GOVERNMENT OF KHYBER PAKHTUNKHWA IRRIGATION

DEPARTMENT SMALL DAMS SECTION MERGED AREA

CONSTRUCTION OF BAZ ALI DAM DISTRICT KURRAM

DETAIL ESTIMATE

CASCADE GROUP OF ENGINEERING CONSULTANT

In association with
ENGINEERING & TECHNICAL ASSOCIATES
Home office: 160 Airline Society Khayaban- e- Jinnah, Lahore- Pakistan,
Tel: +92 42 35229624, Fax: +92 42 35229625
TABLE OF CONTENTS

PAGE RANG

1. ADMINSTRATIVE APPROVAL 2-3

2. SALIENT FEATURES 4-5

3. EXECUTIVE SUMMARY 6-9

4. DETAIL ESTIMATE 10-33

5. DETAIL SHEETS 34-105

6. DRAWINGS 106-156

1
ADMINSTRATIVE APPROVAL

2
3
Scanned with CamScanner
SALIENT FEATURES

4
Detail Estimate Baz Ali Small Dam District Kurram

SALIENT FEATURES

Catchment Area : 44.0 Sq.mile

Mean Annual inflow : 3614 A-ft

Design Flood : 17760 cusecs (503Cumecs)

Reservoir Capacity : 5062 A-ft

Live Storage Capacity : 3904 A-ft

Dead Storage Capacity : 1158 A-ft

Normal Pool Level : 1149.5 m

Maximum Pool Level : 1152.5 m

Minimum Pool Level : 1142 m

Dam Crest Elevation : 1154.3 m

Dam Crest length : 457.65 m

Height of Dam : 24.30 m

Spillway width : 50 m

Irrigation Channel Design discharge: 5.74 cusecs

Command Area : 1352 Acres

Irrigation Intensity : 100%

Estimated Life of dam : Above 30 years

EIRR : 12.19%

FIRR : 11.78%

PC-I : Rs.818.488 Million

5
EXECUTIVE SUMMERY

6
Detail Estimate Baz Ali Small Dam District Kurram

EXECUTIVE SUMMARY

1.0 LOCATION

The proposed Baz Ali Dam falls in the Survey of Pakistan (SOP) Toposheet No. 38
K/2 with latitude and longitude as 33O 39' 39" North and 70O 12' 13" East
respectively. It is located at a distance of 31 km from Sadda Town, the Agency sub
headquarter. It is easily approachable from Sadda bridge constructed on Kurram
River, for a distance of 18 km, and to follow the road till Nainawar Khawar where the
proposed dam site is located downstream of village Subat Khan.

2.0 HYDROLOGY

The dam axis is proposed on Nainawar Khawar, a tributary of Kurram River. The
catchment area of the Nainawar Khawar upto the proposed dam site is 44.0 sq. mile
(114 sq.km). The project area lies in the rainfall region of about 24inches as
compared with annual rainfall of 32inches at Parachinar. The annual inflow at project
site is estimated from SCS method. Estimated average annual inflow is 3614acre-ft
which is about 6.8% of average annual rainfall at project site. Design flood is
estimated from SCS unit hydrograph using 24hour maximum rainfall data. The
spillway design outflow against 200years is reckoned to be 503 cumecs or 17760
cusecs. Reservoir storage capacity at conservation level of 1149.5m (3772ft) is
5062acre-ft and dead storage corresponding to 1142m (3746.9ft) is 1158acre-ft.
About 1352acres can be irrigated at annual demand of about 2756acre-ft at 100%
cropping intensity. Useful life of reservoir is above 30years.

3.0 DAM EMBANKMENT


It is proposed to construct a 24.30m (79.72ft) high and 457.65m (1501ft) long zoned
embankment (clay core) type of dam to store the flood water. This dam would create
a gross storage of 5062 AF out of which 3904AF is live storage. The dam is zoned
with a central impervious clay core and shoulders of river bed and material obtained
from spillway excavation. The u/s and d/s slopes of the dam are 2.5:1 and 2:.1
respectively. The 0.6 m thick riprap is provided on upstream side of dam from dead

7
Detail Estimate Baz Ali Small Dam District Kurram

storage to the dam crest level. The crest elevation of the dam is fixed as 1154.3m
amsl.

4.0 SPILLWAY DESIGN

The spillway is proposed on right side of the dam axis. The spillway consist of an
approach channel which is an open cut and is about 40m long and 50m wide, weir
ogee shape and chute (50x45x0.6m) and Roller bucket at end of chute as terminal
structure. Design discharge for spillway is taken as 503 cumecs (17760cusecs) for
200year design flood and spillway crest is kept as 1149.5m amsl. Surcharge height
above spillway crest is 3.10 m.

5.0 OUTLET WORKS

It is proposed to have a well type C shape of intake structure located on the left side
of the reservoir as close to the reservoir bank as possible. The intake structure
(2.56x2.25x14.55) meter is proposed to be located outside the body of the dam for
the ease of construction of dam body. A 600mm dia steel pipe emanates from the
bottom of the tower at elevation of 1139.85m. It is laid on a left abutment and
terminates into Baffle Impact Type energy dissipation chamber through a regulating
valve. For lowering down of stop logs and opening/closing of the gate an access
bridge is proposed.

6.0 IRRIGATION NETWORKS

Water leaving the energy dissipation chamber enters directly in the irrigation channel.
The design discharge of the channel is 5.70 cusecs for culturable command area of
1352acres at 100% cropping intensity. One main channel (precast) about 12Km long
and two distributaries (5.7Km) are proposed to irrigate the command area on both
side of Nainawar Khawar. Precast parabolic sections are proposed for both
distributaries. The standard segment of precast channel (0.46m top width and 0.31m
deep) will be used for distributaries while for main channel about 0.91m top width and

8
Detail Estimate Baz Ali Small Dam District Kurram

0.60m deep precast segment is proposed at starting RD and same as used in


distributaries at tail.

The PC-1 of the scheme was approved by Provisional Development Working Party
(PDWP) during its meeting held on 18-11-2019. Administrative Approval Attached.
The detail estimate is hereby prepared based on approved bid/BOQ with
contractor premium for works, Consultant approved bid and other general items
as per approved PC-I, overall costing to Rs.941.01 Million for according approval/
Technical Sanction, Please.

Project Manager Assistant Director (PSU)


Baz Ali Dam Kurram Small Dam Section
M/s RHC, ETA & Cascade (JV) Merged Area, Irrigation
Department Peshawar

Deputy Director (PSU)


Small Dam Section Merged Area,
Irrigation Department Peshawar

9
DETAIL ESTIMATE

10
ABSTRACT OF COST

11
CONSTRUCTION OF BAZ AIL SMALL DAM, DISTRICT KURRAM

GENERAL ABSTRACT OF COST


As Per Technical
S.No. Description Sanction Remarks
Total Amount (Rs)
A. PRELIMINARY ITEMS
A.1 LAND ACQUISITION 6.00
SUB TOTAL A: 6.00
B.1 MAIN DAM 535.19
B.2 SPILLWAY 81.80
B.3 INLET & OUTLET WORKS 23.29
B.4 IRRIGATION SYSTEM 101.13
B.5 ACCESS ROAD FOR DAM 11.64
B.6 SITE OFFICE / INSPECTION HUT 3.41
TOTAL B: 756.47
Contractor Premium @9.5% 71.86
Grandd Total with Premium 828.33
C. GENERAL ITEMS
Review/ Updation of Design & Construction
C.1 35.41
supervision Charges

C.2 Contingencies @ 0.5% for Items B-1 to B-6 0.53


C.3 Managerial Staff 33.58
SUB TOTAL C: 69.52
D OTHERS
D.1 Escalation for Items B-1 to B-6. 33.10
Provision for Land Scaping, Plantation Fishries
D.2 4.09
and Solar System
SUB TOTAL D: 37.19
GRAND TOTAL COST: 941.04
Approved PC-I Cost 818.49
Difference between approved PC-I & Detail Estimate 122.55
%age difference of approved PC-I & Detail Estimate 14.97

Project Manager
M/s RHC, ETA Cascade (JV)

12
BAZ ALI DAM, KURRAM DISTRICT
COST ESTIMATE

A-1 LAND ACQUISITION

As Per Technical Sanction


CSR.R
ITEM Description Unit
EF Quantity Rate (Rs)* AMOUNT (Rs)

1 MR Hilly Area Acre 10.00 200,000 2,000,000

2 MR Plain Area Acre 10.00 400,000 4,000,000


Sub Total = 6,000,000
Sub Total(In Million) = 6.00

Quantity Surveyor (QS Project Manager


M/s RHC, ETA Cascade (JV) M/s RHC, ETA Cascade (JV)
13
CONSTRUCTION OF BAZ AIL SMALL DAM, DISTRICT KURRAM
DETAIL COST ESTIMATE
B-1 MAIN DAM
As Per Technical Sanction
S.No. MRS.2019 Unit AMOUNT
Qty Rate (Rs)*
Description (Rs)
1 LS Care and handling of water during construction LS 1.00 500000.00 500,000
Excavation for core trench of Dam Embankment /
Spillway/Intake & Outlet Structure and Irrigation System
2 03-78-a upto a minimum depth of 35 ft in shingle gravel including mᶟ 36002.55 238.38 8,582,287
removing of excavated material by machinery in 1 KM
radius
Excavation for core trench of Dam Embankment /
Spillway/Intake & Outlet Structure and Irrigation System
3 03-78-b upto design depth in Soft Rock/Shale requiring 20% mᶟ 2701.55 432.90 1,169,499
blasting i/c removing of material from outside of the
structure area.
Provide, place and compact impervious clay core in dam
4 03-73 embankment of specified grading, mᶟ 307045.18 357.41 109,741,017
permiability i/c leveling dressing and hauage
obtaining 95% modified AASHTO dry density
Transportation of earth all types for every 500m
5 03-20-c mᶟ 307045.18 26.59 8,164,331
extra lead beyond 1.5 km. upto 8 km.
Transportation of earth all types for every 500m
6 03-20-c mᶟ 307045.18 26.59 8,164,331
extra lead beyond 1.5 km. upto 8 km.
Transportation of earth all types for every 500m
7 03-20-c mᶟ 307045.18 26.59 8,164,331
extra lead beyond 1.5 km. upto 8 km.
Provide , Place & compact shoulder material
(sandy / silty gravel) in Dam Embankment, of
8 03-74 specified grading, leveling/ dressing i/c haulage for mᶟ 367715.34 325.23 119,592,059
obtaining of 95% modified AASHTHO dry density
(Zone-I & II)
Transportation of earth all types for every 500m
9 03-20-c mᶟ 367715.34 26.59 9,777,551
extra lead beyond 1.5 km. upto 8 km.
Transportation of earth all types for every 500m
10 03-20-c mᶟ 0.00 26.59 0
extra lead beyond 1.5 km. upto 8 km.
Transportation of earth all types for every 500m
11 03-20-c mᶟ 0.00 26.59 0
extra lead beyond 1.5 km. upto 8 km.
Provide , Place & compact Coarse Filter (well
graded gravel) in chimney drain vertical / mᶟ
12 03-76 38020.97 1004.04 38,174,575
horizantol on downstream of fine filter i/c
leveling,moistening etc (T2 & T3)

13 03-75 Provide , Place & compact Fine Filter in chimney drain mᶟ 55039.55 1571.56 86,497,955
vertical / horizantol on downstream of clay core (T1)
Providing & Laying stone pitching for top layer only on
14 19-28-a mᶟ 19761.04 4020.26 79,444,499
slope. (Rip rap)

15 06-05-h Plain Cement Concrete including placing, compacting, mᶟ 58.50 7058.77 412,938
finishing & curing (Ratio 1:3:6) (parapet wall)
Random rubble masonry in foundn. & plinth in cement,
16 08-01-d-01 mᶟ 310.50 7907.96 2,455,422
sand mortar : Ratio 1:3 (Parapet wall)
Providing and lowering pezu meter 1.25" GI pipe
17 24-43 m 100.00 854.31 85,431
including all accessories
Providing and installation of Stand type Piezometer incl: all
18 N.S.I No. 10.00 60000 600,000
accessories
19 N.S.I Drilling for 100 no of Grout Holes Rm 300.00 12000.0 3,600,000

20 N.S.I Cement Bags of 50 kg weight for grouting complete in all No. 815.00 1300.00 1,059,500
respects with injection(Bentonite)
21 N.S.I Water Pressure Test No. 150.00 2500.00 375,000
22 N.S.I P&F surface marker No. 3.00 5000.00 15,000
23 N.S.I Slope Indicator No. 3.00 20000.00 60,000
24 N.S.I Settlement Gauges No. 3.00 18000.00 54,000
25 N.S.I Stripping mᶟ 4041.48 112.47 454,545
Sub Total = 487,144,270
Area factor@10% on MRS items 48,042,622

Amount with Area Factor 535,186,892

14

Quantity Surveyor (QS) Project Manager


M/s RHC, ETA Cascade (JV) M/s RHC, ETA Cascade (JV)
CONSTRUCTION OF BAZ AIL SMALL DAM, DISTRICT KURRAM
DETAIL COST ESTIMATE
B-2 SPILLWAY
As Per Technical Sanction
S.No MRS.2019 AMOUNT
Qty Rate (Rs)*
Description (Rs)

Excavation for core trench of Dam Embankment /


Item # 2 Spillway/Intake & Outlet Structure and Irrigation System
03-78-a upto a minimum depth of 35 ft in shingle gravel including Cum 12449.29 238.38 2,967,661
BF
removing of excavated material by machinery in 1 KM
radius
Excavation for core trench of Dam Embankment
/Spillway/Intake & Outlet Structure and Irrigation System
26 03-78-b upto design depth in Soft Rock/Shale requiring 20% Cum 34858.00 432.90 15,090,029
blasting i/c removing of material from outside of the
structure area.
Excavation for core trench of Dam Embankment
/Spillway/Intake & Outlet Structure and Irrigation System
27 03-78-c upto design depth in Medium Hard Rock requiring 50% Cum 1493.91 637.01 951,638
blasting i/c removing of material from outside of the
structure area.
Excavation for core trench of Dam Embankment /
28 03-78-d Spillway/Intake & Outlet Structure and Irrigation System Cum 995.94 906.52 902,842
upto design depth in Hard Rock requiring 75% blasting i/c
removing of material from outside of the structure area

29 06-48-j Lean concrete for use as thin layer under neath footings Cum 212.06 7617.20 1,615,288
with cylinder compressive strength of 1423 psi on 28 days.
PCC 1:3:6 in mass concrete less formwork using 40%
30 06-44-b Cum 423.00 5271.64 2,229,904
boulders
Reinforced cement concrete work as in dams, spillways,
weirs, barrages, cross drainage works and other hydraulic
structures using crushed stone aggregate(screening &
washing) and coarse sand i/c cost of all labour and
31 06-07-d-03 material and all kinds of form works, moulds, shuttering Cum 1872.00 9547.75 17,873,388
lifting/pumping, curing, rendering and finishing the
exposed surface, cast in situ/precast excluding the cost of
steel reinforcement and labour for bending binding also
excluding cost of additives which have to be paid
separately. Type C (1:2:4)

32 06-08-b Supply & fabricate M.S. reinforcement for cement Tonne 118.00 163656.50 19,311,467
concrete (Hot rolled deformed bars Grade 60)
Supplying and Fixing PVC Water Stopper 8" wide 3/8"
thick,providing and fixing PVC water stopper 8" wide 3/8"
33 24-40 thick in verticle (wall or column) or horizontal (floor/slab) m 283.51 559.14 158,522
expansion joint inclusing cutting and jointing complete in
all respects
Providing and Laying stone pitching for top layer only : On
34 19-28-a cu m 164.26 4020.26 660,352
slope
35 19-26 Supplying stone and stone filling in GI wire crate and its cu m 1647.44 2534.73 4,175,816
sewing, excluding cost of crates

36 19-47 Filter granular backfill behind retaining wall (stone/boulder cu m 923.32 1284.59 1,186,088
filling upto one meter to prevent choking of weep holes).
Installation of Anchor Bars in spillway & Dam
37 24-86 Embankment by using No. 11 bar (11' length) including 3” M 108.02 2616.43 282,627
dia bore-hole along with cement slurry bentonite.
38 (Market rate) Polythene Sheet (drainage filter) sq m 96 42 4,032
Item # 14 Providing & Laying stone pitching for top layer only on
19-28-a cu m 528.00 4020.26 2,122,697
BF slope. (Rip rap)
Provide & weave GI wire netting for wire crates 6"x6"
New 19-13-b-02 sq m 8339.2 411.11 3,428,329
mesh : 10 SWG wire
Item # 56
03-67-c Cu.m 3816.12 315.48 1,203,909
BF Structural backfill using Common Material available at site
Erecting & removing formwork to concrete in any shape /
New 06-46-b sq m 460.00 432.74 199,060
position (Vertical)
Sub Total = 74,363,648
Area factor@10% on MRS items 7,435,962

Amount with Area Factor 81,799,610

15

Quantity Surveyor (QS) Project Manager


M/s RHC, ETA Cascade (JV) M/s RHC, ETA Cascade (JV)
CONSTRUCTION OF BAZ AIL SMALL DAM, DISTRICT KURRAM

DETAIL COST ESTIMATE


B-3 INLET & OUTLET WORKS

B-3.1 INTAKE TOWER

As Per Technical Sanction


S.No MRS.2019 Description AMOUNT
Qty Rate (Rs)*
(Rs)
Excavation in shingle or gravel
39 03-11-a formation and rock not requiring cu.m 842.60 220.50 185,794
blasting, undressed, 50m lead:Dry.
Lean concrete for use as thin layer
under neath footings with cylinder
40 06-48-j cu.m 2.11 7617.20 16,049
compressive strength of 1423 psi on
28 days.
R.C.C in roof slab, beam, column &
41 06-07-a-03 other structural members, insitu or cu.m 41.04 9813.67 402,743
precast(Type C(1:2:4)
Supply & fabricate M.S. reinforcement
42 06-08-b for cement concrete,(Hot rolled ton 5.68 163656.50 930,060
deformed bars Grade 60)
Fabrication of heavy steel work with
43 25-10 angle, tees, sheet iron etc for making ton 1.27 213889.00 272,067
trusses, girders etc
Brass base semi circular rubber seal
44 MR Rm 5.09 2800.00 14,252
(2.5 inch)
45 L.S Hoist machine with accessories L.S 1 50000.00 50,000
Providing and fixing GI pipe railing (3
46 16-16 Rm 9.80 3358.33 32,912
feet high)
Sub Total(A) = 1,903,877

Area factor@10% on MRS items 183,962

Amount with Area Factor 2,087,839

Quantity Surveyor (QS) Project Manager


M/s RHC, ETA Cascade (JV) M/s RHC, ETA Cascade (JV)
16
CONSTRUCTION OF BAZ AIL SMALL DAM, DISTRICT KURRAM

DETAIL COST ESTIMATE


B-3 INLET & OUTLET WORKS

B-3.2 ACCESS BRIDGE

AMOUNT
S.No MRS.2019 Description Unit Quantity Rate (Rs)*
(Rs)
Excavation in shingle or gravel
48 03-11-a formation and rock not requiring cu.m 99.78 220.50 22,001
blasting, undressed, 50m lead:Dry.
Lean concrete for use as thin layer
under neath footings with cylinder
49 06-48-j cu.m 1.404 7617.20 10,695
compressive strength of 1423 psi on
28 days.
R.C.C in roof slab, beam, column &
50 06-07-a-03 other structural members, Insitu or cu.m 7.86 9813.67 77,086
precast, Type -C (1:2:4)
Supply & fabricate M.S. reinforcement
51 06-08-b for cement concrete,(Hot rolled ton 1.33 163656.50 217,172
deformed bars Grade 60)
Fabrication of heavy steel work with
52 25-10 angle, tees, sheet iron etc for making ton 2.34 213889.00 500,714
trusses, girders etc
Plain wood work sawn, wrought,
53 12-01-b planed and fixed in position, including cu.m 9.32 218638.14 2,038,582
nails & screws:Shisham wood

Sub Total(B-3.2) = 2,866,251


Area factor@10% on MRS items 286,625
Amount with Area Factor 3,152,876

Quantity Surveyor (QS) Project Manager


M/s RHC, ETA Cascade (JV) M/s RHC, ETA Cascade (JV)
17
CONSTRUCTION OF BAZ AIL SMALL DAM, DISTRICT KURRAM

DETAIL COST ESTIMATE


B-3 INLET & OUTLET WORKS

B-3.3 DELIVERY PIPE

AMOUNT
S.No MRS.2019 Description Unit Qty Rate (Rs)*
(Rs)
Excavation for core trench of Dam
Embankment/Spillway/Intake & Outlet
Structure and Irrigation System upto
Items #3
03-78-b design depth in Soft Rock/Shale cu.m 1414.81 432.90 612,470
B/F
requiring 20% blasting i/c removing of
material from outside of the structure
area

Excavation in shingle or gravel


55 03-11-a formation and rock not requiring cu.m 353.70 220.5 77,991
blasting, undressed, 50m lead:Dry.
Structural backfill using Common
56 03-67-c Cu.m 1167.22 315.5 368,233
Material available at site
Lean concrete for use as thin layer
under neath footings with cylinder
57 06-48-j cu.m 8.50 7,617.2 64,716
compressive strength of 1423 psi on
28 days.
Rcc in raft foundation slab,base slab of
58 06-07-b-03 column & ret wall etc,not including in cu.m 84.24 9813.67 826,704
06-06 type(C)(1:2:4)
Supply & fabricate M.S. reinforcement
59 06-08-b for cement concrete (Hot rolled ton 6.74 163,656.50 1,102,881
deformed bars Grade 60)
Fabrication of heavy steel work with
60 25-10 angle, tees, sheet iron etc for making ton 0.00 213,889.0 0
trusses, girders etc
S/H/J MS Flanged Pipe 18" i/d 6.35
61 24-32-a m 80.00 25,355.3 2,028,422
mm thick
62 MR Bentonite Bags 17427.00 620.00 10,804,740
Sub Total(C) = 15,886,157

Area factor@10% on MRS items 508,142

Amount with Area Factor 16,394,298

Quantity Surveyor (QS) Project Manager


M/s RHC, ETA Cascade (JV) M/s RHC, ETA Cascade (JV)
18
CONSTRUCTION OF BAZ AIL SMALL DAM, DISTRICT KURRAM

DETAIL COST ESTIMATE


B-3 INLET & OUTLET WORKS

B-3.4 DISSIPATION CHAMBER

AMOUNT
S.No MRS.2019 Description Unit Quantity Rate (Rs)*
(Rs)
Excavation in shingle or gravel
64 03-11-a formation and rock not requiring cu.m 313.876 220.50 69,210
blasting, 50m lead.
Lean concrete for use as thin layer
under neath footings with cylinder
65 06-48-j cu.m 11.30 7617.20 86,059
compressive strength of 1423 psi on
28 days.
RCC in raft foundation slab, base slab
66 06-07-b-03 of column & ret. wall etc, not including cu.m 16.71 9,813.67 163,977
in 06-06. Type C(1:2:4)
Supply & fabricate MS reinforcement
67 06-08-b Ton 6.30 163,656.50 1,030,381
for cement concrete Grade-60.
Providing and fixing sluice valve of
BSS quality (BS 5163) and weight
68 24-22-h Class 'B' for GI & PVC pipeline No. 2.00 79517.46 159,035
(including cost of jointing material):- d)
18" (450 mm) dia of Valve
Sub Total(D) = 1,508,662

Area factor@10% on MRS items 150,866

Amount with Area Factor 1,659,528


Total(A+B+C+D) 23,294,541

Quantity Surveyor (QS) Project Manager


M/s RHC, ETA Cascade (JV) M/s RHC, ETA Cascade (JV)
19
CONSTRUCTION OF BAZ AIL SMALL DAM, DISTRICT KURRAM
DETAIL COST ESTIMATE
B-4 IRRIGATION SYSTEM
B-4.1 OPEN CHANNEL
B-4.1.1 MAIN CHANNEL
As Per Technical Sanction
S.No MRS.2019 Description AMOUNT
Qty Rate (Rs)*
(Rs)
Excavation for core trench of Dam
Embankment/Spillway/Intake & Outlet Structure and
71 03-78-b Irrigation System upto design depth in Soft Cu.m 26266.40 432.90 11,370,725
Rock/Shale requiring 20% blasting i/c removing of
material from outside of the structure area.
72 03-67-a-i Structural Excavation in Common Material Cu.m 26266.40 233.63 6,136,619
Structural backfill using Common Material available at
73 03-67-c Cu.m 4848.79 315.48 1,529,696
site
Lean concrete for use as thin layer under neath
74 06-48-j footings with cylinder compressive strength of 1423 Cu.m 0.00 7617.20 0
psi on 28 days.
Providing and laying Pre-cast parabolic segments,
moulded with cement concrete 1:1-1/2:3, including
lowering in water channels to correct alignment and
75 17-11-b m 0.00 1093.54 0
grade, jointing, finishing where necessary,excluding
carriage, complete in all respects:- Top width- 18"
(457mm) & Total Depth- 12"(305mm

Providing and laying Pre-cast parabolic segments,


moulded with cement concrete 1:1-1/2:3, including
lowering in water channels to correct alignment and
76 17-11-c m 0.00 1293.36 0
grade, jointing, finishing where necessary, etc.
complete in all respects:- Top width- 24" (600mm) &
Total Depth- 14"(360mm)
Providing and laying Pre-cast parabolic segments,
moulded with cement concrete 1:1-1/2:3,including
lowering in water channels to correct alignment and
77 17-11-d grade, jointing, finishing where necessary, etc. m 800.00 1646.40 1,317,120
complete in all respects:- Top width- 25" (640mm) &
Total Depth-18"(460mm)

Providing and laying Pre-cast parabolic segments,


moulded with cement concrete 1:1-1/2:3, excluding
carriage, lowering in water channels to correct
78 17-11-f m 7340.00 2306.63 16,930,664
alignment and grade, jointing, finishing where
necessary, etc. complete in all respects:- Top width-
30" (760mm) & Total Depth- 21"(525mm)

Providing and laying Pre-cast parabolic segments,


moulded with cement concrete 1:1-1/2:3, excluding
carriage, lowering in water channels to correct
New 17-11-f(i) m 1450.00 2306.63 3,344,614
alignment and grade, jointing, finishing where
necessary, etc. complete in all respects:- Top width-
36" (920mm) & Total Depth- 24"(610mm)

Supplying clean and screened river or pit sand within


79 03-48, Cu.m 402.78 111.78 45,023
150m including removal of loose earth or overburden.

Sub Total(B-4.1.1) = 40,674,460


Area factor@10% on MRS items 4,067,446
Amount with Area Factor 44,741,906

20

Quantity Surveyor Project Manager


M/s RHC, ETA Cascade (JV) M/s RHC, ETA Cascade (JV)
CONSTRUCTION OF BAZ AIL SMALL DAM, DISTRICT KURRAM
DETAIL COST ESTIMATE
B-4 IRRIGATION SYSTEM

B-4.1.2 DISTRIBUTORY 1

As Per Technical Sanction


S.No MRS.2019 Description AMOUNT
Qty Rate (Rs)*
(Rs)
Excavation in hard rock requiring blasting and
81 03-14-a Cu.m 3060.17 388.40 1,188,570
disposal upto 25m and dressing :Grade I
82 03-67-a-i Structural Excavation in Common Material Cu.m 3060.17 233.63 714,948
Structural backfill using Common Material available at
83 03-67-c Cu.m 835.26 315.48 263,507
site
Lean concrete for use as thin layer under neath
84 06-48-j footings with cylinder compressive strength of 1423 Cu.m 0.00 7617.20 0
psi on 28 days.
Providing and laying Pre-cast parabolic segments,
moulded with cement concrete 1:1-1/2:3, excluding
carriage, lowering in water channels to correct
85 17-11-f m 0.00 2306.63 0
alignment and grade, jointing, finishing where
necessary, etc. complete in all respects:- Top width-
30" (760mm) & Total Depth- 21"(525mm)
Supplying clean and screened river or pit sand within
86 03-48, Cu.m 75.05 111.78 8,390
150m including removal of loose earth or overburden.
Providing and laying Pre-cast parabolic segments,
moulded with cement concrete 1:1-1/2:3,including
Item # lowering in water channels to correct alignment and
17-11-c Cu.m 1787.00 1293.36 2,311,234
76 BF grade, jointing, finishing where necessary, etc.
complete in all respects:- Top width- 24" (600mm) &
Total Depth- 14"(360mm)
Sub Total(B-4.1.2) = 4,486,648
Area factor@10% on MRS items 448,665
Amount with Area Factor 4,935,313

B-4.1.3 DISTRIBUTORY 2

As Per Technical Sanction


S.No MRS.2019 Description AMOUNT
Qty Rate (Rs)*
(Rs)
Excavation in hard rock requiring blasting and
88 03-12-a Cu.m 5273.88 212.74 1,121,964
disposal upto 25m and dressing :Grade I
89 03-67-a-i Structural Excavation in Common Material Cu.m 5273.88 233.63 1,232,135
Structural backfill using Common Material available at
90 03-67-c Cu.m 724.10 315.48 228,439
site
Lean concrete for use as thin layer under neath
91 06-48-j footings with cylinder compressive strength of 1423 Cu.m 0.00 7617.20 0
psi on 28 days.
Providing and laying Pre-cast parabolic segments,
moulded with cement concrete 1:1-1/2:3, excluding
carriage, lowering in water channels to correct
92 17-11-f m 0.00 2306.63 0
alignment and grade, jointing, finishing where
necessary, etc. complete in all respects:- Top width-
30" (760mm) & Total Depth- 21"(525mm)

Providing and laying Pre-cast parabolic segments,


moulded with cement concrete 1:1-1/2:3, including
Item #
lowering in water channels to correct alignment and
75 17-11-b m 2600.00 1093.54 2,843,204
grade, jointing, finishing where necessary,excluding
BF
carriage, complete in all respects:- Top width- 18"
(457mm) & Total Depth- 12"(305mm

Supplying clean and screened river or pit sand within


93 03-48, Cu.m 109.20 111.78 12,206
150m including removal of loose earth or overburden.

Supplying clean and screened river or pit sand within


94 03-48, Cu.m 0.00 111.78 0
150m including removal of loose earth or overburden.

Sub Total(B-4.1.3) = 5,437,949


Area factor@10% on MRS items 543,795
Amount with Area Factor 5,981,744

21

Quantity Surveyor Project Manager


M/s RHC, ETA Cascade (JV) M/s RHC, ETA Cascade (JV)
CONSTRUCTION OF BAZ AIL SMALL DAM, DISTRICT KURRAM
DETAIL COST ESTIMATE
B-4 IRRIGATION SYSTEM
B-4.2 STRUCTURES
B-4.2.1 CROSS DRAINAGE CULVERT
As Per Technical Sanction
S.No MRS.2019 Description AMOUNT
Qty Rate (Rs)*
(Rs)
Excavation in foundation of building, bridges etc
97 03-25-d m3 750.83 328.17 246,401
complete : in shingle/gravel
Lean concrete for use as thin layer under neath
98 06-48-j footings with cylinder compressive strength of 1423 m3 46.28 7617.20 352,554
psi on 28 days.
RCC in raft foundation slab, base slab of column &
99 06-07-b-03 m3 50.47 9813.67 495,296
ret. wall etc, not including in 06-06. Type C(1:2:4)
Supply & fabricate M.S. reinforcement for cement
100 06-08-b Tonne 8.93 163656.50 1,461,780
concrete (Hot rolled deformed bars Grade 60)
Providing & laying R.C.C. pipe sewers, moulded with
cement concrete 1:1-1/2:3 conforming to ASTM
specification C-76-79, Class IV, Wall B, including
101 23-03-c-05 m 140.00 4447.79 622,691
carriage, lowering in trenches to correct alignment
and grade, jointing with rubber ring, cutting pipes
where necessary, testing, etc. complete:- 24" i/d, Wall

Embankment formation in ordinary soil & compaction


by mechanical means at optimum moistures content
102 03-06-b m3 1520.40 89.33 135,817
to 90% max. modified AASHTO dry density (borrow
area)
Providing and Laying grouted stone pitching, in 1:8
103 19-30-a m3 232.50 5541.72 1,288,439
c/s mortar Top layer on slope
PCC 1:3:6 in mass concrete less formwork using
104 06-44-c m3 123.38 5767.84 711,648
30% boulders
Sub Total(B-4.2.1) = 5,314,626
Area factor@10% on MRS items 531,463
Amount with Area Factor 5,846,088
B-4.2.2 ROAD CULVERT
AMOUNT
S.No. MRS.2019 Description Unit Quantity Rate (Rs)*
(Rs)
Excavation in foundation of building, bridges etc
106 03-25-d m3 47.88 328.17 15,713
complete : in shingle/gravel
Lean concrete for use as thin layer under neath
107 06-48-j footings with cylinder compressive strength of 1423 m3 2.29 7617.20 17,428
psi on 28 days.
Plain Cement Concrete including placing,
108 06-05-h m3 5.02 7058.77 35,435
compacting, finishing & curing (Ratio 1:3:6)
Coursed rubble masonry in ground floor in
109 08-05-d-01 m3 15.24 8831.84 134,597
cement,sand mortar : Ratio 1:3
Reinforced Concrete Pipe Culvert (AASHTO M-170)
110 16-29-b-i Rm 16.40 4021.95 65,960
Dia: 610mm
Structural backfill using Common Material available at
111 03-67-c m3 15.80 315.48 4,985
site (Filling)
3
112 16-05-a Aggregate Base Course m 3.51 2603.87 9,140
113 16-10-a Single bitumenous Surface Treatment m3 21.60 261.05 5,639
Sub Total(B-4.2.2) = 288,896
Area factor@10% on MRS items 28,890
Amount with Area Factor 317,786

22

Quantity Surveyor Project Manager


M/s RHC, ETA Cascade (JV) M/s RHC, ETA Cascade (JV)
CONSTRUCTION OF BAZ AIL SMALL DAM, DISTRICT KURRAM
DETAIL COST ESTIMATE
B-4 IRRIGATION SYSTEM

B-4.2.4 OPEN FLUME

As Per Technical Sanction


S.No MRS.2019 Description AMOUNT
Qty Rate (Rs)*
(Rs)

Excavation in foundation of building, bridges etc


115 03-25-d m3 0.00 328.17 0
complete : in shingle/gravel
Lean concrete for use as thin layer under neath
116 06-48-j footings with cylinder compressive strength of 1423 m3 0.00 7617.20 0
psi on 28 days.
RCC in raft foundation slab, base slab of column &
117 06-07-b-03 m3 0.00 9813.67 0
ret. wall etc, not including in 06-06. Type C(1:2:4)
Supply & fabricate M.S. reinforcement for cement
118 06-08-b Tonne 0.00 163656.50 0
concrete (Hot rolled deformed bars Grade 60)
Structural backfill using Common Material available at
119 03-67-c m3 0.00 315.48 0
site
Sub Total(B-4.2.4) = 0
Area factor@10% on MRS items 0
Amount with Area Factor 0

B-4.2.5 AQUEDUCT (5 no.s)

As Per Technical Sanction


S.No MRS.2019 Description AMOUNT
Qty Rate (Rs)*
(Rs)
Earth excavation in open cut 1.5m - 3m depth for
121 03-10-d drains etc & disposal : in Gravel & shingle m3 4128.96 450.18 1,858,775

Filter granular backfill behind retaining wall


122 19-47 (stone/boulder filling upto one meter to prevent m3 1128.04 1284.59 1,449,069
choking of weep holes).
Lean concrete for use as thin layer under neath
123 06-48-j footings with cylinder compressive strength of 1423 m3 53.84 7617.20 410,110
psi on 28 days.
Random rubble masonry in foundn. & plinth in
124 08-01-d-01 cement, sand mortar : Ratio 1:3 m3 0.00 7907.96 0

RCC in roof slab, beam, column & other structural


125 06-07-a-03
members, insitu or precast (1:2:4) m3 1207.34 9813.67 11,848,436
Supply & fabricate M.S. reinforcement for cement
126 06-08-b Ton 120.99 163656.50 19,799,982
concrete (Hot rolled deformed bars Grade 60)

127 LS Misc.(Water stopper,Sealant,Bitumen, etc) 1 250000.00 250,000


L.S
Sub Total(B-4.2.5) = 35,616,372
Area factor@10% on MRS items 3,536,637
Amount with Area Factor 39,153,009

23

Quantity Surveyor Project Manager


M/s RHC, ETA Cascade (JV) M/s RHC, ETA Cascade (JV)
CONSTRUCTION OF BAZ AIL SMALL DAM, DISTRICT KURRAM
DETAIL COST ESTIMATE
B-4 IRRIGATION SYSTEM
B-4.2.6 Super Passage (2 no.s)

As Per Technical Sanction


S.No MRS.2019 Description AMOUNT
Qty Rate (Rs)*
(Rs)
Excavation in foundation of building, bridges etc
129 03-25-b m3 0.00 243.88 0
complete : in ordinary soil
Structural backfill using Common Material available at
130 03-67-c cu.m 0.00 315.48 0
site (Filling)
Lean concrete for use as thin layer under neath
131 06-48-j footings with cylinder compressive strength of 1423 m3 0.00 7617.20 0
psi on 28 days.
Cement Concrete (brick/stone ballast, 1.5" to
132 06-03-e 2"/nullah shingle well graded and cleaned) in m3 0.00 3895.77 0
foundation & plinth (Ratio 1:6:18)
Coursed rubble masonry (Hammer Dressed) in
133 08-02-d-02 m3 0.00 7907.19 0
foundn. & plinth in cement,sand mortar : Ratio 1:4
RCC in raft foundation slab, base slab of column &
134 06-07-b-03 m3 0.00 9813.67 0
ret. wall etc, not including in 06-06. Type C(1:2:4)
Supply & fabricate M.S. reinforcement for cement
135 06-08-b Tonne 0.00 163656.50 0
concrete (Hot rolled deformed bars Grade 60)
Sub Total(B-4.2.6) = 0
Area factor@10% on MRS items 0
Amount with Area Factor 0
B-4.2.7 OUTLET
As Per Technical Sanction
S.No MRS.2019 Description AMOUNT
Qty Rate (Rs)*
(Rs)
Excavation in foundation of building, bridges etc
137 03-25-d m3 37.01 328.17 12,145
complete : in shingle/gravel
Lean concrete for use as thin layer under neath
138 06-48-j footings with cylinder compressive strength of 1423 m3 2.43 7617.20 18,495
psi on 28 days.
Plain Cement Concrete including placing,
139 06-05-h m3 1.48 7058.77 10,419
compacting, finishing & curing (Ratio 1:3:6)
Coursed rubble masonry (Hammer Dressed) in 3
140 08-02-d-01 m 9.99 8300.00 82,900
foundn. &plinth in cement,sand mortar : Ratio 1:3
Providing, laying, cutting, jointing, testing and
disinfecting High Density Polyethylene Pipe (HDPE)
141 24-30-a-06 Rm 12.88 1298.39 16,723
Din-8074/Din-8075/ISO-4427 in trenches, complete in
all respects (110 mm dia) PN-8
Structural backfill using Common Material available at
142 03-67-c Rm 12.21 315.48 3,853
site
Sub Total(B-4.2.7) = 144,535
Area factor@10% on MRS items 14,453
Amount with Area Factor 158,988
GRAND TOTAL 101,134,835

24

Quantity Surveyor Project Manager


M/s RHC, ETA Cascade (JV) M/s RHC, ETA Cascade (JV)
CONSTRUCTION OF BAZ AIL SMALL DAM, DISTRICT KURRAM

DETAIL COST ESTIMATE

A-2 ACCESS ROAD FOR DAM


As Per Technical Sanction
S.No MRS.2019 Description
Qty Rate (Rs)* AMOUNT (Rs)
Excavation in shingle or gravel formation
143 03-11-a & rock not requiring blast, undressed, cu.m 6705.29 220.50 1,478,516
50m lead : Dry
Dressing & Levelling earth to designed
144 03-21-c section gravel work or soft rock not cu.m 6705.29 39.89 267,474
requiring blasting upto cut or fill 6 inches.

Granular Sub Base Course using Pit Run


New 16-04-a cu.m 325.79 1351.29 440,231
Gravel

BF# 112 16-05-a Aggregate Base Course cu.m 325.79 2603.87 848,304

New 16-09-a Bitumenous Prime Coat sq m 2088.00 192.10 401,105

Dense Graded Hot Bitmac (Mobile


New 16-13-c sq m 2088.00 803.50 1,677,708
Asphalt Mixer) 2" Thick
Lean concrete for use as thin layer under
neath footings with cylinder compressive
BF# 107 06-48-j cu.m 5.90 7617.20 44918.48
strength of 1423 psi on 28 days

Plain Cement Concrete including placing,


BF# 148 06-05-f compacting, finishing & curing (Ratio cu.m 54.89 8358.28 458792.37
1:2:4)
Reinforced Concrete Pipe Culvert
BF# 110 16-29-b-i RM 58.50 4021.95 235284.08
(AASHTO M-170) Dia: 610mm
Structural backfill using Common
BF# 111 03-67-c Material available at site. cu.m 126.60 315.48 39939.14

Erecting & removing formwork to


New 06-46-b sq m 317.57 432.74 137426.66
concrete in any shape / position (Vertical)
Providing and laying Pre-cast parabolic
segments, moulded with cement
concrete 1:1-1/2:3, including lowering in
water channels to correct alignment and
BF# 75 17-11-b grade, jointing, finishing where M 580.00 1093.54 634253.20
necessary,excluding carriage, complete
in all respects:- Top width- 18" (457mm)
& Total Depth- 12"(305mm

Sub Total = 10,581,366

Area factor@10% on MRS items 1,058,137

Sub Total = 11,639,503

Quantity Surveyor (QS Project Manager


M/s RHC, ETA Cascade (JV) M/s RHC, ETA Cascade (JV)
CONSTRUCTION OF BAZ AIL SMALL DAM, DISTRICT KURRAM

DETAIL COST ESTIMATE

A-3 SITE OFFICE / INSPECTION HUT

As Per Technical Sanction


S.No MRS.2019 Description AMOUNT
Qty Rate (Rs)*
(Rs)
Structural Excavation in Common
145 03-67-a-i cu.m 0.00 233.63 0
Material
Excavation in foundation of
Item #
03-25-d building, bridges etc complete : in m3 53.51 328.17 17,559
115 BF
shingle/gravel
Lean concrete for use as thin layer
under neath footings with cylinder
146 06-48-j cu.m 23.09 7617.20 175,904
compressive strength of 1423 psi
on 28 days.
Ist class brick work in ground floor
147 07-05-a-03 cu.m 31.75 10236.54 325,041
Cement, sand mortar 1:4
1st class brick work in foundation
New 07-04-a-03 and plinth in Cement, sand mortar cu.m 43.32 9555.71 413,953
1:4.
Damp proof course of cem. conc.
1:2:4 including bitumen coat, 1
New 06-26-b-02 sq.m 26.69 1020.54 27,234
layer polythene & 2 coats bitumen
(2" thick)
Plain Cement Concrete including
148 06-05-f placing, compacting, finishing & cu.m 5.08 8358.28 42,443
curing (Ratio 1:2:4)
RCC in raft foundation slab, base
149 06-07-b-01 slab of column & ret. wall etc, not cu.m 0.00 13062.45 0
including in 06-06. Type C(1:1:2)

RCC in raft foundation slab, base


Item #
06-07-b-03 slab of column & ret. wall etc, not m3 23.05 9813.67 226,176
134 BF
including in 06-06. Type C(1:2:4)

Supply & fabricate M.S.


