL PROP RS210
BASE PLATE RS 210 - 1400 BASE PLATE RS 210 - 1400
Note:- On First Panel Always Two Push Pull Scale
Project No.
KUW15-100065-033
Drwg.No.
B-001
Order No.
901

Prop. From Starting Point


460

460

460

ANCHOR BOLT PERI 14/20X130 ANCHOR BOLT PERI 14/20X130


COORDINATION ISSUED
25

25

25

TRADE APPROVED SIGNATURE DATE


ARCH.
PERI push-pull props and kickers STRUCT.
MECH.
Standard application
HVAC
System 1 h [m] System 2 h [m]
3.0 4.0 5.0 6.0 7.0 8.0 9.0 10.0 11.0 12.0
Permissible width of influence [m] EBref 4.41 3.42 2.69 2.22 2.02 1.74 2.45 2.07 1.80 1.52 ACTION
FRS1 11.5 11.5 11.5 11.5 11.5 11.5 11.5 11.0 11.5 11.5
A B C D E
actual push-pull prob load [kN]
FRS2 10.9 11.5 11.2 10.5
actual kicker load [kN] FAV 2.7 2.9 2.8 2.7 3.2 3.5 4.2 3.6 3.4 3.1
REV. DESCRIPTION DATE
1 13.7 13.7 13.5 13.4 13.7 13.9 11.5 11.0 11.5 11.5

Base plate
Section A-A(-10.60 Level to B2 Level) resulting force [kN]
2 14.2 14.3 13.7 12.8
Section A-A(Raft Level to -10.60 Level) Scale 1:50 1 52.4 51.1 51.1 51.1 49.4 48.2 60.0 60.0 60.0 60.0
2 47.9 49.8 49.9 49.8
Scale 1:50 lifting force VWind [kN/m] 2.5 3.1 3.9 4.7 5.1 5.9 8.4 9.9 11.4 13.0
Distance of base plate [m] from x1 1.2 1.6 2.0 2.4 3.0 3.6 4.2 4.7 5.1 5.5
x=
rear edge of formwork x2 2.6 2.6 2.8 3.0
Top connection point [m] from y1 1.0 1.2 1.5 1.8 1.8 1.8 1.5 1.8 2.1 2.4
Steel Waler SRZ 239 y=
top of formwork y2 4.5 5.5 6.2 6.9
h 0.59 0.59 0.59 0.59 0.59 0.61 0.64 0.66 0.69 0.71

Box out by Site Load assumptions:


- Wind loads according to DIN 1055-4:2005-03
.\SDPM new Logo.jpg
System Development
p
Project Management
- Inland, Wind Load Zone 2
VKZ 99

VKZ 99

- c p = 1,8 applied pressure coefficient


(see Graphic, below) System 2
- Formwork in vertical position on ground
VSRZ-390 VSRZ-390

y1
- q(z) = peak velocity pressure
150

- Values are characteristic values


Combined Group Contracting Co.

y2
System 1 (K.S.C.C.)
In the end area LE the following cp- TEL : 22254545 FAX : 24344610 - 24344686

Formwork height
P.O.BOX : 4819 - SAFAT 13049 KUWAIT
values or wind loads are assumed:

y1

h
1230

Reference height Z
h

Ground surface = 0
p, End
L/h = 5: cp, End =2,9*

F RS
h

1
p, End
L E = length of end area (0,3 x h)

F RS

F RS
D:\eastern car park\EASTERN CAR PARK-SHARQ1111\Picture1.png

2
h = formwork height
L = formwork length FAV FAV
1 2 1
x1 x2
x1
VP-366-510 FA FA

PE-06 For anchoring (lifting) force FA = 1,5 x VWind- 0,9 x G x h > 0


*intermediate values are interpolated G = surface area weight of the formwork including platforms
Ground plan formwork
Drawn : Checked :
cp = 1,8 Scale Sheet Size
cp, End cp, End Project No:
LE Standard area LE Transmittal / submittal Ltr.No. Rev
Detail 1 L Date DWG No:
SD-EC-CGC-ST-FORW-08
1:20