150 06-08-b reinforcement for cement concrete Tonn 2.08 163656.50 340,896
(Hot rolled deformed bars Grade 60)
Provide & lay topping of concrete
1:2:4, including surface finishing &
151 10-15-d sq.m 0.00 812.91 0
dividing in panels : 2" thick
(Flooring)
Cement Plaster 1:5, upto 20' height
152 11-11-c sq.m 265.42 388.62 103,149
3/4" thick (for Wall)
Cement plaster 1:5, upto 20' height
153 11-11-b sq.m 94.23 292.94 27,605
1/2" thick (for slabs)
Preparing surface and painting with
154 13-22-a sq.m 203.79 103.19 21,029
emulsion paint; First coat
Preparing surface and painting with
155 13-22-b emulsion paint : 2nd & each sq.m 203.79 60.06 12,240
subsequent coat.
Distempering New surface : Three
156 11-21-a-03 sq.m 90.88 94.42 8,581
coats
First class tile roofing including
157 09-01 earth,mud plaster,gobri sq.m 102.83 2500.20 257,101
leeping,cement plaster etc complete

26

Quantity Surveyor Project Manager


M/s RHC, ETA Cascade (JV) M/s RHC, ETA Cascade (JV)
CONSTRUCTION OF BAZ AIL SMALL DAM, DISTRICT KURRAM

DETAIL COST ESTIMATE

A-3 SITE OFFICE / INSPECTION HUT

As Per Technical Sanction


S.No MRS.2019 Description AMOUNT
Qty Rate (Rs)*
(Rs)
providing and fixing steel grated
doors, complete with locking
158 25-30-b arrangements & angle iron frame sq.m 6.69 19483.72 130,327
2"x2"x3/8" and 1" squared bars 4"
center to center

Making and fixing steel grated door,


with 1/16" thick sheeting, including
159 25-31 angle iron frame 2"x2"x3/8" and sq.m 9.76 18239.06 177,922
3/4" square bars 4" center to center
with locking arrangement

Providing and Fixing steel windows


18 guage with openable glazed
160 25-39-b-03 sq.m 6.898 8754.07 60,386
panels With 22 SWG wire gauze :
Glass pane 3mm

Providing and Fixing glazed earthen


ware WC squatting type(orisa
161 14-03-a No. 2 2203.07 4,406
pattern)combined with foot rest
.complete in all respects : White

Providing and Fixing glazed earthen


ware WHB complete Size 22"x16"
162 14-05-a-02 ,include bracket set,waste coupling No. 0 8796.61 0
,complete in all respects: Coloured
with pedestal

Providing & Fixing best quality 5


mm glass shelf 24"x5" complete :
163 14-18-a No. 2 1193.75 2,388
with chromium plated bracketes
and railing

Providing & Fixing best quality


looking glass 5 mm thick neatly
164 14-17 fitted on masonary wall etc as per No. 2 2528.28 5,057
instruction of engineer In-charge
complete mirror 22"x16" size

Providing & Fixing chromium


165 14-16-a platted (CP) towel rail complete : No. 2 1033.60 2,067
24" long 3/4" dia
Providing & Fixing CP toilet paper
166 14-15 No. 2 809.43 1,619
holder
167 14-13 Providing and Fixing CP soap dish. No. 2 836.13 1,672

Providing and Fixing glazed earthen


ware low down flushing cistern 3
168 14-10-a gallons capacity,including bracket No. 2 3238.40 6,477
set,copper connection etc.
Complete in all respects : White

27

Quantity Surveyor Project Manager


M/s RHC, ETA Cascade (JV) M/s RHC, ETA Cascade (JV)
CONSTRUCTION OF BAZ AIL SMALL DAM, DISTRICT KURRAM

DETAIL COST ESTIMATE

A-3 SITE OFFICE / INSPECTION HUT

As Per Technical Sanction


S.No MRS.2019 Description AMOUNT
Qty Rate (Rs)*
(Rs)

Providing and Fixing stainless steel


sink with drain board size 48"x24",
169 14-06-a No. 1 6489.11 6,489
including set of brackets, waste
pipe etc-(best quality)

Providing & Fixing chromium platted


170 14-27-a (CP) mixing valve for WHB, sink or No. 3 2739.17 8,218
shower of approved.(best quality)
Providing & Fixing chromium platted
171 14-26-b (CP) shower rose : size 3/4"x6" No. 2 2712.22 5,424
(best quality)
Providing and Fixing 'P' trap of
172 14-32-b approved quality including GI No. 3 439.96 1,320
grating & PCC chamber 4" glazed

Providing and Fixing Fibre


173 14-69-a-01 Glass,corrosion resistant,UV No. 1 12586.28 12,586
stabilized Water Tank :300 gallons
Septic Tank (int.Size: 7'x2'x5')
174 23-10 No. 1 20003.17 20,003
complete
Providing and Fixing GI pipe &
175 14-55-f including specials complete 1/2" dia Rm 100 337.81 33,781
(light)
Supply and fixing of 1.5 HP
Monoblock water pump 1.25"x1"
176 14-79-d No. 1 20850.40 20,850
single phase upto 130 ft head
(Type DE-S2) i/c all accessories.
Supply and Erection girder clamp
177 15-25 hook, 5/8" dia.for hanging ceiling No. 8 322.24 2,578
fans
Supply and Erection best quality AC
ceiling fan complete with GI rod,
178 15-68-a No. 8 3497.69 27,982
canopy, blades & regulator : 36"
sweep
Supply and Erection best quality
179 15-69-a exhaust fan complete with Shutter No. 3 2440.45 7,321
& regulator : 12"sweep
Supply and Erection PVC pipe for
180 15-02-b-02 wiring purpose complete Recessed Rm 66 209.65 13,837
in walls including chase etc : 3/4" i/d
Supply and Erection Sahl wood
181 15-04-b strip batten for wiring complete 3/4" Rm 8 38.12 305
i/d

28

Quantity Surveyor Project Manager


M/s RHC, ETA Cascade (JV) M/s RHC, ETA Cascade (JV)
CONSTRUCTION OF BAZ AIL SMALL DAM, DISTRICT KURRAM

DETAIL COST ESTIMATE

A-3 SITE OFFICE / INSPECTION HUT

As Per Technical Sanction


S.No MRS.2019 Description AMOUNT
Qty Rate (Rs)*
(Rs)
Supply and Erection single core
182 15-05-b PVC insulated copper conductor Rm 70 69.40 4,858
250/440 V grade cable : 3/0.036"
Supply & erection of 25 KVA, 11/0.4
183 15-100-a No. 1 227606.59 227,607
KV Transformer
Supply & erection of HT pole 36'
184 15-97-a No. 4 34347.25 137,389
High(H-Type)
Supply & erection LT Pole 31' High
185 15-97-b No. 2 26498.67 52,997
(H-Type)
LT Panel accessories, installation
186 N.S L.S 4 30000.00 120,000
charges and civil works
Supply and Erection MS sheet box
of 16 SWG, 4"deep with 3/16" thick
187 15-09-b Each 4 213.89 856
bakelite sheet top etc.
complete : 7"x4"
Supply and Erection MS sheet box
of 16 SWG, 4"deep with 3/16" thick
188 15-09-f Each 1 463.58 464
bakelite sheet top etc.
complete : 12"x14"
Supply and Erection of
iron/aluminium clad, 500V
189 15-11-a-02 Each 1 929.62 930
main switch Double pole : 30/35
Amp
Supply and Erection tube light,
including rod, choke etc complete
190 15-24-b Each 10 1481.21 14,812
Single rod (40 watts) with 1 choke &
1 starter
Supply and Erection 3 pin 10/15
191 15-19-a Amp. wall socket Each 4 73.56 294
: Open type
Supply and Erection button
192 15-22-a holder/angle holder Each 16 66.13 1058.08
Bakelite large size
Supply and Erection circuit breaker
193 15-26-b (imported) on sahl wood board Each 2 684.96 1369.92
complete : 20/25/30 Amp.
Making hole in wall with necessary
194 15-67 masonry work for exhaust fan any Each 3 169.43 508.29
size complete
Supply and Erection best quality
195 15-69-a exhaust fan complete with shutter & Each 0 2440.45 0
regulator : 12"sweep
Sub Total = 3,115,067

Area factor@10% on MRS items = 3,294,573

Non Schedule = 120,000

GRAND TOTAL = 3,414,573

29

Quantity Surveyor Project Manager


M/s RHC, ETA Cascade (JV) M/s RHC, ETA Cascade (JV)
BAZ ALI DAM, KURRAM DISTRICT

DETAIL COST ESTIMATE


A-4 LAND SCAPING AND PLANTATION

As Per Technical Sanction


S.No MRS.2019 Description AMOUNT
Qty Rate (Rs)*
(Rs)

1 MR Land scaping and Plantation Sq ft 4046.86 250.00 1,011,715

Sub Total = 1011715

A-5 STREET LIGHTS AND SEATING ARRANGEMENT

Supply and fixing dust and weather proof


15-34 street light fitting with reflector,400 watt No. 6 2474.85 14,849
murcurry vapour lamp etc.comp

MR Seating Arrangement No. 4 12000.00 48,000

Sub Total = 62849.1

A-6 Solar Pump

As Per Technical Sanction


S.No MRS.2019 Description AMOUNT
Qty Rate (Rs)*
(Rs)

Provision of Solar Pump (2HP) 1KW Solar


1 MR System for insspection Hut & 6 nos Street No. L.S 3000000.00 3,000,000
Lights (40W LED)

note: Detail design of Solar System tobe carried by Supervisory Consultant Sub Total = 3,000,000

A-7 FISHRIES

As Per Technical Sanction


S.No MRS.2019 Description AMOUNT
Qty Rate (Rs)*
(Rs)

5 MR* Fishries No. 2000 7.00 14,000

Sub Total = 14000

Quantity Surveyor (QS) Project Manager


Baz Ali Dam Kurram Baz Ali Dam Kurram
M/s RHC, ETA Cascade (JV) M/s RHC, ETA Cascade (JV)
30
Review / Updation and Construction Supervision of Baz Ali Small Dam
District Kurram

Item Costs (Pak Rupees )

A. Remuneration 27,103,560
B. Reimbursable Expenses 4,642,500
Consultants' Total Proposal (A+B) = 31,746,060
Amount in Million 31.74606

Quantity Surveyor( QS)


M/s RHC, ETA Cascade (JV)
31
FIN-4: BREAKDOWN OF REMUNERATION
Sr. Month Billing Rate
Name of staff Position Total Amount
No. Months (Rs)
A. DETAIL DESIGN OF SMALL DAMS

1 Engr. Zafar Iqbal Wattoo Project Manager 3 418,000 1,254,000

2 Zeeshan Shahzad Dam Specialist 3 313,500 940,500

3 Shreef Ullah Resident Engineer 3 313,500 940,500

4 Dr. Khalid Latif Geologist 3 313,500 940,500

Support Staff

1 Basharat Khan Chief Surveyor 3 68,640 205,920

2 Muhammad Usman AutoCAD Operator 3 43,560 130,680

3 Muhammad Amin Computer Operator 3 29,040 87,120

4 TBN Surveyor Helpers 6 29,040 174,240

5 TBN Peon Chowkidar 6 23,760 142,560

6 TBN Driver 6 23,760 142,560


Total -A 4,958,580
B. CONSTRUCTION SUPERVISION (2 Years)

1 Engr. Zafar Iqbal Wattoo Project Manager 12 380,380 4,564,560

2 Shreef Ullah Resident Engineer 24 240,350 5,768,400

3 Dr. Khalid Latif Geologist 6 240,350 1,442,100

4 Muhammad Noman Assistant Resident Engineer 24 114,950 2,758,800

5 Sohail Ahmad Quantity Surveyor 12 37,620 451,440

6 Shaheen Lab Technician 24 37,620 902,880


Siyar ahmad
7 Muhammad Haris Inspector (4 nos) 48 37,620 1,805,760

8 TBN Surveyor 24 37,620 902,880


Support Staff

1 Muhammad Usman Autocad Operator 24 29,040 696,960

2 Muhammad Amin Computer Operator 24 23,760 570,240

3 TBN Peon Chowkidar 48 23,760 1,140,480

4 TBN Driver 48 23,760 1,140,480


Total -B 22,144,980
Total 27,103,560

Quantity SUrveyor (QS)


M/S RHC, ETA Cascade (JV)
32
FORM 5: BREAKDOWN OF REIMBURSABLE EXPENSES
A. LOGISTICS

No Description Unit Quantity Unit Cost Pak Rupees

I Project Manager Office

1 Furnished Office Accommodation Months 3 20,000 60,000


2 Electricity, Water & Gas Charges Months 3 15,000 45,000
3 Office Supplies & Stationary Months 3 5,000 15,000
4 Printing & Photocopying Charges Months 3 10,000 30,000
5 Fax, Postage, Courier & Telephone Charges Months 3 10,000 30,000
6 Transport Including running & Maintenance Months 3 75,000 225,000
Sub Total I 405,000
II Site Office & Camp
1 Furnished Office & Camp Accommodation Months 3 20,000 60,000
2 Electricity, Water & Gas Charges Months 3 15,000 45,000
3 Office Supplies & Stationary Months 3 2,500 7,500
4 Fax, Postage, Courier & Telephone Charges Months 3 5,000 15,000
Transport Including running & Maintenance &
5 Months 3 75,000 225,000
Driver
Sub Total II 352,500
Geophysical survey along Dam & appurtenant
6 Job 1 30,000 30,000
structures
Mobalization/ demobilization of drilling rig/geo-
7 Job 1 30,000 30,000
tech investigation machinery

Drilling by diamond drilling, holes of minimum 75


mm dia. vertical or at specified inclination using
diamond core drilling bit, double barrel tube in
masonry, concrete or rock including cost of all
materials, machinery, labour, water, collection of
core samples, logging & labelling samples,
8 Meter 150 6,500 975,000
supplying wooden core box and re-drilling in
case of collapse of sides etc. complete.
excluding cost of mobilization & demobilization.
(For depth 0 to 50 m and inclined at 0o to 10o
vertically downward) (With all necessary tests
from lab & at sites)

9 Any other activity as per requirement of study Job 1 30,000 30,000


Sub Total III (Geotech) 1,065,000
B. LOGISTICS
I Site Office & Camp
1 Furnished Office & Camp Accommodation Months 24 20,000 480,000
2 Electricity, Water & Gas Charges Months 24 15,000 360,000
3 Office Supplies & Stationary Months 24 2,500 60,000
4 Fax, Postage, Courier & Telephone Charges Months 24 5,000 120,000
Transport Including running & Maintenance &
5 Months 24 75,000 1,800,000
Driver
Total III. 2,820,000
Grand Total (I+II+III) 3,577,500

Quantity Surveyor( QS)


33
M/s RHC, ETA Cascade (JV)
DETAIL SHEET

34
MAIN DAM

35
CONSTRUCTION OF BAZ AIL SMALL DAM, DISTRICT KURRAM
DETAIL COST ESTIMATE
MAIN DAM MEASUREMENT SHEET
Item Length Width Height Remarks /
Description No. Quantity Unit
No. (m) (m) (m)
Scheduled Items
Excavation for core trench of Dam Embankment upto a minimum depth of 35 ft. in shingle gravel
2 including removing of excavated material by machinery in 1 KM radius.
Length Avg. Area
Area (Sq.m)
Main Dam Core Excavation (m) (Sq.m)

0+000 9.333

0+010 10 10.878 10.1055 101.055

0+020 10 14.123 12.5005 125.005

0+030 10 29.037 21.58 215.800

0+040 10 37.584 33.3105 333.105

0+050 10 35.627 36.6055 366.055

0+060 10 77.758 56.6925 566.925

0+070 10 93.331 85.5445 855.445

0+080 10 97.627 95.479 954.790

0+090 10 114.412 106.02 1,060.195

0+100 10 72.394 93.403 934.030

0+110 10 68.352 70.373 703.730

0+120 10 60.642 64.497 644.970

0+130 10 69.34 64.991 649.910

0+140 10 72.756 71.048 710.480

0+150 10 74.601 73.6785 736.785

0+160 10 87.385 80.993 809.930

0+170 10 83.141 85.263 852.630

0+180 10 88.157 85.649 856.490

0+190 10 91.429 89.793 897.930

0+200 10 90.483 90.956 909.560

0+210 10 85.816 88.1495 881.495

0+220 10 98.308 92.062 920.620

0+230 10 98.326 98.317 983.170

0+240 10 71.581 84.9535 849.535

36
Quantity Surveyor (QS)
M/S RHC, ETA Cascade (JV)
Item Length Width Height Remarks /
Description No. Quantity Unit
No. (m) (m) (m)

0+250 10 66.036 68.8085 688.085

0+260 10 69.608 67.822 678.220

0+270 10 85.455 77.5315 775.315

0+280 10 81.305 83.38 833.800

0+290 10 82.187 81.746 817.460

0+300 10 78.761 80.474 804.740

0+310 10 92.706 85.7335 857.335

0+320 10 102.339 97.5225 975.225

0+330 10 103.657 102.998 1,029.980

0+340 10 91.89 97.7735 977.735

0+350 10 77.263 84.5765 845.765

0+360 10 61.024 69.1435 691.435

0+370 10 59.795 60.4095 604.095

0+380 10 59.25 59.5225 595.225

0+390 10 57.285 58.2675 582.675

0+400 10 54.73 56.0075 560.075

0+410 10 37.306 46.018 460.180

0+420 10 75.036 56.171 561.710

0+430 10 70.482 72.759 727.590

0+440 10 97.952 84.217 842.170

0+450 10 29.472 63.712 637.120

0+460 10 37.05 33.261 332.610

0+470 10 45.275 41.1625 411.625

0+480 10 45.821 45.548 455.480

Total: 33,665.290 Cu.m.

37
Quantity Surveyor (QS)
M/S RHC, ETA Cascade (JV)
Item Length Width Height Remarks /
Description No. Quantity Unit
No. (m) (m) (m)
Length Avg. Area
Area (Sq.m)
Blanket Key Excavation (m) (Sq.m)

0+060 17.976

0+080 20 18.868 18.422 368.440

0+100 20 18.653 18.7605 375.210

0+120 20 20.267 19.46 389.200

0+140 20 19.555 19.911 398.220

0+160 20 20.294 19.9245 398.490

0+180 20 14.8 17.547 350.940

0+200 20 16.66 15.73 314.600

0+220 20 16.945 16.8025 336.050

0+240 20 16.514 16.7295 334.590

0+260 20 16.042 16.278 325.560

0+280 20 15.686 15.864 317.280

0+300 20 15.029 15.3575 307.150

0+320 20 14.243 14.636 292.720

0+340 20 13.392 13.8175 276.350

0+350 10 14.533 13.9625 139.625

0+357.870 7.87 14.533 14.533 114.375

Total:- B 5,038.800 Cu.m.

Total:- (A+B) 38,704.090 Cu.m.

Take Qty @ 93.02% of above 93.02% 36,002.545 Cu.m.

Total: 36,002.545 Cu.m.


Excavation for core trench of Dam Embankment upto design depth in Soft Rock/Shale requiring
3 20% blasting i/c removing of material from outside of the structure area.

Quantity as per item no. 1.1 38,704.090 Cu.m.

Take Qty @ 6.98% of above 6.98% 2,701.545 Cu.m.

Total: 2,701.545 Cu.m.

38
Quantity Surveyor (QS)
M/S RHC, ETA Cascade (JV)
Item Length Width Height Remarks /
Description No. Quantity Unit
No. (m) (m) (m)
Provide, place and compact impervious clay core in dam embankment of specified grading,
4 permeability i/c levelling dressing and haulage obtaining 95% modified AASHTO dry density i/c
lead upto 10 km radius.

Length Avg. Area


Main Dam + Blanket up to (m)
Area (Sq.m)
(Sq.m)
RD 60 Impervious Clay Core

0+000 0

0+010 10 15.94 7.97 79.700

0+020 10 120.561 68.2505 682.505

0+030 10 139.12 129.841 1,298.405

0+040 10 154.83 146.975 1,469.750

0+050 10 174.895 164.863 1,648.625

0+060 10 226.866 200.881 2,008.805

0+070 10 233.943 230.405 2,304.045

0+080 10 246.214 240.079 2,400.785

0+090 10 251.04 248.627 2,486.270

0+100 10 255.849 253.445 2,534.445

0+110 10 261.04 258.445 2,584.445

0+120 10 266.179 263.61 2,636.095

0+130 10 271.226 268.703 2,687.025

0+140 10 276.338 273.782 2,737.820

0+150 10 281.374 278.856 2,788.560

0+160 10 285.668 283.521 2,835.210

0+170 10 291.648 288.658 2,886.580

0+180 10 296.143 293.896 2,938.955

0+190 10 301.117 298.63 2,986.300

0+200 10 306.47 303.794 3,037.935

0+210 10 311.816 309.143 3,091.430

0+220 10 317.244 314.53 3,145.300

0+230 10 322.804 320.024 3,200.240

0+240 10 328.819 325.812 3,258.115

0+250 10 334.092 331.456 3,314.555

0+260 10 340.705 337.399 3,373.985

39
Quantity Surveyor (QS)
M/S RHC, ETA Cascade (JV)
Item Length Width Height Remarks /
Description No. Quantity Unit
No. (m) (m) (m)

0+270 10 341.246 340.976 3,409.755

0+280 10 342.06 341.653 3,416.530

0+290 10 342.781 342.421 3,424.205

0+300 10 343.288 343.035 3,430.345

0+310 10 344.085 343.687 3,436.865

0+320 10 344.88 344.483 3,444.825

0+330 10 344.771 344.826 3,448.255

0+340 10 345.179 344.975 3,449.750

0+350 10 345.711 345.445 3,454.450

0+360 10 346.192 345.952 3,459.515

0+370 10 346.735 346.464 3,464.635

0+380 10 347.368 347.052 3,470.515

0+390 10 347.934 347.651 3,476.510

0+400 10 348.655 348.295 3,482.945

0+410 10 309.048 328.852 3,288.515

0+420 10 239.61 274.329 2,743.290

0+430 10 172.568 206.089 2,060.890

0+440 10 55.585 114.077 1,140.765

0+450 10 29.472 42.5285 425.285

0+460 10 37.05 33.261 332.610

0+470 10 45.304 41.177 411.770

0+480 10 45.711 45.5075 455.075

Total: 123,543.185 Cu.m.


Length Avg. Area
Area (Sq.m)
Blanket Impervious Clay (m) (Sq.m)

0+060 656.389

0+080 20 689.865 673.127 13,462.540

0+100 20 675.774 682.82 13,656.390

0+120 20 735.952 705.863 14,117.260

0+140 20 715.497 725.725 14,514.490

0+160 20 741.297 728.397 14,567.940

40
Quantity Surveyor (QS)
M/S RHC, ETA Cascade (JV)
Item Length Width Height Remarks /
Description No. Quantity Unit
No. (m) (m) (m)

0+180 20 536.313 638.805 12,776.100

0+200 20 609.773 573.043 11,460.860

0+220 20 619.4 614.587 12,291.730

0+240 20 600.582 609.991 12,199.820

0+260 20 583.997 592.29 11,845.790

0+280 20 571.943 577.97 11,559.400

0+300 20 545.97 558.957 11,179.130

0+320 20 515.968 530.969 10,619.380

0+340 20 486.276 501.122 10,022.440

0+350 10 528.154 507.215 5,072.150

0+357.870 7.87 528.154 528.154 4,156.572

Total:- B 183,501.992 Cu.m.

Total:- (A+B) 307,045.177 Cu.m.


1.5 Transportation of earth (impervious clay core) all types for every 500m extra lead beyond 1.5 km,
from 1.5 km to 2 km.

Quantity as per item no. 1.3 307,045.177 Cu.m.

Total: 307,045.177 Cu.m.


1.6 Transportation of earth (impervious clay core) all types for every 500m extra lead beyond 1.5 km,
from 2 km to 2.5 km.

Quantity as per item no. 1.3 307,045.177 Cu.m.

Total: 307,045.177 Cu.m.


1.7 Transportation of earth (impervious clay core) all types for every 500m extra lead beyond 1.5 km,
from 2.5 km to 3 km.

Quantity as per item no. 1.3 307,045.177 Cu.m.

Total: 307,045.177 Cu.m.

41
Quantity Surveyor (QS)
M/S RHC, ETA Cascade (JV)
Item Length Width Height Remarks /
Description No. Quantity Unit
No. (m) (m) (m)
1.8 Provide , Place & compact shoulder material (sandy / silty gravel) in Dam Embankment, of
specified grading, levelling/ dressing i/c haulage for obtaining of95% modified AASHTHO dry
density.

Length Avg. Area


Main Dam + Blanket up to (m)
Area (Sq.m)
(Sq.m)
RD 60 Sandy Gravel Material

0+000 8.655

0+010 10 35.353 22.004 220.040

0+020 10 126.956 81.1545 811.545

0+030 10 199.054 163.005 1,630.050

0+040 10 271.631 235.343 2,353.425

0+050 10 340.413 306.022 3,060.220

0+060 10 394.953 367.683 3,676.830

0+070 10 437.164 416.059 4,160.585

0+080 10 472.928 455.046 4,550.460

0+090 10 526.982 499.955 4,999.550

0+100 10 545.319 536.151 5,361.505

0+110 10 570.805 558.062 5,580.620

0+120 10 577.186 573.996 5,739.955

0+130 10 591.64 584.413 5,844.130

0+140 10 608.43 600.035 6,000.350

0+150 10 628.804 618.617 6,186.170

0+160 10 660.954 644.879 6,448.790

0+170 10 680.922 670.938 6,709.380

0+180 10 725.568 703.245 7,032.450

0+190 10 773.243 749.406 7,494.055

0+200 10 780.326 776.785 7,767.845

0+210 10 789.194 784.76 7,847.600

0+220 10 784.486 786.84 7,868.400

0+230 10 838.885 811.686 8,116.855

0+240 10 908.269 873.577 8,735.770

0+250 10 973.325 940.797 9,407.970

42
Quantity Surveyor (QS)
M/S RHC, ETA Cascade (JV)
Item Length Width Height Remarks /
Description No. Quantity Unit
No. (m) (m) (m)

0+260 10 992.156 982.741 9,827.405

0+270 10 961.232 976.694 9,766.940

0+280 10 935.986 948.609 9,486.090

0+290 10 932.058 934.022 9,340.220

0+300 10 924.757 928.408 9,284.075

0+310 10 924.886 924.822 9,248.215

0+320 10 935.663 930.275 9,302.745

0+330 10 950.628 943.146 9,431.455

0+340 10 972.643 961.636 9,616.355

0+350 10 992.012 982.328 9,823.275

0+360 10 993.001 992.507 9,925.065

0+370 10 1005.78 999.391 9,993.905

0+380 10 1021.389 1013.58 10,135.845

0+390 10 1009.79 1015.59 10,155.895

0+400 10 1001.07 1005.43 10,054.300

0+410 10 941.755 971.413 9,714.125

0+420 10 570.86 756.308 7,563.075

0+430 10 262.92 416.89 4,168.900

0+440 10 115.944 189.432 1,894.320

0+450 10 0 57.972 579.720

0+460 10 0 0 0.000

0+470 10 0 0 0.000

0+480 10 0 0 0.000

Total:- A 306,916.475 Cu.m.

Blanket Sandy Gravel Length Avg. Area


Area (Sq.m)
Protection (m) (Sq.m)

0+060 216.183

0+080 20 227.146 221.665 4,433.290

0+100 20 225.001 226.074 4,521.470

0+120 20 244.365 234.683 4,693.660

0+140 20 236.34 240.353 4,807.050

43
Quantity Surveyor (QS)
M/S RHC, ETA Cascade (JV)
Item Length Width Height Remarks /
Description No. Quantity Unit
No. (m) (m) (m)

0+160 20 246.675 241.508 4,830.150

0+180 20 179.084 212.88 4,257.590

0+200 20 202.477 190.781 3,815.610

0+220 20 205.608 204.043 4,080.850

0+240 20 198.505 202.057 4,041.130

0+260 20 192.801 195.653 3,913.060

0+280 20 188.798 190.8 3,815.990

0+300 20 180.676 184.737 3,694.740

0+320 20 170.84 175.758 3,515.160

0+340 20 160.365 165.603 3,312.050

0+350 10 176.009 168.187 1,681.870

0+357.870 7.87 176.009 176.009 1,385.191

Total:- B 60,798.861 Cu.m.

Total:- (A+B) 367,715.336 Cu.m.


1.9 Transportation of earth (shoulder material sandy / silty gravel) all types for every 500m extra lead
beyond 1.5 km, from 1.5 km to 2 km.

Quantity as per item no. 1.7 367,715.336 Cu.m.

Total: 367,715.336 Cu.m.


1.10 Transportation of earth (shoulder material sandy / silty gravel) all types for every 500m extra lead
beyond 1.5 km, from 2 km to 2.5 km.

Quantity as per item no. 1.7 0 Cu.m.

Total: 0 Cu.m.
1.11 Transportation of earth (shoulder material sandy / silty gravel) all types for every 500m extra lead
beyond 1.5 km, from 2.5 km to 3 km.

Quantity as per item no. 1.7 0 Cu.m.

Total: 0 Cu.m.

44
Quantity Surveyor (QS)
M/S RHC, ETA Cascade (JV)
Item Length Width Height Remarks /
Description No. Quantity Unit
No. (m) (m) (m)
1.12 Provide , Place & compact Coarse Filter (well graded gravel) in chimney drain vertical / horizontal
on downstream of fine filter i/c levelling, moistening etc., i/c carriage upto 1 km radius.

Main Dam Horizontal & Length Avg. Area


Area (Sq.m)
Vertical Filter (m) (Sq.m)

0+000 0

0+010 10 3.689 1.8445 18.445

0+020 10 18.685 11.187 111.870

0+030 10 33.035 25.86 258.600

0+040 10 40.845 36.94 369.400

0+050 10 49.263 45.054 450.540

0+060 10 50.286 49.7745 497.745

0+070 10 53.452 51.869 518.690

0+080 10 56.487 54.9695 549.695

0+090 10 65.804 61.1455 611.455

0+100 10 66.798 66.301 663.010

0+110 10 69.001 67.8995 678.995

0+120 10 69.045 69.023 690.230

0+130 10 69.553 69.299 692.990

0+140 10 69.299 69.426 694.260

0+150 10 70.194 69.7465 697.465

0+160 10 70.843 70.5185 705.185

0+170 10 71.219 71.031 710.310

0+180 10 71.103 71.161 711.610

0+190 10 71.981 71.542 715.420

0+200 10 72.647 72.314 723.140

0+210 10 73.025 72.836 728.360

0+220 10 75.355 74.19 741.900

0+230 10 85.63 80.4925 804.925

0+240 10 89.947 87.7885 877.885

0+250 10 91.939 90.943 909.430

0+260 10 91.697 91.818 918.180

45
Quantity Surveyor (QS)
M/S RHC, ETA Cascade (JV)
Item Length Width Height Remarks /
Description No. Quantity Unit
No. (m) (m) (m)

0+270 10 91.461 91.579 915.790

0+280 10 90.52 90.9905 909.905

0+290 10 90.572 90.546 905.460

0+300 10 90.23 90.401 904.010

0+310 10 89.898 90.064 900.640

0+320 10 89.885 89.8915 898.915

0+330 10 89.932 89.9085 899.085

0+340 10 90.862 90.397 903.970

0+350 10 91.761 91.3115 913.115

0+360 10 92.217 91.989 919.890

0+370 10 91.828 92.0225 920.225

0+380 10 91.721 91.7745 917.745

0+390 10 91.589 91.655 916.550

0+400 10 91.508 91.5485 915.485

0+410 10 89.134 90.321 903.210

0+420 10 69.072 79.103 791.030

0+430 10 40.902 54.987 549.870

0+440 10 20.442 30.672 306.720

0+450 10 0 10.221 102.210

0+460 10 0 0 0.000

0+470 10 0 0 0.000

0+480 10 0 0 0.000

Total:- A 31,443.560 Cu.m.


Length Avg. Area
Area (Sq.m)
Main Dam Spawl (m) (Sq.m)

0+000 0.613

0+010 10 3.29 1.9515 19.515

0+020 10 6.12 4.705 47.050

0+030 10 7.859 6.9895 69.895

0+040 10 8.775 8.317 83.170

0+050 10 9.805 9.29 92.900

46
Quantity Surveyor (QS)
M/S RHC, ETA Cascade (JV)
Item Length Width Height Remarks /
Description No. Quantity Unit
No. (m) (m) (m)

0+060 10 10.457 10.131 101.310

0+070 10 10.802 10.6295 106.295

0+080 10 10.9 10.851 108.510

0+090 10 10.982 10.941 109.410

0+100 10 11.066 11.024 110.240

0+110 10 11.248 11.157 111.570

0+120 10 11.648 11.448 114.480

0+130 10 12.038 11.843 118.430

0+140 10 12.376 12.207 122.070

0+150 10 12.979 12.6775 126.775

0+160 10 13.361 13.17 131.700

0+170 10 13.879 13.62 136.200

0+180 10 14.051 13.965 139.650

0+190 10 14.225 14.138 141.380

0+200 10 14.358 14.2915 142.915

0+210 10 14.468 14.413 144.130

0+220 10 14.006 14.237 142.370

0+230 10 13.979 13.9925 139.925

0+240 10 14.144 14.0615 140.615

0+250 10 14.391 14.2675 142.675

0+260 10 14.452 14.4215 144.215

0+270 10 14.42 14.436 144.360

0+280 10 14.178 14.299 142.990

0+290 10 13.947 14.0625 140.625

0+300 10 14.071 14.009 140.090

0+310 10 14.206 14.1385 141.385

0+320 10 14.577 14.3915 143.915

0+330 10 14.951 14.764 147.640

0+340 10 14.864 14.9075 149.075

0+350 10 14.763 14.8135 148.135

47
Quantity Surveyor (QS)
M/S RHC, ETA Cascade (JV)
Item Length Width Height Remarks /
Description No. Quantity Unit
No. (m) (m) (m)

0+360 10 14.758 14.7605 147.605

0+370 10 14.756 14.757 147.570

0+380 10 14.964 14.86 148.600

0+390 10 14.674 14.819 148.190

0+400 10 14.45 14.562 145.620

0+410 10 14.463 14.4565 144.565

0+420 10 14.228 14.3455 143.455

0+430 10 13.751 13.9895 139.895

0+440 10 12.977 13.364 133.640

0+450 10 14.999 13.988 139.880

0+460 10 15.301 15.15 151.500

0+470 10 16.002 15.6515 156.515

0+480 10 16.091 16.0465 160.465

Total:- B 6,193.110 Cu.m.


Main Dam Shingle on Top of Length Avg. Area
Area (Sq.m)
Dam (m) (Sq.m)

0+000 0.854

0+450 450 0.854 0.854 384.300

Total:- C 384.300 Cu.m.

Total: A+B+C 38,020.970 Cu.m.


1.13 Provide , Place & compact Fine Filter in chimney drain vertical / horizontal on downstream of clay
core.
Main Dam Horizontal & Length Avg. Area
Area (Sq.m)
Vertical Filter (m) (Sq.m)

0+000 0

0+010 10 8.723 4.3615 43.615

0+020 10 41.68 25.2015 252.015

0+030 10 59.735 50.7075 507.075

0+040 10 71.233 65.484 654.840

0+050 10 79.291 75.262 752.620

0+060 10 99.187 89.239 892.390

0+070 10 104.591 101.889 1,018.890

0+080 10 110.308 107.45 1,074.495

48
Quantity Surveyor (QS)
M/S RHC, ETA Cascade (JV)
Item Length Width Height Remarks /
Description No. Quantity Unit
No. (m) (m) (m)

0+090 10 116.242 113.275 1,132.750

0+100 10 120.575 118.409 1,184.085

0+110 10 119.666 120.121 1,201.205

0+120 10 121.771 120.719 1,207.185

0+130 10 123.101 122.436 1,224.360

0+140 10 125.853 124.477 1,244.770

0+150 10 126.657 126.255 1,262.550

0+160 10 127.669 127.163 1,271.630

0+170 10 129.206 128.438 1,284.375

0+180 10 132.658 130.932 1,309.320

0+190 10 133.981 133.32 1,333.195

0+200 10 135.091 134.536 1,345.360

0+210 10 137.931 136.511 1,365.110

0+220 10 144.887 141.409 1,414.090

0+230 10 147.256 146.072 1,460.715

0+240 10 148.998 148.127 1,481.270

0+250 10 151.253 150.126 1,501.255

0+260 10 152.607 151.93 1,519.300

0+270 10 151.92 152.264 1,522.635

0+280 10 152.124 152.022 1,520.220

0+290 10 152.114 152.119 1,521.190

0+300 10 152.335 152.225 1,522.245

0+310 10 152.528 152.432 1,524.315

0+320 10 152.736 152.632 1,526.320

0+330 10 152.984 152.86 1,528.600

0+340 10 152.871 152.928 1,529.275

0+350 10 153.208 153.04 1,530.395

0+360 10 153.243 153.226 1,532.255

0+370 10 152.235 152.739 1,527.390

0+380 10 153.227 152.731 1,527.310

49
Quantity Surveyor (QS)
M/S RHC, ETA Cascade (JV)
Item Length Width Height Remarks /
Description No. Quantity Unit
No. (m) (m) (m)

0+390 10 153.581 153.404 1,534.040

0+400 10 153.687 153.634 1,536.340

0+410 10 145.95 149.819 1,498.185

0+420 10 121.418 133.684 1,336.840

0+430 10 73.825 97.6215 976.215

0+440 10 53.819 63.822 638.220

0+450 10 0 26.9095 269.095

0+460 10 0 0 0.000

0+470 10 0 0 0.000

0+480 10 0 0 0.000

Total: 55,039.550 Cu.m.


1.14 Providing and Laying stone pitching for top layer only : On slope.

Length Avg. Area


Area (Sq.m)
Main Dam Stone Pitching (m) (Sq.m)

0+000 14.145

0+010 10 11.32 12.7325 127.325

0+020 10 19.382 15.351 153.510

0+030 10 26.251 22.8165 228.165

0+040 10 29.924 28.0875 280.875

0+050 10 33.193 31.5585 315.585

0+060 10 34.954 34.0735 340.735

0+070 10 35.651 35.3025 353.025

0+080 10 36.406 36.0285 360.285

0+090 10 38.673 37.5395 375.395

0+100 10 40.117 39.395 393.950

0+110 10 40.679 40.398 403.980

0+120 10 41.732 41.2055 412.055

0+130 10 42.706 42.219 422.190

0+140 10 43.436 43.071 430.710

0+150 10 44.884 44.16 441.600

0+160 10 45.782 45.333 453.330

50
Quantity Surveyor (QS)
M/S RHC, ETA Cascade (JV)
Item Length Width Height Remarks /
Description No. Quantity Unit
No. (m) (m) (m)

0+170 10 47.029 46.4055 464.055

0+180 10 47.522 47.2755 472.755

0+190 10 47.965 47.7435 477.435

0+200 10 48.284 48.1245 481.245

0+210 10 48.536 48.41 484.100

0+220 10 48.359 48.4475 484.475

0+230 10 50.349 49.354 493.540

0+240 10 51.302 50.8255 508.255

0+250 10 51.894 51.598 515.980

0+260 10 52.023 51.9585 519.585

0+270 10 52.082 52.0525 520.525

0+280 10 51.498 51.79 517.900

0+290 10 50.967 51.2325 512.325

0+300 10 51.305 51.136 511.360

0+310 10 51.604 51.4545 514.545

0+320 10 52.425 52.0145 520.145

0+330 10 53.315 52.87 528.700

0+340 10 53.092 53.2035 532.035

0+350 10 52.831 52.9615 529.615

0+360 10 52.78 52.8055 528.055

0+370 10 52.76 52.77 527.700

0+380 10 53.287 53.0235 530.235

0+390 10 52.556 52.9215 529.215

0+400 10 51.957 52.2565 522.565

0+410 10 51.943 51.95 519.500

0+420 10 48.945 50.444 504.440

0+430 10 41.46 45.2025 452.025

0+440 10 35.871 38.6655 386.655

0+450 10 0 17.9355 179.355

0+460 10 0 0 0.000

51
Quantity Surveyor (QS)
M/S RHC, ETA Cascade (JV)
Item Length Width Height Remarks /
Description No. Quantity Unit
No. (m) (m) (m)

0+470 10 0 0 0.000

0+480 10 0 0 0.000

Total: 19,761.035 Cu.m.


Length Avg. Area
Area (Sq.m)
Main Dam Drain Boulders (m) (Sq.m)

0+020 4.5

0+440 420 4.5 4.5 1,890.000

Total: 1,890.000 Cu.m.


1.15 Plain Cement Concrete including placing, compacting, finishing & curing (Ratio 1:3:6)

Main Dam Parapet Wall /


Barrier Lean 2 450 0.5 0.1 45.000
Main Dam Parapet Wall /
Barrier Topping 2 450 0.3 0.05 13.500

Total: 58.500 Cu.m


1.16 Random rubble masonry in foundn. & plinth in cement, sand mortar : Ratio 1:3

Main Dam Parapet Wall /


Barrier 2 450 0.3 1.15 310.500

Total: 310.500 Cu.m


1.17 Providing and lowering Piezometer 1.25" GI pipe incl. all accessories

Main Dam 1 100 100.000

Total: 100.000 Rm
1.18 Stripping

Main Dam + Blanket up to Length Avg. Area


Area (Sq.m)
RD 60 Stripping (m) (Sq.m)

0+000 10.377

0+010 10 31.016 20.6965 206.965

0+020 10 92.847 61.9315 619.315

0+030 10 98.627 95.737 957.370

0+040 10 102.477 100.552 1,005.520

0+050 10 105.962 104.22 1,042.195

0+060 10 107.876 106.919 1,069.190

0+070 10 109.342 108.609 1,086.090

0+080 10 111.305 110.324 1,103.235

0+090 10 113.885 112.595 1,125.950

0+100 10 115.078 114.482 1,144.815

52
Quantity Surveyor (QS)
M/S RHC, ETA Cascade (JV)
Item Length Width Height Remarks /
Description No. Quantity Unit
No. (m) (m) (m)

0+110 10 116.35 115.714 1,157.140

0+120 10 117.172 116.761 1,167.610

0+130 10 117.938 117.555 1,175.550

0+140 10 117.442 117.69 1,176.900

0+150 10 117.092 117.267 1,172.670

0+160 10 117.179 117.136 1,171.355

0+170 10 117.14 117.16 1,171.595

0+180 10 116.972 117.056 1,170.560

0+190 10 116.854 116.913 1,169.130

0+200 10 116.904 116.879 1,168.790

0+210 10 117.467 117.186 1,171.855

0+220 10 118.327 117.897 1,178.970

0+230 10 124.896 121.612 1,216.115

0+240 10 127.871 126.384 1,263.835

0+250 10 128.093 127.982 1,279.820

0+260 10 128.215 128.154 1,281.540

0+270 10 128.325 128.27 1,282.700

0+280 10 128.123 128.224 1,282.240

0+290 10 127.977 128.05 1,280.500

0+300 10 127.573 127.775 1,277.750

0+310 10 127.215 127.394 1,273.940

0+320 10 126.857 127.036 1,270.360

0+330 10 126.49 126.674 1,266.735

0+340 10 126.537 126.514 1,265.135

0+350 10 127.183 126.86 1,268.600

0+360 10 127.256 127.22 1,272.195

0+370 10 127.789 127.523 1,275.225

0+380 10 119.778 123.784 1,237.835

0+390 10 120.043 119.911 1,199.105

0+400 10 127.419 123.731 1,237.310

53
Quantity Surveyor (QS)
M/S RHC, ETA Cascade (JV)
Item Length Width Height Remarks /
Description No. Quantity Unit
No. (m) (m) (m)

0+410 10 127.053 127.236 1,272.360

0+420 10 113.46 120.257 1,202.565

0+430 10 103.38 108.42 1,084.200

0+440 10 80.704 92.042 920.420

0+450 10 14.999 47.8515 478.515

0+460 10 15.301 15.15 151.500

0+470 10 16.002 15.6515 156.515

0+480 10 16.091 16.0465 160.465

Total:- A 51,570.250 Cu.m.


Length Avg. Area
Area (Sq.m)
Blanket Stripping (m) (Sq.m)

0+060 431.413

0+080 20 452.821 442.117 8,842.340

0+100 20 447.666 450.244 9,004.870

0+120 20 486.406 467.036 9,340.720

0+140 20 469.323 477.865 9,557.290

0+160 20 487.059 478.191 9,563.820

0+180 20 355.191 421.125 8,422.500

0+200 20 399.839 377.515 7,550.300

0+220 20 406.684 403.262 8,065.230

0+240 20 396.336 401.51 8,030.200

0+260 20 385.013 390.675 7,813.490

0+280 20 376.467 380.74 7,614.800

0+300 20 360.686 368.577 7,371.530

0+320 20 341.822 351.254 7,025.080

0+340 20 321.398 331.61 6,632.200

0+350 10 348.792 335.095 3,350.950

0+357.870 7.87 348.792 348.792 2,744.993

Total:- B 120,930.313 Cu.m.

Total:- (A+B) 172,500.563 Cu.m.

NON Scheduled Items

54
Quantity Surveyor (QS)
M/S RHC, ETA Cascade (JV)
Item Length Width Height Remarks /
Description No. Quantity Unit
No. (m) (m) (m)
1.19 Care and handling of Water during construction.

1 1.000
Total: 1.000 Job
1.20 Providing and installation of Stand type Piezometer incl: all accessories

10 10.000

Total: 10.000 Nos


1.21 Drilling for Grout Holes.
Consolidation Grout Bore 30 10 300.000
Holes 0.075 m dia @ 3m c/c 0.000

Total: 300.000 Rm
1.22 Cement Bentonite slurry grouting complete in all respect. (50 Kg.)

30 27.16667 0 815.000 L=area

Sub Total: 815.000 Cu.m


1.23 Water Pressure Test

30 5 150.000

Total: 150.000 Nos


1.24 P&F surface marker
3 3.000

Total: 3.000 Nos


1.25 Slope Indicator
3 3.000

Total: 3.000 Nos


1.26 Settlement Gauges
3 3.000
Total: 3.000 Nos

55
Quantity Surveyor (QS)
M/S RHC, ETA Cascade (JV)
SPILLWAY

56
CONSTRUCTION OF BAZ AIL SMALL DAM, DISTRICT KURRAM
DETAIL COST ESTIMATE
SPILLWAY MEASUREMENT SHEET
Length Width Height Remarks /
Item No. Description No. Quantity Unit
(m) (m) (m)
Scheduled Items
SPILLWAY
Excavation for core trench of Dam Embankment/Spillway/Intake & Outlet Structure and Irrigation System upto a
26 minimum depth of 35 ft in shingle gravel including removing of excavated material by machinery in 1 KM radius

Avg. Area
Approach Channel Excavation Area (Sq.m)
(Sq.m)

0-140 0.743

0-120 20 1.665 1.204 24.080

0-100 20 13.35 7.5075 150.150

0-080 20 43.84 28.595 571.900

0-060 20 64.62 54.23 1,084.600

0-040 20 95.97 80.295 1,605.900

0-020 20 135.75 115.86 2,317.200

0-010 10 378.864 257.307 2,573.070


Sub Total: (Approach Channel Excavation) 8,326.900 Cu.m.

Spillway Structure Excavation

0-010 378.864

0-009.780 A-A 0.22 433.568 406.216 89.368

0-006.010 B-B 3.77 238.757 336.1625 1,267.333

0+000.500 C-C 6.51 246.975 242.866 1,581.058

0+007.800 D-D 7.3 274.861 260.918 1,904.701

0+012.120 E-E 4.32 530.291 402.576 1,739.128

0+016.100 F-F 3.98 471.419 500.855 1,993.403

0+022.540 G-G 6.44 593.739 532.579 3,429.809

0+027.100 H-H 4.560 674.74 634.2395 2,892.132

0+027.280 0.180 538.411 606.5755 109.184


Sub Total: (Spillway Structure Excavation) 15,006.116 Cu.m.
Avg. Area
Exit Channel Excavation Area (Sq.m)
(Sq.m)

0+027.280 538.411

0+033.500 I-I 6.22 402.082 470.2465 2,924.933

0+060 26.5 282.89 342.486 9,075.879

0+080 20 286.84 284.865 5,697.300

0+100 20 287.25 287.045 5,740.900

0+111.620 11.62 0 143.625 1,668.923

Sub Total: (Exit Channel Excavation) 25,107.935 Cu.m.


Avg. Area
Spillway Dyke Excavation Area (Sq.m)
(Sq.m)

L/S Dyke

0+000 0

0+002.683 1-1 2.683 11.363 5.6815 15.243

0+016.572 2-2 13.889 11.41 11.3865 158.147

0+028.360 3-3 11.788 10.096 10.753 126.756

0+035 6.64 0 5.048 33.519

57
Quantity Surveyor (QS)
M/S RHC, ETA Cascade (JV)
Length Width Height Remarks /
Item No. Description No. Quantity Unit
(m) (m) (m)

R/S Dyke

0+000 0

0+002.888 1-1 2.888 11.576 5.788 16.716

0+021.098 2-2 18.21 11.561 11.5685 210.662

0+038.016 3-3 16.918 10.024 10.7925 182.588

0+050 11.984 0 5.012 60.064


Sub Total: (Spillway Dyke Excavation) 803.695 Cu.m.
Avg. Area
Protection Bund Excavation Area (Sq.m)
(Sq.m)

0+000 4.5 area = avg

0+130 130 4 4.25 552.500 "

Sub Total: (Protection Bund Excavation) 552.500 Cu.m.

Total: 49,797.146 Cu.m.

Take Qty @ 25% of above 25.00% 12,449.287

Total: 12,449.287 Cu.m.


Excavation for core trench of Spillway upto design depth in Soft Rock/Shale requiring 20% blasting i/c removing of
26 material from outside of the structure area.

Take Qty @ 70% of above 70.00% 34,858.002

Total: 34,858.002 Cu.m.


Excavation for core trench of Spillway upto design depth in Medium Hard Rock requiring 50% blasting i/c removing
27 of material from outside of the structure area.

Quantity as per item no. 2.1 49,797.146 Cu.m..

Take Qty @ 3% of above 3.00% 1,493.914 Cu.m..

Total: 1,493.914 Cu.m.


Excavation for core trench of Spillway upto design depth in Hard Rock requiring 75% blasting i/c removing of
28 material from outside of the structure area.

Quantity as per item no. 2.1 49,797.146 Cu.m..

Take Qty @2% of above 2.00% 995.943 Cu.m..

Total: 995.943 Cu.m.


Lean concrete for use as thin layer under neath footings with cylinder compressive strength of 1423 psi on 28 days.
29

U/S Cut off Wall ~ D/S Cut-off Wall 1 2120.58 0.1 212.058 L=area

Total: 212.058 Cu.m.

30 PCC 1:3:6 in mass concrete less formwork using 40% boulders.

PCC Fill under Ogee 1 50 8.46 423.000 W=area

Total: 423.000 Cu.m.

58
Quantity Surveyor (QS)
M/S RHC, ETA Cascade (JV)
Length Width Height Remarks /
Item No. Description No. Quantity Unit
(m) (m) (m)
Reinforced cement concrete work as in dams, spillways, weirs, barrages, cross drainage works and other
hydraulic structures using crushed stone aggregate (screening & washing) and coarse sand i/c cost of all labour
31 and material and all kinds of form works, moulds, shuttering lifting/pumping, curing, rendering and finishing the
exposed surface, cast in situ/precast excluding the cost of steel reinforcement and labour for bending binding also
excluding cost of additives which have to be paid separately. (1:2:4)

U/S Cut off Wall 1 60.6 0.5 3.5 106.050


U/S Bed ~ Stilling Basin,& D/S Approach L=area
bed 1 34.21 56.883 1,945.967 W=avg.

D/S Cut off Wall 1 51.6 0.5 2.5 64.500 H=Avg.

U/S Wing Wall 2 5.3 0.5 7.5 39.750


U/S to Ogee, & Ogee to D/S Chute & Stilling
Basin Side Walls L/S & R/S 2 37.286 0.6 6.315 282.553 H=Avg.

Baffle Blocks 25 1 1.18 29.500 w=area

Chute Blocks 29 0.85 1.7 0.425 17.810 H=Avg.

D/S Wing Wall 2 5 0.5 5.8 29.000

Total: 2,515.130 Cu.m.


32 Supply & fabricate M.S. reinforcement for cement concrete (Hot rolled deformed bars Grade 60)

Qty as per BBS Attached 143,282.900 Kg.

Total: 143.283 Tonne


33 Providing and fixing ribbed polyvinyl chloride (PVC) water stops 8" (203 mm) wide in vertical (Walls/Columns) or
horizontal (Floor/Slabs) expansion joints including cutting and jointing etc. complete in all floors.
Construction, Contraction & Expansion
Joints

Longitudinal Joints 2 37.286 74.572

Transverse Joints 2 56.883 113.766

Ogee to D/S Side Walls L/S & R/S 2 47.586 95.172

Total: 283.510 Rm
34 Providing and Laying stone pitching for top layer only : On slope

L/S Dyke

0+000 0

0+002.683 1-1 2.683 3.097 1.5485 4.155

0+016.572 2-2 13.889 2.295 2.696 37.445

0+028.360 3-3 11.788 1.222 1.7585 20.729

0+035 6.64 0 0.611 4.057

R/S Dyke

0+000 0

0+002.888 1-1 2.888 2.973 1.4865 4.293

0+021.098 2-2 18.21 2.471 2.722 49.568

0+038.016 3-3 16.918 1.599 2.035 34.428

0+050 11.984 0 0.7995 9.581

Total: 164.256 Cu.m.


Supplying stone and stone filling in GI wire crate and its sewing, excluding cost of crates.
35

D/S of Spillway 1 11.5 50 1.5 862.500

Sub Total:-1 862.500 Cu.m

Protection Bund

0+000 6.038 area = avg

0+130 130 6.038 6.038 784.940 "

Sub Total:-2 784.940 Cu.m

Total: 1,647.440 Cu.m.

59
Quantity Surveyor (QS)
M/S RHC, ETA Cascade (JV)
Length Width Height Remarks /
Item No. Description No. Quantity Unit
(m) (m) (m)
Filter granular backfill behind retaining wall (stone/boulder filling upto one meter to prevent choking of weep holes.
36
Quantity as per item no. 2.1 (Spillway
Structure) 15,006.116 Cu.m..

Take Qty @ 6.15% of above 6.15% 923.320 Cu.m..

Total: 923.320 Cu.m.


37 Installation of Anchor Bars in Spillway & Dam Embankment by using No.11 bars (11' Length) including 3" dia bore
hole along with cement slurry bentonite

0.000
Total: 1 108.02 1 1 108.020 Rm
Provide & weave GI wire netting for wire crates 6"x6" mesh : 10 SWG wire
New

Qty as per Item No. 2.10 Sub Total:-1 862.500


Nos of Blocks (a) 1.5 x 1.5 x 1.5 = 3.375
Cu.m 256.000

Surface area of one block (b) 13.500

Sub Total:-1 (a x b) 3,456.000

Qty as per Item No. 2.10 Sub Total:-2 784.940

Nos of Blocks (a) 1.0 x 1.0 x 0.9 = 0.90 Cu.m 872.000

Surface area of one block (b) 5.600

Sub Total:-2 (a x b) 4,883.200

Total: 8,339.200 Sq.m.

New Providing and Laying stone pitching/filling, dry hand packed in pitching & aprons

Spillway Dyke Toe Drain

L/S Dyke

0+000 0

0+002.683 1-1 2.683 3.516 1.758 4.717

0+016.572 2-2 13.889 3.339 3.4275 47.605

0+028.360 3-3 11.788 4.052 3.6955 43.563

0+035 6.64 0 2.026 13.453

R/S Dyke

0+000 0

0+002.888 1-1 2.888 3.568 1.784 5.152

0+021.098 2-2 18.21 3.578 3.573 65.064

0+038.016 3-3 16.918 3.988 3.783 64.001

0+050 11.984 0 1.994 23.896

Sub Total: 267.451 Cu.m.


Protection Bund Launching Apron

0+000

0+130 1 130 1.5 1 195.000

Total: 195.000 Cu.m.

Total: 528.000 Cu.m.


New Polythene Sheet (Drainage Filter)

96 96.000

Total: 96.000 Sq.m.

60
Quantity Surveyor (QS)
M/S RHC, ETA Cascade (JV)
CONSTRUCTION OF BAZ AIL SMALL DAM, DISTRICT KURRAM
DETAIL COST ESTIMATE
SPILLWAY BAR BENDING SCHEDULE
Net Length (m)

Spacing Per Lap Lap Cut


Sr. Nos of Nos of Nos of
Description Bar dia C/C Length Length Length 10mm 13mm 16mm 19mm 25mm Bar Shape
No. Item Bar Laps
(mm) (m) (m) (m)

Spillway Foundation

U/S Cut-off Wall Main Bars

0.15

0.45
1 13 200 2 303 - 0.780 - 3.550 - 2,151.300 - - - 2.950
B/F

U/S Cut-off Wall Dist.. Bars

0.15

0.15
2 13 200 2 13 4 0.780 3.120 63.870 - 1,660.620 - - - 60.450
B/F

U/S to Ogee, & Ogee to D/S

0.30

0.30
3 Chute & Stilling Basin Side 13 200 2 220 3 0.780 2.340 40.076 - 17,633.440 - - - 37.136
Main Bars B&T

U/S to Ogee, & Ogee to D/S

0.30

0.30
4 Chute & Stilling Basin Side 13 200 2 187 3 0.780 2.340 46.790 - 17,499.460 - - - 43.850
Dist.. Bars B&T

2.50
5 Ogee Main Bars B&T 13 200 2 250 - 0.780 - 9.400 - 4,700.000 - - - 6.600

0.30

0.30

0.30
6 Ogee Dist.. Bars B&T 13 200 2 47 4 0.780 3.120 55.170 - 5,185.980 - - - 51.450

0.30 0.30

3.40

2.30
7 Cut-off Key Main Bars B 13 200 1 278 - 0.780 - 7.200 - 2,001.600 - - - 0.900

0.30

0.30
8 Cut-off Key Dist.. Bars B 13 200 1 36 4 0.780 3.120 59.170 - 2,130.120 - - - 55.450

1.63
9 Chute Blocks Main Bars 13 150 29 5 - 0.780 - 4.110 - 595.950 - - - 2.480

0.45

0.45
10 Chute Blocks Dist.. Bars 13 200 29 13 - 0.780 - 1.675 - 631.475 - - - 0.775

2.26
11 Baffle Blocks Main Bars 16 125 25 10 - 0.960 - 5.320 - - 1,330.000 - - 3.060

0.45

0.45
12 Baffle Blocks Dist.. Bars 13 150 25 23 - 0.780 - 2.125 - 1,221.875 - - - 1.225

D/S Cut-off Wall Main Bars

61
Quantity Surveyor (QS)
M/s RHC, ETA Cascade (JV)
Net Length (m)

Spacing Per Lap Lap Cut


Sr. Nos of Nos of Nos of
Description Bar dia C/C Length Length Length 10mm 13mm 16mm 19mm 25mm Bar Shape
No. Item Bar Laps
(mm) (m) (m) (m)
D/S Cut-off Wall Main Bars

0.15

0.15
13 13 200 2 278 - 0.780 - 4.850 - 2,696.600 - - - 4.550
B/F

D/S Cut-off Wall Dist.. Bars

0.15

0.15
14 13 200 2 24 4 0.780 3.120 58.870 - 2,825.760 - - - 55.450
B/F

0.20

1.75
15 End Sill Main Bars T 13 200 1 250 - 0.780 - 7.000 - 1,750.000 - - - 4.750 0.30

0.30

0.30
16 End Sill Dist.. Bars T 13 200 1 17 4 0.780 3.120 55.170 - 937.890 - - - 51.450

0.30

0.30
17 End Sill Bars T 16 1 2 4 0.960 3.840 55.890 - - 111.780 - - 51.450

Side Walls

Side Wall Foundation Main

0.50

0.50
1 25 300 4 137 - 1.500 - 7.150 - - - - 3,918.200 6.150
Bars B&T

Side Wall Foundation Main


2 25 300 4 137 - 1.500 - 3.150 - - - - 1,726.200 3.150
Bars B&T

Side Wall Foundation Dist..

0.50

0.50
3 13 200 4 32 3 0.780 2.340 44.190 - 5,656.320 - - - 40.850
Bars B&T

0.60
4 Side Wall Dowel Bar 25 150 2 274 - 1.500 - 4.100 - - - - 2,246.800 3.000 avg.

0.50

0.60
5 Side Wall Dowel Bar 19 150 2 274 - 1.140 - 4.100 - - - 2,246.800 - 3.000 avg.

0.50

0.20
6 Side Wall Main Bar 25 300 2 137 - 1.500 - 3.200 - - - - 876.800 3.000

0.20
7 Side Wall Main Bar 19 300 2 137 - 1.140 - 3.200 - - - 876.800 - 3.000

0.15

0.15
8 Side Wall Dist.. Bars B/F 13 200 4 30 3 0.780 2.340 43.490 - 5,218.800 - - - 40.850

9 Construction Joints Dowels 13 200 4 187 - 0.780 - 1.560 - 1,166.880 - - - 1.560

62
Quantity Surveyor (QS)
M/s RHC, ETA Cascade (JV)
Net Length (m)

Spacing Per Lap Lap Cut


Sr. Nos of Nos of Nos of
Description Bar dia C/C Length Length Length 10mm 13mm 16mm 19mm 25mm Bar Shape
No. Item Bar Laps
(mm) (m) (m) (m)

0.60
10 U/S Wing Walls Dowel Bar 25 150 2 47 - 1.500 - 4.850 - - - - 455.900 3.750 avg.

0.50

0.60
11 U/S Wing Walls Dowel Bar 19 150 2 47 - 1.140 - 4.850 - - - 455.900 - 3.750 avg.

0.50

0.20
12 U/S Wing Walls Main Bar 25 300 2 24 - 1.500 - 3.950 - - - - 189.600 3.750

0.20
13 U/S Wing Walls Main Bar 19 300 2 24 - 1.140 - 3.950 - - - 189.600 - 3.750

U/S Wing Walls Dist.. Bars

0.15

0.15
14 13 200 4 38 - 0.780 - 7.150 - 1,086.800 - - - 6.850
B/F

D/S Wing Wall Foundation


15 25 200 4 25 - 1.500 - 5.950 - - - - 595.000

0.50

0.50
4.950
Main Bars B&T

D/S Wing Wall Foundation


16 13 200 4 26 - 0.780 - 5.850 - 608.400 - - -

0.50

0.50
4.850
Dist.. Bars B&T

17 D/S Wing Walls Dowel Bar 25 150 2 34 - 1.500 - 4.000 - - - - 272.000

0.60
2.900 avg.
0.50

0.60
18 D/S Wing Walls Dowel Bar 19 150 2 34 - 1.140 - 4.000 - - - 272.000 - 2.900 avg.

0.50

0.20
19 D/S Wing Walls Main Bar 25 300 2 17 - 1.500 - 3.100 - - - - 105.400 2.900

20 D/S Wing Walls Main Bar 19 300 2 17 - 1.140 - 3.100 - - - 105.400 -

0.20
2.900

D/S Wing Walls Dist.. Bars

0.15

0.15
21 13 200 4 29 - 0.780 - 5.150 - 597.400 - - - 4.850
B/F

Total Length (Rm) - 77,956.670 1,441.780 4,146.500 10,385.900


Unit Weight (Kg / m) 0.560 0.994 1.552 2.235 3.973
Weight (Kg) - 77,488.930 2,237.643 9,267.428 41,263.181
Enhance factor @ 10% (Kg) - 7,748.893 223.764 926.743 4,126.318
Total Weight (Kg) 143,282.900
Reduce to limit 118,000.000

63
Quantity Surveyor (QS)
M/s RHC, ETA Cascade (JV)
INLET & OUTLET WORKS

64
CONSTRUCTION OF BAZ AIL SMALL DAM, DISTRICT KURRAM
DETAIL COST ESTIMATE
B-3.1 INTAKE TOWER MEASUREMENT SHEET
Length Width Height Remarks /
Item No. Description No. Quantity Unit
(m) (m) (m)
Scheduled Items
39 Excavation in shingle or gravel formation & rock not requiring blast, undressed, 50m lead : Dry

Avg. Area
Area (Sq.m)
Intake Approach Channel Excavation (Sq.m)

0-024.627 20.837

0-000 24.627 20.837 20.837 513.153


Sub Total: (Approach Channel Excavation) 513.153 Cu.m.

Intake Structure Excavation


L,W&H =
1 7.3 45.13 329.449 Avg.
Sub Total: (Intake Structure Excavation) 329.449 Cu.m.

Total: 842.602 Cu.m.


40 Lean concrete for use as thin layer under neath footings with cylinder compressive strength of 1423 psi on
28 days.

Under Intake 1 5.3 5.3 0.075 2.107

Total: 2.107 Cu.m.


41 RCC in roof slab, beam, column & other structural members, insitu or precast. (1:2:4)

Intake Tower Walls 2 2.61 0.3 14.425 22.590

" 1 1.75 0.3 14.425 7.573

" 2 0.35 0.35 14.425 3.534

" 1 0.6 1.05 0.3 0.189

" 2 0.6 0.35 14.425 6.059

Tie Beam 5 1.75 0.25 0.5 1.094

Total: 41.039 Cu.m.


42 Supply & fabricate M.S. reinforcement for cement concrete (Hot rolled deformed bars Grade 60)

Qty as per Item no. 3.1.3 41.039 Cu.m

Qty as per Item no. 3.1.7 30.000 Cu.m

Total: 71.039 Cu.m

Steel @ 80 Kg. / Cu.m 80 5,683.120 Kg.

Total: 5.683 Tonne

65
Quantity Surveyor (QS)
M/S RHC, ETA Cascade (JV)
Length Width Height Remarks /
Item No. Description No. Quantity Unit
(m) (m) (m)
43 Fabrication of heavy steel work with angle, tees, sheet iron etc. for making trusses, girders etc.

Trash Rack 1 1.26 70 14.425 1,272.285 W=Kg/ Sq.m

Total: 1,272.285 Kg.

Total: 1.272 Tonne


46 Providing and fixing 3 row GI pipe railing 1m (3 feet high)

Intake Tower Top 2 2.6 5.200

Intake Tower Top 2 2.3 4.600


Total: 9.800 Rm
Items from Other Bills of BOQ -
Scheduled Items
41 RCC in roof slab, beam, column & other structural members, insitu or precast. (1:2:4)

Intake Base 1 5 5 1.2 30.000

Total: 30.000 Cu.m.


Item# 33 Supplying and Fixing PVC Water Stopper 8" wide 3/8" thick. Providing and fixing PVC water stopper 8" wide
BF 3/8" thick in vertical (Wall/Column) or horizontal (Floor/Slab) expansion joint inclusing cutting and jointing
complete in all respects.

Intake Tower Walls 2 2.61 5.220

" 1 1.75 1.750

2 0.6 1.200

" 2 14.425 28.850

" 1 14.425 14.425

2 0.6 14.425 17.310


Total: 68.755 Rm
Non Scheduled Items
New Brass base semi circular rubber seal (2.5 inch)

1 1.03 1.030

2 2.03 4.060

Total: 5.090 Rm
New Hoist machine with accessories

1 1.000

Total: 1.000 Job

66
Quantity Surveyor (QS)
M/S RHC, ETA Cascade (JV)
CONSTRUCTION OF BAZ AIL SMALL DAM, DISTRICT KURRAM
DETAIL COST ESTIMATE
B-3.2 INTAKE ACCESS BRIDGE MEASUREMENT SHEET
Length Width Height Remarks /
Item No. Description No. Quantity
(m) (m) (m) Unit

Scheduled Items
48 Excavation in shingle or gravel formation & rock not requiring blast, undressed, 50m lead : Dry

Bridge Excavation

Pier 1 5.4 10.3 55.620 W= area

Abutment 1 4.6 9.6 44.160 W= area

Total: 99.780 Cu.m.


49 Lean concrete for use as thin layer under neath footings with cylinder compressive strength of 1423 psi on 28
days.

Under Pier Base 1 3.4 2.6 0.1 0.884

Under Abutment Base 1 2.6 2 0.1 0.520

Total: 1.404 Cu.m.


50 RCC in roof slab, beam, column & other structural members, insitu or precast. (1:2:4)

Pier 1 1.2 0.8 5.02 4.819

Pier Head 1 2.2 0.8 0.5 0.880

Abutment 1 2 0.7 1.54 2.156

Total: 7.855 Cu.m.


51 Supply & fabricate M.S. reinforcement for cement concrete (Hot rolled deformed bars Grade 60)

Qty as per Item no. 3.2.7 8.736 Cu.m

Qty as per Item no. 3.2.3 7.855 Cu.m

Total: 16.591 Cu.m

Steel @ 80 Kg. / Cu.m 1,327.280 Kg.

Total: 1.327 Tonne


52 Fabrication of heavy steel work with angle, tees, sheet iron etc. for making
trusses, girders etc. Unit Weight / m

Bottom Chord 150 x 75 x 18 Kg/ m PFC 4 8.45 18 608.400

Top Chord 150 x 75 x 18 Kg/ m PFC 4 8.45 18 608.400

Horizontal Bracing 125 x 65 x 15 Kg/ m PFC 8 1.59 15 190.800

Vertical Bracing 100 x 75 x 10 Kg/ m PFC 8 1.45 10 116.000

Inclined Bracing 100 x 75 x 10 Kg/ m PFC 32 1.62 10 518.400

Sub Total: A 2,042.000 Kg.

Steel Bearing Plate 240 x 240 x 10 mm 8 0.24 0.24 0.01 0.005

Steel Plate 210 x 210 x 16 mm 8 0.21 0.21 0.016 0.006

Total: 0.011 Cu.m

Sub Total: B @ 7850 Kg. / Cu.m 86.350 Kg.

Nut Bolt etc. @ 10% of A&B 212.835

Sub Total: C 212.835 Kg.

Total: A+B+C 2,341.185 Kg.

Total: 2.341 Tonne

67
Quantity Surveyor (QS)
M/S RHC, ETA Cascade (JV)
Length Width Height Remarks /
Item No. Description No. Quantity
(m) (m) (m) Unit

53 Plain wood work sawn, wrought, planed & fixed in position, including nails & screws : Shisham wood

Wooden Cross Beam 29 1.55 0.15 0.15 1.011

Bridge Deck 1 16.96 1.4 0.025 0.594

Wooden Post 58 0.05 0.05 0.6 0.087

Wooden Bracing 2 16.96 0.45 0.5 7.632


Total: 9.324 Cu.m

Item# Structural backfill using Common Material available at site.


73 BF

Quantity as per item no. 3.2.1 99.780 Cu.m..

Take Qty @ 33% of above 33.00% 32.927 Cu.m..

Total: 32.927 Cu.m.

68
Quantity Surveyor (QS)
M/S RHC, ETA Cascade (JV)
CONSTRUCTION OF BAZ AIL SMALL DAM, DISTRICT KURRAM
DETAIL COST ESTIMATE
B-3.3 DELIVERY PIPE (CONDUITE) MEASUREMENT SHEET
Length Width Height Remarks /
Item No. Description No. Quantity
(m) (m) (m) Unit

Scheduled Items
55 Excavation for core trench of Dam Embankment/Spillway/Intake & Outlet Structure and Irrigation System
upto design depth in Soft Rock/Shale requiring 20% blasting i/c removing of material from outside of the
structure area
Avg. Area
Area (Sq.m)
Conduite Excavation (Sq.m)

0+002.275 22.37

0+010 7.725 22.37 22.37 172.808

0+020 10 24.331 23.3505 233.505

0+030 10 32.516 28.4235 284.235

0+040 10 44.498 38.507 385.070

0+050 10 28.247 36.3725 363.725

0+060 10 20.528 24.3875 243.875

0+070 10 15.113 17.8205 178.205

0+080 10 11.904 13.5085 135.085

D/d area after Cut-off Walls -1 76 3 1 -228.000

Total: 1,768.508 Cu.m.

Take Qty @ 80% of above 80.00% 1,414.806

55 Excavation in shingle or gravel formation & rock not requiring blast, undressed, 50m lead : Dry

Take Qty @ 20% of above 20.00% 353.702 Cu.m.


Item# 73 Structural backfill using Common Material available at site.
BF

Quantity as per item no. 3.3.1 1,768.508 Cu.m..

Take Qty @ 66% of above 66.00% 1,167.215 Cu.m..

Total: 1,167.215 Cu.m.


Lean concrete for use as thin layer under neath footings with cylinder compressive strength of 1423 psi
57
on 28 days.

Under Conduite Pad 1 80 1.062 0.1 8.496


Total: 8.496 Cu.m.

58 RCC in raft foundation slab, base slab of column & ret. wall etc., not including in 06-06. (1:2:4)

Cut-off Walls 8 3 0.5 1 12.000

Conduite Thrust Block 1 80 1.062 1 84.960

D/d Pipe Thrust Block -1 80 0.159 -12.720 W=Area

Total: 84.240 Cu.m.

69
Quantity Surveyor (QS)
M/S RHC, ETA Cascade (JV)
Length Width Height Remarks /
Item No. Description No. Quantity
(m) (m) (m) Unit

59 Supply & fabricate M.S. reinforcement for cement concrete (Hot rolled deformed bars Grade 60)

Qty as per Item no. 3.3.3 84.240 Cu.m

Total: 84.240 Cu.m

Steel @ 80 Kg. / Cu.m 80 6,739.200 Kg.

Total: 6.739 Tonne

60 Fabrication of heavy steel work with angle, tees, sheet iron etc. for making trusses, girders etc.

Not Required 0.000


Total: 0.000 Tonne

61 S/H/J MS Flanged Pipe 18" i/d 6.35 mm thick

Conduite 1 80 80.000
Total: 80.000 Rm
Non BOQ - Non Scheduled Items
62 Bentonite
Avg. Area
Area (Sq.m)
Bentonite Fill (Sq.m)

0+000 2.508

0+010 10 2.508 2.508 25.080

0+020 10 2.508 2.508 25.080

0+030 10 2.508 2.508 25.080

0+040 10 2.508 2.508 25.080

0+050 10 2.508 2.508 25.080

0+060 10 2.508 2.508 25.080

0+070 10 2.508 2.508 25.080

0+080 10 2.508 2.508 25.080

Below Dam Key Trench 6 47.51 47.51 285.060

Total: 485.700 Cu.m

Calculation Factor for Bags / Cu.m 35.880

Total: 17,427.000 Bags

70
Quantity Surveyor (QS)
M/S RHC, ETA Cascade (JV)
CONSTRUCTION OF BAZ AIL SMALL DAM, DISTRICT KURRAM
DETAIL COST ESTIMATE
B-3.4 DISSIPATION CHAMBER (OUTLET STRUCTURE) MEASUREMENT SHEET
Length Width Height Remarks /
Item No. Description No. Quantity
(m) (m) (m) Unit

Scheduled Items
64 Excavation in shingle or gravel formation & rock not requiring blast, undressed, 50m lead : Dry

Outlet Structure Excavation


L= area & H
1 142.671 2.2 313.876 = Avg.

Total: 313.876 Cu.m.


Lean concrete for use as thin layer under neath footings with cylinder compressive strength of 1423 psi on
65
28 days.

Outlet Structure 1 112.975 0.1 11.298 L=avg. area

Total: 11.298 Cu.m.

66 RCC in raft foundation slab, base slab of column & ret. wall etc., not including in 06-06. (1:2:4)

Outlet Structure

Control Room Base 1 5.5 4.5 0.3 7.425

Stair Case Base 1 4.05 3.23 0.15 1.962

Dissipation Chamber 1 2.9 2.3 0.15 1.001

Conduite Thrust Block 1 7 1.062 1 7.434

D/d Pipe Thrust Block -1 7 0.159 -1.113 W=Area

Total: 16.709 Cu.m.

67 Supply & fabricate M.S. reinforcement for cement concrete (Hot rolled deformed bars Grade 60)

Qty as per Item no. 3.4.3 16.709 Cu.m

Qty as per Item no. 3.4.7 46.253 Cu.m

Total: 62.962 Cu.m

Steel @ 100 Kg. / Cu.m 100 6,296.200 Kg.

Total: 6.296 Tonne

Providing and fixing sluice valve of BSS quality (BS 5163) and weight Class 'B' for GI & PVC pipeline
68 (including cost of jointing material):- d) 18" (450 mm) dia of Valve

2 2.000

Total: 2.000 Nos

Quantity Surveyor (QS)


71
M/S RHC, ETA Cascade (JV)
IRRIGATION SYSTEM

72
CONSTRUCTION OF BAZ AIL SMALL DAM, DISTRICT KURRAM
DETAIL COST ESTIMATE
IRRIGATION SYSTEM & ALLIED STRUCTURES MEASUREMENT SHEET
Length Width Height Remarks /
Item No. Description No. Quantity Unit
(m) (m) (m)
4.1.1 MAIN IRRIGATION CHANNEL
Scheduled Items
Excavation for Irrigation System upto design depth in Soft Rock/Shale requiring 20% blasting i/c removing of
71
material from outside of the structure area.
Main Canal RD 0+000 ~ 9+590 (Detail
Attached) 52,245.100
Main Canal RD 0+000 ~ 6+400 Prism Pad W= avg.
Cutt 1 6400 0.03 192.000 area
Main Canal RD 6+400 ~ 9+590 Prism Pad
Cutt 1 3190 0.03 95.700 "

Total: 52,532.800 Cu.m.

Take Qty @ 50% of above 0.5 26,266.400

Total: 26,266.400 Cu.m.


72 Structural Excavation In Common Material

Quantity as per item no. 4.1.1.1 52,532.800 Cu.m..

Take Qty @ 50% of above 0.5 26,266.400 Cu.m..


Total: 26,266.400 Cu.m.

73 Structural backfill using Common Material available at site.


Main Canal RD 0+000 ~ 9+590 (Detail
Attached) 3,496.600
Main Canal RD 0+000 ~ 6+400 Prism Pad W= avg.
Fill 1 6400 0.05 320.000 area
Main Canal RD 6+400 ~ 9+590 Prism Pad
Fill 1 3190 0.05 159.500 "

Main Canal RD 0+000 ~ 6+400 Back Fill 1 6400 0.091 582.400 "

Main Canal RD 6+400 ~ 9+590 Back Fill 1 3190 0.091 290.290 "

Total: 4,848.790 Cu.m.


Lean concrete for use as thin layer under neath footings with cylinder compressive strength of 1423 psi on 28 days.
74
0.000
Total: 0.000 Cu.m.
Providing and laying Pre-cast parabolic segments, moulded with cement concrete 1:1-1/2:3, including lowering in
75 water channels to correct alignment and grade, jointing, finishing where necessary, excluding carriage, complete in
all respects:- Top width- 18" (457mm) & Total Depth- 12"(305mm)

0.000
Total: 0.000 Rm
Providing and laying Pre-cast parabolic segments, moulded with cement concrete 1:1-1/2:3,including lowering in
76 water channels to correct alignment and grade, jointing, finishing where necessary, etc. complete in all respects:-
Top width- 24" (600mm) & Total Depth- 14"(360mm)
0.000
Total: 0.000 Rm
Providing and laying Pre-cast parabolic segments, moulded with cement concrete 1:1-1/2:3,including lowering in
77 water channels to correct alignment and grade, jointing, finishing where necessary, etc. complete in all respects:-
Top width- 25.5" (640mm) & Total Depth- 18"(460mm)

Main Canal RD 8+790 ~ 9+590 1 800 800.000


Total: 800.000 Rm
Providing and laying Pre-cast parabolic segments, moulded with cement concrete 1:1-1/2:3, excluding carriage,
78 lowering in water channels to correct alignment and grade, jointing, finishing where necessary, etc. complete in all
respects:- Top width- 30" (760mm) & Total Depth- 21"(525mm)
Main Canal RD 1+450 ~ 8+790 1 7340 7,340.000
Total: 7,340.000 Rm
Providing and laying Pre-cast parabolic segments, moulded with cement concrete 1:1-1/2:3, excluding carriage,
79 lowering in water channels to correct alignment and grade, jointing, finishing where necessary, etc. complete in all
respects:- Top width- 36" (920mm) & Total Depth- 24"(610mm)

Main Canal RD 0+000 ~ 1+450 1 1450 1,450.000

Total: 1,450.000 Rm

86 Supplying clean and screened river or pit sand within 150m including removal of loose earth or overburden.

Main Canal RD 0+000 ~ 6+400 1 6400 0.042 268.800 W=area

Main Canal RD 6+400 ~ 9+590 1 3190 0.042 133.980 "

73
Quantity Surveyor
M/S RHC, ETA Cascade (JV)
Length Width Height Remarks /
Item No. Description No. Quantity Unit
(m) (m) (m)

Total: 402.780 Cu.m.


4.1.2 DISTRIBUTOR - 1
Scheduled Items
Excavation in hard rock requiring blasting and disposal upto 25m & dressing : Grade I
81

Disty-1 RD 0+000 ~ 1+787 (Detail Attached) 6,066.730 Cu.m..

W= avg.
Disty-1 RD 0+000 ~ 1+787 Prism Pad Cutt 1 1787 0.03 53.610 area

Total: 6,120.340 Cu.m.

Take Qty @ 50% of above 0.5 3,060.170

Total: 3,060.170 Cu.m.


82 Structural Excavation In Common Material

Quantity as per item no. 4.1.2.1 6,120.340 Cu.m..

Take Qty @ 50% of above 0.5 3,060.170 Cu.m..

Total: 3,060.170 Cu.m.


Structural backfill using Common Material available at site.
83

Disty-1 RD 0+000 ~ 1+787 (Detail Attached) 583.290 Cu.m..


W= avg.
Disty-1 RD 0+000 ~ 1+787 Prism Pad Fill 1 1787 0.05 89.350 area

Disty-1 RD 0+000 ~ 1+787 Back Fill 1 1787 0.091 162.617 "

Total: 835.257 Cu.m.


Lean concrete for use as thin layer under neath footings with cylinder compressive strength of 1423 psi on 28 days.
84

0.000

Total: 0.000 Cu.m.


Providing and laying Pre-cast parabolic segments, moulded with cement concrete 1:1-1/2:3, excluding carriage,
85 lowering in water channels to correct alignment and grade, jointing, finishing where necessary, etc. complete in all
respects:- Top width- 30" (760mm) & Total Depth- 21"(525mm)

0.000

Total: 0.000 Rm

86 Supplying clean and screened river or pit sand within 150m including removal of loose earth or overburden.

Disty-1 RD 0+000 ~ 1+787 1 1787 0.042 75.054 W=area

Total: 75.054 Cu.m.


Items from Other Bills of BOQ -
Scheduled Items
Providing and laying Pre-cast parabolic segments, moulded with cement concrete 1:1-1/2:3,including lowering in
Item # 76 water channels to correct alignment and grade, jointing, finishing where necessary, etc. complete in all respects:-
BF Top width- 24" (600mm) & Total Depth- 14"(360mm)

Disty-1 RD 0+000 ~ 1+787 1 1787 1,787.000


Total: 1,787.000 Rm

74
Quantity Surveyor
M/S RHC, ETA Cascade (JV)
Length Width Height Remarks /
Item No. Description No. Quantity Unit
(m) (m) (m)
4.1.3 DISTRIBUTOR - 2
Scheduled Items
Earth excavation in irrigation channels/drains & disposal upto 25m. & dressing : in Ordinary Soil
88

Disty-2 RD 0+000 ~ 2+600 (Detail Attached) 10,469.750 Cu.m.

W= avg.
Disty-2 RD 0+000 ~ 2+600 Prism Pad Cutt 1 2600 0.03 78.000 area

Total: 10,547.750 Cu.m.

Take Qty @ 50% of above 0.5 5,273.875

Total: 5,273.875 Cu.m.

89 Structural Excavation In Common Material

Quantity as per item no. 4.1.3.1 10,547.750 Cu.m..

Take Qty @ 50% of above 0.5 5,273.875 Cu.m..

Total: 5,273.875 Cu.m.

90 Structural backfill using Common Material available at site.

Disty-2 RD 0+000 ~ 2+600 (Detail Attached) 357.500 Cu.m..


W= avg.
Disty-2 RD 0+000 ~ 2+600 Prism Pad Fill 1 2600 0.05 130.000 area

Disty-2 RD 0+000 ~ 2+600 Back Fill 1 2600 0.091 236.600 "

Total: 724.100 Cu.m.


Lean concrete for use as thin layer under neath footings with cylinder compressive strength of 1423 psi on 28 days.
91

0.000

Total: 0.000 Cu.m.


Providing and laying Pre-cast parabolic segments, moulded with cement concrete 1:1-1/2:3, excluding carriage,
92 lowering in water channels to correct alignment and grade, jointing, finishing where necessary, etc. complete in all
respects:- Top width- 30" (760mm) & Total Depth- 21"(525mm)

0.000

Total: 0.000 Rm

93 Supplying clean and screened river or pit sand within 150m including removal of loose earth or overburden.

Disty-2 RD 0+000 ~ 2+600 1 2600 0.042 109.200 W=area

Total: 109.200 Cu.m.


Supplying clean and screened river or pit sand within 150m including removal of loose earth or overburden.
94

0.000

Total: 0.000 Cu.m.


Items from Other Bills of BOQ -
Scheduled Items
Providing and laying Pre-cast parabolic segments, moulded with cement concrete 1:1-1/2:3, including lowering in
Item # 75 water channels to correct alignment and grade, jointing, finishing where necessary, excluding carriage, complete in
BF all respects:- Top width- 18" (457mm) & Total Depth- 12"(305mm)

Disty-2 RD 0+000 ~ 2+600 1 2600 2,600.000


Total: 2,600.000 Rm

75
Quantity Surveyor
M/S RHC, ETA Cascade (JV)
Length Width Height Remarks /
Item No. Description No. Quantity Unit
(m) (m) (m)
4.2 STRUCTURES
4.2.1 Cross Drainage Culvert
Scheduled Items
Excavation in foundation of building, bridges etc. complete : in shingle/gravel
97

U/S Catch Pit 1 2.45 3.2 1.325 10.388 H=Avg.

For Pipe 1 10 1.15 0.825 9.488 H=Avg.

D/S Transition 1 1.15 2.85 1.3 4.261 H=Avg.

D/S Walls & Step 1 3.3 3.25 2.75 29.494 H=Avg.

Total: for 01 No. Structure 53.631 Cu.m.

Total: for 14 No Structures 750.834 Cu.m.


Lean concrete for use as thin layer under neath footings with cylinder compressive strength of 1423 psi on 28 days.
98

U/S Catch Pit 1 2.45 3.2 0.075 0.588

For Pipe 1 10 1.15 0.075 0.863

D/S Transition 1 1.15 2.85 0.075 0.246

D/S Walls & Step 1 3.3 3.25 0.15 1.609

Total: for 01 No. Structure 3.306 Cu.m.

Total: for 14 No Structures 46.284 Cu.m.


RCC in raft foundation slab, base slab of column & ret. wall etc., not including in 06-06. (1:2:4)
99

U/S Catch Pit 1 2.3 3.05 0.15 1.052

D/S Transition 1 1 2.7 0.15 0.405

D/S Walls & Step 1 3.15 3.1 0.22 2.148

Total: for 01 No. Structure 3.605 Cu.m.

Total: for 14 No Structures 50.470 Cu.m.

100 Supply & fabricate M.S. reinforcement for cement concrete (Hot rolled deformed bars Grade 60)

Qty as per Item no. 4.2.1.4 3.605 Cu.m

Qty as per Item no. 4.2.1.10 4.369 Cu.m

Total: 7.974 Cu.m

Steel @ 80 Kg. / Cu.m 637.920 Kg.

Total: for 01 No. Structure 0.638 Tonne

Total: for 14 No Structures 8.932 Tonne


Providing & laying R.C.C. pipe sewers, moulded with cement concrete 1:1-1/2:3 conforming to ASTM specification
101 C-76-79, Class IV, Wall B, including carriage, lowering in trenches to correct alignment and grade, jointing with
rubber ring, cutting pipes where necessary, testing, etc. complete:- 24" i/d, Wall B

Pipe 1 10 10.000

Total: for 01 No. Structure 10.000 Rm

Total: for 14 No Structures 140.000 Rm


Embankment formation in ordinary soil & compaction by mechanical means at optimum moistures content to 90%
102 max. modified AASHTO dry density (borrow area).

Embankment on Culvert 1 9.05 6 2 108.600

Total: for 01 No. Structure 108.600 Cu.m..

Total: for 14 No Structures 1,520.400 Cu.m.

103 Providing and Laying grouted stone pitching, in 1:8 c/s mortar Top layer on slope.

U/S Side Protection 1 3.05 3.68 0.45 5.051

U/S Side Protection 2 3 4.28 0.45 11.556

Total: for 01 No. Structure 16.607 Cu.m..

Total: for 14 No Structures 232.498 Cu.m.

76
Quantity Surveyor
M/S RHC, ETA Cascade (JV)
Length Width Height Remarks /
Item No. Description No. Quantity Unit
(m) (m) (m)
104 PCC 1:3:6 in mass concrete less formwork using 30% boulders.

D/S Steps Filling 1 2.35 3.75 8.813 w=area

Total: for 01 No. Structure 8.813 Cu.m

Total: for 14 No Structures 123.382 Cu.m

4.2.2 Road Culvert (02 Nos)


Scheduled Items
106 Excavation in foundation of building, bridges etc. complete : in shingle/gravel

U/S Catch Pit 1 1.75 1.75 1.5 4.594 H=Avg.

D/S Catch Pit 1 1.75 1.75 1.85 5.666 H=Avg.

For Pipe 1 7.6 1.2 1.5 13.680 H=Avg.

Total: for 01 No. Structure 23.940 Cu.m.

Total: for 02 No Structures 47.880 Cu.m.


Lean concrete for use as thin layer under neath footings with cylinder compressive strength of 1423 psi on 28 days.
107

U/S Catch Pit 1 1.75 1.75 0.075 0.230

D/S Catch Pit 1 1.75 1.75 0.075 0.230

For Pipe 1 7.6 1.2 0.075 0.684

Total: for 01 No. Structure 1.144 Cu.m.

Total: for 02 No Structures 2.288 Cu.m.

108 Plain Cement Concrete including placing, compacting, finishing & curing (Ratio 1:3:6)

Pad Under Pipe 1 7.6 1.05 0.15 1.197

Pad Along Pipe 1 7.6 1.05 0.375 2.993

D/d Pipe area -1 7.6 0.221 -1.680

Total: for 01 No. Structure 2.510 Cu.m.

Total: for 02 No Structures 5.020 Cu.m.

109 Stone Masonry Dressed Coursed With Mortar

U/S Catch Pit Base 1 1.6 1.6 0.3 0.768

U/S Catch Pit Walls 4 1.3 0.3 1.95 3.042

D/S Catch Pit Base 1 1.6 1.6 0.3 0.768

D/S Catch Pit Walls 4 1.3 0.3 1.95 3.042

Total: for 01 No. Structure 7.620 Cu.m.

Total: for 02 No Structures 15.240 Cu.m.


Reinforced Concrete Pipe Culvert (AASHTO M-170) Dia: 610mm
110

Pipe 1 8.2 8.200

Total: for 01 No. Structure 8.200 Rm

Total: for 02 No Structures 16.400 Rm

111 Structural backfill using Common Material available at site.

Quantity as per item no. 4.2.2.9 23.940 Cu.m..

Total: 23.940 Cu.m..

Take Qty @ 33% of above 0.33 7.900 Cu.m..

Total: for 01 No. Structure 7.900 Cu.m..

Total: for 02 No Structures 15.800 Cu.m.


112 Aggregate Base Course

Road on Culvert 1 3 3.9 0.15 1.755

Total: for 01 No. Structure 1.755 Cu.m..

Total: for 02 No Structures 3.510 Cu.m.

77
Quantity Surveyor
M/S RHC, ETA Cascade (JV)
Length Width Height Remarks /
Item No. Description No. Quantity Unit
(m) (m) (m)
113 Single bituminous Surface Treatment

Road on Culvert 1 3 3.6 10.800

Total: for 01 No. Structure 10.800 Sq.m..

78
Quantity Surveyor
M/S RHC, ETA Cascade (JV)
Length Width Height Remarks /
Item No. Description No. Quantity Unit
(m) (m) (m)

Total: for 02 No Structures 21.600 Sq.m..

4.2.3 OPEN FLUME


Scheduled Items
115 Excavation in foundation of building, bridges etc. complete : in shingle/gravel
0.000
Total: for 01 No. Structure 0.000 Cu.m..
Total: for 01 No. Structure 0.000 Cu.m..
Lean concrete for use as thin layer under neath footings with cylinder compressive strength of 1423 psi on 28 days.
116

0.000
Total: for 01 No. Structure 0.000 Cu.m..

Total: for 01 No. Structure 0.000 Cu.m..

117 RCC in raft foundation slab, base slab of column & ret. wall etc., not including in 06-06. (1:2:4)

0.000
Total: for 01 No. Structure 0.000 Cu.m..

Total: for 01 No. Structure 0.000 Cu.m..

118 Supply & fabricate M.S. reinforcement for cement concrete (Hot rolled deformed bars Grade 60)

Qty as per Item no. 4.2.3.3 0.000 Cu.m

Total: 0.000 Cu.m

Steel @ 80 Kg. / Cu.m 0.000 Kg.

Total: for 01 No. Structure 0.000 Tonne

Total: for 01 No. Structure 0.000 Tonne

119 Structural backfill using Common Material available at site.

Quantity as per item no. 4.2.3.1 0.000 Cu.m..

Total: 0.000 Cu.m..

Take Qty @ 33% of above 0.33 0.000 Cu.m..

Total: for 01 No. Structure 0.000 Cu.m..

Total: for 01 No. Structure 0.000 Cu.m..

4.2.4 Aqueduct (5 Nos)


Scheduled Items

121 Earth excavation in open cut 1.5m - 3m depth for drains etc. & disposal : in Gravel & shingle

U/S Transition 1 3 1.06 3 9.540

U/S Transition Cut-off Wall 2 3 0.3 0.2 0.360

" 1 1.06 0.25 0.2 0.053

U/S Approach 1 5 1.06 2.5 13.250

U/S Approach Cut-off Wall 2 5 0.3 0.2 0.600

" 1 1.06 0.25 0.2 0.053

U/S Abutment Base 1 3.8 4.36 3.5 57.988

Pier Base 13 3.8 4.36 2.35 506.152

Around Pier Apron Cutoff 13 140 0.3 0.3 163.800

D/S Abutment Base 1 3.8 4.36 3.25 53.846

D/S Approach 1 5 1.06 2 10.600

D/S Approach Cut-off Wall 2 5 0.3 0.3 0.900

" 1 1.06 0.25 0.3 0.080

D/S Transition 1 3 1.06 2.5 7.950

D/S Transition Cut-off Wall 2 3 0.3 0.3 0.540

" 1 1.06 0.25 0.3 0.080

79
Quantity Surveyor
M/S RHC, ETA Cascade (JV)
Length Width Height Remarks /
Item No. Description No. Quantity Unit
(m) (m) (m)

Total: for 01 No. Structure 825.792 Cu.m.

Total: for 05 No. Structures 4,128.960 Cu.m.

122 Filter granular backfill behind retaining wall (stone/boulder filling upto one meter to prevent choking of weep holes.

Quantity as per item no. 4.2.4.7 683.660 Cu.m..

Total: 683.660 Cu.m..

Take Qty @ 33% of above 0.33 225.608 Cu.m..

Total: for 01 No. Structure 225.608 Cu.m.

Total: for 05 No. Structures 1,128.040 Cu.m.


Lean concrete for use as thin layer under neath footings with cylinder compressive strength of 1423 psi on 28 days.
123

U/S Transition 1 3 1.06 0.1 0.318

U/S Approach 1 5 1.06 0.1 0.530

U/S Abutment Base 1 1.8 2.36 0.1 0.425

Pier Base 13 1.8 2.36 0.1 5.522

D/S Abutment Base 1 1.8 2.36 0.1 0.425

D/S Approach 1 5 1.06 0.1 0.530

D/S Transition 1 3 1.06 0.1 0.318

U/S & D/S Transition Fill Concrete 2 3 0.45 2.700 w=area

Total: for 01 No. Structure 10.768 Cu.m.

Total: for 05 No. Structures 53.840 Cu.m.

124 Random rubble masonry in foundn. & plinth in cement, sand mortar : Ratio 1:3.

0.000

Total: for 01 No. Structure 0.000 Cu.m.

Total: for 05 No. Structures 0.000 Cu.m.

125 RCC in roof slab, beam, column & other structural members, insitu or precast. (1:2:4)

U/S Abutment Wall 1 1.36 0.5 3 2.040

U/S Abutment Wall Top 1 1.71 0.85 0.3 0.436

Pier 13 1.36 0.5 6.675 59.007

Pier Top 13 1.71 0.85 0.3 5.669

D/S Abutment Wall 1 1.36 0.5 3 2.040

D/S Abutment Wall Top 1 1.71 0.85 0.3 0.436

Trough Slab 1 140 1.21 0.6 101.640

Trough Walls Upto Abutments 2 140 0.3 0.75 63.000

U/S Abutment ~ Transition Trough Walls 2 8 0.3 0.75 3.600

D/S Abutment ~ Transition Trough Walls 2 8 0.3 0.75 3.600

Total: for 01 No. Structure 241.468 Cu.m.

Total: for 05 No. Structures 1,207.340 Cu.m.

126 Supply & fabricate M.S. reinforcement for cement concrete (Hot rolled deformed bars Grade 60)

Qty as per Item no. 4.2.4.5 241.468 Cu.m

Qty as per Item no. 4.2.4.8 60.994 Cu.m

Total: 302.462 Cu.m

Steel @ 80 Kg. / Cu.m 24,196.960 Kg.

80
Quantity Surveyor
M/S RHC, ETA Cascade (JV)
Length Width Height Remarks /
Item No. Description No. Quantity Unit
(m) (m) (m)

Total: for 01 No. Structure 24.197 Tonne

Total: for 05 No. Structures 120.985 Tonne

New Item Misc. (Water Stopper, Sealant, Bitumen, etc.)

0.2 0.200

Total: for 01 No. Structure 0.200 LS

Total: for 05 No. Structure 1.000 LS

4.2.5 Super Passage (2 Nos)


Scheduled Items

129 Excavation in foundation of building, bridges etc. complete : in shingle/gravel

0.000

Total: for 01 No. Structure 0.000 Cu.m..

Total: for 01 No. Structure 0.000 Cu.m..

130 Structural backfill using Common Material available at site.

Quantity as per item no. 4.2.5.1 0.000 Cu.m..

Total: 0.000 Cu.m..

Take Qty @ 33% of above 0.33 0.000 Cu.m..

Total: for 01 No. Structure 0.000 Cu.m..

Total: for 01 No. Structure 0.000 Cu.m..


Lean concrete for use as thin layer under neath footings with cylinder compressive strength of 1423 psi on 28 days.
131

0.000

Total: for 01 No. Structure 0.000 Cu.m..

Total: for 01 No. Structure 0.000 Cu.m..


Cement Concrete (brick/stone ballast, 1.5" to 2"/nullah shingle well graded and cleaned) in foundation & plinth
132 (Ratio 1:6:18).

0.000

Total: for 01 No. Structure 0.000 Cu.m..

Total: for 01 No. Structure 0.000 Cu.m..

133 Coursed rubble masonry (Hammer Dressed) in foundn. & plinth in cement, sand mortar : Ratio 1:4.

0.000

Total: for 01 No. Structure 0.000 Cu.m..

Total: for 01 No. Structure 0.000 Cu.m..

134 RCC in raft foundation slab, base slab of column & ret. wall etc., not including in 06-06. (1:2:4)

0.000

Total: for 01 No. Structure 0.000 Cu.m..

Total: for 01 No. Structure 0.000 Cu.m..

135 Supply & fabricate M.S. reinforcement for cement concrete (Hot rolled deformed bars Grade 60)

Qty as per Item no. 4.2.5.6 0.000 Cu.m

Total: 0.000 Cu.m

Steel @ 80 Kg. / Cu.m 0.000 Kg.

Total: for 01 No. Structure 0.000 Tonne

Total: for 01 No. Structure 0.000 Tonne

81
Quantity Surveyor
M/S RHC, ETA Cascade (JV)
Length Width Height Remarks /
Item No. Description No. Quantity Unit
(m) (m) (m)
4.2.6 Pipe Outlet (4 Nos)
Scheduled Items

137 Excavation in foundation of building, bridges etc. complete : in shingle/gravel

U/S Catch Pit 1 1.65 1.65 1.35 3.675 H=Avg.

D/S Catch Pit 1 1.4 1.4 1.75 3.430 H=Avg.

For Pipe 1 2.77 0.5 1.55 2.147 H=Avg.

Total: for 01 No. Structure 9.252 Cu.m..

Total: for 04 No Structures 37.008 Cu.m.


Lean concrete for use as thin layer under neath footings with cylinder compressive strength of 1423 psi on 28 days.
138

U/S Catch Pit 1 1.65 1.65 0.1 0.272

D/S Catch Pit 1 1.4 1.4 0.1 0.196

For Pipe 1 2.77 0.5 0.1 0.139

Total: for 01 No. Structure 0.607 Cu.m..

Total: for 04 No Structures 2.428 Cu.m.

139 Plain Cement Concrete including placing, compacting, finishing & curing (Ratio 1:3:6)

U/S Catch Pit Under Parabolic section 2 0.225 0.267 0.120 w=area

For Pipe Encasement 1 2.77 0.3 0.3 0.249

Total: for 01 No. Structure 0.369 Cu.m..

Total: for 04 No Structures 1.476 Cu.m.

140 Coursed rubble masonry (Hammer Dressed) in foundn. & plinth in cement, sand mortar : Ratio 1:3

U/S Catch Pit Base 1 1.45 1.45 0.225 0.473

U/S Catch Pit Walls 2 1.45 0.225 0.95 0.620

D/S Catch Pit Base 1 1.2 1.2 0.225 0.324

D/S Catch Pit Walls 4 1.2 0.225 1 1.080

Total: for 01 No. Structure 2.497 Cu.m.

Total: for 04 No Structures 9.988 Cu.m.

Providing, laying, cutting, jointing, testing and disinfecting High Density Polyethylene Pipe (HDPE) Din-8074/Din-
141
8075/ISO-4427 in trenches, complete in all respects (110 mm dia) PN-8

Pipe 1 3.22 3.220

Total: for 01 No. Structure 3.220 Rm

Total: for 04 No Structures 12.880 Rm

142 Structural backfill using Common Material available at site.

Quantity as per item no. 4.2.6.7 9.252 Cu.m..

Total: 9.252 Cu.m..

Take Qty @ 33% of above 0.33 3.053 Cu.m..

Total: for 01 No. Structure 3.053 Cu.m..

Total: for 04 No Structures 12.212 Cu.m.

82
Quantity Surveyor
M/S RHC, ETA Cascade (JV)
DESCRIPTION OF ITEM : Spec. No:
Item Code: 17-11f(i) Unit(British):Rft
Item Name: Providing and laying Pre-cast parabolic segments, moulded with
cement concrete 1:1-1/2:3, excluding carriage, lowering in water channels to correct
alignment and grade, jointing, finishing where necessary, etc. complete in all
respects: - Top width-36" (920 mm) & Total Depth-24"(610 mm)
Detail Qty Unit Rate (Rs) Amount
MATERIAL
Ordinary Portland Cement 0.07 Bag 980 1 Bag 68.60
Fine Sand 0.65 Cft 2600 100 Cft 16.90
Pre-Cast Parabolic Segments(3' 1 RFT 460 1 RFT 460.00
Length) 920mm x 610mm (36" x 24")
Total Material 57.84 % 545.50
LABOUR
Mason 0.09 Day 1500 1 Day 135.00
Labourer 0.11 Day 800 1 Day 88.00
Sundrise (Labour Only): 3.00% 6.69
Total Labour 22.66 % 229.69

151.16
Contractor Profit 10% + Over Heads on(M+L+E) 2% +Income Tax 7.5% 19.50%

Composite Rates PerRft Rs. 926.35 Per Meter : Rs. 3039.361076


Labour Rates PerRft Rs. 237.702 Per Meter : Rs. 779.9000521

Quantity Surveyor (QS)


83
M/S RHC, ETA Cascade (JV)
ACCESS ROAD

84
CONSTRUCTION OF BAZ AIL SMALL DAM, DISTRICT KURRAM

ACCESS TO INSPECTION & REALIGNMENT OF KACHA TRACK


DETAIL MEASUREMENT SHEET
Length Width Height Quantity
Description No.
(m) (m) (m) (Cum)
Schedule Items
Road to Inspection Hut
Roadway Excavation in Surplus / Unsuitable Common Material.

Intake & Inspection Hut Access Road 580 3.6 1 2088


RD 0+000 ~ 0+580 (Detail Attached)
Realignment of Kacha Trak
Realignment of Kacha Track 1282.58 3.6 1 4617.288
RD 0+000 ~ 1+282.58 (Detail Attached)

Grand Total 6,705.288


Dressing & levelling earth to designed section Gravel work or soft rock not requiring blasting upto cut or fill 6 inches.

Length Width Height Quantity


Description No.
(m) (m) (m) (Sqm)
Intake & Inspection Hut Access Road
580 3.6 2088
RD 0+000 ~ 0+580 (Detail Attached)

Realignment of Kacha Track 1282.58 3.6 4617.288


RD 0+000 ~ 1+282.58 (Detail Attached)

Grand Total 6,705.288


Bill No. A2: Access Road for Dam
Item # BF#
Aggregate Base Course
112 16-05-a
Area(Sq.m) Mean X-
Quantity
RD Length(M) (Main Sectional Remarks
(Cu.m)
Dam Body) Area(Sq.m)
Road Toward Inspection Hut 0+00-0+140
0+000 0.562
0+020 20.0 0.562 0.562 11.234
0+040 20.0 0.562 0.562 11.234
0+060 20.0 0.562 0.562 11.234
0+080 20.0 0.562 0.562 11.234
0+100 20.0 0.562 0.562 11.234
0+120 20.0 0.562 0.562 11.234
0+140 20.0 0.562 0.562 11.234
Sub Total (01) = 78.64
Road Toward Main Dam Body 0+00-0+440
0+00 0.562
0+020 20 0.562 0.562 11.234
0+040 20 0.562 0.562 11.234
0+060 20 0.562 0.562 11.234
0+080 20 0.562 0.562 11.234
0+100 20 0.562 0.562 11.234
0+120 20 0.562 0.562 11.234
0+140 20 0.562 0.562 11.234
0+160 20 0.562 0.562 11.234
0+180 20 0.562 0.562 11.234
0+200 20 0.562 0.562 11.234

Quantity Surveyor
M/s RHC, ETA Cascade (JV)
85
0+220 20 0.562
0.562 11.234
0+240 20 0.562
0.562 11.234
0+260 20 0.562
0.562 11.234
0+280 20 0.562
0.562 11.234
0+300 20 0.562
0.562 11.234
0+320 20 0.562
0.562 11.234
0+340 20 0.562
0.562 11.234
0+360 20 0.562
0.562 11.234
0+380 20 0.562
0.562 11.234
0+400 20 0.562
0.562 11.234
0+420 20 0.562
0.562 11.234
0+440 20 0.562
0.562 11.234
Sub Total (2) = 247.148
Total Qty = 325.79
16-13-c Dense Graded Hot Bitmac (Mobile Asphalt Mixer) 2" Thick
Quantity
RD Length(M) Width (m) Mean Area (m ²) Remarks
(m ²)
Road Toward Inspection Hut 0+00-0+140
0+000 3.600
0+020 20.0 3.600 3.600 72.000
0+040 20.0 3.600 3.600 72.000
0+060 20.0 3.600 3.600 72.000
0+080 20.0 3.600 3.600 72.000
0+100 20.0 3.600 3.600 72.000
0+120 20.0 3.600 3.600 72.000
0+140 20.0 3.600 3.600 72.000
Sub Total (01) = 504.00
Road Toward Main Dam Body 0+00-0+440
0+00 3.600
0+020 20 3.600 3.600 72.000
0+040 20 3.600 3.600 72.000
0+060 20 3.600 3.600 72.000
0+080 20 3.600 3.600 72.000
0+100 20 3.600 3.600 72.000
0+120 20 3.600 3.600 72.000
0+140 20 3.600 3.600 72.000
0+160 20 3.600 3.600 72.000
0+180 20 3.600 3.600 72.000
0+200 20 3.600 3.600 72.000
0+220 20 3.600 3.600 72.000
0+240 20 3.600 3.600 72.000
0+260 20 3.600 3.600 72.000
0+280 20 3.600 3.600 72.000
0+300 20 3.600 3.600 72.000
0+320 20 3.600 3.600 72.000
0+340 20 3.600 3.600 72.000
0+360 20 3.600 3.600 72.000
0+380 20 3.600 3.600 72.000
0+400 20 3.600 3.600 72.000
0+420 20 3.600 3.600 72.000
0+440 20 3.600 3.600 72.000
Sub Total (2) = 1,584.000
Total Qty = 2,088.00
ACCESS ROAD CULVERT MEASUREMENT SHEET
Quantity
S.No. Deecription No.
Area (m²) Length (m) (mᶾ)
For 8 No. Culverts
1 Excavation in Earth Work 6 4.89 7.317 214.71
Filling of Earth Work Excavation with
2 Exacavated Material 6 2.88 7.317 126.60
3 Form Work 6 A = 52.93 317.57
4 PCC 1:2:4 in Main Pipe 6 1.171853 7.017 49.34

5 PCC 1:2:4 in Pipe Collars 24 0.090262 1.210 2.62


5 PCC 1:2:4 in Pipe Outlet Steps 6 0.27 1.810 2.93
PCC 1:2:4 Total 54.89
6 PCC 1:4:8 Lean Concrete 6 0.543 1.810 5.90

Quantity Surveyor
M/s RHC, ETA Cascade (JV)
86
INSPECTION HUT

87
CONSTRUCTION OF BAZ AIL SMALL DAM, DISTRICT KURRAM
DETAIL COST ESTIMATE
SITE OFFICE / INSPECTION HUT MEASUREMENT SHEET
Item Length Width Height Remarks /
Description No. Quantity
No. (ft.) (ft.) (ft.) Unit

BOQ ITEMS
CIVIL WORKS
6.1 Structural Excavation in Common Material

Horizontal Walls

Bed 1 36.25 3.25 2 235.625

Bath 1 3.5 3.25 2 22.750

Bed & Bath 1 33 3.25 2 214.500

Verandah 1 36.25 3.25 2 235.625

Vertical Walls

Bed 2 23.5 3.25 2 305.500

Bath 2 9.5 3.25 2 123.500

Kitchen 1 7.5 3.25 2 48.750

Stair 1 3.5 3.5 2 24.500

Entrance Stair 1 29.5 3 0.5 44.250

Boundary Wall

Horizontal Walls 2 49.25 2.25 1.5 332.438

Vertical Walls 2 44.75 2.25 1.5 302.063

Total: 1,889.501 Cft

Total with Enhance Factor @: 1 53.505 Cu.m

6.2 Lean concrete for use as thin layer underneath footings with cylinder compressive strength of 1423 psi on 28
days.

Horizontal Walls

Bed 1 36.25 3.25 0.75 88.359

Bath 1 3.5 3.25 0.75 8.531

Bed & Bath 1 33 3.25 0.75 80.438

Verandah 1 36.25 3.25 0.75 88.359

Vertical Walls

Bed 2 23.5 3.25 0.75 114.563

Bath 2 9.5 3.25 0.75 46.313

Kitchen 1 7.5 3.25 0.75 18.281

Stair 1 3.5 3.5 0.75 9.188

Entrance Stair 1 29.5 3 0.5 44.250

Boundary Wall

Horizontal Walls 2 49.25 2.25 0.75 166.219

Vertical Walls 2 44.75 2.25 0.75 151.031

Total: 815.532 Cft

Total with Enhance Factor @: 1 23.093 Cu.m

6.3 1st class brick work in ground floor Cement, sand mortar 1:4

88
Quantity Surveyor (QS)
M/S RHC, ETA Cascade (JV)
Item Length Width Height Remarks /
Description No. Quantity
No. (ft.) (ft.) (ft.) Unit

Horizontal Walls

Bed 1 36.25 0.75 10 271.875

Bath 1 6 0.75 10 45.000

Bed & Bath 1 35.5 0.75 10 266.250

Verandah 1 36.25 0.75 10 271.875

Vertical Walls

Bed 2 23.5 0.75 10 352.500

Bath 2 12 0.75 10 180.000

Kitchen 1 10 0.75 10 75.000

Total: 1,462.500 Cft

Door & Window Deductions

D1 2 3.5 0.75 7 36.750

D2 1 3 0.75 7 15.750

D3 2 2.5 0.75 7 26.250

W1 2 6 0.75 4.5 40.500

W2 1 4 0.75 4.5 13.500

V 1 1.5 0.75 1.5 1.688

Verandah Opening-1 1 8.75 0.75 8 52.500

Verandah Opening-2 1 11.625 0.75 8 69.750

Lintel Deductions

Qty as Per Item no. 6.56 (B) 84.470

Total: 341.158 Cft

Net: 1,121.342 Cft

Total with Enhance Factor @: 1 31.753 Cu.m

6.4 Plain Cement Concrete including placing, compacting, finishing & curing (Ratio 1:2:4)

Flooring

Bed 2 14 12 0.25 84.000

Bath 2 6 5.833 0.25 17.499

Kitchen 1 6 10 0.25 15.000

Verandah 1 25.125 10 0.25 62.813

Total: 179.312 Cft

Total with Enhance Factor @: 1 5.078 Cu.m

6.5 RCC in raft foundation slab, base slab of column & ret. wall etc., not including in 06-06. (1:1:2)

0.000

Total: 0.000 Cft

Total with Enhance Factor @: 1 0.000 Cu.m

6.1 RCC in raft foundation slab, base slab of column & ret. wall etc., not including in 06-06. (1:2:4)

89
Quantity Surveyor (QS)
M/S RHC, ETA Cascade (JV)
Item Length Width Height Remarks /
Description No. Quantity
No. (ft.) (ft.) (ft.) Unit

Stair Foundation

1 3.5 3.5 1 12.250

Total: 12.250 Cft

Total with Enhance Factor @: 1 0.347 Cu.m

6.2 RCC in roof slab, beam, column & other structural members, insitu or precast. (1:2:4)

Stair

Stair Wall 4 3.5 0.75 2 21.000

Waist 1 16.662 3.5 0.417 24.318

Steps 16 3.5 0.833 0.625 14.578 Ans=1/2

Sub Total: A 59.896 Cu.m

Lintel Beam

Horizontal Walls

Bed 0 0 0 0.5 0.000

Bath 0 0 0 0.5 0.000

Bed & Bath 2 14 12 0.5 168.000

Kitchen 2 -24.25 5.833 0.5 -141.450

Verandah Beam 1 30.25 0.75 1 22.688

Vertical Walls

Bed 1 25.125 10 0.5 125.625

Bath 0 0 0 0.5 0.000

Kitchen 1 0 0 0.5 0.000

Sub Total: B 174.863 Cu.m

Roof Slab

Building Slab 1 41 28.25 0.5 579.125

Sub Total: C 579.125 Cu.m

Total: (A+B+C) 813.884 Cft

Total with Enhance Factor @: 1 23.047 Cu.m

6.6 Supply & fabricate M.S. reinforcement for cement concrete (Hot rolled deformed bars Grade 60)

Qty as per Item No.6.55 0.347 Cu.m

Qty as per Item No.6.56 20.487 Cu.m

Total: 20.834 Cu.m

Steel @ 100 Kg./Cu.m 2,083.400 Kg

Total: 2,083.400 Kg

Total with Enhance Factor @: 1 2.083 Tonne

6.7 Provide & lay topping of concrete 1:2:4, including surface finishing & dividing in panels : 2" thick

0.000

Total: 0.000 Sft

Total with Enhance Factor @: 1 0.000 Sq.m

90
Quantity Surveyor (QS)
M/S RHC, ETA Cascade (JV)
Item Length Width Height Remarks /
Description No. Quantity
No. (ft.) (ft.) (ft.) Unit

6.8 Cement Plaster 1:5, upto 20' height 3/4" thick.

Walls Internal Plaster

Bed 4 14 10 560.000

" 4 12 10 480.000

Bath 4 6 10 240.000

" 4 5.833 10 233.320

Kitchen 2 6 10 120.000

" 2 10 10 200.000

Verandah 2 25.125 10 502.500

" 2 10 10 200.000

Sub Total: A 2,535.820 Sft

Take Qty @ 60% for 3/4" Thick Plaster 1,521.492 Sft

Door & Window Deductions

D1 2 3.5 7 49.000

D2 1 3 7 21.000

D3 2 2.5 7 35.000

W1 2 6 4.5 54.000

W2 1 4 4.5 18.000

V 1 1.5 1.5 2.250

Verandah Opening-1 1 8.75 8 70.000

Verandah Opening-2 1 11.625 8 93.000

Deduction Total: 342.250 Sft

Walls External Plaster

Horizontal Walls 2 37 12 888.000

Vertical Walls 2 24.25 12 582.000

Parapet Walls

Horizontal Walls 2 41 1.5 123.000

Vertical Walls 2 28.25 1.5 84.750

Sub Total: 1,677.750 Sft

Total: 2,856.992 Sft

Total with Enhance Factor @: 1 265.423 Sq.m

6.9 Cement plaster 1:5, upto 20' height 1/2" thick.

Qty as per Item No. 6.8 A (Internal Plaster) 2,535.820

91
Quantity Surveyor (QS)
M/S RHC, ETA Cascade (JV)
Item Length Width Height Remarks /
Description No. Quantity
No. (ft.) (ft.) (ft.) Unit

Take Qty @ 40% for 1/2" Thick Plaster 1,014.328 Sft

Total: 1,014.328 Sft

Total with Enhance Factor @: 1 94.234 Sq.m

6.10 Preparing surface and painting with emulsion paint; First coat

Qty as per Item No. 6.8 A (Internal Plaster) 2,535.820 Sft

Qty as per Item No. 6.8 A (Deductions) -342.250 Sft

Total: 2,193.570 Sft

Total with Enhance Factor @: 1 203.789 Sq.m

6.11 Preparing surface and painting with emulsion paint : 2nd & each subsequent coat.

Qty as per Item No. 6.10 2,193.570 Sft

Total: 2,193.570 Sft

Total with Enhance Factor @: 1 203.789 Sq.m

6.12 Distempering New surface : Three coats

Qty as per Item No. 6.57 978.246 Sft

Total: 978.246 Sft

Total with Enhance Factor @: 1 90.882 Sq.m

6.13 First class tile roofing including earth, mud plaster, gobri leeping, cement plaster etc. complete.

Building Slab 1 40.25 27.5 1,106.875

Total: 1,106.875 Sft

Total with Enhance Factor @: 1 102.832 Sq.m

6.14 Providing and fixing steel grated doors, complete with locking arrangement, angle iron frame 2"x2"x3/8" and
3/4" round bars 4" centre to centre.( for Main Gate)

Main Gate 1 9 8 72.000

Total: 72.000 Sft

Total with Enhance Factor @: 1 6.689 Sq.m

6.15 Providing and fixing steel grated doors, with 1/16" thick sheeting including angle iron frame 2"x2"x3/8" and
3/4" square bars 4" centre to centre with locking arrangement. (for Internal Doors)

D1 2 3.5 7 49.000

D2 1 3 7 21.000

D3 2 2.5 7 35.000

Total: 105.000 Sft

Total with Enhance Factor @: 1 9.755 Sq.m

6.16 Providing and Fixing steel windows with openable glazed panels With 22 SWG wire gauze : Glass pane 3mm

W1 2 6 4.5 54.000

W2 1 4 4.5 18.000

V 1 1.5 1.5 2.250

Total: 74.250 Sft

Total with Enhance Factor @: 1 6.898 Sq.m

92
Quantity Surveyor (QS)
M/S RHC, ETA Cascade (JV)
Item Length Width Height Remarks /
Description No. Quantity
No. (ft.) (ft.) (ft.) Unit

PLUMBING WORKS
6.17 Providing and Fixing glazed earthen ware WC squatting type with built-in foot rests : White

Bath 2 2.000

Total: 2.000 No

Total with Enhance Factor @: 1 2.000 No

6.18 Providing and Fixing glazed earthen ware WHB complete Size 22"x16" : Coloured with pedestal

Bath 0 0.000

Total: 0.000 No

Total with Enhance Factor @: 1 0.000 No

6.19 Providing & Fixing best quality 5 mm glass shelf 24"x5" with chromium plated brackets and railing

Bath 2 2.000

Total: 2.000 No

Total with Enhance Factor @: 1 2.000 No

6.20 Providing & Fixing best quality 5 mm mirror 22"x16" size

Bath 2 2.000

Total: 2.000 No

Total with Enhance Factor @: 1 2.000 No

6.21 Providing & Fixing CP towel rail 24" long 3/4" dia

Bath 2 2.000

Total: 2.000 No

Total with Enhance Factor @: 1 2.000 No

6.22 Providing and Fixing CP (chromium plated) toilet paper holder complete

Bath 2 2.000

Total: 2.000 No

Total with Enhance Factor @: 1 2.000 No

6.23 Providing and fixing chromium plated soap dish complete.

Bath 2 2.000

Total: 2.000 No

Total with Enhance Factor @: 1 2.000 No

6.24 Providing and Fixing glazed earthen ware low down flushing cistern 3 gallons (13.63 Litters) capacity

Bath 2 2.000

Total: 2.000 No

Total with Enhance Factor @: 1 2.000 No

6.25 Providing and Fixing stainless steel sink with drain board size (120 x 60 cm) 48"x24", including set of
brackets, waste pipe etc. - (Best Quality)

Kitchen Sink 1 1.000

Total: 1.000 No

Total with Enhance Factor @: 1 1.000 No

6.26 Providing and fixing chromium plated (CP) mixing valve for wash hand basin (WHB), sink or shower of
approved (Best) quality

Bath 2 2.000

Kitchen Sink 1 1.000

93
Quantity Surveyor (QS)
M/S RHC, ETA Cascade (JV)
Item Length Width Height Remarks /
Description No. Quantity
No. (ft.) (ft.) (ft.) Unit

Total: 3.000 No

Total with Enhance Factor @: 1 3.000 No

6.27 Providing and fixing chromium plated (CP) shower rose: Size 3/4"x6" (20mm x 150 mm) (Best Quality)

Bath 2 2.000

Total: 2.000 No

Total with Enhance Factor @: 1 2.000 No

6.28 Providing and Fixing 'P' trap of approved quality including GI grating & PCC chamber 4" (100 mm) glazed.

Bath 2 2.000

Kitchen 1 1.000

Total: 3.000 No

Total with Enhance Factor @: 1 3.000 No

6.29 Providing and fixing Fibre Glass , corrosion resistant, UV stabilized Water Tank : 300 gallons

1 1.000

Total: 1.000 No

Total with Enhance Factor @: 1 1.000 No

6.30 Septic Tank (int.Size: 7'x2'x5') complete

1 1.000

Total: 1.000 No

Total with Enhance Factor @: 1 1.000 No

6.31 Providing and Fixing GI pipe & including specials complete: 1/2" dia (light)

Bath 2 40 80.000

Kitchen 1 30 30.000

Pump to Tank to Bath, Toilet & Kitchen 4 54.521 218.084

Total: 328.084 Rft

Total with Enhance Factor @: 1 100.000 Rm

6.32 Supply and fixing of 1.5 HP Monoblock water pump 1.25"x1" single phase upto 130 ft. head (Type DE-S2) i/c
all accessories

1 1.000

Total: 1.000 No

Total with Enhance Factor @: 1 1.000 No

94
Quantity Surveyor (QS)
M/S RHC, ETA Cascade (JV)
Item Length Width Height Remarks /
Description No. Quantity
No. (ft.) (ft.) (ft.) Unit

ELECTRICAL WORKS
6.33 Supply and Erection girder clamp hook, 5/8" dia for hanging ceiling fans

8 8.000

Total: 8.000 No

Total with Enhance Factor @: 1 8.000 No

6.34 Supply and Erection best quality AC ceiling fan complete with GI rod, canopy, blades & regulator : 36" sweep

8 8.000

Total: 8.000 No

Total with Enhance Factor @: 1 8.000 No

6.35 Supply and Erection best quality exhaust fan complete with Shutter & regulator : 12"sweep

Bath & Kitchen 3 3.000

Total: 3.000 No

Total with Enhance Factor @: 1 3.000 No

6.36 Supply and Erection PVC pipe for wiring purpose complete Recessed in walls including chase etc. : 3/4" i/d

216.535 216.535

Total: 216.535 Rft

Total with Enhance Factor @: 1 66.000 Rm

6.37 Supply and Erection Sahl wood strip batten for wiring complete 3/4".

1 26.247 26.247

Total: 26.247 Rft

Total with Enhance Factor @: 1 8.000 Rm

6.38 Supply and Erection single core PVC insulated copper conductor 250/440 V grade cable : 3/0.036"

229.659 229.659

Total: 229.659 Rft

Total with Enhance Factor @: 1 70.000 Rm

6.39 Supply & erection of 25 KVA, 11/0.4 KV Transformer

1 1.000

Total: 1.000 No

Total with Enhance Factor @: 1 1.000 No

6.40 Supply & erection of HT pole 36' High(H-Type)

4 4.000

Total: 4.000 No

Total with Enhance Factor @: 1 4.000 No

6.41 Supply & erection LT Pole 31' High (H-Type)

2 2.000

Total: 2.000 No

Total with Enhance Factor @: 1 2.000 No

95
Quantity Surveyor (QS)
M/S RHC, ETA Cascade (JV)
Item Length Width Height Remarks /
Description No. Quantity
No. (ft.) (ft.) (ft.) Unit

6.42 Supply and Erection MS sheet box of 16 SWG, 4"deep with 3/16" thick Bakelite sheet top etc. complete :

4 4.000

Total: 4.000 No

Total with Enhance Factor @: 1 4.000 No

6.43 Supply and Erection MS sheet box of 16 SWG, 4"deep with 3/16" thick Bakelite sheet top etc. complete :
12"x14"

1 1.000

Total: 1.000 No

Total with Enhance Factor @: 1 1.000 No

6.44 Supply and Erection of iron/aluminium clad, 500V main switch Double pole : 30/35 Amp.

1 1.000

Total: 1.000 No

Total with Enhance Factor @: 1 1.000 No

6.45 Supply and Erection tube light, including rod, choke etc. complete Single rod (40 watts) with 1 choke & 1
starter

10 10.000

Total: 10.000 No

Total with Enhance Factor @: 1 10.000 No

6.46 Supply and Erection 3 pin 10/15 Amp. wall socket : Open type

4 4.000

Total: 4.000 No

Total with Enhance Factor @: 1 4.000 No

6.47 Supply and Erection button holder/angle holder Bakelite large size

16 16.000

Total: 16.000 No

Total with Enhance Factor @: 1 16.000 No

6.48 Supply and Erection circuit breaker (imported) on sahl wood board complete : 20/25/30 Amp.

2 2.000

Total: 2.000 No

Total with Enhance Factor @: 1 2.000 No

6.49 Making hole in wall with necessary masonry work for exhaust fan any size complete

3 3.000

Total: 3.000 No

Total with Enhance Factor @: 1 3.000 No

6.50 Supply and Erection best quality exhaust fan complete with shutter & regulator : 12"sweep

0.000

Total: 0.000 No

Total with Enhance Factor @: 1 0.000 No

96
Quantity Surveyor (QS)
M/S RHC, ETA Cascade (JV)
CONSTRUCTION OF BAZ AIL SMALL DAM, DISTRICT KURRAM
DETAIL COST ESTIMATE
SITE OFFICE / INSPECTION HUT BAR BENDING SCHEDULE
Net Length (m)

Spacing Nos Per Lap Lap Cut


Sr. Nos of Nos of
Description Bar dia C/C of Length Length Length 10mm 13mm 16mm 19mm 25mm Bar Shape
No. Item Bar
(mm) Laps (m) (m) (m)

Foundation

0.68

0.68
1 F-1 Base Bottom Main Bars #13 12 4 411 - 0.780 - 6.275 - 10,316.100 - - - 4.925

0.68

0.68
2 F-1 Base Bottom Dist.. #13 12 4 411 - 0.780 - 6.275 - 10,316.100 - - - 4.925

Porch Column

1.50
1 Column Dowels #19 4 6 - 1.140 - 7.092 - - - 170.208 - 5.592

0.50
2 Column Main Bars #19 4 6 - 1.140 - 10.960 - - - 263.040 - 10.460

0.500
3 Column Stirrups #10 6 4 2058 - 0.600 - 2.856 23,510.592 - - - - 2.356

Lintels

1.43

1.43
1 L1 Bottom Main Bars #19 2 3 1 1.140 1.140 13.415 - - - 80.490 - 9.425

1.43

1.43
2 L1 Top Main Bars #13 2 2 1 0.780 0.780 13.055 - 52.220 - - - 9.425

1.250

0.68
3 L1 Stirrups #10 7 2 1347 - 0.600 - 4.350 11,718.900 - - - -

0.68
0.500

1.250

1.93

1.93
4 L2 Bottom Main Bars #13 4 3 - 0.780 - 11.275 - 135.300 - - - 7.425

1.93

1.93
5 L2 Top Main Bars #13 4 2 - 0.780 - 11.275 - 90.200 - - - 7.425

97
Quantity Surveyor (QS)
M/S RHC,ETA Cascade (JV)
Net Length (m)

Spacing Nos Per Lap Lap Cut


Sr. Nos of Nos of
Description Bar dia C/C of Length Length Length 10mm 13mm 16mm 19mm 25mm Bar Shape
No. Item Bar
(mm) Laps (m) (m) (m)
1.750

0.68
6 L2 Stirrups #10 4 4 1857 - 0.600 - 5.350 39,739.800 - - - -

0.68
0.500

1.750

0.93

0.93
7 L3 Bottom Main Bars #13 1 2 - 0.780 - 10.275 - 20.550 - - - 8.425

0.93

0.93
8 L3 Top Main Bars #13 1 2 - 0.780 - 10.275 - 20.550 - - - 8.425

0.750

0.68
9 L3 Stirrups #10 5 1 1686 - 0.600 - 3.350 5,648.100 - - - -

0.68
0.500

0.750

1.93

1.93
10 L4 Bottom Main Bars #13 3 2 - 0.780 - 9.275 - 55.650 - - - 5.425

1.93

1.93
11 L4 Top Main Bars #13 3 2 - 0.780 - 9.275 - 55.650 - - - 5.425

1.750

0.68
12 L4 Stirrups #10 5 3 1086 - 0.600 - 5.350 17,430.300 - - - -

0.68
0.500

1.750

1.93

1.93
13 L4 Bottom Main Bars #13 2 2 - 0.780 - 8.775 - 35.100 - - - 4.925

1.93

1.93
14 L4 Top Main Bars #13 2 2 - 0.780 - 8.775 - 35.100 - - - 4.925

1.750

0.68
15 L4 Stirrups #10 5 2 986 - 0.600 - 5.350 10,550.200 - - - -

0.68
0.500

1.750

1.93

1.93
16 L4 Bottom Main Bars #13 2 2 - 0.780 - 8.025 - 32.100 - - - 4.175

1.93

1.93
17 L4 Top Main Bars #13 2 2 - 0.780 - 8.025 - 32.100 - - - 4.175

1.750

0.68
18 L4 Stirrups #10 5 2 836 - 0.600 - 5.350 8,945.200 - - - -

0.68
0.500

98
Quantity Surveyor (QS)
M/S RHC,ETA Cascade (JV)
Net Length (m)

Spacing Nos Per Lap Lap Cut


Sr. Nos of Nos of
Description Bar dia C/C of Length Length Length 10mm 13mm 16mm 19mm 25mm Bar Shape
No. Item Bar
(mm) Laps (m) (m) (m)
1.750

1.93

1.93
19 L4 Bottom Main Bars #13 2 2 1 0.780 0.780 14.555 - 58.220 - - - 9.925

1.93

1.93
20 L4 Top Main Bars #13 2 2 1 0.780 0.780 14.555 - 58.220 - - - 9.925

1.750

0.68
21 L4 Stirrups #10 5 2 1986 - 0.600 - 5.350 21,250.200 - - - -

0.68
0.500

1.750

1.93

1.93
22 L4 Bottom Main Bars #13 5 2 - 0.780 - 7.775 - 77.750 - - - 3.925

1.93

1.93
23 L4 Top Main Bars #13 5 2 - 0.780 - 7.775 - 77.750 - - - 3.925

1.750

0.68
24 L4 Stirrups #10 5 5 786 - 0.600 - 5.350 21,025.500 - - - -

0.68
0.500

1.750

0.93

0.93
25 L4 Bottom Main Bars #13 1 2 - 0.780 - 5.775 - 11.550 - - - 3.925

0.93

0.93
26 L4 Top Main Bars #13 1 2 - 0.780 - 5.775 - 11.550 - - - 3.925

0.750

0.30
27 L4 Stirrups #10 5 1 786 - 0.600 - 2.600 2,043.600 - - - -

0.30
0.500

0.750
Roof Beam

1.43

1.43
1 B-1 Bottom Main Bars #19 1 2 1 1.140 1.140 20.665 - - - 41.330 - 16.675

2 B-1 Middle / Temp Bars #19 1 2 1 1.140 1.140 17.815 - - - 35.630 - 16.675

1.43

1.43
3 B-1 Top Main Bars #19 1 2 1 1.140 1.140 20.665 - - - 41.330 - 16.675

1.250

99
Quantity Surveyor (QS)
M/S RHC,ETA Cascade (JV)
Net Length (m)

Spacing Nos Per Lap Lap Cut


Sr. Nos of Nos of
Description Bar dia C/C of Length Length Length 10mm 13mm 16mm 19mm 25mm Bar Shape
No. Item Bar
(mm) Laps (m) (m) (m)

0.93
4 B-1 Stirrups #10 4 1 4170 - 0.600 - 4.850 20,224.500 - - - -

0.93
0.500

1.250

1.43

1.43
5 B-2 Bottom Main Bars #19 2 4 1 1.140 1.140 21.415 - - - 171.320 - 17.425

6 B-2 Middle / Temp Bars #19 2 2 1 1.140 1.140 18.565 - - - 74.260 - 17.425

1.43

1.43
7 B-2 Top Main Bars #19 2 2 1 1.140 1.140 21.415 - - - 85.660 - 17.425

1.250

0.93
8 B-2 Stirrups #10 4 2 4357 - 0.600 - 4.850 42,262.900 - - - -

0.93
0.500

1.250

B-3A, 3B, 3C Bottom Main

1.93

1.93
9 #19 1 3 2 1.140 2.280 29.919 - - - 89.757 - 23.789
Bars

B-3A, 3B, 3C Middle / Temp


10 #13 1 2 1 0.780 0.780 24.569 - 49.138 - - - 23.789
Bars

1.93

1.93
11 B-3A, 3B, 3C Top Main Bars #13 1 2 2 0.780 1.560 29.199 - 58.398 - - - 23.789

1.750

0.68
12 B-3A, 3B Stirrups #10 5 1 2690 - 0.600 - 5.350 14,391.500 - - - -

0.68
0.500

1.750

3.68

3.68
13 B-3C Bottom Main Bars #19 1 3 1 1.140 1.140 18.759 - - - 56.277 - 10.269

14 B-3C Middle / Temp Bars #13 1 4 - 0.780 - 10.269 - 41.076 - - - 10.269

3.500

0.68
15 B-3C Stirrups #10 10 1 1028 - 0.600 - 8.850 9,097.800 - - - -

0.68
0.500

3.500

1.43

1.43
16 B-4 Bottom Main Bars #19 1 2 1 1.140 1.140 20.665 - - - 41.330 - 16.675

100
Quantity Surveyor (QS)
M/S RHC,ETA Cascade (JV)
Net Length (m)

Spacing Nos Per Lap Lap Cut


Sr. Nos of Nos of
Description Bar dia C/C of Length Length Length 10mm 13mm 16mm 19mm 25mm Bar Shape
No. Item Bar
(mm) Laps (m) (m) (m)
17 B-4 Middle / Temp Bars #19 1 2 1 1.140 1.140 17.815 - - - 35.630 - 16.675

1.43

1.43
18 B-4 Top Main Bars #19 1 2 1 1.140 1.140 20.665 - - - 41.330 - 16.675

1.250

0.93
19 B-4 Stirrups #10 4 1 4170 - 0.600 - 4.850 20,224.500 - - - -

0.93
0.500

1.250

0.68

0.68
20 Pergola 3-D #13 3 2 - 0.780 - 11.619 - 69.714 - - - 10.269

0.25

0.25
21 Pergola 3-D Ties #10 4 3 2568 - 0.600 - 1.175 9,052.200 - - - - 0.675

0.68

0.68
22 Pergola 3-D #13 7 2 - 0.780 - 9.442 - 132.188 - - - 8.092

0.25

0.25
23 Pergola 3-D Ties #10 4 7 1587 - 0.600 - 1.175 13,053.075 - - - - 0.675

Roof Slab Bottom Steel

Bath
1 #10 10 2 1044 - 0.600 - 10.425 21,767.400 - - - - 10.425
Bottom Main Bar

Bath
2 #10 10 2 1044 - 0.600 - 10.425 21,767.400 - - - - 10.425
Bottom Dist.. Bar

Bed
3 #10 10 1 2544 1 0.600 0.600 17.525 44,583.600 - - - - 16.925
Bottom Main Bar

Bed
4 #10 10 1 1694 2 0.600 1.200 26.625 45,102.750 - - - - 25.425
Bottom Dist.. Bar

Kitchen & Servant


5 #10 10 2 1769 1 0.600 0.600 13.525 47,851.450 - - - - 12.925
Bottom Main Bar

Kitchen & Servant


6 #10 10 2 1294 1 0.600 0.600 18.275 47,295.700 - - - - 17.675
Bottom Dist.. Bar

Dining & Lounge


7 #10 10 2 2094 1 0.600 0.600 17.525 73,394.700 - - - - 16.925
Bottom Main Bar

101
Quantity Surveyor (QS)
M/S RHC,ETA Cascade (JV)
Net Length (m)

Spacing Nos Per Lap Lap Cut


Sr. Nos of Nos of
Description Bar dia C/C of Length Length Length 10mm 13mm 16mm 19mm 25mm Bar Shape
No. Item Bar
(mm) Laps (m) (m) (m)
Bottom Main Bar

Dining & Lounge


8 #10 10 2 1694 1 0.600 0.600 21.525 72,926.700 - - - - 20.925
Bottom Dist.. Bar

Reception Lobby
9 #10 10 2 2144 1 0.600 0.600 13.525 57,995.200 - - - - 12.925
Bottom Main Bar

Reception Lobby
10 #10 10 2 1294 1 0.600 0.600 22.025 57,000.700 - - - - 21.425
Bottom Dist.. Bar

Podium
11 #10 10 2 1419 - 0.600 - 7.675 21,781.650 - - - - 7.675
Bottom Main Bar

Podium
12 #10 10 2 769 1 0.600 0.600 14.775 22,723.950 - - - - 14.175
Bottom Dist.. Bar

Porch
13 #10 5.5 1 3624 1 0.600 0.600 17.525 63,510.600 - - - - 16.925
Bottom Main Bar

Porch
14 #10 7 1 2419 1 0.600 0.600 20.525 49,649.975 - - - - 19.925
Bottom Dist.. Bar
Roof Slab Top Steel

Bath
1 #10 10 2 626 - 0.600 - 4.375 5,477.500 - - - - 4.375
Top Main Bar

Bath
2 #10 12 2 92 - 0.600 - 10.250 1,886.000 - - - - 10.250
Top Dist.. Bar

Bath
3 #10 10 2 801 1 0.600 0.600 13.725 21,987.450 - - - - 13.125
Top Main Bar

Bath
4 #10 12 2 131 - 0.600 - 7.000 1,834.000 - - - - 7.000
Top Dist.. Bar

Bed
5 #10 10 1 2476 - 0.600 - 4.375 10,832.500 - - - - 4.375
Top Main Bar

Bed
6 #10 12 1 366 2 0.600 1.200 27.950 10,229.700 - - - - 26.750
Top Dist.. Bar

Bed
7 #10 10 2 1201 1 0.600 0.600 14.100 33,868.200 - - - - 13.500
Top Main Bar

102
Quantity Surveyor (QS)
M/S RHC,ETA Cascade (JV)
Net Length (m)

Spacing Nos Per Lap Lap Cut


Sr. Nos of Nos of
Description Bar dia C/C of Length Length Length 10mm 13mm 16mm 19mm 25mm Bar Shape
No. Item Bar
(mm) Laps (m) (m) (m)
Top Main Bar

Bed
8 #10 12 2 1126 - 0.600 - 8.000 18,016.000 - - - - 8.000
Top Dist.. Bar

Bed
9 #10 9 1 2362 - 0.600 - 9.083 21,454.046 - - - - 9.083
Top Main Bar

Bed
10 #10 12 1 758 1 0.600 0.600 13.225 10,024.550 - - - - 12.625
Top Dist.. Bar

Kitchen & Servant


11 #10 10 2 1614 - 0.600 - 4.333 13,986.924 - - - - 4.333
Top Main Bar

Kitchen & Servant


12 #10 12 2 362 - 0.600 - 9.459 6,848.316 - - - - 9.459
Top Dist.. Bar

Kitchen & Servant


13 #10 10 2 1001 - 0.600 - 4.333 8,674.666 - - - - 4.333
Top Main Bar

Kitchen & Servant


14 #10 12 2 522 - 0.600 - 5.750 6,003.000 - - - - 5.750
Top Dist.. Bar

Kitchen & Servant


15 #10 5.5 2 1819 - 0.600 - 9.083 33,043.954 - - - - 9.083
Top Main Bar

Kitchen & Servant


16 #10 12 2 758 - 0.600 - 5.750 8,717.000 - - - - 5.750
Top Dist.. Bar

Dining & Lounge


17 #10 10 2 1001 - 0.600 - 4.333 8,674.666 - - - - 4.333
Top Main Bar

Dining & Lounge


18 #10 12 2 362 - 0.600 - 7.667 5,550.908 - - - - 7.667
Top Dist.. Bar

Dining & Lounge


19 #10 10 2 1401 - 0.600 - 4.333 12,141.066 - - - - 4.333
Top Main Bar

Dining & Lounge


20 #10 12 2 362 - 0.600 - 9.000 6,516.000 - - - - 9.000
Top Dist.. Bar

Dining & Lounge


21 #10 10 2 1801 - 0.600 - 5.500 19,811.000 - - - - 5.500
Top Main Bar

103
Quantity Surveyor (QS)
M/S RHC,ETA Cascade (JV)
Net Length (m)

Spacing Nos Per Lap Lap Cut


Sr. Nos of Nos of
Description Bar dia C/C of Length Length Length 10mm 13mm 16mm 19mm 25mm Bar Shape
No. Item Bar
(mm) Laps (m) (m) (m)

Dining & Lounge


22 #10 12 2 459 - 0.600 - 11.000 10,098.000 - - - - 11.000
Top Dist.. Bar

Dining & Lounge


23 #10 10 2 1401 - 0.600 - 9.083 25,450.566 - - - - 9.083
Top Main Bar

Dining & Lounge


24 #10 12 2 758 - 0.600 - 9.000 13,644.000 - - - - 9.000
Top Dist.. Bar

Reception Lobby
25 #10 9 1 1223 - 0.600 - 11.750 14,370.250 - - - - 11.750
Top Main Bar

Reception Lobby
26 #10 12 1 980 - 0.600 - 7.500 7,350.000 - - - - 7.500
Top Dist.. Bar

27 Corner Extra Top Bars #13 10 3 - 0.780 - 5.500 - 165.000 - - - 5.500

Building Parapet Wall Main

0.46

2.00
27 #10 10 1 21397 - 0.600 - 4.420 94,574.740 - - - - 1.960
Bar

Building Parapet Wall Dist..


28 #10 12 1 165 17 0.600 10.200 224.160 36,986.400 - - - - 213.960
Bar

Building Parapet Wall Extra


29 #13 1 2 17 0.780 13.260 227.220 - 454.440 - - - 213.960
Bar

Porch
30 #10 10 2 2001 - 0.600 - 4.250 17,008.500 - - - - 4.250
Top Main Bar

Porch
31 #10 12 2 355 - 0.600 - 12.000 8,520.000 - - - - 12.000
Top Dist.. Bar

Porch
32 #10 10 2 1701 - 0.600 - 5.000 17,010.000 - - - - 5.000
Top Main Bar

Porch
33 #10 12 2 418 - 0.600 - 10.500 8,778.000 - - - - 10.500
Top Dist.. Bar

0.46

2.00
34 Porch Parapet Wall Main Bar #10 10 1 7297 - 0.600 - 4.420 32,252.740 - - - - 1.960

104
Quantity Surveyor (QS)
M/S RHC,ETA Cascade (JV)
Net Length (m)

Spacing Nos Per Lap Lap Cut


Sr. Nos of Nos of
Description Bar dia C/C of Length Length Length 10mm 13mm 16mm 19mm 25mm Bar Shape
No. Item Bar
(mm) Laps (m) (m) (m)

35 Porch Parapet Wall Dist.. Bar #10 12 1 165 5 0.600 3.000 75.960 12,533.400 - - - - 72.960

36 Porch Parapet Wall Extra Bar #13 1 2 5 0.780 3.900 76.860 - 153.720 - - - 72.960

Total Length (Rm) 1,501,674.684 22,615.434 - 1,227.592 -


Unit Weight (Kg / m) 0.560 0.994 1.552 2.235 3.973
Weight (Kg) 840,937.823 22,479.741 - 2,743.668 -
Total Weight (Kg) 866,161.232
Total Weight (Tonne) 392.885

105
Quantity Surveyor (QS)
M/S RHC,ETA Cascade (JV)
CONSULTANCY SERVICES FOR REVIEW/ UPDATION OF DESIGN AND CONSTRUCTION
SUPERVISION OF BAZ ALI SMALL DAM
(DISTRICT KURRAM)

JUNE-2022
A Joint Venture of

(Lead Firm) Cascade Group of Engineering Consultants (CGEC)


160 Airline Society Khayaban- e- Jinnah, near Shaukat Khanum Lahore Pakistan
Tel: 042 35314993, Fax: 042 35956009

In association with

106
A
NULL
NOTES:-

11
65 EXISTING ROAD 1. ALL LEVELS AND DIMENSIONS ARE IN METER UNLESS
INDICATED OTHERWISE.

50
11
G.P.S

NU
LL
1165
50 CANAL / DISTY.

A
11

1160 HOUSES

HOUSE DAM ACCESS ROAD EXISTING HOUSES


11
40
11
60

INTAKE TOWER
1150 GRAVE YARD
NULLA
1150

0+090
1142

11
STABILIZING

BASIN

60
1175
U/S 1135 BM-07 NALLA
MAIN BM-06
115
5 D AM 1155 EXISTING TRACK

NULL
D/S

11
MAIN CANAL BM-05 MINOR NALLA

A
30
NU
LL 11 BM-12
1170 11
A 60
1150
-0+15
0
45
ROAD/ TRACK
BM-13
-0+140
0
-0+13

-0+120
0

1170
-0+11
0

EXISTING TRACK
-0+10
11

0
-0+09

CULTIVATION
0
-0+08
0
-0+07
55

0
-0+06
50
-0+0
40
-0+0
30

AREA
-0+0
20
-0+0

50
10
-0+0
00 ST
0+0CRE
EE 10
OG 0+0

11
20 IN
0+0 G BAS

CONTOUR MAJOR
30
LLIN0+0
STI 40 ON
0+0 APR
NE 50

BM-04
STO 0+0
60
0+0
70 0+000
0+0
0+010

80

SPILLWAY
0+020

0+0
0+030

0
0+040

0+09
0+050

0+060

0+070

00
0+080

0+090

0+100

0+110

0+120

0+130

0+1
10 PROTECTION
GABION WALL
CREST EL. 1125.50
0+1
0+1
20

0+1
30
40
11
25
11

0+1 4
50
3

0+1 6

BM-09
5
60
0+1
70 2
75

0+1

50
80
0+1
0
19
12

0+

11
200 1

0+
210

GR
7
30

CONTOUR MINOR
0+

9
220
0+
05

11

BM-03

AV
PROPOSED REALIGNED BM-01 112
0
BAZ ALI BM-08 BM-01

EY
KACHA TRACK
VILLAGE BENCH MARK

AR
PROTECTION BM-14
20
11 BM-11

D
GABION WALL BM-02 HOUSES A
11
40 LL BM-16 BM-15
NU
45

BM-10
11

HOUSE
DISTY-1
15
35

15
11

1130 11

NULLA
11

1160
5
112

11
MOUNTAIN 1110

55
MAIN CANAL
EXISTING ROAD

HOUSES 00
5 11 0 200 400 600 800 1000 m
110

11
25
0
109
11
20 SCALE

BAZ ALI BENCH MARK LIST


11
35
1115
REFERENCE DRAWINGS :-
BM-23
00

BM NO. EASTING NORTHING ELEVATION


11

11
15

11
BM-24

05
BM-01 E = 613993.492 N = 3723997.075 EL = 1137.912
5
BM-02 E = 614053.134 N = 3723941.737 EL = 1137.915 109
1100
DRAWING IS RELEASED
BM-03 E = 614506.530 N = 3724218.793 EL = 1137.944 NU
LL DISTY-2 FOR CONSTRUCTION
110

BM-04 E = 614507.314 N = 3724251.996 EL = 1139.063 A 90


BM-17
0

10

BM-05 E = 614436.522 N = 3724782.520 EL = 1139.790


BM-06 E = 614416.203 N = 3724888.574 EL = 1140.058 BM-18
BM-07 E = 614371.251 N = 3724896.352 EL = 1141.369 HOUSES REV. DATE BY DESCRIPTION CHKD. CERT. APPR.
BM-08 E = 615024.857 N = 3724260.851 EL = 1136.503 NO.
CLIENT:
BM-09 E = 615043.533 N = 3724315.716 EL = 1137.827 BM-22
PSU SMALL DAM SECTION MERGED AREAS
BM-10 E = 615263.918 N = 3724057.976 EL = 1123.785 85

10
10
BM-21 IRRIGATION DEPARTMENT . KPK.

80
BM-11 E = 615289.109 N = 3724100.434 EL = 1132.514 HOUSES BM-19
BM-12 E = 615613.431 N = 3724784.588 EL = 1136.386 CONSULTANTS: A J.V OF
BM-20 REHMAN HABIB CONSULTANTS (PVT) LTD.
BM-13 E = 615638.045 N = 3724749.067 EL = 1139.354
80
10

BM-14 E = 615728.690 N = 3724182.080 EL = 1127.283 1070 CASCADE GROUP


BM-15 E = 615799.229 N = 3724140.569 EL = 1134.346 HOUSES 85 OF ENGINEERING & CONSULTANTS
10

BM-16 E = 615736.149 N = 3724097.827 EL = 1137.377 IN ASSOCIATION WITH:


NU

1085
BM-17 E = 616429.918 N = 3722874.139 EL = 1110.738 HOUSES ENGINEERING & TECHNICAL ASSOCIATES
LL

75
10
A

BM-18 E = 616462.862 N = 3722831.693 EL = 1108.796 5


PROJECT:
106

BM-19 E = 616971.289 N = 3722372.518 EL = 1089.832


CONSULTANCY SERVICES FOR REVIEW / UPDATION
0
107 OF DESIGN AND CONSTRUCTION SUPERVISION OF
BM-20 E = 617023.260 N = 3722361.363 EL = 1088.007
BAZ ALI SMALL DAM, DISTRICT KURRAM
BM-21 E = 617171.406 N = 3722575.436 EL = 1095.390
EXISTING ROAD TITLE: BAZ ALI SMALL DAM
BM-22 E = 617143.153 N = 3722621.464 EL = 1101.835
DISTRICT KURRAM
BM-23 E = 616967.212 N = 3723393.193 EL = 1100.962
BM-24 E = 616942.770 N = 3723375.309 EL = 1103.183
65
10
GENERAL LAYOUT PLAN WITH BENCH MARK
BM-26 E = 616584.625 N = 3721171.794 EL = 1142.896 BM-26 0
10
6 DRAWN DESIGNED CHECKED APPROVED SCALE DATE
BM-27 E = 616575.572 N = 3721133.108 EL = 1149.632
Usman Y. Arshad I. Zeeshan S. Khurshid Z. Shown JUN,2022

55
10
BM-27 DRG.No:- BAD-CD-GEN-02 SHEET:- SUB SH.- ----

107
108
109
110
111
112
113
NOTES:-

1160 1160 1. ALL DIMENSIONS AND LEVELS ARE IN METERS UNLESS


U/S BEDDING MATERIAL CL OF DAM D/S
OTHERWISE MENTIONED.
5.00 2. EARTHFILL, CORE, FILTER & CLAY BLANKET MATERIALS TO BE
NSL COMPACTED AT 95% OF MAXIMUM DRY DENSITY DETERMINED
THROUGH MODIFIED AASHTO COMPACTION T120.
CLAY CORE 3. THE GRADATION CURVES TO BE FOLLOWED FOR EARTHFILL,
2 FILTER (FINE AND COARSE FILTER), CORE & RIPRAP MATERIALS.
2
1150 1 1150 4. FILTER MATERIAL WILL REQUIRED PROCESSING / SCREENING
1 FROM SUITABLE AVAILABLE MATERIAL AT SITE.
6.00 THE BASE OF THE TRENCH IS 5. CORE SHOULD BE PLACED ON MINIMUM 5M BELOW FROM
CORE TRENCH DESIGNED TO BE 1.00 m IN BED NSL OR AS DIRECTED BY SITE ENGINEER.
ROCK AND DEPTH OF THE CORE 6. THE RIPRAP MATERIAL IS TO WITHSTAND VERY SEVERE ACTION
TRENCH MAY BE DECIDED AS FROM WAVES AND DESTRUCTIVE FORCES ASSOCIATED WITH
PER SITE CONDITION. FREEZING AND THAWING, WETTING AND DRYING.
7. THE MINIMUM DEPTH OF CORE IS 5M AND IF CHANGING IS
1140 1140
REQUIRED THEN THE SITE ENGINEER WILL DECIDE IT AS PER
SITE CONDITION.
8. ATTERBERG'S LIMIT TEST SHOULD BE CONDUCTED FOR
SELECTION OF THE CORE MATERIAL. ONLY THOSE MATERIALS
ARE ALLOWED THAT HAVE PLASTIC INDEX VALUE RANGE OF
(10-12).
9. THE SIDE SLOPE OF CORE TRENCH SHALL BE 1V:1H OR AS
1130 1130 DIRECTED BY SITE ENGINEER.
10. THE CUT SLOPE IN NATURAL GROUND SHALL BE MINIMUM
1V:1H OR AS DIRECTED BY SITE ENGINEER.

1120 1120

1155.741

1155.807

1155.666
CUT / FILL
LEVEL

10.64
-6.12
OFFSET

0.00
1147.411
1146.803

1151.342

1153.345

1155.039

1155.677
1155.572

1155.813

1155.807

1155.796

1155.696

1155.476

1155.344

1155.080

1154.619

1154.579

1153.536
NSL
-50.147

-44.875

-34.837

-28.127

-18.112

-15.419
-14.683

20.301

26.574

51.589

56.705

62.278

70.000
-2.489

9.151
4.589
0.000
OFFSET

RD -0+030
0 5 10 15 20 25 M

SCALE

REFERENCE DRAWINGS :-
BAD-CD-MD-01,02,03

DRAWING IS RELEASED

FOR CONSTRUCTION

REV. DATE BY DESCRIPTION CHKD. CERT. APPR.


NO.
CLIENT:
PSU SMALL DAM SECTION MERGED AREAS
IRRIGATION DEPARTMENT . KPK.
CONSULTANTS: A J.V OF
REHMAN HABIB CONSULTANTS (PVT) LTD.
CASCADE GROUP
OF ENGINEERING & CONSULTANTS
IN ASSOCIATION WITH:
ENGINEERING & TECHNICAL ASSOCIATES
PROJECT:
CONSULTANCY SERVICES FOR REVIEW / UPDATION
OF DESIGN AND CONSTRUCTION SUPERVISION OF
BAZ ALI SMALL DAM, DISTRICT KURRAM
TITLE:
BAZ ALI DAM
DISTRICT KURRAM
TITLE:
MAIN DAM CROSS SECTIONS
DRAWN DESIGNED CHECKED APPROVED SCALE DATE
Usman Y. Arshad I. Zeeshan S. Khurshid Z. Shown JUN,2022
DRG.No:- BAD-CD-MD-04 SHEET:- 25 OF 25 SUB SH.- ----

Xref .\BAZ ALI-SEAL-FOR MAIN DAM.dwg


114
1160 U/S D/S 1160 NOTES:-
CL OF DAM
BEDDING MATERIAL
5.00
NSL 1. ALL DIMENSIONS AND LEVELS ARE IN METERS UNLESS
OTHERWISE MENTIONED.
2. EARTHFILL, CORE, FILTER & CLAY BLANKET MATERIALS TO BE
2
2
CLAY CORE COMPACTED AT 95% OF MAXIMUM DRY DENSITY DETERMINED
1150 1 1150 THROUGH MODIFIED AASHTO COMPACTION T120.
1 3. THE GRADATION CURVES TO BE FOLLOWED FOR EARTHFILL,
6.00 THE BASE OF THE TRENCH IS FILTER (FINE AND COARSE FILTER), CORE & RIPRAP MATERIALS.
CORE TRENCH DESIGNED TO BE 1.00 m IN BED 4. FILTER MATERIAL WILL REQUIRED PROCESSING / SCREENING
ROCK AND DEPTH OF THE CORE
FROM SUITABLE AVAILABLE MATERIAL AT SITE.
TRENCH MAY BE DECIDED AS
PER SITE CONDITION.
5. CORE SHOULD BE PLACED ON MINIMUM 5M BELOW FROM
NSL OR AS DIRECTED BY SITE ENGINEER.
1140 1140 6. THE RIPRAP MATERIAL IS TO WITHSTAND VERY SEVERE ACTION
FROM WAVES AND DESTRUCTIVE FORCES ASSOCIATED WITH
FREEZING AND THAWING, WETTING AND DRYING.
7. THE MINIMUM DEPTH OF CORE IS 5M AND IF CHANGING IS
REQUIRED THEN THE SITE ENGINEER WILL DECIDE IT AS PER
SITE CONDITION.
8. ATTERBERG'S LIMIT TEST SHOULD BE CONDUCTED FOR
SELECTION OF THE CORE MATERIAL. ONLY THOSE MATERIALS
1130 1130
ARE ALLOWED THAT HAVE PLASTIC INDEX VALUE RANGE OF
(10-12).
9. THE SIDE SLOPE OF CORE TRENCH SHALL BE 1V:1H OR AS
DIRECTED BY SITE ENGINEER.
10. THE CUT SLOPE IN NATURAL GROUND SHALL BE MINIMUM
1V:1H OR AS DIRECTED BY SITE ENGINEER.
1120 1120

1154.476

1154.989

1155.752
CUT / FILL
LEVEL

10.49
-5.49
OFFSET

1154.989 0.00

1149.801
1142.624

1154.132

1155.790

1153.104
1139.053

1140.956
1141.839

1148.275

1153.487

1154.266

1155.723

1155.339
1155.323

1153.816
1153.807
NSL
-62.564

-48.002

-28.220

-11.132
-46.076

-43.887

-13.996

48.585
49.865
30.292
31.880

55.064

70.000
-7.741

11.974
0.000

8.583
OFFSET

RD -0+010

0 5 10 15 20 25 M

1160 U/S D/S 1160


BEDDING MATERIAL CL OF DAM SCALE
5.00
NSL
REFERENCE DRAWINGS :-

CLAY CORE 2 BAD-CD-MD-01,02,03


2
1150 1 1150
1
6.00 THE BASE OF THE TRENCH IS DRAWING IS RELEASED
CORE TRENCH DESIGNED TO BE 1.00 m IN BED
ROCK AND DEPTH OF THE CORE
TRENCH MAY BE DECIDED AS FOR CONSTRUCTION
PER SITE CONDITION.

1140 1140

REV. DATE BY DESCRIPTION CHKD. CERT. APPR.


NO.
CLIENT:
PSU SMALL DAM SECTION MERGED AREAS
1130 1130 IRRIGATION DEPARTMENT . KPK.
CONSULTANTS: A J.V OF
REHMAN HABIB CONSULTANTS (PVT) LTD.
CASCADE GROUP
OF ENGINEERING & CONSULTANTS
1120 1120 IN ASSOCIATION WITH:
1155.471

1155.870

1155.707

CUT / FILL ENGINEERING & TECHNICAL ASSOCIATES


LEVEL
PROJECT:
CONSULTANCY SERVICES FOR REVIEW / UPDATION
10.65

OF DESIGN AND CONSTRUCTION SUPERVISION OF


-5.99

OFFSET
0.00

BAZ ALI SMALL DAM, DISTRICT KURRAM


1143.691

1155.201
1155.342
1145.915

1153.205

1155.178

1155.589

1155.870

1155.599

1154.217

1154.193

1152.314
1152.310
TITLE:
NSL
BAZ ALI DAM
DISTRICT KURRAM
TITLE:
MAIN DAM CROSS SECTIONS
-47.791

-42.045

-22.150

-13.388

28.433

41.735

56.072
52.645

69.983
70.000
16.138
-3.016

0.000

OFFSET
DRAWN DESIGNED CHECKED APPROVED SCALE DATE
Usman Y. Arshad I. Zeeshan S. Khurshid Z. Shown JUN,2022
RD -0+020
DRG.No:- BAD-CD-MD-04 SHEET:- 24 OF 25 SUB SH.- ----

Xref .\BAZ ALI-SEAL-FOR MAIN DAM.dwg


115
1160 1160
NOTES:-
U/S CL OF DAM D/S

6.35 1. ALL DIMENSIONS AND LEVELS ARE IN METERS UNLESS


CREST EL. 1154.50

0.6
OTHERWISE MENTIONED.

0 .2
2.25 CORE CREST EL. 1153.00

0
3.50 2. EARTHFILL, CORE, FILTER & CLAY BLANKET MATERIALS TO BE
HIGH FLOOD LEVEL. 1152.30

5
1 COMPACTED AT 95% OF MAXIMUM DRY DENSITY DETERMINED
3.00 SANDY GRAVEL
NORMAL CONSERVATION LEVEL EL. 1149.50 THROUGH MODIFIED AASHTO COMPACTION T120.
1150 1150
3. THE GRADATION CURVES TO BE FOLLOWED FOR EARTHFILL,
NSL FILTER (FINE AND COARSE FILTER), CORE & RIPRAP MATERIALS.
2.50
4. FILTER MATERIAL WILL REQUIRED PROCESSING / SCREENING
1 CLAY CORE
1 1 TOE DRAIN FROM SUITABLE AVAILABLE MATERIAL AT SITE.
5. CORE SHOULD BE PLACED ON MINIMUM 5M BELOW FROM
6.00 NSL OR AS DIRECTED BY SITE ENGINEER.
CORE TRENCH FINE FILTER
CLAY BLANKET 6. THE RIPRAP MATERIAL IS TO WITHSTAND VERY SEVERE ACTION
1140 1.50m THICK 0.75m THICK 1140 FROM WAVES AND DESTRUCTIVE FORCES ASSOCIATED WITH
COARSE FILTER
STRIPPING 1m 1m THICK FREEZING AND THAWING, WETTING AND DRYING.
NSL 7. THE MINIMUM DEPTH OF CORE IS 5M AND IF CHANGING IS
REQUIRED THEN THE SITE ENGINEER WILL DECIDE IT AS PER
SITE CONDITION.
8. ATTERBERG'S LIMIT TEST SHOULD BE CONDUCTED FOR
SELECTION OF THE CORE MATERIAL. ONLY THOSE MATERIALS
1130 1130 ARE ALLOWED THAT HAVE PLASTIC INDEX VALUE RANGE OF
(10-12).
9. THE SIDE SLOPE OF CORE TRENCH SHALL BE 1V:1H OR AS
DIRECTED BY SITE ENGINEER.
10. THE CUT SLOPE IN NATURAL GROUND SHALL BE MINIMUM
1V:1H OR AS DIRECTED BY SITE ENGINEER.

1120 1120
1134.617

1154.500

1154.500

1154.500

1150.073
1150.073
1148.273
1148.273
1149.773

1149.773

1148.523
CUT / FILL
LEVEL
-52.66

13.36
15.36
1149.427 17.31
18.81
1149.256 20.31

25.43

27.93
OFFSET

1149.968 -2.95

1150.110 0.00

3.40
1136.741

1140.791

1145.581
1134.184

1144.388

1146.769

1148.030

1149.848

1150.536

1149.806

1147.470

1146.273

1145.309

1144.783
NSL
-35.231
-63.618

-44.060

-25.189

-18.588

-15.523

46.701

64.081
20.377

38.698

67.622

70.000
-7.451

16.325
17.423
-2.733

8.222
0.000
OFFSET

RD 0+010

0 5 10 15 20 25 M

1160 U/S D/S 1160 SCALE


C
BEDDING MATERIAL
5.00
EL.1154.33 REFERENCE DRAWINGS :-
NSL
BAD-CD-MD-01,02,03
CLAY CORE 2
2
1150 1 1150
1
6.00 THE BASE OF THE TRENCH IS DRAWING IS RELEASED
CORE TRENCH DESIGNED TO BE 1.00 m IN BED
ROCK AND DEPTH OF THE CORE FOR CONSTRUCTION
TRENCH MAY BE DECIDED AS
PER SITE CONDITION.

1140 1140

REV. DATE BY DESCRIPTION CHKD. CERT. APPR.


NO.
CLIENT:
PSU SMALL DAM SECTION MERGED AREAS
IRRIGATION DEPARTMENT . KPK.
1130 1130
CONSULTANTS: A J.V OF
REHMAN HABIB CONSULTANTS (PVT) LTD.
CASCADE GROUP
OF ENGINEERING & CONSULTANTS
1120 1120 IN ASSOCIATION WITH:
1153.832

1154.327

1154.698

CUT / FILL ENGINEERING & TECHNICAL ASSOCIATES


LEVEL PROJECT:
CONSULTANCY SERVICES FOR REVIEW / UPDATION
OF DESIGN AND CONSTRUCTION SUPERVISION OF
-5.15

OFFSET
0.00

9.98

BAZ ALI SMALL DAM, DISTRICT KURRAM


TITLE:
1151.711
1138.849

1141.315

1143.506

1151.296

1153.627

1154.327
1154.393

1154.774
1154.594

1154.399

1152.598

1151.790

1151.200

1147.292
BAZ ALI DAM
NSL DISTRICT KURRAM
TITLE:
MAIN DAM CROSS SECTIONS
-46.031

-40.654

-34.538

-12.940

24.461

44.665
39.784

52.328

70.000
12.279
13.090

19.235
-7.275

0.000
0.684

OFFSET
DRAWN DESIGNED CHECKED APPROVED SCALE DATE
Usman Y. Arshad I. Zeeshan S. Khurshid Z. Shown JUN,2022
RD 0+000 DRG.No:- BAD-CD-MD-04 SHEET:- 23 OF 25 SUB SH.- ----

Xref .\BAZ ALI-SEAL-FOR MAIN DAM.dwg


116
1160 CL OF DAM 1160 NOTES:-
U/S D/S

6.35 1. ALL DIMENSIONS AND LEVELS ARE IN METERS UNLESS


CREST EL. 1154.50

0.6
OTHERWISE MENTIONED.

0.2
CORE CREST EL. 1153.00

0
3.50 2. EARTHFILL, CORE, FILTER & CLAY BLANKET MATERIALS TO BE
HIGH FLOOD LEVEL. 1152.30

5
COMPACTED AT 95% OF MAXIMUM DRY DENSITY DETERMINED
1150 NORMAL CONSERVATION LEVEL EL. 1149.50 1150 THROUGH MODIFIED AASHTO COMPACTION T120.
2.25 3. THE GRADATION CURVES TO BE FOLLOWED FOR EARTHFILL,
FINE FILTER 1 FILTER (FINE AND COARSE FILTER), CORE & RIPRAP MATERIALS.

0
2.50

0.3
FINE FILTER RIP RAP 4. FILTER MATERIAL WILL REQUIRED PROCESSING / SCREENING
1 COARSE FILTER FROM SUITABLE AVAILABLE MATERIAL AT SITE.
RIP RAP
5. CORE SHOULD BE PLACED ON MINIMUM 5M BELOW FROM
BEDDING MATERIAL SANDY GRAVEL CLAY CORE NSL OR AS DIRECTED BY SITE ENGINEER.
SANDY GRAVEL MATERIAL
MATERIAL 6. THE RIPRAP MATERIAL IS TO WITHSTAND VERY SEVERE ACTION
1140 1140
TOE DRAIN FROM WAVES AND DESTRUCTIVE FORCES ASSOCIATED WITH
CLAY BLANKET FREEZING AND THAWING, WETTING AND DRYING.
1.50m THICK NSL 7. THE MINIMUM DEPTH OF CORE IS 5M AND IF CHANGING IS
1 REQUIRED THEN THE SITE ENGINEER WILL DECIDE IT AS PER
1 COARSE FILTER SITE CONDITION.
STRIPPING 1m 6.00 1m THICK FINE FILTER 8. ATTERBERG'S LIMIT TEST SHOULD BE CONDUCTED FOR
CORE TRENCH 0.75m THICK SELECTION OF THE CORE MATERIAL. ONLY THOSE MATERIALS
1130 NSL 1130 ARE ALLOWED THAT HAVE PLASTIC INDEX VALUE RANGE OF
(10-12).
9. THE SIDE SLOPE OF CORE TRENCH SHALL BE 1V:1H OR AS
DIRECTED BY SITE ENGINEER.
10. THE CUT SLOPE IN NATURAL GROUND SHALL BE MINIMUM
1V:1H OR AS DIRECTED BY SITE ENGINEER.

1120 1120
1133.157

1154.500

1154.500

1154.500

1135.927
1135.927
1134.127
1134.127
1135.627

1135.627
CUT / FILL
LEVEL
-56.31

45.18
47.18

1134.685 49.13
50.63
52.13

54.26
OFFSET

1138.713 -2.95

1138.675 0.00

3.40

1138.701

1137.701

1137.161
1132.639

1135.492

1137.630

1138.784

1138.850

1137.974

1136.462

1135.629

1135.640

1135.589

1134.642
1134.514
1139.485
NSL

-17.811
-39.870

-32.868

-10.243

49.541
29.314

43.439
20.178

23.938

55.339

59.784

68.898
70.000
10.834

17.600
-2.985

2.749
0.000

7.739
OFFSET

RD 0+030

0 5 10 15 20 25 M

1160 1160
U/S CL OF DAM D/S SCALE

6.35
CREST EL. 1154.50 REFERENCE DRAWINGS :-
0.6
0.2

CORE CREST EL. 1153.00


0

3.50
HIGH FLOOD LEVEL. 1152.30
5

RIP RAP BAD-CD-MD-01,02,03


1150 NORMAL CONSERVATION LEVEL EL. 1149.50 1150
2.25
1 TOE DRAIN DRAWING IS RELEASED

0
2.50

0.3
RIP RAP CLAY CORE 3.00 SANDY GRAVEL
1
BEDDING MATERIAL FOR CONSTRUCTION
1
CLAY BLANKET 1 NSL
1140 1.50m THICK 1140
6.00 FINE FILTER
CORE TRENCH COARSE FILTER
CLAY BLANKET 1m THICK 0.75m THICK REV. DATE
1.50m THICK NO. BY DESCRIPTION CHKD. CERT. APPR.
STRIPPING 1m
CLIENT:
PSU SMALL DAM SECTION MERGED AREAS
NSL
IRRIGATION DEPARTMENT . KPK.
1130 1130
CONSULTANTS: A J.V OF
REHMAN HABIB CONSULTANTS (PVT) LTD.
CASCADE GROUP
OF ENGINEERING & CONSULTANTS
1120 1120 IN ASSOCIATION WITH:
1062.939

1083.573

1083.573

1083.573

1073.339
1073.339
1071.539
1071.539
1073.039

1073.039

1070.384
CUT / FILL ENGINEERING & TECHNICAL ASSOCIATES
LEVEL PROJECT:
CONSULTANCY SERVICES FOR REVIEW / UPDATION
OF DESIGN AND CONSTRUCTION SUPERVISION OF
-54.53

26.42
28.42
30.37
1143.173 31.87
33.37

38.49

OFFSET 43.80
-2.95

1144.849 0.00

3.40

BAZ ALI SMALL DAM, DISTRICT KURRAM


1145.011

1140.491
TITLE:
1144.932
1133.340

1134.633

1139.616
1139.877
1140.073

1142.348

1144.420
1144.855

1144.843

1144.995

1144.830

1144.398

1143.253

1140.306

1140.320

1139.915
BAZ ALI DAM
NSL
DISTRICT KURRAM
TITLE:
MAIN DAM CROSS SECTIONS
-51.981

-42.089

-31.226
-30.585
-29.206

-19.927

-11.336

31.641
18.961

31.075

50.305
51.427

66.098

70.000
-6.401

13.548
-9.404

4.001
0.000
0.537

9.524

OFFSET
DRAWN DESIGNED CHECKED APPROVED SCALE DATE
Usman Y. Arshad I. Zeeshan S. Khurshid Z. Shown JUN,2022
RD 0+020 DRG.No:- BAD-CD-MD-04 SHEET:- 22 OF 25 SUB SH.- ----

Xref .\BAZ ALI-SEAL-FOR MAIN DAM.dwg


117
NOTES:-
1160 U/S CL OF DAM D/S 1160

6.35 1. ALL DIMENSIONS AND LEVELS ARE IN METERS UNLESS


CREST EL. 1154.50 OTHERWISE MENTIONED.

0.6
0.2
CORE CREST EL. 1153.00 2. EARTHFILL, CORE, FILTER & CLAY BLANKET MATERIALS TO BE

0
3.50
HIGH FLOOD LEVEL. 1152.30

5
COMPACTED AT 95% OF MAXIMUM DRY DENSITY DETERMINED
THROUGH MODIFIED AASHTO COMPACTION T120.
1150 NORMAL CONSERVATION LEVEL EL. 1149.50 1150
2.25 3. THE GRADATION CURVES TO BE FOLLOWED FOR EARTHFILL,
FILTER (FINE AND COARSE FILTER), CORE & RIPRAP MATERIALS.
1

0
2.50 4. FILTER MATERIAL WILL REQUIRED PROCESSING / SCREENING

0.3
FINE FILTER FINE FILTER RIP RAP
1 FROM SUITABLE AVAILABLE MATERIAL AT SITE.
RIP RAP COARSE FILTER 5. CORE SHOULD BE PLACED ON MINIMUM 5M BELOW FROM
BEDDING MATERIAL NSL OR AS DIRECTED BY SITE ENGINEER.
6. THE RIPRAP MATERIAL IS TO WITHSTAND VERY SEVERE ACTION
SANDY GRAVEL
1140
MATERIAL CLAY CORE SANDY GRAVEL MATERIAL 1140 FROM WAVES AND DESTRUCTIVE FORCES ASSOCIATED WITH
FREEZING AND THAWING, WETTING AND DRYING.
7. THE MINIMUM DEPTH OF CORE IS 5M AND IF CHANGING IS
TOE DRAIN REQUIRED THEN THE SITE ENGINEER WILL DECIDE IT AS PER
3.00 SITE CONDITION.
8. ATTERBERG'S LIMIT TEST SHOULD BE CONDUCTED FOR
SELECTION OF THE CORE MATERIAL. ONLY THOSE MATERIALS
1130 1130 ARE ALLOWED THAT HAVE PLASTIC INDEX VALUE RANGE OF
NSL
(10-12).
CLAY BLANKET BOULDER FILL 9. THE SIDE SLOPE OF CORE TRENCH SHALL BE 1V:1H OR AS
STRIPPING 1m 1 FINE FILTER
1.50m THICK 1 DIRECTED BY SITE ENGINEER.
COARSE FILTER 0.75m THICK
6.00 1m THICK 10. THE CUT SLOPE IN NATURAL GROUND SHALL BE MINIMUM
CORE TRENCH 1V:1H OR AS DIRECTED BY SITE ENGINEER.

1120 1120
1132.853

1154.500

1154.500

1154.500

1132.540
1132.540
1130.740
1130.740
1132.240

1132.240

1130.780
CUT / FILL
LEVEL
1132.359 -57.07

52.81
54.81
56.76
1131.064 58.26
59.76

64.88

67.80
OFFSET

-2.95

1130.420 0.00

3.40
1132.241

1131.351

1129.891

1130.751
1131.953

1131.830

1132.028

1131.316

1131.037

1130.605

1130.540

1130.412

1130.432

1130.308

1130.452

1129.807

1130.810

1130.640
NSL
-63.618

-60.744

-57.362

-52.492
-50.602

-41.319

-36.466

-29.353

-14.700

51.571
21.645

33.404

37.466

58.502

68.723
70.000
11.517
-6.575

-3.999

0.000

6.322
OFFSET

RD 0+050

0 5 10 15 20 25 M

1160 U/S D/S 1160 SCALE


CL OF DAM

6.35
CREST EL. 1154.50 REFERENCE DRAWINGS :-
0.6
0.2

CORE CREST EL. 1153.00


0

3.50
HIGH FLOOD LEVEL. 1152.30 BAD-CD-MD-01,02,03
5

1150 NORMAL CONSERVATION LEVEL EL. 1149.50 1150


2.25
1 DRAWING IS RELEASED

0
2.50

0.3
FINE FILTER FINE FILTER RIP RAP
1 FOR CONSTRUCTION
RIP RAP COARSE FILTER
BEDDING MATERIAL
SANDY GRAVEL
1140 SANDY GRAVEL MATERIAL 1140
MATERIAL CLAY CORE
REV. DATE BY DESCRIPTION CHKD. CERT. APPR.
NO.
TOE DRAIN
CLIENT:
3.00
PSU SMALL DAM SECTION MERGED AREAS
IRRIGATION DEPARTMENT . KPK.
1130 1 1130
NSL 1 CONSULTANTS: A J.V OF
CLAY BLANKET COARSE FILTER FINE FILTER
STRIPPING 1m SANDY GRAVEL
1.50m THICK 6.00 1m THICK 0.75m THICK REHMAN HABIB CONSULTANTS (PVT) LTD.
CORE TRENCH
CASCADE GROUP
OF ENGINEERING & CONSULTANTS

1120 1120 IN ASSOCIATION WITH:


1132.834

1154.500

1154.500

1154.500

1132.600
1132.600
1130.800
1130.800
1132.300

1132.300

1132.300

1130.967
CUT / FILL
ENGINEERING & TECHNICAL ASSOCIATES
LEVEL PROJECT:
CONSULTANCY SERVICES FOR REVIEW / UPDATION
OF DESIGN AND CONSTRUCTION SUPERVISION OF
-57.11

52.67
54.67
56.62
58.12
59.62
1131.145 61.74

64.74

67.41
OFFSET
-2.95

BAZ ALI SMALL DAM, DISTRICT KURRAM


1131.924 0.00

1131.456 3.40

TITLE:
BAZ ALI DAM
1132.275
1132.503

1132.266

1132.184

1131.476
1131.399

1131.328
1131.320

1133.425

1131.845

1132.186
1132.154
1132.178

1131.812

1131.239

1130.338

1130.166

1130.627

1130.336

1130.798

1130.888
NSL DISTRICT KURRAM
TITLE:
MAIN DAM CROSS SECTIONS
-42.741
-65.553
-64.095

-54.315

-36.055
-35.395

-32.955
-31.603

-12.237

40.812
24.472

28.430

45.054

52.147

61.600

70.000
11.203

19.937
8.371
0.000
0.644

5.922
3.449

7.864

OFFSET DRAWN DESIGNED CHECKED APPROVED SCALE DATE


Usman Y. Arshad I. Zeeshan S. Khurshid Z. Shown JUN,2022

RD 0+040 DRG.No:- BAD-CD-MD-04 SHEET:- 21 OF 25 SUB SH.- ----

Xref .\BAZ ALI-SEAL-FOR MAIN DAM.dwg


118
1160 U/S CL OF DAM D/S 1160 NOTES:-

6.35 1. ALL DIMENSIONS AND LEVELS ARE IN METERS UNLESS


CREST EL. 1154.50

0.6
OTHERWISE MENTIONED.

0.2
CORE CREST EL. 1153.00

0
3.50
HIGH FLOOD LEVEL. 1152.30 2. EARTHFILL, CORE, FILTER & CLAY BLANKET MATERIALS TO BE

5
COMPACTED AT 95% OF MAXIMUM DRY DENSITY DETERMINED
1150 NORMAL CONSERVATION LEVEL EL. 1149.50 1150 THROUGH MODIFIED AASHTO COMPACTION T120.
2.25 3. THE GRADATION CURVES TO BE FOLLOWED FOR EARTHFILL,
1 FILTER (FINE AND COARSE FILTER), CORE & RIPRAP MATERIALS.

0
2.50

0.3
FINE FILTER FINE FILTER RIP RAP
4. FILTER MATERIAL WILL REQUIRED PROCESSING / SCREENING
1 FROM SUITABLE AVAILABLE MATERIAL AT SITE.
RIP RAP COARSE FILTER 5. CORE SHOULD BE PLACED ON MINIMUM 5M BELOW FROM
BEDDING MATERIAL NSL OR AS DIRECTED BY SITE ENGINEER.
1140
SANDY GRAVEL
1140
6. THE RIPRAP MATERIAL IS TO WITHSTAND VERY SEVERE ACTION
MATERIAL SANDY GRAVEL MATERIAL
CLAY CORE FROM WAVES AND DESTRUCTIVE FORCES ASSOCIATED WITH
FREEZING AND THAWING, WETTING AND DRYING.
TOE DRAIN
7. THE MINIMUM DEPTH OF CORE IS 5M AND IF CHANGING IS
REQUIRED THEN THE SITE ENGINEER WILL DECIDE IT AS PER
3.00 SITE CONDITION.
8. ATTERBERG'S LIMIT TEST SHOULD BE CONDUCTED FOR
SELECTION OF THE CORE MATERIAL. ONLY THOSE MATERIALS
1130 1130 ARE ALLOWED THAT HAVE PLASTIC INDEX VALUE RANGE OF
NSL
1
(10-12).
CLAY BLANKET STRIPPING 1m
1.50m THICK 1 FINE FILTER BOULDER FILL 9. THE SIDE SLOPE OF CORE TRENCH SHALL BE 1V:1H OR AS
COARSE FILTER 0.75m THICK DIRECTED BY SITE ENGINEER.
CORE TRENCH 6.00 1m THICK 10. THE CUT SLOPE IN NATURAL GROUND SHALL BE MINIMUM
1V:1H OR AS DIRECTED BY SITE ENGINEER.

1120 1120
1132.017

1154.500

1154.500

1154.500

1132.500
1132.500
1130.700
1130.700
1132.200

1132.200

1130.372
CUT / FILL
LEVEL
1131.510 -59.16

52.90

1130.817 54.90
56.85
1130.533 58.35
59.85

64.97

68.62
OFFSET

-2.95

1130.846 0.00

1130.853 3.40
1131.553

1131.313

1131.126

1130.799

1130.837

1130.383

1130.428

1130.230

1130.583

1130.833
1130.903

1130.350
NSL
-59.652

-56.523

-53.234

-26.793

-18.465

46.575
22.805

25.906

29.505

50.419
52.308

55.093

58.343

70.000
-4.592

0.000

3.267
OFFSET

RD 0+070

0 5 10 15 20 25 M

1160 U/S D/S 1160


CL OF DAM SCALE
6.35
CREST EL. 1154.50
0.6

REFERENCE DRAWINGS :-
0.2

CORE CREST EL. 1153.00


0

3.50
HIGH FLOOD LEVEL. 1152.30
5

BAD-CD-MD-01,02,03
1150 NORMAL CONSERVATION LEVEL EL. 1149.50 1150
2.25
1 DRAWING IS RELEASED

0
2.50

0.3
FINE FILTER FINE FILTER RIP RAP
1
RIP RAP COARSE FILTER FOR CONSTRUCTION
BEDDING MATERIAL
SANDY GRAVEL
1140 SANDY GRAVEL MATERIAL 1140
MATERIAL CLAY CORE

REV. DATE BY DESCRIPTION CHKD. CERT. APPR.


TOE DRAIN NO.
3.00 CLIENT:
PSU SMALL DAM SECTION MERGED AREAS
1130 1130
IRRIGATION DEPARTMENT . KPK.
NSL CONSULTANTS:
CLAY BLANKET 1 A J.V OF
STRIPPING 1m 1 FINE FILTER BOULDER FILL
1.50m THICK COARSE FILTER 0.75m THICK REHMAN HABIB CONSULTANTS (PVT) LTD.
6.00 1m THICK
CORE TRENCH CASCADE GROUP
OF ENGINEERING & CONSULTANTS
1120 1120 IN ASSOCIATION WITH:
1132.461

1154.500

1154.500

1154.500

1132.520
1132.520
1130.720
1130.720
1132.220

1132.220

1130.161
CUT / FILL ENGINEERING & TECHNICAL ASSOCIATES
LEVEL
PROJECT:
CONSULTANCY SERVICES FOR REVIEW / UPDATION
OF DESIGN AND CONSTRUCTION SUPERVISION OF
-58.05

52.85
54.85
56.80
58.30
59.80

64.92

1130.121 69.04
OFFSET
-2.95

1130.633 0.00

3.40

BAZ ALI SMALL DAM, DISTRICT KURRAM


1131.221

1130.821
1131.869

1131.332

1130.600

1130.609

1130.643

1130.440

1130.019

1130.237

1130.983

1130.784

1130.113
1131.985

1130.345

TITLE:
BAZ ALI DAM
NSL
DISTRICT KURRAM
TITLE:
MAIN DAM CROSS SECTIONS
-64.746

-56.230

-47.276

-31.630

-15.792

-12.557

17.161

42.020
23.776

31.454

50.995

55.405

61.908

69.496
70.000
4.795
0.000

OFFSET
DRAWN DESIGNED CHECKED APPROVED SCALE DATE
Usman Y. Arshad I. Zeeshan S. Khurshid Z. Shown JUN,2022
RD 0+060 DRG.No:- BAD-CD-MD-04 SHEET:- 20 OF 25 SUB SH.- ----

Xref .\BAZ ALI-SEAL-FOR MAIN DAM.dwg


119
1160 CL OF DAM 1160 NOTES:-
U/S D/S

6.35 1. ALL DIMENSIONS AND LEVELS ARE IN METERS UNLESS


CREST EL. 1154.50

0.6
OTHERWISE MENTIONED.

0.2
CORE CREST EL. 1153.00

0
3.50 2. EARTHFILL, CORE, FILTER & CLAY BLANKET MATERIALS TO BE
HIGH FLOOD LEVEL. 1152.30

5
COMPACTED AT 95% OF MAXIMUM DRY DENSITY DETERMINED
1150 NORMAL CONSERVATION LEVEL EL. 1149.50 1150 THROUGH MODIFIED AASHTO COMPACTION T120.
2.25 3. THE GRADATION CURVES TO BE FOLLOWED FOR EARTHFILL,
1 FILTER (FINE AND COARSE FILTER), CORE & RIPRAP MATERIALS.

0
2.50

0.3
FINE FILTER FINE FILTER RIP RAP 4. FILTER MATERIAL WILL REQUIRED PROCESSING / SCREENING
1 FROM SUITABLE AVAILABLE MATERIAL AT SITE.
RIP RAP COARSE FILTER 5. CORE SHOULD BE PLACED ON MINIMUM 5M BELOW FROM
BEDDING MATERIAL NSL OR AS DIRECTED BY SITE ENGINEER.
SANDY GRAVEL 6. THE RIPRAP MATERIAL IS TO WITHSTAND VERY SEVERE ACTION
1140 SANDY GRAVEL MATERIAL 1140
MATERIAL CLAY CORE FROM WAVES AND DESTRUCTIVE FORCES ASSOCIATED WITH
FREEZING AND THAWING, WETTING AND DRYING.
7. THE MINIMUM DEPTH OF CORE IS 5M AND IF CHANGING IS
TOE DRAIN REQUIRED THEN THE SITE ENGINEER WILL DECIDE IT AS PER
3.00 SITE CONDITION.
8. ATTERBERG'S LIMIT TEST SHOULD BE CONDUCTED FOR
SELECTION OF THE CORE MATERIAL. ONLY THOSE MATERIALS
1130 1130 ARE ALLOWED THAT HAVE PLASTIC INDEX VALUE RANGE OF
NSL
CLAY BLANKET
(10-12).
STRIPPING 1m 1 FINE FILTER SANDY GRAVEL 9. THE SIDE SLOPE OF CORE TRENCH SHALL BE 1V:1H OR AS
1.50m THICK 1 COARSE FILTER 0.75m THICK DIRECTED BY SITE ENGINEER.
6.00 1m THICK 10. THE CUT SLOPE IN NATURAL GROUND SHALL BE MINIMUM
CORE TRENCH
1V:1H OR AS DIRECTED BY SITE ENGINEER.

1120 1120
1132.369

1154.500

1154.500

1154.500

1132.460
1132.460
1130.660
1130.660
1132.160

1132.160

1130.860
CUT / FILL
LEVEL
-58.28

52.99
54.99
56.94
58.44
59.94

1130.906 65.06

67.66
OFFSET

-2.95

1130.894 0.00

3.40
1131.841

1130.801
1131.489

1131.345

1131.013

1130.820

1130.980

1130.327

1130.475

1130.822

1130.985

1130.900

1130.823
NSL
-25.331
-55.497

-34.728

-17.054

-13.963

28.686
21.213

36.382

51.268

64.754

70.000
12.255
-5.096

4.679
0.000
OFFSET

RD 0+090

0 5 10 15 20 25 M

1160 U/S D/S 1160


CL OF DAM SCALE

6.35
CREST EL. 1154.50 REFERENCE DRAWINGS :-
0.6
0.2

CORE CREST EL. 1153.00


0

3.50
HIGH FLOOD LEVEL. 1152.30
5

BAD-CD-MD-01,02,03
1150 NORMAL CONSERVATION LEVEL EL. 1149.50 1150
2.25
1 DRAWING IS RELEASED

0
2.50

0.3
FINE FILTER FINE FILTER RIP RAP
1
RIP RAP FOR CONSTRUCTION
COARSE FILTER
BEDDING MATERIAL
SANDY GRAVEL
1140 SANDY GRAVEL MATERIAL 1140
MATERIAL CLAY CORE

REV. DATE BY DESCRIPTION CHKD. CERT. APPR.


TOE DRAIN NO.
CLIENT:
3.00
PSU SMALL DAM SECTION MERGED AREAS
IRRIGATION DEPARTMENT . KPK.
1130 1130
NSL CONSULTANTS: A J.V OF
CLAY BLANKET STRIPPING 1m 1
1 FINE FILTER SANDY GRAVEL
1.50m THICK
COARSE FILTER 0.75m THICK
REHMAN HABIB CONSULTANTS (PVT) LTD.
CORE TRENCH 6.00 1m THICK CASCADE GROUP
OF ENGINEERING & CONSULTANTS
1120 1120 IN ASSOCIATION WITH:
1132.372

1154.500

1154.500

1154.500

1132.480
1132.480
1130.680
1130.680
1132.180

1132.180

1130.616
CUT / FILL ENGINEERING & TECHNICAL ASSOCIATES
LEVEL PROJECT:
CONSULTANCY SERVICES FOR REVIEW / UPDATION
OF DESIGN AND CONSTRUCTION SUPERVISION OF
-58.27

1130.855 52.94
54.94
56.89
58.39
59.89

65.01

68.14
OFFSET
-2.95

1130.996 0.00

3.40

BAZ ALI SMALL DAM, DISTRICT KURRAM


1131.031

1130.761

1130.871 TITLE:
1131.852

1131.769

1131.308

1131.079

1130.999

1131.023

1130.994
1131.020

1130.338

1130.460

1130.854

1130.587
BAZ ALI DAM
NSL
DISTRICT KURRAM
TITLE:
MAIN DAM CROSS SECTIONS
-12.342
-56.245

-51.355

-41.036

-28.706

-21.957
-21.139

47.260
27.880
25.265

50.244

52.948

70.000
0.961
0.000

2.395

5.400

OFFSET
DRAWN DESIGNED CHECKED APPROVED SCALE DATE
Usman Y. Arshad I. Zeeshan S. Khurshid Z. Shown JUN,2022
RD 0+080 DRG.No:- BAD-CD-MD-04 SHEET:- 19 OF 25 SUB SH.- ----

Xref .\BAZ ALI-SEAL-FOR MAIN DAM.dwg


120
1160 U/S CL OF DAM D/S 1160 NOTES:-

6.35 1. ALL DIMENSIONS AND LEVELS ARE IN METERS UNLESS


CREST EL. 1154.50

0.6
OTHERWISE MENTIONED.

0.2
CORE CREST EL. 1153.00

0
3.50
HIGH FLOOD LEVEL. 1152.30 2. EARTHFILL, CORE, FILTER & CLAY BLANKET MATERIALS TO BE

5
COMPACTED AT 95% OF MAXIMUM DRY DENSITY DETERMINED
1150 NORMAL CONSERVATION LEVEL EL. 1149.50 1150 THROUGH MODIFIED AASHTO COMPACTION T120.
2.25 3. THE GRADATION CURVES TO BE FOLLOWED FOR EARTHFILL,
1 FILTER (FINE AND COARSE FILTER), CORE & RIPRAP MATERIALS.

0
2.50

0.3
FINE FILTER FINE FILTER RIP RAP
4. FILTER MATERIAL WILL REQUIRED PROCESSING / SCREENING
1 FROM SUITABLE AVAILABLE MATERIAL AT SITE.
RIP RAP COARSE FILTER 5. CORE SHOULD BE PLACED ON MINIMUM 5M BELOW FROM
BEDDING MATERIAL NSL OR AS DIRECTED BY SITE ENGINEER.
1140
SANDY GRAVEL
1140
6. THE RIPRAP MATERIAL IS TO WITHSTAND VERY SEVERE ACTION
MATERIAL SANDY GRAVEL MATERIAL
CLAY CORE FROM WAVES AND DESTRUCTIVE FORCES ASSOCIATED WITH
FREEZING AND THAWING, WETTING AND DRYING.
7. THE MINIMUM DEPTH OF CORE IS 5M AND IF CHANGING IS
TOE DRAIN
REQUIRED THEN THE SITE ENGINEER WILL DECIDE IT AS PER
3.00 SITE CONDITION.
8. ATTERBERG'S LIMIT TEST SHOULD BE CONDUCTED FOR
SELECTION OF THE CORE MATERIAL. ONLY THOSE MATERIALS
1130 1130 ARE ALLOWED THAT HAVE PLASTIC INDEX VALUE RANGE OF
NSL COARSE FILTER FINE FILTER (10-12).
CLAY BLANKET CORE TRENCH 1 SANDY GRAVEL
STRIPPING 1m 1m THICK 0.75m THICK
1.50m THICK 1 9. THE SIDE SLOPE OF CORE TRENCH SHALL BE 1V:1H OR AS
DIRECTED BY SITE ENGINEER.
6.00 10. THE CUT SLOPE IN NATURAL GROUND SHALL BE MINIMUM
1V:1H OR AS DIRECTED BY SITE ENGINEER.

1120 1120
1132.181

1154.500

1154.500

1154.500

1132.420
1132.420
1130.620
1130.620
1132.120

1132.120
1131.286
CUT / FILL
LEVEL
-58.75

53.08
55.08
57.03
58.53
60.03

65.15
66.82
OFFSET

-2.95

1131.677 0.00

3.40

1131.221

1131.251
1131.706

1131.448

1131.394

1131.680

1131.665

1131.288

1131.414

1131.246
NSL
-54.794

-28.007

-18.655

21.048

29.283

36.023

52.248

70.000
-1.330

4.930
0.000
OFFSET

RD 0+110

0 5 10 15 20 25 M

1160 U/S D/S 1160


CL OF DAM SCALE

6.35
CREST EL. 1154.50
0.6

REFERENCE DRAWINGS :-
0.2

CORE CREST EL. 1153.00


0

3.50
HIGH FLOOD LEVEL. 1152.30
5

BAD-CD-MD-01,02,03
1150 NORMAL CONSERVATION LEVEL EL. 1149.50 1150
2.25
1 DRAWING IS RELEASED

0
2.50

0.3
FINE FILTER FINE FILTER RIP RAP
1
RIP RAP COARSE FILTER FOR CONSTRUCTION
BEDDING MATERIAL
SANDY GRAVEL
1140 SANDY GRAVEL MATERIAL 1140
MATERIAL CLAY CORE

REV. DATE BY DESCRIPTION CHKD. CERT. APPR.


TOE DRAIN NO.
3.00 CLIENT:
PSU SMALL DAM SECTION MERGED AREAS
1130 1130
IRRIGATION DEPARTMENT . KPK.
NSL 1 CONSULTANTS: A J.V OF
CLAY BLANKET STRIPPING 1m 1 FINE FILTER SANDY GRAVEL
1.50m THICK REHMAN HABIB CONSULTANTS (PVT) LTD.
COARSE FILTER 0.75m THICK
CORE TRENCH 6.00 1m THICK
CASCADE GROUP
OF ENGINEERING & CONSULTANTS
1120 1120 IN ASSOCIATION WITH:
1132.335

1154.500

1154.500

1154.500

1132.440
1132.440
1130.640
1130.640
1132.140

1132.140

1130.953
CUT / FILL ENGINEERING & TECHNICAL ASSOCIATES
LEVEL
PROJECT:
CONSULTANCY SERVICES FOR REVIEW / UPDATION
OF DESIGN AND CONSTRUCTION SUPERVISION OF
-58.36

53.03
55.03
56.98
58.48
59.98

65.10

67.48
OFFSET
-2.95

1130.944 0.00

3.40

BAZ ALI SMALL DAM, DISTRICT KURRAM


1130.941
1131.844
1131.830
1131.800

1130.880

1130.960

1130.946

1131.016

1131.060

1130.952

1130.954
1131.399

1130.895

1130.929

1131.118

TITLE:
BAZ ALI DAM
NSL
DISTRICT KURRAM
TITLE:
MAIN DAM CROSS SECTIONS
-56.191
-54.748
-52.960

-26.738

-14.158

-11.555

47.638
29.233

52.004

63.457

70.000
-6.732

6.962
0.000

6.306
8.103

OFFSET
DRAWN DESIGNED CHECKED APPROVED SCALE DATE
Usman Y. Arshad I. Zeeshan S. Khurshid Z. Shown JUN,2022
RD 0+100 DRG.No:- BAD-CD-MD-04 SHEET:- 18 OF 25 SUB SH.- ----

Xref .\BAZ ALI-SEAL-FOR MAIN DAM.dwg


121
1160 U/S CL OF DAM D/S 1160 NOTES:-

6.35 1. ALL DIMENSIONS AND LEVELS ARE IN METERS UNLESS


CREST EL. 1154.50

0.6
OTHERWISE MENTIONED.

0.2
CORE CREST EL. 1153.00

0
3.50
HIGH FLOOD LEVEL. 1152.30 2. EARTHFILL, CORE, FILTER & CLAY BLANKET MATERIALS TO BE

5
COMPACTED AT 95% OF MAXIMUM DRY DENSITY DETERMINED
1150 NORMAL CONSERVATION LEVEL EL. 1149.50 1150 THROUGH MODIFIED AASHTO COMPACTION T120.
2.25
3. THE GRADATION CURVES TO BE FOLLOWED FOR EARTHFILL,
1 FILTER (FINE AND COARSE FILTER), CORE & RIPRAP MATERIALS.

0
2.50

0.3
FINE FILTER FINE FILTER RIP RAP
4. FILTER MATERIAL WILL REQUIRED PROCESSING / SCREENING
1 FROM SUITABLE AVAILABLE MATERIAL AT SITE.
RIP RAP COARSE FILTER 5. CORE SHOULD BE PLACED ON MINIMUM 5M BELOW FROM
BEDDING MATERIAL NSL OR AS DIRECTED BY SITE ENGINEER.
1140
SANDY GRAVEL
1140
6. THE RIPRAP MATERIAL IS TO WITHSTAND VERY SEVERE ACTION
MATERIAL CLAY CORE SANDY GRAVEL MATERIAL
FROM WAVES AND DESTRUCTIVE FORCES ASSOCIATED WITH
FREEZING AND THAWING, WETTING AND DRYING.
7. THE MINIMUM DEPTH OF CORE IS 5M AND IF CHANGING IS
TOE DRAIN
REQUIRED THEN THE SITE ENGINEER WILL DECIDE IT AS PER
3.00 SITE CONDITION.
8. ATTERBERG'S LIMIT TEST SHOULD BE CONDUCTED FOR
SELECTION OF THE CORE MATERIAL. ONLY THOSE MATERIALS
1130 1130 ARE ALLOWED THAT HAVE PLASTIC INDEX VALUE RANGE OF
NSL CLAY BLANKET CORE TRENCH COARSE FILTER
STRIPPING 1m 1 FINE FILTER (10-12).
1.50m THICK 1m THICK SANDY GRAVEL
1 0.75m THICK 9. THE SIDE SLOPE OF CORE TRENCH SHALL BE 1V:1H OR AS
DIRECTED BY SITE ENGINEER.
6.00
10. THE CUT SLOPE IN NATURAL GROUND SHALL BE MINIMUM
1V:1H OR AS DIRECTED BY SITE ENGINEER.
1120 1120
1132.588

1154.500

1154.500

1154.500

1132.416
1132.416
1130.616
1130.616
1132.116

1132.116
1131.088
CUT / FILL
LEVEL
-57.73

1131.479 53.08

55.08
57.03
58.53
1131.283 60.03

65.16
67.21
OFFSET

-2.95

1132.309 0.00

1132.336 3.40

1131.431

1131.502
1132.137

1132.267

1131.926

1131.929

1132.260

1131.686

1131.008
NSL
-54.561

-21.014

-18.030
-45.489

20.276

27.706

60.436
33.855

52.629

70.000
-5.988

0.000

3.214
OFFSET

RD 0+130

0 5 10 15 20 25 M

1160 U/S D/S 1160


CL OF DAM SCALE

6.35
CREST EL. 1154.50
0.6

REFERENCE DRAWINGS :-
0.2

CORE CREST EL. 1153.00


0

3.50
HIGH FLOOD LEVEL. 1152.30
5

BAD-CD-MD-01,02,03
1150 NORMAL CONSERVATION LEVEL EL. 1149.50 1150
2.25
1 DRAWING IS RELEASED

0
2.50

0.3
FINE FILTER FINE FILTER RIP RAP
1
RIP RAP COARSE FILTER FOR CONSTRUCTION
BEDDING MATERIAL
SANDY GRAVEL
1140 SANDY GRAVEL MATERIAL 1140
MATERIAL CLAY CORE

REV. DATE BY DESCRIPTION CHKD. CERT. APPR.


TOE DRAIN NO.
3.00 CLIENT:
PSU SMALL DAM SECTION MERGED AREAS
1130 1130
IRRIGATION DEPARTMENT . KPK.
COARSE FILTER
NSL CLAY BLANKET CORE TRENCH FINE FILTER CONSULTANTS: A J.V OF
STRIPPING 1m 1 1m THICK SANDY GRAVEL
1.50m THICK 0.75m THICK
1 REHMAN HABIB CONSULTANTS (PVT) LTD.
6.00
CASCADE GROUP
OF ENGINEERING & CONSULTANTS
1120 1120 IN ASSOCIATION WITH:
1132.044

1154.500

1154.500

1154.500

1132.418
1132.418
1130.618
1130.618
1132.118

1132.118
1131.255
CUT / FILL ENGINEERING & TECHNICAL ASSOCIATES
LEVEL
PROJECT:
CONSULTANCY SERVICES FOR REVIEW / UPDATION
OF DESIGN AND CONSTRUCTION SUPERVISION OF
-59.09

53.08
55.08
57.03
58.53
60.03

65.15
66.88
OFFSET
-2.95

1132.226 0.00

1132.288 3.40

BAZ ALI SMALL DAM, DISTRICT KURRAM


1131.551

1132.277

1131.622

1131.617

1131.176
1131.598

1131.858

1131.689

1131.695

1132.195

1131.399

TITLE:
BAZ ALI DAM
NSL
DISTRICT KURRAM
TITLE:
MAIN DAM CROSS SECTIONS
-57.946

-54.904

-36.776

-24.607

-19.350

48.052
28.835

52.467

70.000
0.000

3.178

5.613
1.865

OFFSET
DRAWN DESIGNED CHECKED APPROVED SCALE DATE
Usman Y. Arshad I. Zeeshan S. Khurshid Z. Shown JUN,2022
RD 0+120 DRG.No:- BAD-CD-MD-04 SHEET:- 17 OF 25 SUB SH.- ----

Xref .\BAZ ALI-SEAL-FOR MAIN DAM.dwg


122
1160 U/S CL OF DAM D/S 1160 NOTES:-

6.35
CREST EL. 1154.50 1. ALL DIMENSIONS AND LEVELS ARE IN METERS UNLESS

0.6
OTHERWISE MENTIONED.

0.2
CORE CREST EL. 1153.00

0
3.50
HIGH FLOOD LEVEL. 1152.30 2. EARTHFILL, CORE, FILTER & CLAY BLANKET MATERIALS TO BE

5
COMPACTED AT 95% OF MAXIMUM DRY DENSITY DETERMINED
1150 NORMAL CONSERVATION LEVEL EL. 1149.50 1150 THROUGH MODIFIED AASHTO COMPACTION T120.
2.25
3. THE GRADATION CURVES TO BE FOLLOWED FOR EARTHFILL,
1 FILTER (FINE AND COARSE FILTER), CORE & RIPRAP MATERIALS.

0
2.50

0.3
FINE FILTER FINE FILTER RIP RAP
4. FILTER MATERIAL WILL REQUIRED PROCESSING / SCREENING
1
RIP RAP FROM SUITABLE AVAILABLE MATERIAL AT SITE.
COARSE FILTER
5. CORE SHOULD BE PLACED ON MINIMUM 5M BELOW FROM
BEDDING MATERIAL
NSL OR AS DIRECTED BY SITE ENGINEER.
SANDY GRAVEL 6. THE RIPRAP MATERIAL IS TO WITHSTAND VERY SEVERE ACTION
1140 SANDY GRAVEL MATERIAL 1140
MATERIAL CLAY CORE FROM WAVES AND DESTRUCTIVE FORCES ASSOCIATED WITH
FREEZING AND THAWING, WETTING AND DRYING.
TOE DRAIN
7. THE MINIMUM DEPTH OF CORE IS 5M AND IF CHANGING IS
REQUIRED THEN THE SITE ENGINEER WILL DECIDE IT AS PER
3.00 SITE CONDITION.
8. ATTERBERG'S LIMIT TEST SHOULD BE CONDUCTED FOR
SELECTION OF THE CORE MATERIAL. ONLY THOSE MATERIALS
1130 1130
NSL CLAY BLANKET
ARE ALLOWED THAT HAVE PLASTIC INDEX VALUE RANGE OF
STRIPPING 1m CORE TRENCH COARSE FILTER FINE FILTER
1.50m THICK 1 (10-12).
1m THICK 0.75m THICK SANDY GRAVEL
1 9. THE SIDE SLOPE OF CORE TRENCH SHALL BE 1V:1H OR AS
DIRECTED BY SITE ENGINEER.
6.00
10. THE CUT SLOPE IN NATURAL GROUND SHALL BE MINIMUM
1V:1H OR AS DIRECTED BY SITE ENGINEER.
1120 1120
1133.229

1154.500

1154.500

1154.500

1132.412
1132.412
1130.612
1130.612
1132.112

1132.112

1130.724
CUT / FILL
LEVEL
-56.13

1130.611 53.09
1130.526 55.09

57.04
58.54
60.04

65.17

67.94
OFFSET

-2.95

1132.122 0.00

1132.129 3.40
1132.874

1132.579

1132.183

1132.108

1131.497

1131.226

1130.678

1130.916

1130.664
NSL
-53.976

-31.720

-16.023

47.841
27.231
20.632

53.578
54.927

61.266

70.000
-6.805

0.000

3.644
OFFSET

RD 0+150

0 5 10 15 20 25 M

1160 U/S D/S 1160


CL OF DAM SCALE

6.35
CREST EL. 1154.50
0.6

REFERENCE DRAWINGS :-
0.2

CORE CREST EL. 1153.00


0

3.50
HIGH FLOOD LEVEL. 1152.30
5

BAD-CD-MD-01,02,03
1150 NORMAL CONSERVATION LEVEL EL. 1149.50 1150
2.25
1 DRAWING IS RELEASED

0
2.50

0.3
FINE FILTER FINE FILTER RIP RAP
1
RIP RAP COARSE FILTER FOR CONSTRUCTION
BEDDING MATERIAL
SANDY GRAVEL
1140 SANDY GRAVEL MATERIAL 1140
MATERIAL CLAY CORE

REV. DATE BY DESCRIPTION CHKD. CERT. APPR.


TOE DRAIN NO.
3.00 CLIENT:
PSU SMALL DAM SECTION MERGED AREAS
1130 1130 IRRIGATION DEPARTMENT . KPK.
NSL CLAY BLANKET CORE TRENCH COARSE FILTER FINE FILTER
STRIPPING 1m CONSULTANTS: A J.V OF
1.50m THICK 1 1m THICK 0.75m THICK SANDY GRAVEL
1
REHMAN HABIB CONSULTANTS (PVT) LTD.
6.00
CASCADE GROUP
OF ENGINEERING & CONSULTANTS
1120 1120 IN ASSOCIATION WITH:
1133.065

1154.500

1154.500

1154.500

1132.414
1132.414
1130.614
1130.614
1132.114

1132.114

1130.906
CUT / FILL ENGINEERING & TECHNICAL ASSOCIATES
LEVEL
PROJECT:
CONSULTANCY SERVICES FOR REVIEW / UPDATION
-56.54

OF DESIGN AND CONSTRUCTION SUPERVISION OF

1131.188 53.09

55.09
57.04
58.54
60.04

65.16

67.58
OFFSET
1132.329 -2.95

1132.336 0.00

1132.342 3.40

BAZ ALI SMALL DAM, DISTRICT KURRAM


1132.242

1131.282
1132.676

1132.163
1132.164

1132.256

1131.370

1131.106

1130.836
TITLE:
NSL
BAZ ALI DAM
DISTRICT KURRAM
TITLE:
MAIN DAM CROSS SECTIONS
-54.201

-17.421
-16.710

-13.840

54.481
27.195

37.132

52.944

70.000
-3.336

0.000

3.299

5.628

OFFSET
DRAWN DESIGNED CHECKED APPROVED SCALE DATE
Usman Y. Arshad I. Zeeshan S. Khurshid Z. Shown JUN,2022
RD 0+140
DRG.No:- BAD-CD-MD-04 SHEET:- 16 OF 25 SUB SH.- ----

Xref .\BAZ ALI-SEAL-FOR MAIN DAM.dwg


123
1160 U/S CL OF DAM D/S 1160 NOTES:-

6.35
CREST EL. 1154.50 1. ALL DIMENSIONS AND LEVELS ARE IN METERS UNLESS

0.6
0.2
CORE CREST EL. 1153.00 OTHERWISE MENTIONED.

0
3.50
HIGH FLOOD LEVEL. 1152.30

5
2. EARTHFILL, CORE, FILTER & CLAY BLANKET MATERIALS TO BE
COMPACTED AT 95% OF MAXIMUM DRY DENSITY DETERMINED
1150 NORMAL CONSERVATION LEVEL EL. 1149.50 1150
2.25 THROUGH MODIFIED AASHTO COMPACTION T120.
3. THE GRADATION CURVES TO BE FOLLOWED FOR EARTHFILL,
1

0
2.50 FILTER (FINE AND COARSE FILTER), CORE & RIPRAP MATERIALS.

0.3
FINE FILTER FINE FILTER RIP RAP
1 4. FILTER MATERIAL WILL REQUIRED PROCESSING / SCREENING
RIP RAP COARSE FILTER FROM SUITABLE AVAILABLE MATERIAL AT SITE.
BEDDING MATERIAL 5. CORE SHOULD BE PLACED ON MINIMUM 5M BELOW FROM
NSL OR AS DIRECTED BY SITE ENGINEER.
SANDY GRAVEL
1140 SANDY GRAVEL MATERIAL 1140 6. THE RIPRAP MATERIAL IS TO WITHSTAND VERY SEVERE ACTION
MATERIAL CLAY CORE
FROM WAVES AND DESTRUCTIVE FORCES ASSOCIATED WITH
FREEZING AND THAWING, WETTING AND DRYING.
TOE DRAIN 7. THE MINIMUM DEPTH OF CORE IS 5M AND IF CHANGING IS
REQUIRED THEN THE SITE ENGINEER WILL DECIDE IT AS PER
3.00
SITE CONDITION.
8. ATTERBERG'S LIMIT TEST SHOULD BE CONDUCTED FOR
1130 1130 SELECTION OF THE CORE MATERIAL. ONLY THOSE MATERIALS
NSL CLAY BLANKET FINE FILTER
ARE ALLOWED THAT HAVE PLASTIC INDEX VALUE RANGE OF
STRIPPING 1m CORE TRENCH COARSE FILTER
1.50m THICK 1
1m THICK 0.75m THICK (10-12).
1 SANDY GRAVEL 9. THE SIDE SLOPE OF CORE TRENCH SHALL BE 1V:1H OR AS
6.00 DIRECTED BY SITE ENGINEER.
10. THE CUT SLOPE IN NATURAL GROUND SHALL BE MINIMUM
1V:1H OR AS DIRECTED BY SITE ENGINEER.
1120 1120
1133.154

1154.500

1154.500

1154.500

1132.408
1132.408
1130.608
1130.608
1132.108

1132.108

1130.480
CUT / FILL
LEVEL
-56.32

53.10
55.10
57.05
58.55
60.05

65.17

68.43
OFFSET

-2.95

1131.873 0.00

3.40
1131.961

1131.041
1132.460

1132.732

1132.024

1131.026

1131.114
1132.455

1131.819

1131.803

1131.558

1131.259

1131.047

1130.603

1130.388
NSL
-63.216

-53.512

-32.286

-15.225

33.681

53.841
25.348

32.132

37.726

66.225

70.000
14.430
-7.319

4.517
0.000

8.619
OFFSET

RD 0+170

0 5 10 15 20 25 M

1160 U/S D/S 1160


CL OF DAM SCALE
6.35
CREST EL. 1154.50
0.6

REFERENCE DRAWINGS :-
0.2

CORE CREST EL. 1153.00


0

3.50
HIGH FLOOD LEVEL. 1152.30
5

BAD-CD-MD-01,02,03
1150 NORMAL CONSERVATION LEVEL EL. 1149.50 1150
2.25
1

0
2.50 DRAWING IS RELEASED

0.3
FINE FILTER FINE FILTER RIP RAP
1
RIP RAP COARSE FILTER FOR CONSTRUCTION
BEDDING MATERIAL
SANDY GRAVEL
1140 SANDY GRAVEL MATERIAL 1140
MATERIAL CLAY CORE

REV. DATE BY DESCRIPTION CHKD. CERT. APPR.


TOE DRAIN NO.
3.00 CLIENT:
PSU SMALL DAM SECTION MERGED AREAS
1130 1130 IRRIGATION DEPARTMENT . KPK.
NSL CLAY BLANKET
STRIPPING 1m CORE TRENCH COARSE FILTER FINE FILTER
1.50m THICK 1 CONSULTANTS: A J.V OF
1 1m THICK 0.75m THICK
SANDY GRAVEL
REHMAN HABIB CONSULTANTS (PVT) LTD.
6.00
CASCADE GROUP
OF ENGINEERING & CONSULTANTS
1120 1120
IN ASSOCIATION WITH:
1133.436

1154.500

1154.500

1154.500

1132.410
1132.410
1130.610
1130.610
1132.110

1132.110

1130.543
CUT / FILL
LEVEL
ENGINEERING & TECHNICAL ASSOCIATES
PROJECT:
CONSULTANCY SERVICES FOR REVIEW / UPDATION
-55.61

1131.033 53.10
55.10
57.05
58.55
60.05

1130.396 65.17

1130.549 68.30
OFFSET OF DESIGN AND CONSTRUCTION SUPERVISION OF
-2.95

1131.978 0.00

3.40

BAZ ALI SMALL DAM, DISTRICT KURRAM


1133.056
1133.056

1132.103

1131.963

1131.937
1131.934

1131.624

1131.107

1131.122

1131.014

1130.797

1130.493
TITLE:
NSL BAZ ALI DAM
DISTRICT KURRAM
TITLE:
MAIN DAM CROSS SECTIONS
-53.915
-53.340

-15.624

53.481
26.220

29.554

49.926

59.196

65.569

68.050
70.000
12.137
4.023
4.774
0.000
1.855

OFFSET
DRAWN DESIGNED CHECKED APPROVED SCALE DATE
Usman Y. Arshad I. Zeeshan S. Khurshid Z. Shown JUN,2022
RD 0+160
DRG.No:- BAD-CD-MD-04 SHEET:- 15 OF 25 SUB SH.- ----

Xref .\BAZ ALI-SEAL-FOR MAIN DAM.dwg


124
1160 U/S CL OF DAM D/S 1160 NOTES:-

6.35
CREST EL. 1154.50 1. ALL DIMENSIONS AND LEVELS ARE IN METERS UNLESS

0.6
0 .2
CORE CREST EL. 1153.00 OTHERWISE MENTIONED.

0
3.50
HIGH FLOOD LEVEL. 1152.30

5
2. EARTHFILL, CORE, FILTER & CLAY BLANKET MATERIALS TO BE
COMPACTED AT 95% OF MAXIMUM DRY DENSITY DETERMINED
1150 NORMAL CONSERVATION LEVEL EL. 1149.50 1150
2.25 THROUGH MODIFIED AASHTO COMPACTION T120.
3. THE GRADATION CURVES TO BE FOLLOWED FOR EARTHFILL,
1

0
2.50 FILTER (FINE AND COARSE FILTER), CORE & RIPRAP MATERIALS.

0.3
FINE FILTER FINE FILTER RIP RAP
1 4. FILTER MATERIAL WILL REQUIRED PROCESSING / SCREENING
RIP RAP COARSE FILTER FROM SUITABLE AVAILABLE MATERIAL AT SITE.
BEDDING MATERIAL 5. CORE SHOULD BE PLACED ON MINIMUM 5M BELOW FROM
NSL OR AS DIRECTED BY SITE ENGINEER.
SANDY GRAVEL
1140 SANDY GRAVEL MATERIAL 1140 6. THE RIPRAP MATERIAL IS TO WITHSTAND VERY SEVERE ACTION
MATERIAL CLAY CORE
FROM WAVES AND DESTRUCTIVE FORCES ASSOCIATED WITH
FREEZING AND THAWING, WETTING AND DRYING.
TOE DRAIN 7. THE MINIMUM DEPTH OF CORE IS 5M AND IF CHANGING IS
REQUIRED THEN THE SITE ENGINEER WILL DECIDE IT AS PER
3.00
SITE CONDITION.
8. ATTERBERG'S LIMIT TEST SHOULD BE CONDUCTED FOR
1130 1130 SELECTION OF THE CORE MATERIAL. ONLY THOSE MATERIALS
NSL ARE ALLOWED THAT HAVE PLASTIC INDEX VALUE RANGE OF
CLAY BLANKET
STRIPPING 1m 1 (10-12).
1.50m THICK 1 FINE FILTER SANDY GRAVEL
COARSE FILTER
9. THE SIDE SLOPE OF CORE TRENCH SHALL BE 1V:1H OR AS
0.75m THICK
6.00 1m THICK DIRECTED BY SITE ENGINEER.
CORE TRENCH 10. THE CUT SLOPE IN NATURAL GROUND SHALL BE MINIMUM
1V:1H OR AS DIRECTED BY SITE ENGINEER.
1120 1120
1132.890

1154.500

1154.500

1154.500

1132.404
1132.404
1130.604

1132.104

1132.104

1130.419
CUT / FILL
LEVEL
-56.98

53.11
55.11
57.06

1130.577 60.06

65.18

68.55
OFFSET

-2.95

1130.936 0.00

3.40
1131.451

1131.231

1131.041
1132.636

1131.373

1131.229

1130.852

1131.040

1130.964

1131.089

1131.068

1131.090

1131.086

1131.106

1130.388

1130.424
NSL

-13.981
-62.132

-37.478

-22.827
-32.135

47.085

49.616
20.840

28.414
30.253

38.722

60.579

63.918

70.000
11.820
-4.617

5.661
0.000
OFFSET

RD 0+190

0 5 10 15 20 25 M

1160 U/S D/S 1160


CL OF DAM SCALE
6.35
CREST EL. 1154.50
0.6

REFERENCE DRAWINGS :-
0.2

CORE CREST EL. 1153.00


0

3.50
HIGH FLOOD LEVEL. 1152.30
5

BAD-CD-MD-01,02,03
1150 NORMAL CONSERVATION LEVEL EL. 1149.50 1150
2.25
1

0
2.50 DRAWING IS RELEASED

0.3
FINE FILTER FINE FILTER RIP RAP
1
RIP RAP COARSE FILTER FOR CONSTRUCTION
BEDDING MATERIAL
SANDY GRAVEL
1140 SANDY GRAVEL MATERIAL 1140
MATERIAL CLAY CORE

REV. DATE BY DESCRIPTION CHKD. CERT. APPR.


TOE DRAIN NO.
3.00 CLIENT:
PSU SMALL DAM SECTION MERGED AREAS
1130 1130 IRRIGATION DEPARTMENT . KPK.
NSL CLAY BLANKET STRIPPING 1m CORE TRENCH 1 COARSE FILTER FINE FILTER CONSULTANTS:
1.50m THICK 1 1m THICK 0.75m THICK
A J.V OF
SANDY GRAVEL
REHMAN HABIB CONSULTANTS (PVT) LTD.
6.00
CASCADE GROUP
OF ENGINEERING & CONSULTANTS
1120 1120
IN ASSOCIATION WITH:
1132.793

1154.500

1154.500

1154.500

1132.406
1132.406
1130.606
1130.606
1132.106

1132.106

1130.363
CUT / FILL
LEVEL
ENGINEERING & TECHNICAL ASSOCIATES
PROJECT:
CONSULTANCY SERVICES FOR REVIEW / UPDATION
-57.22

1131.156 53.11

1131.034 55.11
57.06
58.56
60.06

65.18

68.67
OFFSET OF DESIGN AND CONSTRUCTION SUPERVISION OF
-2.95

1131.648 0.00

1131.608 3.40

BAZ ALI SMALL DAM, DISTRICT KURRAM


1132.381

1131.851
1131.851

1130.371
1132.396

1131.872

1131.793

1131.527

1131.290

1131.284

1131.384

1131.057

1131.054

1130.356
1131.368

TITLE:
NSL BAZ ALI DAM
DISTRICT KURRAM
TITLE:
-17.451
-54.069
-53.133

-16.072
-14.760
-13.400

MAIN DAM CROSS SECTIONS


55.591
16.941

40.019
24.155

26.614

53.059

67.522
32.795

70.000
3.701
0.000

5.570

7.939

OFFSET
DRAWN DESIGNED CHECKED APPROVED SCALE DATE
Usman Y. Arshad I. Zeeshan S. Khurshid Z. Shown JUN,2022
RD 0+180
DRG.No:- BAD-CD-MD-04 SHEET:- 14 OF 25 SUB SH.- ----

Xref .\BAZ ALI-SEAL-FOR MAIN DAM.dwg


125
1160 U/S CL OF DAM D/S 1160 NOTES:-

6.35 1. ALL DIMENSIONS AND LEVELS ARE IN METERS UNLESS


CREST EL. 1154.50

0.6
OTHERWISE MENTIONED.

0.2
CORE CREST EL. 1153.00

0
3.50
HIGH FLOOD LEVEL. 1152.30 2. EARTHFILL, CORE, FILTER & CLAY BLANKET MATERIALS TO BE

5
COMPACTED AT 95% OF MAXIMUM DRY DENSITY DETERMINED
1150 NORMAL CONSERVATION LEVEL EL. 1149.50 1150 THROUGH MODIFIED AASHTO COMPACTION T120.
2.25 3. THE GRADATION CURVES TO BE FOLLOWED FOR EARTHFILL,
1 FILTER (FINE AND COARSE FILTER), CORE & RIPRAP MATERIALS.

0
2.50

0.3
FINE FILTER FINE FILTER RIP RAP 4. FILTER MATERIAL WILL REQUIRED PROCESSING / SCREENING
1 FROM SUITABLE AVAILABLE MATERIAL AT SITE.
RIP RAP COARSE FILTER 5. CORE SHOULD BE PLACED ON MINIMUM 5M BELOW FROM
BEDDING MATERIAL NSL OR AS DIRECTED BY SITE ENGINEER.
SANDY GRAVEL 6. THE RIPRAP MATERIAL IS TO WITHSTAND VERY SEVERE ACTION
1140 SANDY GRAVEL MATERIAL 1140
MATERIAL CLAY CORE FROM WAVES AND DESTRUCTIVE FORCES ASSOCIATED WITH
FREEZING AND THAWING, WETTING AND DRYING.
7. THE MINIMUM DEPTH OF CORE IS 5M AND IF CHANGING IS
REQUIRED THEN THE SITE ENGINEER WILL DECIDE IT AS PER
3.00 SITE CONDITION.
8. ATTERBERG'S LIMIT TEST SHOULD BE CONDUCTED FOR
NSL SELECTION OF THE CORE MATERIAL. ONLY THOSE MATERIALS
1130 1130 ARE ALLOWED THAT HAVE PLASTIC INDEX VALUE RANGE OF
NSL 1
CLAY BLANKET STRIPPING 1m 1 (10-12).
COARSE FILTER FINE FILTER
1.50m THICK
1m THICK 0.75m THICK SANDY GRAVEL 9. THE SIDE SLOPE OF CORE TRENCH SHALL BE 1V:1H OR AS
CORE TRENCH 6.00 DIRECTED BY SITE ENGINEER.
10. THE CUT SLOPE IN NATURAL GROUND SHALL BE MINIMUM
1V:1H OR AS DIRECTED BY SITE ENGINEER.

1120 1120
1133.332

1154.500

1154.500

1154.500

1132.400
1132.400
1130.600
1130.600
1132.100

1132.100

1130.628
CUT / FILL
LEVEL
-55.87

53.12
55.12
57.07
58.57
1130.616 60.07

65.19

68.14
OFFSET

1132.637 -2.95

1132.482 0.00

3.40

1130.851
1132.942

1132.622

1131.980

1132.292
1132.225

1132.717

1132.693

1132.706

1132.665

1132.233

1131.723

1132.279

1131.223

1130.626
NSL
-58.762

-25.180
-40.089

-22.898

-20.638

45.621
43.634
26.818

29.242

59.577

70.000
13.242
10.720
-4.903
-2.942
-1.396
0.000
1.892
OFFSET

RD 0+210

0 5 10 15 20 25 M

1160 U/S D/S 1160


CL OF DAM SCALE

6.35
CREST EL. 1154.50 REFERENCE DRAWINGS :-
0.6
0.2

CORE CREST EL. 1153.00


0

3.50
HIGH FLOOD LEVEL. 1152.30
5

BAD-CD-MD-01,02,03
1150 NORMAL CONSERVATION LEVEL EL. 1149.50 1150
2.25
1 DRAWING IS RELEASED

0
2.50

0.3
FINE FILTER FINE FILTER RIP RAP
1
RIP RAP COARSE FILTER
FOR CONSTRUCTION
BEDDING MATERIAL
SANDY GRAVEL
1140 SANDY GRAVEL MATERIAL 1140
MATERIAL CLAY CORE

REV. DATE BY DESCRIPTION CHKD. CERT. APPR.


TOE DRAIN NO.
CLIENT:
3.00
PSU SMALL DAM SECTION MERGED AREAS
1130 1130
IRRIGATION DEPARTMENT . KPK.
NSL
CLAY BLANKET 1 CONSULTANTS: A J.V OF
STRIPPING 1m 1
1.50m THICK FINE FILTER SANDY GRAVEL
COARSE FILTER 0.75m THICK REHMAN HABIB CONSULTANTS (PVT) LTD.
6.00
CORE TRENCH 1m THICK
CASCADE GROUP
OF ENGINEERING & CONSULTANTS
1120 1120 IN ASSOCIATION WITH:
1132.964

1154.500

1154.500

1154.500

1132.402
1132.402
1130.602
1130.602
1132.102

1132.102

1130.495
CUT / FILL ENGINEERING & TECHNICAL ASSOCIATES
LEVEL PROJECT:
CONSULTANCY SERVICES FOR REVIEW / UPDATION
OF DESIGN AND CONSTRUCTION SUPERVISION OF
-56.79

53.12
55.12
57.07
58.57
60.07

65.19

68.40
OFFSET
-2.95

1131.418 0.00

3.40

BAZ ALI SMALL DAM, DISTRICT KURRAM


1130.881

1130.981
1131.710

1131.932

1131.857

1131.640

1131.673

1131.382

1131.503
1131.263

1130.874

1130.968

1130.982

1130.942

1130.869

1130.475

1130.498
TITLE:
BAZ ALI DAM
NSL
DISTRICT KURRAM
TITLE:
MAIN DAM CROSS SECTIONS
-30.411
-37.146

-23.382

-16.420

-10.256

46.741
21.168

27.692

32.747

51.885

56.404

61.798

70.000
16.202
-1.953

4.591
0.000

6.412

OFFSET
DRAWN DESIGNED CHECKED APPROVED SCALE DATE
Usman Y. Arshad I. Zeeshan S. Khurshid Z. Shown JUN,2022
RD 0+200 DRG.No:- BAD-CD-MD-04 SHEET:- 13 OF 25 SUB SH.- ----

Xref .\BAZ ALI-SEAL-FOR MAIN DAM.dwg

126
1160 U/S CL OF DAM D/S 1160 NOTES:-

6.35 1. ALL DIMENSIONS AND LEVELS ARE IN METERS UNLESS


CREST EL. 1154.50

0.6
OTHERWISE MENTIONED.

0.2
CORE CREST EL. 1153.00

0
3.50
HIGH FLOOD LEVEL. 1152.30 2. EARTHFILL, CORE, FILTER & CLAY BLANKET MATERIALS TO BE

5
COMPACTED AT 95% OF MAXIMUM DRY DENSITY DETERMINED
1150 NORMAL CONSERVATION LEVEL EL. 1149.50 1150 THROUGH MODIFIED AASHTO COMPACTION T120.
2.25 3. THE GRADATION CURVES TO BE FOLLOWED FOR EARTHFILL,
1 FILTER (FINE AND COARSE FILTER), CORE & RIPRAP MATERIALS.

0
2.50

0.3
FINE FILTER FINE FILTER RIP RAP 4. FILTER MATERIAL WILL REQUIRED PROCESSING / SCREENING
1 FROM SUITABLE AVAILABLE MATERIAL AT SITE.
RIP RAP COARSE FILTER 5. CORE SHOULD BE PLACED ON MINIMUM 5M BELOW FROM
BEDDING MATERIAL NSL OR AS DIRECTED BY SITE ENGINEER.
SANDY GRAVEL 6. THE RIPRAP MATERIAL IS TO WITHSTAND VERY SEVERE ACTION
1140 SANDY GRAVEL MATERIAL 1140
MATERIAL CLAY CORE TOE DRAIN FROM WAVES AND DESTRUCTIVE FORCES ASSOCIATED WITH
SANDY GRAVEL FREEZING AND THAWING, WETTING AND DRYING.
3.00
7. THE MINIMUM DEPTH OF CORE IS 5M AND IF CHANGING IS
NSL REQUIRED THEN THE SITE ENGINEER WILL DECIDE IT AS PER
SITE CONDITION.
8. ATTERBERG'S LIMIT TEST SHOULD BE CONDUCTED FOR
FINE FILTER SELECTION OF THE CORE MATERIAL. ONLY THOSE MATERIALS
1130 1 COARSE FILTER 0.75m THICK 1130 ARE ALLOWED THAT HAVE PLASTIC INDEX VALUE RANGE OF
NSL CLAY BLANKET
STRIPPING 1m 1 1m THICK (10-12).
1.50m THICK
CORE TRENCH 6.00
9. THE SIDE SLOPE OF CORE TRENCH SHALL BE 1V:1H OR AS
DIRECTED BY SITE ENGINEER.
10. THE CUT SLOPE IN NATURAL GROUND SHALL BE MINIMUM
1V:1H OR AS DIRECTED BY SITE ENGINEER.

1120 1120
1133.428

1154.500

1154.500

1154.500

1136.075
1136.075
1134.275
1134.275
1135.775

1135.775
1134.890
CUT / FILL
LEVEL
-55.63

44.85
46.85
48.80
1135.049 50.30
51.80

56.92
58.69
OFFSET

-2.95

1133.343 0.00

3.40
1132.921

1132.091

1135.661
1132.764

1133.072

1132.690

1132.240
1132.210

1131.958

1133.997

1134.724
1134.650

1135.056

1135.257

1135.624

1135.644

1135.582

1135.482

1134.696
NSL
-36.331
-64.006

-48.217
-46.542

-23.532
-22.842

-19.684

-13.255

15.461

40.384
22.155

27.455

32.565
33.894

37.433

50.309

70.000
14.182

19.449
0.000

6.922
OFFSET

RD 0+230

0 5 10 15 20 25 M

1160 U/S D/S 1160


CL OF DAM SCALE

6.35
CREST EL. 1154.50 REFERENCE DRAWINGS :-
0.6
0.2

CORE CREST EL. 1153.00


0

3.50
HIGH FLOOD LEVEL. 1152.30
5

BAD-CD-MD-01,02,03
1150 NORMAL CONSERVATION LEVEL EL. 1149.50 1150
2.25
1 DRAWING IS RELEASED

0
2.50

0.3
FINE FILTER FINE FILTER RIP RAP
1
RIP RAP COARSE FILTER
FOR CONSTRUCTION
BEDDING MATERIAL
SANDY GRAVEL
1140 SANDY GRAVEL MATERIAL 1140
MATERIAL CLAY CORE

TOE DRAIN REV. DATE BY DESCRIPTION CHKD. CERT. APPR.


NO.
3.00 SANDY GRAVEL
CLIENT:
NSL PSU SMALL DAM SECTION MERGED AREAS
1130 1130
IRRIGATION DEPARTMENT . KPK.
NSL CLAY BLANKET STRIPPING 1m 1 FINE FILTER
1 COARSE FILTER 0.75m THICK SANDY GRAVEL CONSULTANTS: A J.V OF
1.50m THICK
CORE TRENCH 1m THICK
REHMAN HABIB CONSULTANTS (PVT) LTD.
6.00
CASCADE GROUP
OF ENGINEERING & CONSULTANTS
1120 1120 IN ASSOCIATION WITH:
1133.467

1154.500

1154.500

1154.500

1133.295
1133.295
1131.495
1131.495
1132.995

1132.995
1131.965
CUT / FILL ENGINEERING & TECHNICAL ASSOCIATES
LEVEL PROJECT:
CONSULTANCY SERVICES FOR REVIEW / UPDATION
OF DESIGN AND CONSTRUCTION SUPERVISION OF
-55.53

1131.704 51.11
53.11
55.06
56.56
58.06

63.18
65.24
OFFSET
-2.95

1133.331 0.00

1133.719 3.40

BAZ ALI SMALL DAM, DISTRICT KURRAM


1132.741

1131.881
1133.112

1132.802

1132.392
1132.775

1133.053

1132.679
1132.569

1133.187

1133.995

1134.117

1134.149

1133.717

1132.099

1132.050
TITLE:
BAZ ALI DAM
NSL
DISTRICT KURRAM
TITLE:
MAIN DAM CROSS SECTIONS
-20.131
-51.160

-22.962

-18.742
-65.367

-43.033

-31.778

13.091

46.784
48.548
21.036

26.574

32.329

38.140

51.335

70.000
-9.382

0.000

3.874

OFFSET
DRAWN DESIGNED CHECKED APPROVED SCALE DATE
Usman Y. Arshad I. Zeeshan S. Khurshid Z. Shown JUN,2022
RD 0+220 DRG.No:- BAD-CD-MD-04 SHEET:- 12 OF 25 SUB SH.- ----

Xref .\BAZ ALI-SEAL-FOR MAIN DAM.dwg


127
1160 U/S CL OF DAM D/S 1160 NOTES:-

6.35 1. ALL DIMENSIONS AND LEVELS ARE IN METERS UNLESS


CREST EL. 1154.50

0.6
OTHERWISE MENTIONED.

0.2
CORE CREST EL. 1153.00

0
3.50
HIGH FLOOD LEVEL. 1152.30 2. EARTHFILL, CORE, FILTER & CLAY BLANKET MATERIALS TO BE

5
COMPACTED AT 95% OF MAXIMUM DRY DENSITY DETERMINED
1150 NORMAL CONSERVATION LEVEL EL. 1149.50 1150 THROUGH MODIFIED AASHTO COMPACTION T120.
2.25 3. THE GRADATION CURVES TO BE FOLLOWED FOR EARTHFILL,
1 FILTER (FINE AND COARSE FILTER), CORE & RIPRAP MATERIALS.

0
2.50

0.3
FINE FILTER FINE FILTER RIP RAP 4. FILTER MATERIAL WILL REQUIRED PROCESSING / SCREENING
1 FROM SUITABLE AVAILABLE MATERIAL AT SITE.
RIP RAP COARSE FILTER 5. CORE SHOULD BE PLACED ON MINIMUM 5M BELOW FROM
BEDDING MATERIAL NSL OR AS DIRECTED BY SITE ENGINEER.
SANDY GRAVEL TOE DRAIN 6. THE RIPRAP MATERIAL IS TO WITHSTAND VERY SEVERE ACTION
1140 SANDY GRAVEL MATERIAL 1140
MATERIAL CLAY CORE SANDY GRAVEL FROM WAVES AND DESTRUCTIVE FORCES ASSOCIATED WITH
3.00
FREEZING AND THAWING, WETTING AND DRYING.
NSL 7. THE MINIMUM DEPTH OF CORE IS 5M AND IF CHANGING IS
REQUIRED THEN THE SITE ENGINEER WILL DECIDE IT AS PER
SITE CONDITION.
8. ATTERBERG'S LIMIT TEST SHOULD BE CONDUCTED FOR
FINE FILTER
COARSE FILTER
SELECTION OF THE CORE MATERIAL. ONLY THOSE MATERIALS
1130 1 0.75m THICK 1130
NSL 1 1m THICK ARE ALLOWED THAT HAVE PLASTIC INDEX VALUE RANGE OF
CLAY BLANKET STRIPPING 1m
(10-12).
1.50m THICK CORE TRENCH 6.00 9. THE SIDE SLOPE OF CORE TRENCH SHALL BE 1V:1H OR AS
DIRECTED BY SITE ENGINEER.
10. THE CUT SLOPE IN NATURAL GROUND SHALL BE MINIMUM
1V:1H OR AS DIRECTED BY SITE ENGINEER.

1120 1120
1133.058

1154.500

1154.500

1154.500

1137.125
1137.125
1135.325
1135.325
1136.825

1136.825

1135.482
CUT / FILL
LEVEL
-56.56

42.49
44.49
1135.748 46.44
47.94
49.44

54.56

57.25
OFFSET

-2.95

1133.914 0.00

3.40
1131.901

1131.901

1135.831
1132.732

1136.370
1132.349
1132.227

1131.696

1133.287

1133.397

1134.559
1134.679

1136.019

1136.205

1136.049
1136.028

1135.513

1135.173
NSL
-51.731
-53.524

-43.722
-59.189

-34.468

-28.676

-10.805

43.384

46.514
25.110

27.376

36.000
36.879

55.505

70.000
16.792
-5.479

6.821
0.000

7.956
OFFSET

RD 0+250

0 5 10 15 20 25 M

1160 U/S D/S 1160


CL OF DAM SCALE

6.35
CREST EL. 1154.50 REFERENCE DRAWINGS :-
0.6
0.2

CORE CREST EL. 1153.00


0

3.50
HIGH FLOOD LEVEL. 1152.30
5

BAD-CD-MD-01,02,03
1150 NORMAL CONSERVATION LEVEL EL. 1149.50 1150
2.25
1 DRAWING IS RELEASED

0
2.50

0.3
FINE FILTER FINE FILTER RIP RAP
1
RIP RAP COARSE FILTER
FOR CONSTRUCTION
BEDDING MATERIAL
SANDY GRAVEL TOE DRAIN
1140 SANDY GRAVEL MATERIAL 1140
MATERIAL CLAY CORE
3.00 SANDY GRAVEL
REV. DATE BY DESCRIPTION CHKD. CERT. APPR.
NSL NO.
CLIENT:
PSU SMALL DAM SECTION MERGED AREAS
FINE FILTER
1130 COARSE FILTER 0.75m THICK 1130
IRRIGATION DEPARTMENT . KPK.
1
NSL 1 1m THICK
CLAY BLANKET STRIPPING 1m CONSULTANTS: A J.V OF
1.50m THICK CORE TRENCH 6.00
REHMAN HABIB CONSULTANTS (PVT) LTD.
CASCADE GROUP
OF ENGINEERING & CONSULTANTS
1120 1120 IN ASSOCIATION WITH:
1132.926

1154.500

1154.500

1154.500

1137.100
1137.100
1135.300
1135.300
1136.800

1136.800

1135.189
CUT / FILL ENGINEERING & TECHNICAL ASSOCIATES
LEVEL
PROJECT:
CONSULTANCY SERVICES FOR REVIEW / UPDATION
OF DESIGN AND CONSTRUCTION SUPERVISION OF
-56.89

42.55
1135.766 44.55

46.50
48.00
49.50

54.62

57.84
OFFSET
-2.95

1133.629 0.00

3.40

BAZ ALI SMALL DAM, DISTRICT KURRAM


1136.011
1132.786
1132.753
1132.787

1132.126
1131.995

1131.995

1131.913

1132.555

1132.744

1134.737
1134.944

1135.473

1135.546

1136.153

1136.055

1135.995

1135.757

1135.686
1135.346

1134.980
TITLE:
BAZ ALI DAM
NSL
DISTRICT KURRAM
TITLE:
MAIN DAM CROSS SECTIONS
-18.501
-63.152
-62.645
-60.940

-53.646
-51.620

-28.059

-25.719

44.314

48.704
20.447

28.744

41.317

47.325
31.377

33.968
35.922

70.000
11.728
13.674

17.163
-9.367

0.000

OFFSET
DRAWN DESIGNED CHECKED APPROVED SCALE DATE
Usman Y. Arshad I. Zeeshan S. Khurshid Z. Shown JUN,2022
RD 0+240 DRG.No:- BAD-CD-MD-04 SHEET:- 11 OF 25 SUB SH.- ----

Xref .\BAZ ALI-SEAL-FOR MAIN DAM.dwg

128
1160 CL OF DAM 1160 NOTES:-
U/S D/S

6.35 1. ALL DIMENSIONS AND LEVELS ARE IN METERS UNLESS


CREST EL. 1154.50

0.6
OTHERWISE MENTIONED.

0.2
CORE CREST EL. 1153.00

0
3.50 2. EARTHFILL, CORE, FILTER & CLAY BLANKET MATERIALS TO BE
HIGH FLOOD LEVEL. 1152.30

5
COMPACTED AT 95% OF MAXIMUM DRY DENSITY DETERMINED
1150 NORMAL CONSERVATION LEVEL EL. 1149.50 1150 THROUGH MODIFIED AASHTO COMPACTION T120.
2.25 3. THE GRADATION CURVES TO BE FOLLOWED FOR EARTHFILL,
1 FILTER (FINE AND COARSE FILTER), CORE & RIPRAP MATERIALS.

0
2.50

0.3
FINE FILTER FINE FILTER RIP RAP 4. FILTER MATERIAL WILL REQUIRED PROCESSING / SCREENING
1 FROM SUITABLE AVAILABLE MATERIAL AT SITE.
RIP RAP COARSE FILTER 5. CORE SHOULD BE PLACED ON MINIMUM 5M BELOW FROM
BEDDING MATERIAL NSL OR AS DIRECTED BY SITE ENGINEER.
SANDY GRAVEL TOE DRAIN 6. THE RIPRAP MATERIAL IS TO WITHSTAND VERY SEVERE ACTION
1140 SANDY GRAVEL MATERIAL 1140
MATERIAL CLAY CORE SANDY GRAVEL
FROM WAVES AND DESTRUCTIVE FORCES ASSOCIATED WITH
3.00
FREEZING AND THAWING, WETTING AND DRYING.
NSL
7. THE MINIMUM DEPTH OF CORE IS 5M AND IF CHANGING IS
REQUIRED THEN THE SITE ENGINEER WILL DECIDE IT AS PER
SITE CONDITION.
FINE FILTER 8. ATTERBERG'S LIMIT TEST SHOULD BE CONDUCTED FOR
1 COARSE FILTER 0.75m THICK SELECTION OF THE CORE MATERIAL. ONLY THOSE MATERIALS
1130 NSL 1 1m THICK 1130 ARE ALLOWED THAT HAVE PLASTIC INDEX VALUE RANGE OF
CLAY BLANKET STRIPPING 1m CORE TRENCH (10-12).
1.50m THICK 9. THE SIDE SLOPE OF CORE TRENCH SHALL BE 1V:1H OR AS
6.00 DIRECTED BY SITE ENGINEER.
10. THE CUT SLOPE IN NATURAL GROUND SHALL BE MINIMUM
1V:1H OR AS DIRECTED BY SITE ENGINEER.

1120 1120
1133.482

1154.500

1154.500

1154.500

1137.200
1137.200
1135.400
1135.400
1136.900

1136.900

1135.419
CUT / FILL
LEVEL
-55.50

1135.629 42.32

1135.663 44.32
46.27
1135.591 47.77
49.27

54.39

57.35
OFFSET

-2.95

1135.484 0.00

3.40
1132.814
1132.687

1132.120

1133.900

1134.849

1135.770

1136.636

1136.422

1136.079

1135.804

1135.199
NSL
-49.991
-51.879

-39.462

-15.748

42.421
18.101

29.826

44.789

47.495
23.818

38.479

70.000
-3.704

0.000
1.668
OFFSET

RD 0+270

0 5 10 15 20 25 M

1160 U/S D/S 1160


CL OF DAM SCALE

6.35
CREST EL. 1154.50 REFERENCE DRAWINGS :-
0.6
0.2

CORE CREST EL. 1153.00


0

3.50
HIGH FLOOD LEVEL. 1152.30
5

BAD-CD-MD-01,02,03
1150 NORMAL CONSERVATION LEVEL EL. 1149.50 1150
2.25
1 DRAWING IS RELEASED

0
2.50

0.3
FINE FILTER FINE FILTER RIP RAP
1
RIP RAP FOR CONSTRUCTION
COARSE FILTER
BEDDING MATERIAL
SANDY GRAVEL TOE DRAIN
1140 SANDY GRAVEL MATERIAL 1140
MATERIAL CLAY CORE SANDY GRAVEL
3.00
REV. DATE BY DESCRIPTION CHKD. CERT. APPR.
NSL NO.
CLIENT:
PSU SMALL DAM SECTION MERGED AREAS
FINE FILTER
1 COARSE FILTER 0.75m THICK IRRIGATION DEPARTMENT . KPK.
1130 1 1130
NSL 1m THICK
CLAY BLANKET CONSULTANTS: A J.V OF
STRIPPING 1m CORE TRENCH
1.50m THICK
REHMAN HABIB CONSULTANTS (PVT) LTD.
6.00
CASCADE GROUP
OF ENGINEERING & CONSULTANTS
1120 1120 IN ASSOCIATION WITH:
1133.208

1154.500

1154.500

1154.500

1137.150
1137.150
1135.350
1135.350
1136.850

1136.850

1135.516
CUT / FILL ENGINEERING & TECHNICAL ASSOCIATES
LEVEL PROJECT:
CONSULTANCY SERVICES FOR REVIEW / UPDATION
OF DESIGN AND CONSTRUCTION SUPERVISION OF
1132.707 -56.18

42.43
44.43

1135.698 46.38
47.88
49.38

54.50

57.17
OFFSET
1134.018 -2.95

1134.200 0.00

3.40

BAZ ALI SMALL DAM, DISTRICT KURRAM


TITLE:
1132.451

1134.381
1132.422

1131.480

1134.050

1136.566
1136.612

1135.850
1135.866

1135.286
1132.693

1131.567

1136.203

1135.313
BAZ ALI DAM
NSL
DISTRICT KURRAM
TITLE:
MAIN DAM CROSS SECTIONS
-56.540

-51.647
-50.927

-34.077

-31.633
-55.188

16.421

40.407

46.739
31.327

39.287

68.826
70.000
18.473
-3.110
-1.592
0.000
1.915

OFFSET
DRAWN DESIGNED CHECKED APPROVED SCALE DATE
Usman Y. Arshad I. Zeeshan S. Khurshid Z. Shown JUN,2022
RD 0+260 DRG.No:- BAD-CD-MD-04 SHEET:- 10 OF 25 SUB SH.- ----

Xref .\BAZ ALI-SEAL-FOR MAIN DAM.dwg


129
1160 U/S CL OF DAM D/S 1160 NOTES:-

6.35
CREST EL. 1154.50 1. ALL DIMENSIONS AND LEVELS ARE IN METERS UNLESS

0.6
OTHERWISE MENTIONED.

0.2
CORE CREST EL. 1153.00

0
3.50
HIGH FLOOD LEVEL. 1152.30

5
2. EARTHFILL, CORE, FILTER & CLAY BLANKET MATERIALS TO BE
COMPACTED AT 95% OF MAXIMUM DRY DENSITY DETERMINED
1150 NORMAL CONSERVATION LEVEL EL. 1149.50 1150 THROUGH MODIFIED AASHTO COMPACTION T120.
2.25
3. THE GRADATION CURVES TO BE FOLLOWED FOR EARTHFILL,
1 FILTER (FINE AND COARSE FILTER), CORE & RIPRAP MATERIALS.

0
2.50

0.3
FINE FILTER FINE FILTER RIP RAP
4. FILTER MATERIAL WILL REQUIRED PROCESSING / SCREENING
1
RIP RAP FROM SUITABLE AVAILABLE MATERIAL AT SITE.
COARSE FILTER
5. CORE SHOULD BE PLACED ON MINIMUM 5M BELOW FROM
BEDDING MATERIAL
NSL OR AS DIRECTED BY SITE ENGINEER.
SANDY GRAVEL TOE DRAIN 6. THE RIPRAP MATERIAL IS TO WITHSTAND VERY SEVERE ACTION
1140 SANDY GRAVEL MATERIAL 1140
MATERIAL CLAY CORE FROM WAVES AND DESTRUCTIVE FORCES ASSOCIATED WITH
3.00 SANDY GRAVEL
FREEZING AND THAWING, WETTING AND DRYING.
NSL 7. THE MINIMUM DEPTH OF CORE IS 5M AND IF CHANGING IS
REQUIRED THEN THE SITE ENGINEER WILL DECIDE IT AS PER
SITE CONDITION.
1 FINE FILTER 8. ATTERBERG'S LIMIT TEST SHOULD BE CONDUCTED FOR
NSL 1 COARSE FILTER SELECTION OF THE CORE MATERIAL. ONLY THOSE MATERIALS
STRIPPING 1m 0.75m THICK
1130 CLAY BLANKET 1130
CORE TRENCH 1m THICK ARE ALLOWED THAT HAVE PLASTIC INDEX VALUE RANGE OF
1.50m THICK
(10-12).
6.00
9. THE SIDE SLOPE OF CORE TRENCH SHALL BE 1V:1H OR AS
DIRECTED BY SITE ENGINEER.
10. THE CUT SLOPE IN NATURAL GROUND SHALL BE MINIMUM
1V:1H OR AS DIRECTED BY SITE ENGINEER.
1120 1120
1127.568

1154.500

1154.500

1137.291
1137.291
1135.491

1135.334
CUT / FILL

1135.580 1135.491 47.57


1136.991 49.07

1136.991 54.19
1154.500 3.40
LEVEL
-52.90

1135.812 42.12

44.12
46.07

57.50
OFFSET

1135.925 -2.95

1135.995 0.00
1134.639

1134.652

1135.860

1135.746

1136.538
1136.598

1136.489

1136.112

1135.863

1135.117
1133.605

1135.495
NSL
-64.682

-45.157

-28.455

-13.759

41.641
21.081

47.574
48.187
22.225

25.136

32.049

37.093

70.000
-7.188

-2.705

0.000
OFFSET

RD 0+290

0 5 10 15 20 25 M

1160 U/S D/S 1160


CL OF DAM SCALE

6.35
CREST EL. 1154.50
0.6

REFERENCE DRAWINGS :-
0.2

CORE CREST EL. 1153.00


0

3.50
HIGH FLOOD LEVEL. 1152.30
5

BAD-CD-MD-01,02,03
1150 NORMAL CONSERVATION LEVEL EL. 1149.50 1150
2.25
1

0
2.50 DRAWING IS RELEASED

0.3
FINE FILTER FINE FILTER RIP RAP
1
RIP RAP COARSE FILTER FOR CONSTRUCTION
BEDDING MATERIAL
SANDY GRAVEL TOE DRAIN
1140 SANDY GRAVEL MATERIAL 1140
MATERIAL CLAY CORE SANDY GRAVEL
NSL 3.00
REV. DATE BY DESCRIPTION CHKD. CERT. APPR.
NSL NO.
CLIENT:

1 FINE FILTER PSU SMALL DAM SECTION MERGED AREAS


COARSE FILTER 0.75m THICK
1130 STRIPPING 1m
1
1m THICK 1130 IRRIGATION DEPARTMENT . KPK.
CLAY BLANKET
CORE TRENCH
1.50m THICK CONSULTANTS: A J.V OF
6.00
REHMAN HABIB CONSULTANTS (PVT) LTD.
CASCADE GROUP
OF ENGINEERING & CONSULTANTS
1120 1120 IN ASSOCIATION WITH:
1133.742

1154.500

1154.500

1154.500

1137.273
1137.273
1135.473
1135.473
1136.973

1136.973

1135.345
CUT / FILL ENGINEERING & TECHNICAL ASSOCIATES
LEVEL
PROJECT:
CONSULTANCY SERVICES FOR REVIEW / UPDATION
-54.84

OF DESIGN AND CONSTRUCTION SUPERVISION OF


42.16
44.16
46.11
1135.584 47.61
49.11

54.23

57.48
OFFSET
-2.95

1135.634 0.00

1135.710 3.40

BAZ ALI SMALL DAM, DISTRICT KURRAM


1133.013
1132.916

1135.476

1135.437

1136.617
1132.975

1135.059

1135.499

1136.148

1135.428

1135.508

1135.128
TITLE:
NSL
BAZ ALI DAM
DISTRICT KURRAM
TITLE:
MAIN DAM CROSS SECTIONS
-48.183
-47.402
-50.269

-14.129

45.299

47.535
48.086
20.163

32.662

70.000
-9.061

-6.796
-5.250

2.952
0.000

OFFSET
DRAWN DESIGNED CHECKED APPROVED SCALE DATE
Usman Y. Arshad I. Zeeshan S. Khurshid Z. Shown JUN,2022
RD 0+280
DRG.No:- BAD-CD-MD-04 SHEET:- 09 OF 25 SUB SH.- ----

Xref .\BAZ ALI-SEAL-FOR MAIN DAM.dwg


130
1160 U/S CL OF DAM D/S 1160 NOTES:-

6.35 1. ALL DIMENSIONS AND LEVELS ARE IN METERS UNLESS


CREST EL. 1154.50

0.6
OTHERWISE MENTIONED.

0.2
CORE CREST EL. 1153.00

0
3.50
HIGH FLOOD LEVEL. 1152.30 2. EARTHFILL, CORE, FILTER & CLAY BLANKET MATERIALS TO BE

5
COMPACTED AT 95% OF MAXIMUM DRY DENSITY DETERMINED
1150 NORMAL CONSERVATION LEVEL EL. 1149.50 1150 THROUGH MODIFIED AASHTO COMPACTION T120.
2.25 3. THE GRADATION CURVES TO BE FOLLOWED FOR EARTHFILL,
1 FILTER (FINE AND COARSE FILTER), CORE & RIPRAP MATERIALS.

0
2.50

0.3
FINE FILTER FINE FILTER RIP RAP 4. FILTER MATERIAL WILL REQUIRED PROCESSING / SCREENING
1 FROM SUITABLE AVAILABLE MATERIAL AT SITE.
RIP RAP COARSE FILTER 5. CORE SHOULD BE PLACED ON MINIMUM 5M BELOW FROM
BEDDING MATERIAL NSL OR AS DIRECTED BY SITE ENGINEER.
SANDY GRAVEL TOE DRAIN 6. THE RIPRAP MATERIAL IS TO WITHSTAND VERY SEVERE ACTION
1140 SANDY GRAVEL MATERIAL 1140
MATERIAL CLAY CORE 3.00 SANDY GRAVEL FROM WAVES AND DESTRUCTIVE FORCES ASSOCIATED WITH
FREEZING AND THAWING, WETTING AND DRYING.
7. THE MINIMUM DEPTH OF CORE IS 5M AND IF CHANGING IS
NSL
REQUIRED THEN THE SITE ENGINEER WILL DECIDE IT AS PER
COARSE FILTER
SITE CONDITION.
NSL CLAY BLANKET STRIPPING 1m 1 FINE FILTER 8. ATTERBERG'S LIMIT TEST SHOULD BE CONDUCTED FOR
1 1m THICK
1.50m THICK 0.75m THICK SELECTION OF THE CORE MATERIAL. ONLY THOSE MATERIALS
1130 1130 ARE ALLOWED THAT HAVE PLASTIC INDEX VALUE RANGE OF
6.00
(10-12).
9. THE SIDE SLOPE OF CORE TRENCH SHALL BE 1V:1H OR AS
DIRECTED BY SITE ENGINEER.
10. THE CUT SLOPE IN NATURAL GROUND SHALL BE MINIMUM
1V:1H OR AS DIRECTED BY SITE ENGINEER.

1120 1120
1135.923

1154.500

1154.500

1154.500

1137.350
1137.350
1135.550
1135.550
1137.050

1137.050

1135.196
CUT / FILL
LEVEL
-49.39

41.98
43.98
45.93
47.43
1135.370 48.93

54.05

57.76
OFFSET

-2.95

1136.683 0.00

3.40

1135.741
1135.486

1135.262

1135.647

1136.366

1136.982

1135.152

1135.224
1136.628

1136.779

1135.975

1135.425

1135.265
NSL
-52.966

-40.433

-35.086

-23.153

67.341
10.271

43.152

48.483
22.969

26.574

51.586

70.000
-7.973

2.386
0.000
OFFSET

RD 0+310

0 5 10 15 20 25 M

1160 U/S D/S 1160


CL OF DAM SCALE

6.35
CREST EL. 1154.50
REFERENCE DRAWINGS :-
0.6
0.2

CORE CREST EL. 1153.00


0

3.50
HIGH FLOOD LEVEL. 1152.30
5

BAD-CD-MD-01,02,03
1150 NORMAL CONSERVATION LEVEL EL. 1149.50 1150
2.25
1 DRAWING IS RELEASED

0
2.50

0.3
FINE FILTER FINE FILTER RIP RAP
1
RIP RAP COARSE FILTER
FOR CONSTRUCTION
BEDDING MATERIAL
SANDY GRAVEL TOE DRAIN
1140 SANDY GRAVEL MATERIAL 1140
MATERIAL CLAY CORE SANDY GRAVEL
3.00
REV. DATE BY DESCRIPTION CHKD. CERT. APPR.
NSL NO.
CLIENT:
1 PSU SMALL DAM SECTION MERGED AREAS
NSL STRIPPING 1m 1 FINE FILTER
COARSE FILTER IRRIGATION DEPARTMENT . KPK.
1130 CLAY BLANKET 0.75m THICK 1130
CORE TRENCH 1m THICK
1.50m THICK
CONSULTANTS: A J.V OF
6.00
REHMAN HABIB CONSULTANTS (PVT) LTD.
CASCADE GROUP
OF ENGINEERING & CONSULTANTS
1120 1120 IN ASSOCIATION WITH:
1135.048

1154.500

1154.500

1154.500

1137.318
1137.318
1135.518
1135.518
1137.018

1137.018

1135.360
CUT / FILL ENGINEERING & TECHNICAL ASSOCIATES
LEVEL
PROJECT:
CONSULTANCY SERVICES FOR REVIEW / UPDATION
OF DESIGN AND CONSTRUCTION SUPERVISION OF
-51.58

42.05
44.05
46.04
47.50
1135.412 49.00

54.13

57.44
OFFSET
-2.95

1136.356 0.00

3.40

BAZ ALI SMALL DAM, DISTRICT KURRAM


1134.321
1134.934

1134.364

1136.244

1136.782

1135.652

1135.590

1135.460
1136.056

1136.298

1135.437

1135.166
TITLE:
BAZ ALI DAM
NSL
DISTRICT KURRAM
TITLE:
MAIN DAM CROSS SECTIONS
-64.700

-41.836

-18.456
-45.388

48.308
48.994
22.660

35.847

52.473
32.598

70.000
-7.581

16.545
0.000

OFFSET
DRAWN DESIGNED CHECKED APPROVED SCALE DATE
Usman Y. Arshad I. Zeeshan S. Khurshid Z. Shown JUN,2022
RD 0+300 DRG.No:- BAD-CD-MD-04 SHEET:- 08 OF 25 SUB SH.- ----

Xref .\BAZ ALI-SEAL-FOR MAIN DAM.dwg


131
1160 1160 NOTES:-
U/S CL OF DAM D/S

6.35 1. ALL DIMENSIONS AND LEVELS ARE IN METERS UNLESS

0.6
CREST EL. 1154.50
OTHERWISE MENTIONED.

0.2
0
3.50 CORE CREST EL. 1153.00 2. EARTHFILL, CORE, FILTER & CLAY BLANKET MATERIALS TO BE

5
HIGH FLOOD LEVEL. 1152.30
COMPACTED AT 95% OF MAXIMUM DRY DENSITY DETERMINED
NORMAL CONSERVATION LEVEL EL. 1149.50 THROUGH MODIFIED AASHTO COMPACTION T120.
1150 1150
2.25 3. THE GRADATION CURVES TO BE FOLLOWED FOR EARTHFILL,
1 FILTER (FINE AND COARSE FILTER), CORE & RIPRAP MATERIALS.

0
0.3
2.50 FINE FILTER FINE FILTER RIP RAP 4. FILTER MATERIAL WILL REQUIRED PROCESSING / SCREENING
GRAVEL PROTECTION RIP RAP
FROM SUITABLE AVAILABLE MATERIAL AT SITE.
0.50m THICK 1 COARSE FILTER 5. CORE SHOULD BE PLACED ON MINIMUM 5M BELOW FROM
BEDDING MATERIAL NSL OR AS DIRECTED BY SITE ENGINEER.
SANDY GRAVEL TOE DRAIN 6. THE RIPRAP MATERIAL IS TO WITHSTAND VERY SEVERE ACTION
1140 SANDY GRAVEL MATERIAL 1140 FROM WAVES AND DESTRUCTIVE FORCES ASSOCIATED WITH
MATERIAL CLAY CORE 3.00 SANDY GRAVEL
FREEZING AND THAWING, WETTING AND DRYING.
7. THE MINIMUM DEPTH OF CORE IS 5M AND IF CHANGING IS
NSL REQUIRED THEN THE SITE ENGINEER WILL DECIDE IT AS PER
CORE TRENCH
SITE CONDITION.
STRIPPING 1m 1 COARSE FILTER
NSL CLAY BLANKET 1 FINE FILTER 8. ATTERBERG'S LIMIT TEST SHOULD BE CONDUCTED FOR
1m THICK
1.50m THICK 0.75m THICK SELECTION OF THE CORE MATERIAL. ONLY THOSE MATERIALS
1130 1130 ARE ALLOWED THAT HAVE PLASTIC INDEX VALUE RANGE OF
6.00
(10-12).
9. THE SIDE SLOPE OF CORE TRENCH SHALL BE 1V:1H OR AS
DIRECTED BY SITE ENGINEER.
10. THE CUT SLOPE IN NATURAL GROUND SHALL BE MINIMUM
1V:1H OR AS DIRECTED BY SITE ENGINEER.

1120 1120
1136.881

1154.500

1154.500

1154.500

1137.450
1137.450
1135.650
1135.650
1137.150

1137.150

1135.304
CUT / FILL
LEVEL
-47.00

41.76
43.76
45.71
47.21
1135.602 48.71

53.83

57.52
OFFSET

-2.95

1136.701 0.00

3.40
1135.979

1136.738

1136.899

1136.910

1136.768

1137.083

1136.696

1136.798

1135.998

1135.372

1135.379

1135.449

1135.138

1135.115
NSL
-56.626

-38.356

-33.228

-16.447

-10.959

65.491
40.046

48.644
24.607

35.353

50.657

70.000
13.216
-4.202

-0.620
0.000
OFFSET

RD 0+330

0 5 10 15 20 25 M

1160 U/S D/S 1160


CL OF DAM SCALE

6.35
0.6

CREST EL. 1154.50 REFERENCE DRAWINGS :-


0.2

3.50 CORE CREST EL. 1153.00


5

HIGH FLOOD LEVEL. 1152.30


BAD-CD-MD-01,02,03
1150 NORMAL CONSERVATION LEVEL EL. 1149.50 2.25 1150
1
DRAWING IS RELEASED

0
0.3
GRAVEL PROTECTION 2.50 FINE FILTER FINE FILTER RIP RAP
RIP RAP
0.50m THICK FOR CONSTRUCTION
1 COARSE FILTER
BEDDING MATERIAL
SANDY GRAVEL TOE DRAIN
1140 SANDY GRAVEL MATERIAL 1140
MATERIAL CLAY CORE 3.00 SANDY GRAVEL
REV. DATE BY DESCRIPTION CHKD. CERT. APPR.
NO.
NSL
CLIENT:
CLAY BLANKET 1 COARSE FILTER FINE FILTER PSU SMALL DAM SECTION MERGED AREAS
STRIPPING 1m
NSL 1.50m THICK 1 1m THICK 0.75m THICK
CORE TRENCH IRRIGATION DEPARTMENT . KPK.
1130 1130
6.00 CONSULTANTS: A J.V OF
REHMAN HABIB CONSULTANTS (PVT) LTD.
CASCADE GROUP
OF ENGINEERING & CONSULTANTS
1120 1120 IN ASSOCIATION WITH:
1136.301

1154.500

1154.500

1154.500

1137.400
1137.400
1134.850
1134.850
1136.039

1137.100

1134.937
CUT / FILL ENGINEERING & TECHNICAL ASSOCIATES
LEVEL PROJECT:
CONSULTANCY SERVICES FOR REVIEW / UPDATION
OF DESIGN AND CONSTRUCTION SUPERVISION OF
-48.45

41.87
43.87
1135.283 45.82
47.32
1135.362 48.82

53.94

58.27
OFFSET
-2.95

1137.009 0.00

3.40

BAZ ALI SMALL DAM, DISTRICT KURRAM


TITLE:
1136.651

1134.961
1136.197
1136.234

1137.012

1136.675

1137.102

1137.125

1135.854

1135.582

1135.003

1134.935

1135.005
BAZ ALI DAM
NSL DISTRICT KURRAM
TITLE:
MAIN DAM CROSS SECTIONS
-27.851
-38.862
-37.697

-32.808

60.211
45.563
28.252

48.619
23.585

53.350
55.360

70.000
-8.365

2.351

5.481
0.000

OFFSET
DRAWN DESIGNED CHECKED APPROVED SCALE DATE
Usman Y. Arshad I. Zeeshan S. Khurshid Z. Shown JUN,2022
RD 0+320 DRG.No:- BAD-CD-MD-04 SHEET:- 07 OF 25 SUB SH.- ----

Xref .\BAZ ALI-SEAL-FOR MAIN DAM.dwg


132
1160 1160 NOTES:-
U/S CL OF DAM D/S

6.35 1. ALL DIMENSIONS AND LEVELS ARE IN METERS UNLESS

0.6
CREST EL. 1154.50
OTHERWISE MENTIONED.

0.2

0
3.50 CORE CREST EL. 1153.00 2. EARTHFILL, CORE, FILTER & CLAY BLANKET MATERIALS TO BE

5
HIGH FLOOD LEVEL. 1152.30
COMPACTED AT 95% OF MAXIMUM DRY DENSITY DETERMINED
NORMAL CONSERVATION LEVEL EL. 1149.50 THROUGH MODIFIED AASHTO COMPACTION T120.
1150 1150
2.25 3. THE GRADATION CURVES TO BE FOLLOWED FOR EARTHFILL,
1 FILTER (FINE AND COARSE FILTER), CORE & RIPRAP MATERIALS.

0
0.3
GRAVEL PROTECTION 2.50 FINE FILTER FINE FILTER RIP RAP 4. FILTER MATERIAL WILL REQUIRED PROCESSING / SCREENING
0.50m THICK RIP RAP FROM SUITABLE AVAILABLE MATERIAL AT SITE.
1
COARSE FILTER 5. CORE SHOULD BE PLACED ON MINIMUM 5M BELOW FROM
BEDDING MATERIAL NSL OR AS DIRECTED BY SITE ENGINEER.
SANDY GRAVEL SANDY GRAVEL MATERIAL TOE DRAIN 6. THE RIPRAP MATERIAL IS TO WITHSTAND VERY SEVERE ACTION
1140 SANDY GRAVEL 1140 FROM WAVES AND DESTRUCTIVE FORCES ASSOCIATED WITH
MATERIAL CLAY CORE 3.00
FREEZING AND THAWING, WETTING AND DRYING.
NSL 7. THE MINIMUM DEPTH OF CORE IS 5M AND IF CHANGING IS
REQUIRED THEN THE SITE ENGINEER WILL DECIDE IT AS PER
NSL 1 SITE CONDITION.
CLAY BLANKET STRIPPING 1m COARSE FILTER
1.50m THICK
1 FINE FILTER 8. ATTERBERG'S LIMIT TEST SHOULD BE CONDUCTED FOR
1m THICK 0.75m THICK SELECTION OF THE CORE MATERIAL. ONLY THOSE MATERIALS
6.00
CORE TRENCH
1130 1130 ARE ALLOWED THAT HAVE PLASTIC INDEX VALUE RANGE OF
(10-12).
9. THE SIDE SLOPE OF CORE TRENCH SHALL BE 1V:1H OR AS
DIRECTED BY SITE ENGINEER.
10. THE CUT SLOPE IN NATURAL GROUND SHALL BE MINIMUM
1V:1H OR AS DIRECTED BY SITE ENGINEER.

1120 1120
1137.813

1154.500

1154.500

1154.500

1137.655
1137.655
1135.855
1135.855
1137.355

1137.355
1136.380
CUT / FILL
LEVEL
-44.67

41.30

1136.084 43.30
45.25
46.75
1136.527 48.25

53.37
55.32
OFFSET

-2.95

1137.478 0.00

3.40
1137.214

1138.096

1137.026

1136.552

1136.174

1136.116

1136.497
1137.395

1136.689

1136.598

1136.889

1136.865

1136.078
NSL
-53.626

-37.150

-22.272

-19.259

-12.610

48.101

57.571
43.660
24.653
25.260

31.562

50.787
36.488

70.000
13.245
0.000
OFFSET

RD 0+350

0 5 10 15 20 25 M

1160 U/S D/S 1160


CL OF DAM SCALE

6.35
0.6

CREST EL. 1154.50 REFERENCE DRAWINGS :-


0.2

3.50 CORE CREST EL. 1153.00


5

HIGH FLOOD LEVEL. 1152.30


BAD-CD-MD-01,02,03
1150 NORMAL CONSERVATION LEVEL EL. 1149.50 1150
2.25
1 DRAWING IS RELEASED

0
0.3
GRAVEL PROTECTION 2.50 FINE FILTER FINE FILTER RIP RAP
0.50m THICK RIP RAP
FOR CONSTRUCTION
1 COARSE FILTER
BEDDING MATERIAL
SANDY GRAVEL TOE DRAIN
1140 SANDY GRAVEL MATERIAL 1140
MATERIAL CLAY CORE 3.00 SANDY GRAVEL
REV. DATE BY DESCRIPTION CHKD. CERT. APPR.
NSL NO.
CLIENT:
NSL CLAY BLANKET STRIPPING 1m
1
1
COARSE FILTER FINE FILTER PSU SMALL DAM SECTION MERGED AREAS
1.50m THICK 1m THICK 0.75m THICK
CORE TRENCH IRRIGATION DEPARTMENT . KPK.
1130 6.00 1130
CONSULTANTS: A J.V OF
REHMAN HABIB CONSULTANTS (PVT) LTD.
CASCADE GROUP
OF ENGINEERING & CONSULTANTS
1120 1120 IN ASSOCIATION WITH:
1137.479

1154.500

1154.500

1154.500

1137.550
1137.550
1135.750
1135.750
1137.250

1137.250

1135.719
CUT / FILL ENGINEERING & TECHNICAL ASSOCIATES
LEVEL PROJECT:
CONSULTANCY SERVICES FOR REVIEW / UPDATION
OF DESIGN AND CONSTRUCTION SUPERVISION OF
-45.50

41.53
43.53
45.48
1135.842 46.98
1135.933 48.48

53.60

1135.702 56.67
OFFSET
-2.95

1137.379 0.00

3.40

BAZ ALI SMALL DAM, DISTRICT KURRAM


TITLE:
1136.471
1137.259
1137.265
1137.233

1136.707

1136.643

1137.590

1136.429

1136.143

1135.885

1135.905

1135.848
1135.927

1135.433
BAZ ALI DAM
NSL DISTRICT KURRAM
TITLE:
MAIN DAM CROSS SECTIONS
-38.375
-37.843
-37.163

-18.240

-15.757

15.271

42.607

47.632
48.547
49.100
20.952

25.628

30.040

50.497

57.177

70.000
4.522
0.000

OFFSET
DRAWN DESIGNED CHECKED APPROVED SCALE DATE
Usman Y. Arshad I. Zeeshan S. Khurshid Z. Shown JUN,2022
RD 0+340 DRG.No:- BAD-CD-MD-04 SHEET:- 06 OF 25 SUB SH.- ----

Xref .\BAZ ALI-SEAL-FOR MAIN DAM.dwg


133
1160 U/S CL OF DAM D/S 1160 NOTES:-

6.35

0.6
CREST EL. 1154.50 1. ALL DIMENSIONS AND LEVELS ARE IN METERS UNLESS

0.2

0
OTHERWISE MENTIONED.
3.50 CORE CREST EL. 1153.00

5
HIGH FLOOD LEVEL. 1152.30 2. EARTHFILL, CORE, FILTER & CLAY BLANKET MATERIALS TO BE
COMPACTED AT 95% OF MAXIMUM DRY DENSITY DETERMINED
1150 NORMAL CONSERVATION LEVEL EL. 1149.50 1150 THROUGH MODIFIED AASHTO COMPACTION T120.
2.25 3. THE GRADATION CURVES TO BE FOLLOWED FOR EARTHFILL,
FINE FILTER
1 FILTER (FINE AND COARSE FILTER), CORE & RIPRAP MATERIALS.

0
0.3
GRAVEL PROTECTION 2.50 RIP RAP
0.50m THICK
RIP RAP FINE FILTER COARSE FILTER 4. FILTER MATERIAL WILL REQUIRED PROCESSING / SCREENING
1 TOE DRAIN FROM SUITABLE AVAILABLE MATERIAL AT SITE.
BEDDING MATERIAL 5. CORE SHOULD BE PLACED ON MINIMUM 5M BELOW FROM
3.00
SANDY GRAVEL SANDY GRAVEL MATERIAL SANDY GRAVEL NSL OR AS DIRECTED BY SITE ENGINEER.
MATERIAL 6. THE RIPRAP MATERIAL IS TO WITHSTAND VERY SEVERE ACTION
1140 1140
CLAY CORE FROM WAVES AND DESTRUCTIVE FORCES ASSOCIATED WITH
NSL
FREEZING AND THAWING, WETTING AND DRYING.
7. THE MINIMUM DEPTH OF CORE IS 5M AND IF CHANGING IS
FINE FILTER REQUIRED THEN THE SITE ENGINEER WILL DECIDE IT AS PER
1 COARSE FILTER 0.75m THICK
NSL STRIPPING 1m 1 SITE CONDITION.
1m THICK
CLAY BLANKET 8. ATTERBERG'S LIMIT TEST SHOULD BE CONDUCTED FOR
6.00
1.50m THICK CORE TRENCH SELECTION OF THE CORE MATERIAL. ONLY THOSE MATERIALS
1130 1130 ARE ALLOWED THAT HAVE PLASTIC INDEX VALUE RANGE OF
(10-12).
9. THE SIDE SLOPE OF CORE TRENCH SHALL BE 1V:1H OR AS
DIRECTED BY SITE ENGINEER.
10. THE CUT SLOPE IN NATURAL GROUND SHALL BE MINIMUM
1V:1H OR AS DIRECTED BY SITE ENGINEER.

1120 1120
1138.060

1154.500

1154.500

1154.500

1141.043
1141.043
1139.243
1139.243
1140.743

1140.743

1137.734
CUT / FILL
LEVEL
-44.05

33.67
35.67
37.62
39.12
40.62

1138.093 45.75

51.76
OFFSET

-2.95

1138.271 0.00

3.40
1137.451

1140.991
1137.474

1137.780

1137.940

1138.052
1138.012
1137.655

1137.265

1138.399

1139.519

1141.203

1141.378

1137.698

1136.905
NSL
-53.971

-20.781
-35.368

-13.895

45.440
46.037
25.857

29.188

51.184

56.904
57.597
34.369

70.000
12.053
-2.152

0.000
0.560
OFFSET

RD 0+370

0 5 10 15 20 25 M

1160 U/S D/S 1160


CL OF DAM SCALE

6.35
0.6

CREST EL. 1154.50


REFERENCE DRAWINGS :-
0.2

3.50 CORE CREST EL. 1153.00


5

HIGH FLOOD LEVEL. 1152.30


BAD-CD-MD-01,02,03
1150 NORMAL CONSERVATION LEVEL EL. 1149.50 1150
2.25
1 DRAWING IS RELEASED

0
GRAVEL PROTECTION

0.3
FINE FILTER FINE FILTER RIP RAP
0.50m THICK 2.50
RIP RAP 1 COARSE FILTER
FOR CONSTRUCTION
BEDDING MATERIAL SANDY GRAVEL TOE DRAIN
MATERIAL SANDY GRAVEL MATERIAL SANDY GRAVEL
1140 3.00 1140
CLAY CORE
NSL
REV. DATE BY DESCRIPTION CHKD. CERT. APPR.
NO.
NSL 1 CLIENT:
CLAY BLANKET
STRIPPING 1m 1
COARSE FILTER
FINE FILTER PSU SMALL DAM SECTION MERGED AREAS
1.50m THICK 6.00 0.75m THICK
1130
CORE TRENCH 1m THICK
1130
IRRIGATION DEPARTMENT . KPK.
CONSULTANTS: A J.V OF
REHMAN HABIB CONSULTANTS (PVT) LTD.
CASCADE GROUP
OF ENGINEERING & CONSULTANTS
1120 1120 IN ASSOCIATION WITH:
1137.939

1154.500

1154.500

1154.500

1138.239
1138.239
1136.439
1136.439
1137.939

1137.939

1136.512
CUT / FILL ENGINEERING & TECHNICAL ASSOCIATES
LEVEL
PROJECT:
CONSULTANCY SERVICES FOR REVIEW / UPDATION
OF DESIGN AND CONSTRUCTION SUPERVISION OF
-44.35

1138.218 39.98
41.98
43.93
45.43
1136.867 46.93

1136.489 52.05

54.91
OFFSET
-2.95

1137.658 0.00

3.40

BAZ ALI SMALL DAM, DISTRICT KURRAM


1136.931
1137.470

1137.519

1138.380

1139.388
1139.607

1139.248

1137.396

1136.383

1137.067

1136.933
1136.775
TITLE:
BAZ ALI DAM
NSL
DISTRICT KURRAM
TITLE:
MAIN DAM CROSS SECTIONS
-41.517

-35.955

-16.577

40.267

43.405

47.155
20.879
21.703

26.477

51.785
52.474

64.645

68.622
70.000
16.468
0.000

OFFSET
DRAWN DESIGNED CHECKED APPROVED SCALE DATE
Usman Y. Arshad I. Zeeshan S. Khurshid Z. Shown JUN,2022
RD 0+360 DRG.No:- BAD-CD-MD-04 SHEET:- 05 OF 25 SUB SH.- ----

Xref .\BAZ ALI-SEAL-FOR MAIN DAM.dwg

134
1160 U/S CL OF DAM D/S 1160 NOTES:-

6.35 1. ALL DIMENSIONS AND LEVELS ARE IN METERS UNLESS

0.6
CREST EL. 1154.50

0.2
OTHERWISE MENTIONED.

0
CORE CREST EL. 1153.00

5
3.50
HIGH FLOOD LEVEL. 1152.30 2. EARTHFILL, CORE, FILTER & CLAY BLANKET MATERIALS TO BE
COMPACTED AT 95% OF MAXIMUM DRY DENSITY DETERMINED
1150 NORMAL CONSERVATION LEVEL EL. 1149.50 2.25 1150 THROUGH MODIFIED AASHTO COMPACTION T120.
FINE FILTER 3. THE GRADATION CURVES TO BE FOLLOWED FOR EARTHFILL,

0
GRAVEL PROTECTION 1

0.3
0.50m THICK 2.50 RIP RAP FILTER (FINE AND COARSE FILTER), CORE & RIPRAP MATERIALS.
RIP RAP COARSE FILTER
FINE FILTER TOE DRAIN 4. FILTER MATERIAL WILL REQUIRED PROCESSING / SCREENING
1 FROM SUITABLE AVAILABLE MATERIAL AT SITE.
BEDDING MATERIAL 3.00 SANDY GRAVEL
CLAY CORE SANDY GRAVEL MATERIAL 5. CORE SHOULD BE PLACED ON MINIMUM 5M BELOW FROM
SANDY GRAVEL
MATERIAL NSL OR AS DIRECTED BY SITE ENGINEER.
6. THE RIPRAP MATERIAL IS TO WITHSTAND VERY SEVERE ACTION
1140 1140
NSL FROM WAVES AND DESTRUCTIVE FORCES ASSOCIATED WITH
FREEZING AND THAWING, WETTING AND DRYING.
FINE FILTER 7. THE MINIMUM DEPTH OF CORE IS 5M AND IF CHANGING IS
1 1 COARSE FILTER 0.75m THICK
NSL 1 1 REQUIRED THEN THE SITE ENGINEER WILL DECIDE IT AS PER
CLAY BLANKET STRIPPING 1m 1m THICK
6.00 SITE CONDITION.
1.50m THICK CORE TRENCH 8. ATTERBERG'S LIMIT TEST SHOULD BE CONDUCTED FOR
SELECTION OF THE CORE MATERIAL. ONLY THOSE MATERIALS
1130 1130 ARE ALLOWED THAT HAVE PLASTIC INDEX VALUE RANGE OF
(10-12).
9. THE SIDE SLOPE OF CORE TRENCH SHALL BE 1V:1H OR AS
DIRECTED BY SITE ENGINEER.
10. THE CUT SLOPE IN NATURAL GROUND SHALL BE MINIMUM
1V:1H OR AS DIRECTED BY SITE ENGINEER.

1120 1120
1138.687

1154.500

1154.500

1154.500

1142.710
1142.710
1140.910
1140.910
1142.410

1142.410

1139.304
CUT / FILL
LEVEL
-42.48

29.92
31.92
33.87
35.37
1141.388 36.87

41.99

48.21
OFFSET

-2.95

1139.667 0.00

3.40

1141.641

1138.851
1142.032
1137.740

1138.567

1138.533

1138.929
1139.049
1139.425

1139.828
1139.573

1139.684

1140.715

1139.787
1139.545

1138.776
1138.765

1138.448
NSL
-60.027

-27.519

-19.990

-11.725

46.321
41.017

44.853
20.693

36.658
38.007

51.756
52.419
53.088

70.000
-9.643
-8.217

-4.519
-3.555

0.000
0.666
OFFSET

RD 0+390

0 5 10 15 20 25 M
1160 U/S D/S 1160
CL OF DAM
SCALE
6.35
CREST EL. 1154.50 REFERENCE DRAWINGS :-
0.6
0.2

CORE CREST EL. 1153.00


0

3.50
HIGH FLOOD LEVEL. 1152.30
5

BAD-CD-MD-01,02,03
1150 NORMAL CONSERVATION LEVEL EL. 1149.50 1150
FINE FILTER 2.25
1 DRAWING IS RELEASED

0
2.50

0.3
GRAVEL PROTECTION FINE FILTER COARSE FILTER RIP RAP
0.50m THICK 1 TOE DRAIN
RIP RAP FOR CONSTRUCTION
CLAY CORE SANDY GRAVEL MATERIAL 3.00 SANDY GRAVEL
BEDDING MATERIAL SANDY GRAVEL
MATERIAL
1140 1140
NSL
REV. DATE BY DESCRIPTION CHKD. CERT. APPR.
FINE FILTER NO.
1 COARSE FILTER
1 0.75m THICK
NSL STRIPPING 1m CLIENT:
1m THICK
CORE TRENCH
6.00 PSU SMALL DAM SECTION MERGED AREAS
1130
CLAY BLANKET
1130
IRRIGATION DEPARTMENT . KPK.
1.50m THICK
CONSULTANTS: A J.V OF
REHMAN HABIB CONSULTANTS (PVT) LTD.
CASCADE GROUP
OF ENGINEERING & CONSULTANTS
1120 1120 IN ASSOCIATION WITH:
1138.211

1154.500

1154.500

1154.500

1141.821
1141.821
1140.021
1140.021
1141.521

1141.521

1138.655
CUT / FILL ENGINEERING & TECHNICAL ASSOCIATES
LEVEL
PROJECT:
CONSULTANCY SERVICES FOR REVIEW / UPDATION
OF DESIGN AND CONSTRUCTION SUPERVISION OF
-43.67

31.92

1142.272 33.92
35.87
37.37
38.87

44.00

1138.646 49.73
OFFSET
-2.95

1138.914 0.00

3.40

BAZ ALI SMALL DAM, DISTRICT KURRAM

1138.621
1137.762

1137.869

1137.953

1138.149

1139.067

1140.207

1141.916

1138.642

1137.946

1137.404
1137.785

1141.685

1140.125
1139.905

1139.205
TITLE:
BAZ ALI DAM
NSL
DISTRICT KURRAM
TITLE:
MAIN DAM CROSS SECTIONS
-11.241
-37.779

-33.552

-14.762

31.201
10.921

41.308
42.215

46.470

48.935
49.726
25.493

34.328

50.976

61.463

70.000
-7.847

0.000
1.573

OFFSET
DRAWN DESIGNED CHECKED APPROVED SCALE DATE
Usman Y. Arshad I. Zeeshan S. Khurshid Z. Shown JUN,2022
RD 0+380 DRG.No:- BAD-CD-MD-04 SHEET:- 04 OF 25 SUB SH.- ----

Xref .\BAZ ALI-SEAL-FOR MAIN DAM.dwg


135
1160 U/S CL OF DAM D/S 1160 NOTES:-

6.35 1. ALL DIMENSIONS AND LEVELS ARE IN METERS UNLESS

0.6
CREST EL. 1154.50

0.2
OTHERWISE MENTIONED.

0
3.50 CORE CREST EL. 1153.00

5
HIGH FLOOD LEVEL. 1152.30 2. EARTHFILL, CORE, FILTER & CLAY BLANKET MATERIALS TO BE
RIP RAP COMPACTED AT 95% OF MAXIMUM DRY DENSITY DETERMINED
1150 NORMAL CONSERVATION LEVEL EL. 1149.50 1150 THROUGH MODIFIED AASHTO COMPACTION T120.
GRAVEL PROTECTION FINE FILTER 3. THE GRADATION CURVES TO BE FOLLOWED FOR EARTHFILL,
FINE FILTER 2.25
0.50m THICK RIP RAP 2.50 FILTER (FINE AND COARSE FILTER), CORE & RIPRAP MATERIALS.

0
1 TOE DRAIN

0.3
COARSE FILTER
BEDDING MATERIAL 1
CLAY CORE
3.00 SANDY GRAVEL
4. FILTER MATERIAL WILL REQUIRED PROCESSING / SCREENING
SANDY GRAVEL FROM SUITABLE AVAILABLE MATERIAL AT SITE.
MATERIAL 5. CORE SHOULD BE PLACED ON MINIMUM 5M BELOW FROM
NSL NSL OR AS DIRECTED BY SITE ENGINEER.
6.00 6. THE RIPRAP MATERIAL IS TO WITHSTAND VERY SEVERE ACTION
1140 1140
FROM WAVES AND DESTRUCTIVE FORCES ASSOCIATED WITH
CORE TRENCH COARSE FILTER FINE FILTER
NSL CLAY BLANKET 1m THICK
FREEZING AND THAWING, WETTING AND DRYING.
0.75m THICK
1.50m THICK STRIPPING 1m 7. THE MINIMUM DEPTH OF CORE IS 5M AND IF CHANGING IS
REQUIRED THEN THE SITE ENGINEER WILL DECIDE IT AS PER
SITE CONDITION.
8. ATTERBERG'S LIMIT TEST SHOULD BE CONDUCTED FOR
SELECTION OF THE CORE MATERIAL. ONLY THOSE MATERIALS
1130 1130 ARE ALLOWED THAT HAVE PLASTIC INDEX VALUE RANGE OF
(10-12).
9. THE SIDE SLOPE OF CORE TRENCH SHALL BE 1V:1H OR AS
DIRECTED BY SITE ENGINEER.
10. THE CUT SLOPE IN NATURAL GROUND SHALL BE MINIMUM
1V:1H OR AS DIRECTED BY SITE ENGINEER.

1120 1120
0000.000 0000.000

0000.000 0000.000

1154.500

1154.500

1144.019
1144.019
1142.219
1142.219
1143.719

1143.719

1141.767
CUT / FILL
LEVEL

26.98
28.98
30.93
32.43
33.93

39.05

42.95
OFFSET

1145.589 0.00

3.40

1141.681
1140.170

1140.810

1140.740

1145.414

1141.696
1141.784

1141.086

1140.366
1140.928

1146.195

1143.135

1142.509

1142.415

1140.625
NSL
-61.121

-30.774

-22.206

-17.705

12.511

40.082
42.092

48.056

60.322
38.125

57.725

70.000
19.698
2.303
0.000

5.546
OFFSET

RD 0+410

0 5 10 15 20 25 M
1160 U/S D/S 1160
CL OF DAM
SCALE
6.35
CREST EL. 1154.50
REFERENCE DRAWINGS :-
0.6
0.2

CORE CREST EL. 1153.00


0

3.50
HIGH FLOOD LEVEL. 1152.30
5

BAD-CD-MD-01,02,03
RIP RAP
1150 NORMAL CONSERVATION LEVEL EL. 1149.50 1150
GRAVEL PROTECTION
2.25
0.50m THICK FINE FILTER

0
RIP RAP 2.50 1 DRAWING IS RELEASED

0.3
BEDDING MATERIAL FINE FILTER TOE DRAIN
COARSE FILTER
1
CLAY CORE
3.00 SANDY GRAVEL FOR CONSTRUCTION
CLAY BLANKET SANDY GRAVEL SANDY GRAVEL MATERIAL
1.50m THICK MATERIAL

1140 1 NSL 1140


1
6.00 COARSE FILTER
CORE TRENCH 1m THICK FINE FILTER REV. DATE
NSL STRIPPING 1m BY DESCRIPTION CHKD. CERT. APPR.
0.75m THICK NO.
CLIENT:
PSU SMALL DAM SECTION MERGED AREAS
1130 1130
IRRIGATION DEPARTMENT . KPK.
CONSULTANTS: A J.V OF
REHMAN HABIB CONSULTANTS (PVT) LTD.
CASCADE GROUP
OF ENGINEERING & CONSULTANTS
1120 1120 IN ASSOCIATION WITH:
1139.665

1154.500

1154.500

1142.963
1142.963
1141.163
1141.163
1142.663

1142.663

1140.217
1154.500

CUT / FILL ENGINEERING & TECHNICAL ASSOCIATES


LEVEL
PROJECT:
CONSULTANCY SERVICES FOR REVIEW / UPDATION
OF DESIGN AND CONSTRUCTION SUPERVISION OF
-40.04

29.36
31.36
1141.441 33.31
34.81
36.31

41.43

46.32
OFFSET
1142.810 -2.95

3.40
1142.757 0.00

BAZ ALI SMALL DAM, DISTRICT KURRAM

1139.631
1141.152

1139.502
1139.475

1139.458
1139.500

1139.989

1143.023

1141.197

1142.148

1141.406
1140.643
1140.079

1140.266
1140.087

1140.077
TITLE:
BAZ ALI DAM
NSL
DISTRICT KURRAM
TITLE:
MAIN DAM CROSS SECTIONS
-25.300

-23.167
-22.137

-13.674

40.276
42.353
44.146

46.942
48.529
33.419

54.045

56.400

70.000
15.893
-2.957
-1.005
0.000

6.069
7.779

OFFSET
DRAWN DESIGNED CHECKED APPROVED SCALE DATE
Usman Y. Arshad I. Zeeshan S. Khurshid Z. Shown JUN,2022
RD 0+400 DRG.No:- BAD-CD-MD-04 SHEET:-03 OF 25 SUB SH.- ----

Xref .\BAZ ALI-SEAL-FOR MAIN DAM.dwg


136
1160 U/S CL OF DAM D/S 1160 NOTES:-

6.35 1. ALL DIMENSIONS AND LEVELS ARE IN METERS UNLESS


CREST EL. 1154.50

0.6
OTHERWISE MENTIONED.

0.2
CORE CREST EL. 1153.00

0
3.50
HIGH FLOOD LEVEL. 1152.30 2. EARTHFILL, CORE, FILTER & CLAY BLANKET MATERIALS TO BE

5
2.25 COMPACTED AT 95% OF MAXIMUM DRY DENSITY DETERMINED
1 3.00 SANDY GRAVEL
1150 GRAVEL PROTECTION NORMAL CONSERVATION LEVEL EL. 1149.50 1150 THROUGH MODIFIED AASHTO COMPACTION T120.
0.50m THICK 3. THE GRADATION CURVES TO BE FOLLOWED FOR EARTHFILL,
2.50
FILTER (FINE AND COARSE FILTER), CORE & RIPRAP MATERIALS.
NSL 1 4. FILTER MATERIAL WILL REQUIRED PROCESSING / SCREENING
NSL
6.00 TOE DRAIN FROM SUITABLE AVAILABLE MATERIAL AT SITE.
CORE TRENCH 5. CORE SHOULD BE PLACED ON MINIMUM 5M BELOW FROM
STRIPPING 1m NSL OR AS DIRECTED BY SITE ENGINEER.
1140 CLAY BLANKET 1140
6. THE RIPRAP MATERIAL IS TO WITHSTAND VERY SEVERE ACTION
1.50m THICK FROM WAVES AND DESTRUCTIVE FORCES ASSOCIATED WITH
FREEZING AND THAWING, WETTING AND DRYING.
7. THE MINIMUM DEPTH OF CORE IS 5M AND IF CHANGING IS
REQUIRED THEN THE SITE ENGINEER WILL DECIDE IT AS PER
SITE CONDITION.
8. ATTERBERG'S LIMIT TEST SHOULD BE CONDUCTED FOR
SELECTION OF THE CORE MATERIAL. ONLY THOSE MATERIALS
1130 1130 ARE ALLOWED THAT HAVE PLASTIC INDEX VALUE RANGE OF
(10-12).
9. THE SIDE SLOPE OF CORE TRENCH SHALL BE 1V:1H OR AS
DIRECTED BY SITE ENGINEER.
10. THE CUT SLOPE IN NATURAL GROUND SHALL BE MINIMUM
1V:1H OR AS DIRECTED BY SITE ENGINEER.

1120 1120

1145.011

1154.500

1154.500

1154.503

1149.851
1149.852
1148.055
1148.047
1149.547

1149.551

1146.359
CUT / FILL
LEVEL

-26.67

13.86
15.86

1147.433 17.81
19.31
20.81

25.93

32.31
OFFSET

-2.96

1148.448 0.00

1149.160 3.39
1143.311

1149.371

1148.821
1143.480

1143.433

1144.406

1144.995

1146.130

1147.204

1147.494

1147.096

1145.625

1144.103

1143.752

1143.546
NSL
-49.754

-41.723

-36.045

-28.138

-19.833

-11.588

26.576

37.970

57.212

60.704

70.000
18.128
-7.127

-4.212

0.000

3.147

9.562
5.988
OFFSET

RD 0+430

0 5 10 15 20 25 M
1160 U/S D/S 1160
CL OF DAM
SCALE
6.35
0.4

CREST EL. 1154.50


06.6

REFERENCE DRAWINGS :-
0.2

CORE CREST EL. 1153.00


0

3.50
HIGH FLOOD LEVEL. 1152.30
5

RIP RAP BAD-CD-MD-01,02,03


GRAVEL PROTECTION NORMAL CONSERVATION LEVEL EL. 1149.50
1150 1150
0.50m THICK TOE DRAIN
FINE FILTER 2.25
2.50 1 3.00 SANDY GRAVEL DRAWING IS RELEASED
CLAY BLANKET
1.50m THICK 1
FOR CONSTRUCTION
6.00 NSL
FINE FILTER
CORE TRENCH 0.75m THICK
1140 NSL 1140
STRIPPING 1m
REV. DATE BY DESCRIPTION CHKD. CERT. APPR.
NO.
CLIENT:
PSU SMALL DAM SECTION MERGED AREAS
1130 1130
IRRIGATION DEPARTMENT . KPK.
CONSULTANTS: A J.V OF
REHMAN HABIB CONSULTANTS (PVT) LTD.
CASCADE GROUP
OF ENGINEERING & CONSULTANTS
1120 1120 IN ASSOCIATION WITH:
1142.613

1154.500

1154.500

1154.500

1145.947
1145.949
1144.152
1144.144
1145.644

1145.648

1143.475
CUT / FILL ENGINEERING & TECHNICAL ASSOCIATES
LEVEL
PROJECT:
CONSULTANCY SERVICES FOR REVIEW / UPDATION
OF DESIGN AND CONSTRUCTION SUPERVISION OF
-32.67

22.64
24.64
26.59
28.09
29.59

1143.945 34.71

39.06

OFFSET
-2.96

1146.769 0.00

3.21

BAZ ALI SMALL DAM, DISTRICT KURRAM


1141.740

1141.731
1141.581

1141.751
1142.145

1142.034
1142.206

1145.788
1145.933

1147.567

1146.236

1144.823

1143.657

1142.564

1141.640
TITLE:
BAZ ALI DAM
NSL
DISTRICT KURRAM
TITLE:
MAIN DAM CROSS SECTIONS
-55.438

-36.249

-22.684
-21.283

64.681
64.142
34.558

36.784

50.600

66.875

70.000
-5.001

13.655
-4.078

8.741
0.000

3.892

OFFSET
DRAWN DESIGNED CHECKED APPROVED SCALE DATE
Usman Y. Arshad I. Zeeshan S. Khurshid Z. Shown JUN,2022
RD 0+420 DRG.No:- BAD-CD-MD-04 SHEET:-02 OF 25 SUB SH.- ----

Xref .\BAZ ALI-SEAL-FOR MAIN DAM.dwg

137
1160 U/S CL OF DAM D/S 1160
NOTES:-
6.35 NSL
1. ALL DIMENSIONS AND LEVELS ARE IN METERS UNLESS
OTHERWISE MENTIONED.
2. EARTHFILL, CORE, FILTER & CLAY BLANKET MATERIALS TO BE
1150 1150 COMPACTED AT 95% OF MAXIMUM DRY DENSITY DETERMINED
THROUGH MODIFIED AASHTO COMPACTION T120.
3. THE GRADATION CURVES TO BE FOLLOWED FOR EARTHFILL,
FILTER (FINE AND COARSE FILTER), CORE & RIPRAP MATERIALS.
4. FILTER MATERIAL WILL REQUIRED PROCESSING / SCREENING
FROM SUITABLE AVAILABLE MATERIAL AT SITE.
5. CORE SHOULD BE PLACED ON MINIMUM 5M BELOW FROM
NSL OR AS DIRECTED BY SITE ENGINEER.
1140 1140
6. THE RIPRAP MATERIAL IS TO WITHSTAND VERY SEVERE ACTION
FROM WAVES AND DESTRUCTIVE FORCES ASSOCIATED WITH
FREEZING AND THAWING, WETTING AND DRYING.
7. THE MINIMUM DEPTH OF CORE IS 5M AND IF CHANGING IS
REQUIRED THEN THE SITE ENGINEER WILL DECIDE IT AS PER
SITE CONDITION.
8. ATTERBERG'S LIMIT TEST SHOULD BE CONDUCTED FOR
1130 1130 SELECTION OF THE CORE MATERIAL. ONLY THOSE MATERIALS
ARE ALLOWED THAT HAVE PLASTIC INDEX VALUE RANGE OF
(10-12).
9. THE SIDE SLOPE OF CORE TRENCH SHALL BE 1V:1H OR AS
DIRECTED BY SITE ENGINEER.
10. THE CUT SLOPE IN NATURAL GROUND SHALL BE MINIMUM
1V:1H OR AS DIRECTED BY SITE ENGINEER.
1120 1120

1155.730
1154.068
1154.500

1154.500

1154.503
1153.839
1154.771
CUT / FILL
LEVEL

OFFSET

-5.68
-4.03
-2.96

1155.172 0.00

3.39
4.88
1154.768 5.82

70.000 1146.694
1153.221
1151.802

1153.832

1148.882
1146.878

1148.649

1151.404

1152.705

1153.380

1154.383

1154.925

1156.036
1155.504

1155.227
1155.156

1153.555

1150.094

1149.364

1148.513
NSL
-53.764

-25.082

-17.634
-64.033

-37.338

-34.186

-28.128

-14.118

48.921
36.651

41.349

45.982
21.079
22.622
23.472
-4.811

10.144
12.083
-6.908

0.000

5.874
OFFSET

RD 0+450

0 5 10 15 20 25 M
1160 U/S D/S 1160
CL OF DAM

SCALE
6.35
CREST EL. 1154.50
0.6
0.2

CORE CREST EL. 1153.00 REFERENCE DRAWINGS :-


0

3.50
HIGH FLOOD LEVEL. 1152.30
5

BAD-CD-MD-01,02,03
1150 1150
NSL
6.00
NSL CORE TRENCH
DRAWING IS RELEASED
STRIPPING 1m
FOR CONSTRUCTION

1140 1140

REV. DATE BY DESCRIPTION CHKD. CERT. APPR.


NO.
CLIENT:
PSU SMALL DAM SECTION MERGED AREAS
1130 1130
IRRIGATION DEPARTMENT . KPK.
CONSULTANTS: A J.V OF
REHMAN HABIB CONSULTANTS (PVT) LTD.
CASCADE GROUP
OF ENGINEERING & CONSULTANTS
1120 1120
1149.216
1148.377

1154.500

1154.500

1154.504

1150.778
1151.637

CUT / FILL IN ASSOCIATION WITH:


LEVEL ENGINEERING & TECHNICAL ASSOCIATES
PROJECT:
CONSULTANCY SERVICES FOR REVIEW / UPDATION
-19.33
1149.369 -18.26

11.77
12.63

OFFSET
1151.430 -2.96

1151.597 0.00

3.39

OF DESIGN AND CONSTRUCTION SUPERVISION OF


BAZ ALI SMALL DAM, DISTRICT KURRAM
1145.362

1151.372

1150.282

1146.262

1146.142
1144.447

1145.965

1148.243

1150.200

1151.779

1151.460

1152.059

1150.958

1149.026

1147.594

1147.089

1145.208
NSL TITLE:
BAZ ALI DAM
DISTRICT KURRAM
TITLE:
-43.841
-52.744

-47.436

-25.807

-18.249

-15.718

45.541
21.458

28.062

59.174
39.157

53.766

70.000
10.014

16.845
-2.984

-0.718

4.464
0.000
0.885

OFFSET MAIN DAM CROSS SECTIONS


DRAWN DESIGNED CHECKED APPROVED SCALE DATE
Usman Y. Arshad I. Zeeshan S. Khurshid Z. Shown JUN,2022
RD 0+440 DRG.No:- BAD-CD-MD-04 SHEET:-01 OF 25 SUB SH.- ----

Xref .\BAZ ALI-SEAL-FOR MAIN DAM.dwg


138
139
N 3725011 N 3725011

E 612441

E 612541

E 612641

E 612741

E 612841

E 612941

E 613041

E 613141

E 613241

E 613341

E 613441

E 613541

E 613641

E 613741
NOTES:-

C1
1. ALL LEVELS AND DIMENSIONS ARE IN METER UNLESS
INDICATED OTHERWISE.
C2

N 3724911 N 3724911

9
.2
.77

91
38

+2
+3

=0
=0
PT

PC
.16
59
+3
0+ C3 =0
35 PC
11
1 0+4
.5
1152
40
U/S
36 0+4
30
EXISTING ROAD
.5 0+4

CL
FLO 20
W

AY
0+0
30

11
BL
0+3
OUTLET

A
0+4

0+3
2.5

NK
N

37
10

50

1155
115

ET
40
0+4

0+3
1142.5

.5
00
113

20

0+3
0+3
7.5 90

.0
00
00
1136.5

0+2

0+
0+3
N 3724811 80 N 3724811

80

0+2

11
0+3

.5
IV 70

60
37 : 2.5

0+2

35

9
0+3

.1
H 60

3
4

1
10
11

0+2

C
.0
0+3

+
=0
50

20

0+2

PT
IV
0+3 : 2.2 .55
40

00
5H 73

0+1
+0
0+3 =0

80
30 PC

0+1
0+3
1135.0

60
20

0+1
0+3

40
10

0+1
0+3
115

20

0+ 1
00

.5 0+2 2.5

00

0+0
90
1140.0 32

80
0+2

0+0
11
80
0 0
6. 5.

60
0+2
N 3724711 N 3724711

0+0
70
3 3

40
0+2
1145.0 11 11

0+ 0
60
11

20
0+2

0+0
11 3 5.0
50
MAIN CANAL

00
0+2
49 40
.5 0+2
30
.5
116 1132 0+2
4.0
113
2 0
5.0 NU 0+2

11 LLA 10

72 H 0+2
00

.5 0+1
90
CULTIVATED AREA 11
0+1
80
62
.5
0+1
70
2. 5
1132.5 0+1
113

DA
N 3724611 .5 60
11 N 3724611

MC
67 0+1
52
116

50

RE
11

S
0+1
.5

TE
40

L: 1
0

0+1
30 1132.5
.0

154

11
0+1

.50
20

31
m
W 0+1
10
11
7.5 LO

.5
0+1
F 31
115
00

0.0
IV
0+0
90 .5
: 2.5 0+0

113
H 80
9.5 0+0
114
70
0+0 IV
: 2.2
11

60 5H
0+0
N 3724511 N 3724511
35

50
.0
.5

0+0
40

MAIN DAM EL. 1154.50


.0
42

40
11

.0
0+0
.5
FL
0
11

30
47 40 9.
OW 0+0
11 11 20

11
2
0+0
.5 1130.0
27
10

.5 0+0
11
37
00

11 5-0.+00
115-0 +02
10 NU
LLA
-0+
0 H
030

8.5
1140.0

112
OW
FL
.5
N 3724411 42 .5 N 3724411
11 52
11
9.5

0 45 90 135 180 215M


114
1157.5
.0
1172

.5
1132
W

.5
1165

57 1125.0
FLO

11 SCALE
.5
0

5.0
.
45

1137 112
11

RESERVOIR EL. 1149.50 .5


N 3724311 N 3724311 REFERENCE DRAWINGS :-
RESERVOIR
115
FL

2.5
OW

1160.0
2.5 CULTIVATED AREA
DRAWING IS RELEASED
115

11
1160.0

37
.5

.0
27

.5

25
150
11 FOR CONSTRUCTION
1157.5

-0+
11

11
140
1152.5
N 3724211 -0+ 72 N 3724211
130
-0+
0 11 .5
1149.5
12
-0+
0
55
-0+
11 .0
0
10
-0+ 0
09
-0+
08
0
.0
-0+
0 SPILLWAY DYKE L/S 24 REV. DATE
AP HAN147.0

07
-0+
.0 11 11 BY DESCRIPTION CHKD. CERT. APPR.
CULTIVATED AREA
C .1
PR N 0

30 25 NO.
EL

0
06
OA EL

-0+ .0
11

1122.5
0
CH

00
50

0+
+0

0
01
KACHA TRACK -0 CLIENT:

0+

0
40

0+130
4.0

0+02

0+120
0

0+110
30
+0

0+100
0+090
0+0

0+040

0+080
-0
MERGED AREAS SMALL DAM SECTION

0+050

0+070
0+060
30
PE 4.50
SLO :1V 115
2H
E EL.

+0
DYK 1125.50
AY
CREST EL.
LLW
GABION WALL
-0
SPI
PROTECTION
:1V

20
2H

N 3724111 N 3724111
PE=
SLO

+0
-0 10
+0
0 ST IRRIGATION DEPARTMENT . KPK.

11
-0
00 RE
0+E C 10
.0
11

25
5.00

0
115

E
SPILLWAY DYKE R/S
60

G 0+ 0 SI N GABION
70

O 02 A

.0
0+ G B 0 CONSULTANTS:
11

A J.V OF
.0

N 3 PROTECTION WALL
2.5

LI 0 N
IL 0+ BIO40

11
115
4.50 ST A
G 0+0
EXCAVATION
0
REHMAN HABIB CONSULTANTS (PVT) LTD.
EL.
7.5

E :1V

22
2H

05
DYK
AY PE=
LLW SLO
SPI

0+ 0 EXTENTS
06
5.00

.5
113

0+ 0
07
0+
CH
EX NN

SPILLWAY 08
0
CASCADE GROUP
A
IT EL

0+ 0
09
.5
0+
0+
10
0
1132 OF ENGINEERING & CONSULTANTS
0
11

N 3724011 N 3724011
0+

0
12

IN ASSOCIATION WITH:
0+

0
13

112
115 0
0+

14
5.0 0+
50
ENGINEERING & TECHNICAL ASSOCIATES

11
+1

7.5
0
+1
6 0 112

35
0
17
0
MOSQUE 0.0
0+ PROJECT:

.0
0
18 3
.5

0+ 85.9
42

0+
1
CONSULTANCY SERVICES FOR REVIEW / UPDATION
11

OF DESIGN AND CONSTRUCTION SUPERVISION OF


BAZ ALI VILLAGE
BAZ ALI SMALL DAM, DISTRICT KURRAM
N 3723911 N 3723911
TITLE: BAZ ALI DAM
DISTRICT KURRAM
SPILLWAY LOCATION PLAN
E 612441

E 612541

E 612641

E 612741

E 612841

E 612941

E 613041

E 613141

E 613241

E 613341

E 613441

E 613541

E 613641

E 613741
DRAWN DESIGNED CHECKED APPROVED SCALE DATE
Nabi Amin Usman R. Zeeshan S. Zafar Iqbal Shown JUNE,2022
N 3723811 N 3723811
DRG.No:- BAD-CD-SP-01 SHEET:- SUB SH.- ----

140
N 3724403
.0 SPILLWAY CENTER LINE COORDINATES
1142
.5 45
11

7.5
RD NORTH EAST RD NORTH
.0 EAST
BH-07
14
5 NOTES:-

115
-0+097.35 3724178.7952 612739.5361 0+070 3724045.1760
1 .0 612839.5706

.0
40

45
-0+090 3724172.4088 612743.1736 0+080 11
3724037.6424 612846.1462

11

2.5
.0 1. ALL LEVELS AND DIMENSIONS ARE IN METER UNLESS
35
-0+080 3724163.7881 612748.2412 0+090 11

114
3724030.1083 612852.7222
-0+070 3724155.2483 612753.4441 0+100 3724022.5744 612859.2980 INDICATED OTHERWISE.
1145.0 -0+060 3724146.7916 612758.7810 0+110 3724015.0405 612865.8738
N 3724353 5
37.

1172.5
-0+050 3724138.4201 612764.2506 110+120 3724007.5067 612872.4495
-0+040 3724130.1360 612769.8515 0+130 3723999.9728 612879.0253
-0+030 3724121.9411 612775.5823 0+140 3723992.4389 612885.6011
-0+020 3724113.8377 612781.4417 0+150 3723984.9752 612892.2556
-0+010 3724105.8277 612787.4282 0+160 3723977.7725 114
612899.1931
5.0
N

1167
0+000 3724097.9130 612793.5402 0+170 3723970.8544 612906.4116

11
.5

.5
1142

60
0+010 3724090.3792 612800.1159 0+180 3723964.2298 612913.9017

.5
N 3724303

1149

.0

1147
0+020 3724082.8453 612806.6917 0+190 3723957.9101 612921.6507
RESERVOIR

.5
0+030 3724075.3111 612813.2678 0+200 3723951.9053 612929.6463
.5 0+040 3724067.7776
47 .5 612819.8433 0+210 3723946.2250 612937.8755
11 52
0+050 11
3724060.2437 612826.4191
.5 0+220 3723940.8783 612946.3254
1157
0+060 3724052.7099 612832.9948 0+225.47 3723938.0978 612951.0363

FLO

116
1155.0

7.5
N 3724253 114
5.0 6 5.0 1162.5
B 11

1147
.0 1167
70
11 .5
7.5

.5
.0
115 11
75 117
2.5
150 1170.0
A -0+
140 117
7.5
-0+ 116
130 118 5 .0
N 3724203 -0+ 5.0
0
12
-0+
11

0.0
0 118
52

11
-0+
5.

7.5 EXCAVATION EXTENTS COORDINATES


0 117

11
10
-0+

57
DESC. NORTH EAST
90

.5
0 1175.0
-0+ A 3724201.39 612668.87
0
08
-0+ B 3724245.42 612757.72
0
N 3724153 11 AP HAN147. 07 C 3723958.28 612907.76
67 -0+
C .1
PR N 00 1162.0 1170.0
EL

.5 0 SPILLWAY DYKE L/S


OA EL 06 D 3723966.17 612930.13
CH -0+
50

ST
A=
1167.5

0+
+0

03
ST

5
A=
0+
-0 11

03
ST

0
A
40

=0

4.0
65

+0

0
ST

25
+0

A=
0+
.0

02
ST

0
-0

A=
.50

0 20 40 60 80 100M

0+
PE 54

01
30

ST
11
SLO :1V

5
EL.

A=
2H ND

0+
BU

+0

01
ST
ON

0
A=
CTI

0+
OTE

-0

ST

00
PR :1V

5
A=
20
2H

0+
E=

00
P
SLO

0
11 +0 SCALE
50 -0 10
N 3724103 .0 +0
-0 0 ST 11
00 RE 6 0.0
0+E C 10 5.0
0
REFERENCE DRAWINGS :-
E 0
O
G 0+ 0 SIN 11
02 A 11 BAD-CD-SP-01
ST

11 5
A=

0+ G B 0 7.5
0+

52 55
ST

00
A=

0
0

.0
+0
11

.5
05
ST

N 3 N
A=

KACHA TRACK LI 0
0+
01
ST
52

IL 0+ BIO40
0
A=
0+
01
ST

5
.5

A=

T
0+

A
G 0+0
02

S
ST

.50
A=

54
0
+0

11
EL.
ST

EXCAVATION DRAWING IS RELEASED


5

ND

0 :1V
A=

BU
0

= 2H
+0

ON

05
PE
ST

CTI
0

SLO
A=

OTE

1145.0
0+

PR

0+ EXTENTS 1150
03
ST

11
A

0
=0

11 .0
+

N 3724053 06 115
04

0
ST

5.0
0

50
A=

2.5
0+

55 FOR CONSTRUCTION
0

0+
ST

45

0 .0
A=
0+

.0
05
0

1167.5 + 07
CH
EX NN

0 0 114
08 7.5
A
IT EL

0+ 0
09
SPILLWAY DYKE R/S 0+ 0 1142
10 .5
11 0+ REV. DATE BY DESCRIPTION CHKD. CERT. APPR.
10
50 NO.
1

.0
0+
SE

20
CLIENT:
1
E

0+

0 MERGED AREAS SMALL DAM SECTION


D

N 3724003
11

13
11
ET

.0
0+

4
57

14 5.0 IRRIGATION DEPARTMENT . KPK.


A

45
IL

0+
.5

0
11

11
''A

11 15
60

''

62 0+ 0 CONSULTANTS: A J.V OF
16 2.5
.0

.5
0+ 114
0 REHMAN HABIB CONSULTANTS (PVT) LTD.
17
0+ 0
18 3 1142.5 CASCADE GROUP
0+ 85.9 OF ENGINEERING & CONSULTANTS
11 1
75 0+ D
N 3723953 1140.0
.0 IN ASSOCIATION WITH:
7.5

C ENGINEERING & TECHNICAL ASSOCIATES


115

1137.5 PROJECT:
CONSULTANCY SERVICES FOR REVIEW / UPDATION
1135.0
OF DESIGN AND CONSTRUCTION SUPERVISION OF
BAZ ALI SMALL DAM, DISTRICT KURRAM
TITLE: BAZ ALI DAM
N 3723903 DISTRICT KURRAM
SPILLWAY LAYOUT PLAN

DRAWN DESIGNED CHECKED APPROVED SCALE DATE


E 612605

E 612655

E 612705

E 612755

E 612805

E 612855

E 612905

E 612955

E 613005

E 613055
Nabi Amin Usman R. Zeeshan S. Zafar Iqbal Shown JUNE,2022

DRG.No:- BAD-CD-SP-02 SHEET:- SUB SH.- ----

141
A B C D E F G H I

10.00 1.92 10.36 15.00 10.00


NOTES:-
Z Z J J WING WALL IS TO BE TIE UP
1m INTO THE ROCK 1. ALL LEVELS AND DIMENSIONS ARE IN METER UNLESS

4.30

5.00
AS PER SITE CONDITION

1.00
2.50

2.00
INDICATED OTHERWISE.

8.30
4.00

0.40

0.40

2.50
3.00
3.00
3.00
CONSTRUCTION JOINT

STILLING BASIN EL.1144.00

15.00
CHUTE BLOCKS

0.85
1.70

OGEE CREST EL.1149.50

ENDSILL / TERMIND SILL

PIPE Ø 40mm
0.85

15.00
0-020

SLOPE EXIT CHANNEL


0-010

1V:1000H EL.1145.00

0+060
0+050
0+040
0+020

0+030
0+010
0+000
44.00

1.00

GABION EL.1145.20
APPROACH CHANNEL FLOW

1.00
EL. 1147.00
SLOPE
2H : 1V
3.70 1.56 7.04

BAFFLE BLOCK

15.00
CONSTRUCTION JOINT

2.50
4.00
8.30

0 3 6 9 12 15M

5.00
4.30

SCALE

REFERENCE DRAWINGS :-
SEE DETAIL "H"
39.38 7.91
BAD-CD-SP-01
PLAN VIEW BAD-CD-SP-02

1158 U/S D/S 1158


A B C D E F G H I DRAWING IS RELEASED
3.77 6.51 7.30 4.32 3.98 6.44 4.56 9.44
1.92
1156 10.00 10.36 15.00 10.00 1156 FOR CONSTRUCTION
13.68 5.00
EL.1154.50
1154 1154
1.70 3.70 1.56 7.04 2.70 4.42
H.F.L EL.1152.30
4.50

1152 1152
SIDE WALL REV. DATE
7.50

BY DESCRIPTION CHKD. CERT. APPR.


OGEE CREST EL.1150.00 NO.
1150 EL.1149.50 NSL 1150
CLIENT:
EL.1148.60 MERGED AREAS SMALL DAM SECTION
2
3.3
0.60

1148 APPROACH CHUTE BLOCK 2% SLOPE 1148


EL.1147.00 EL.1147.00 PLUM
CONCRETE TOP EL.1144.85 END SILL IRRIGATION DEPARTMENT . KPK.
BAFFLE BLOCK
2 GABION
1146 1 1146
EL.1145.20 EXIT CHANNEL CONSULTANTS: A J.V OF
3.50

1 STILLING BASIN 2
PCC LEAN (0.1m) SLOPE 1:1000
1.50

1
1144 SAND CUSHION (0.3m)
1 EL.1144.00
3.00 1144
REHMAN HABIB CONSULTANTS (PVT) LTD.
1
1 1 CASCADE GROUP
CUT OFF WALL DEPTH IS TENTATIVE 1 OF ENGINEERING & CONSULTANTS
2.50

1142 0.75 PIPE Ø 40mm 1142


AND SHOULD BE TIED 1m IN TO THE 0.75 1.50
ROCK AS PER SITE CONDITIONS
1140
IN ASSOCIATION WITH:
1140
11.87 7.18 2.24 13.08
CUT OFF WALL DEPTH IS TENTATIVE
AND SHOULD BE TIED 1m IN TO THE
ENGINEERING & TECHNICAL ASSOCIATES
0.50 1.00 0.92 0.50 1.96 ROCK AS PER SITE CONDITIONS PROJECT:
1138 1138
CONSULTANCY SERVICES FOR REVIEW / UPDATION
1136 1136 OF DESIGN AND CONSTRUCTION SUPERVISION OF
BAZ ALI SMALL DAM, DISTRICT KURRAM
1147.000

1146.000
1147.000
1143.500
1143.500
1146.000

1146.000

1144.363

1141.600
1141.600
1142.600

1142.600
1140.500
1140.500
1143.700

1143.700
1143.700

1145.184

1145.174
EXCAVATION/
FILL
LEVEL TITLE: BAZ ALI DAM
DISTRICT KURRAM
1146.989

1149.359
1149.367

1149.497

1149.497

1149.497
1149.497
1149.497

1149.497
1149.494

1149.497
1149.497

1149.497

1149.497

1142.688
1149.497

NSL SPILLWAY EXCAVATION PLAN AND PROFILE

225.455
DRAWN DESIGNED CHECKED APPROVED SCALE DATE
-97.35

-10.00
-10.00

11.62
12.95
13.70

26.78
27.28

36.28
37.28

40.00

50.00
-9.50
-9.50

RD
0.00

6.27

9.55

Nabi Amin Usman R. Zeeshan S. Zafar Iqbal Shown JUNE,2022

PROFILE VIEW DRG.No:- BAD-CD-SP-03 SHEET:- SUB SH.- ----

142
1158 U/S A
NOTES:-
1156

1154
1. ALL LEVELS AND DIMENSIONS ARE IN METER UNLESS
INDICATED OTHERWISE.
1152

7.50
1150

1148

MATCH LINE A
APPROACH EL.1147.00

1146

3.50
1144

1142

1140

1138

1136
1147.000

1147.000

1147.000

1147.000

1147.000

1147.000

1147.000

1147.000

1147.000

1147.000
1143.500
1143.500
EXCAVATION/
FILL
LEVEL
1146.989

1147.223

1147.521

1147.691

1147.861

1148.119

1148.714

1149.070

1149.215

1149.359
1149.367
NSL
-97.35

-90.00

-80.00

-70.00

-60.00

-50.00

-40.00

-30.00

-20.00

-10.00
-10.00
-9.50
RD

1158 A B C D E F G H I
3.77 6.51 7.30 4.32 3.98 6.44 4.56 9.44
1.92
1156 10.00 10.36 15.00 10.00
13.68 5.00
EL.1154.50
1154
1.70 3.70 1.56 7.04 2.70 4.42
H.F.L EL.1152.30
4.50

1152
SIDE WALL
7.50

OGEE CREST EL.1150.00


1150 EL.1149.50 NSL

MATCH LINE B
EL.1148.60
2
3.3
0.60
MATCH LINE A

1148 APPROACH CHUTE BLOCK


EL.1147.00 PLUM END SILL
CONCRETE TOP EL.1144.85
2 GABION SLOPE 1:1000
1146 1
3.50

EL.1145.20
1 STILLING BASIN 2
PCC LEAN (0.1m) SAND CUSHION (0.3m)

1.50
1 1
EL.1144.00

3.00
1144
1
1 1
1
2.50

1142 0.75
0.75 BAFFLE BLOCK
PIPE Ø 40mm 1.50 0 3.7 7.4 11.1 14.8 18.5M
1140
11.87 7.18 2.24 13.08 SCALE
0.50 1.00 0.92 0.50 1.96
1138

1136 REFERENCE DRAWINGS :-


1146.000
1147.000
1143.500
1143.500
1146.000

1146.000

1144.363

1141.600
1141.600
1142.600

1142.600
1140.500
1140.500
1143.700

1143.700
1143.700

1145.184

1145.174

1145.165

1145.155

1145.145

1145.135
EXCAVATION/
FILL
BAD-CD-SP-01
LEVEL BAD-CD-SP-02
1149.359
1149.367

1149.497

1149.497

1149.497
1149.497
1149.497

1149.497
1149.494

1149.497
1149.497

1149.497

1149.497

1149.497

1149.497

1149.497

1149.497
1149.497

NSL
DRAWING IS RELEASED
-10.00
-10.00

FOR CONSTRUCTION
11.62
12.95
13.70

26.78
27.28

36.28
37.28

40.00

50.00

60.00

70.00

80.00

90.00
-9.50
-9.50

0.00

6.27

9.55

RD

1158 D/S 1158

REV. DATE BY DESCRIPTION CHKD. CERT. APPR.


1156 1156 NO.
CLIENT:
1154 1154 MERGED AREAS SMALL DAM SECTION
1152 1152
IRRIGATION DEPARTMENT . KPK.
CONSULTANTS: A J.V OF
MATCH LINE B

1150 1150

REHMAN HABIB CONSULTANTS (PVT) LTD.


1148 1148
CASCADE GROUP
1146
EXIT CHANNEL 1146 OF ENGINEERING & CONSULTANTS

1144 SLOPE 1:1000 1144


IN ASSOCIATION WITH:
ENGINEERING & TECHNICAL ASSOCIATES
1142 1142 PROJECT:

1140 1140
CONSULTANCY SERVICES FOR REVIEW / UPDATION
OF DESIGN AND CONSTRUCTION SUPERVISION OF
1138 1138 BAZ ALI SMALL DAM, DISTRICT KURRAM
1136 1136 TITLE: BAZ ALI DAM
DISTRICT KURRAM
1145.125

1145.115

EXCAVATION/
FILL
LEVEL
SPILLWAY EXCAVATION PROFILE
1149.230

1148.997

1148.997

1148.997

1148.639

1148.373

1148.246

1147.801

1147.034

1146.389

1145.771

1145.158

1144.494

1143.385

1142.688
NSL
DRAWN DESIGNED CHECKED APPROVED SCALE DATE
Nabi Amin Usman R. Zeeshan S. Zafar Iqbal Shown JUNE,2022
200.000

210.000

225.455
100.00

110.00

120.00

130.00

140.00

146.87

150.00

160.00

170.00

180.00

190.00

220.00
RD
DRG.No:- BAD-CD-SP-04 SHEET:- SUB SH.- ----

143
NOTES:

1. ALL LEVELS AND DIMENSIONS ARE IN METER UNLESS


INDICATED OTHERWISE.
3. REINFORCED CONCRETE STRENGTH FOR SPILLWAY
WALL AND FLOOR SHALL BE OF (CUBE STRENGTH OF
5000 PSI IN LABORATORYAND 3750 PSI AT SITE, AND
Ø13@200mm C/C CYLINDER STRENGTH OF 3000 PSI AT 28 DAYS).

Ø13@200mm C/C

Ø13@200mm C/C Ø13@200mm C/C

Ø13@200mm C/C Ø13@200mm C/C


Ø13@200mm C/C
Ø13@200mm C/C

DETAIL "B"
Ø13@200mm C/C
SCALE 1:0.5

DETAIL "A"
SCALE 1:0.5

Ø13@200mm C/C

REFERENCE DRAWINGS :-

BAD-CD-SP-12 (1 of 2)

DRAWING IS RELEASED
Ø13@200mm C/C
FOR CONSTRUCTION

Ø13@150mm C/C

Ø13@200mm C/C Ø13@200mm C/C REV. DATE BY DESCRIPTION CHKD. CERT. APPR.
NO.
CLIENT:
MERGED AREAS SMALL DAM SECTION
IRRIGATION DEPARTMENT . KPK.
CONSULTANTS: A J.V OF
REHMAN HABIB CONSULTANTS (PVT) LTD.
CASCADE GROUP
OF ENGINEERING & CONSULTANTS

Ø13@200mm C/C
IN ASSOCIATION WITH:
ENGINEERING & TECHNICAL ASSOCIATES
PROJECT:
CONSULTANCY SERVICES FOR REVIEW / UPDATION
OF DESIGN AND CONSTRUCTION SUPERVISION OF
Ø13@200mm C/C
BAZ ALI SMALL DAM, DISTRICT KURRAM
DETAIL "C" TITLE: BAZ ALI DAM
SCALE 1:1 DISTRICT KURRAM
SPILLWAY
DETAILS REINFORCEMENT
DRAWN DESIGNED CHECKED APPROVED SCALE DATE
Ammar N. Hussain Zeeshan S. Zafar Iqbal Shown JUNE,2022

DRG.No:- BAD-CD-SP-17 SHEET:- 1 of 2 SUB SH.- ----

144
NOTES:

1. ALL LEVELS AND DIMENSIONS ARE IN METER UNLESS


Ø13@200mm C/C INDICATED OTHERWISE.
Ø16@200mm C/C 2Ø16 3. REINFORCED CONCRETE STRENGTH FOR SPILLWAY
2Ø13 WALL AND FLOOR SHALL BE OF (CUBE STRENGTH OF
5000 PSI IN LABORATORYAND 3750 PSI AT SITE, AND
Ø13@200mm C/C
CYLINDER STRENGTH OF 3000 PSI AT 28 DAYS).
Ø16@125c/c
Ø13@150c/c

CONSTRUCTION JOINT

Ø10@200mm C/C

Ø13@200mm C/C

Ø13@200c/c
DETAIL "D"
DETAIL "E"
SCALE 1:0.5 Ø13@200mm C/C

Ø13@200mm C/C

Ø25@300mm C/C Ø19@300mm C/C


REFERENCE DRAWINGS :-

H/3
BAD-CD-SP-12 (2 of 2)

DRAWING IS RELEASED

FOR CONSTRUCTION

H
REV. DATE BY DESCRIPTION CHKD. CERT. APPR.
NO.
CLIENT:
MERGED AREAS SMALL DAM SECTION
IRRIGATION DEPARTMENT . KPK.
H/2 MID CURTAIL ALTERNATIVE

CONSULTANTS: A J.V OF
Ø25@150mm C/C Ø19@150mm C/C
REHMAN HABIB CONSULTANTS (PVT) LTD.
CASCADE GROUP
OF ENGINEERING & CONSULTANTS
IN ASSOCIATION WITH:
ENGINEERING & TECHNICAL ASSOCIATES
PROJECT:
CONSULTANCY SERVICES FOR REVIEW / UPDATION
OF DESIGN AND CONSTRUCTION SUPERVISION OF
BAZ ALI SMALL DAM, DISTRICT KURRAM
TITLE: BAZ ALI DAM
DISTRICT KURRAM
SPILLWAY
SECTION J-J Ø13@200mm C/C DETAILS REINFORCEMENT
Ø25@200mm C/C
DRAWN DESIGNED CHECKED APPROVED SCALE DATE
Ammar N. Hussain Zeeshan S. Zafar Iqbal Shown JUNE,2022

DRG.No:- BAD-CD-SP-17 SHEET:- 2 of 2 SUB SH.- ----

145
1165

0
.5 NOTES:-
57
11
0
.5 1. ALL LEVELS AND DIMENSIONS ARE IN METER UNLESS
47
11
INDICATED OTHERWISE.
55
11

1160

50
0+4

ACCESS ROAD
50
11

1155

45 0
11 .5
42
0+4
40 11

ACCESS BRIDGE MAIN DAM CREST


EL. 1154.500m

1150

30
0+4

DISSIPATION
CHAMBER

1145
0+000

0+040
0+010

0+020

0+030

0+050

0+060

0+110
0+070

0+080
40
0+4
CANAL
INTAKE TOWER

1140
30
0+4
ACH
41.00

1142.50
APPRO
EL. 11

0 4 8 12 16 20M

20 SCALE
0+4
REFERENCE DRAWINGS :-
1160 U/S CONDUIT PLAN VIEW D/S 1160

DAM CREST 6.35


El. 1154.50 El. 1154.50 CL DRAWING IS RELEASED
CORE CREST EL. 1153.00
2.50 FOR CONSTRUCTION
1
N.C.L EL. 1149.50
1150 2.25 1150
1

CONDUIT INVERT
REV. DATE BY DESCRIPTION CHKD. CERT. APPR.
EL. 1141.00 NO.
NSL
KEY TRENCH DISSIPATION CLIENT:
CHAMBER PSU SMALL DAM SECTION MERGED AREAS
EARTHFILL
El. 1141.00 SLOPE. 1V:80H EARTHFILL IRRIGATION DEPARTMENT . KPK.
1140 1140 CONSULTANTS: A J.V OF
CUT OFF WALL PCC FILL
CONDUIT REHMAN HABIB CONSULTANTS (PVT) LTD.
STABILIZING
10.00 10.00 10.00 10.00 10.00 10.00 10.00 10.00 POND CASCADE GROUP
OF ENGINEERING & CONSULTANTS
IN ASSOCIATION WITH:
ENGINEERING & TECHNICAL ASSOCIATES
1130 PROJECT:
1130
CONSULTANCY SERVICES FOR REVIEW / UPDATION
1145.038 1140.600

1144.997 1140.475

1145.285 1140.350

1146.163 1140.225

1147.401 1140.100

1145.596 1139.975

1144.149 1139.850

1142.862 1139.725

1141.892 1139.600
EXCAVATION OF DESIGN AND CONSTRUCTION SUPERVISION OF
BAZ ALI SMALL DAM, DISTRICT KURRAM
TITLE:
BAZ ALI SMALL DAM
NSL
DISTRICT KURRAM
0+000

0+010

0+020

0+030

0+040

0+050

0+060

0+070

0+080
CONDUIT PLAN AND PROFILE VIEW
DISTANCE
DRAWN DESIGNED CHECKED APPROVED SCALE DATE
Faisal A. Arshad I. Zeeshan S. Khurshid Z. Shown JUN,2022
CONDUIT PROFILE VIEW
DRG.No:- BAD-CD-IC-01 SHEET:- 1 of 1 SUB SH.- ----

146
D
CL NOTES:
CL 1. ALL DIMENSIONS & LEVELS ARE IN METERS UNLESS
E E OTHERWISE SPECIFIED.
SAFETY RAILING 2. MECHANICAL EQUIPMENTS (GUARD VALVES,
HOIST MACHINE WITH

1.325
5.000 REGULATING VALVES, GATES HOISTING LIFT ETC.)
STEEL GRILL ON TOP HOIST & 50mmØ HOIST TEM ROD
STOPLOGS OPERATING PLATFORM AND EMBEDDED PARTS DETAILS ARE TENTATIVE,

0.406
1154.5 m CONCRETE BEAM CONTRACTOR WILL SUBMIT ITS ARRANGEMENTS AND
WITH 100mmØ PIPE 2.610

0.300
FOR HOIST STEM ROD SPECIFICATIONS FOR REVIEW AND APPROVAL OF

0.600
0.625 1.310 0.675
THE ENGINEER.

0.300
3. REINFORCED CONCRETE STRENGTH SHALL BE OF

0.650
0.350 (CUBE STRENGTH OF 5000 PSI IN LABORATORY AND

0.350
3750 PSI AT SITE, AND CYLINDER STRENGTH OF 3000
MAXIMUM FLOOD LEVEL: 1152.3 m PSI AT 28 DAYS).

TRASHRACK 0.300

2.350

2.350
5.000
1.050

1.050
CL CL
2.350 C C
STOPLOGS

0.350
0.300 1.750 0.300

0.650
0.600 0.650

0.300

0.300

0.300
2.610
NORMAL CONSERVATION LEVEL: 1149.5 m

0.300 0.450 0.300

STEM ROD
GUIDE BRACKET
CL
A A D
300mm RCC WALL PANEL
PLAN A-A
BETWEEN COLUMNS SCALE: 1:45

D
50mmØ HOIST CL
STEM ROD 0 1.5 3 4.5 6 7.5 m

SCALE
REFERENCE DRAWINGS :-

1.325
5.000
5.778

2.610
0.625 1.310 0.675
DRAWING IS RELEASED

0.350 0.300
HOIST OPERATED STEEL
GATE OPEN POOSITION FOR CONSTRUCTION

1.710 0.300 REV. DATE BY DESCRIPTION CHKD. CERT. APPR.


NO.

2.350

2.350
5.000
1.750

1.050
HOIST OPERATED STEEL CL CL CLIENT:

SILL LEVEL: 1142.73 m


GATE CLOSE POSITION C C PSU SMALL DAM SECTION MERGED AREAS
IRRIGATION DEPARTMENT . KPK.
2.030 mm GATE'S TRAVEL

NSL
0.905

CONSULTANTS: A J.V OF
B B

0.300 0.350
GRANULAR BACK FILL
REHMAN HABIB CONSULTANTS (PVT) LTD.
0.300

0.600 0.650
CASCADE GROUP
0.300

0.300
GRANULAR BACK FILL
OF ENGINEERING & CONSULTANTS
0.450

DELIVERY PIPE
1141.0 m 2.610
IN ASSOCIATION WITH:
1140.700 m ENGINEERING & TECHNICAL ASSOCIATES
PROJECT:
0.300

0.300 0.450 0.300 CONSULTANCY SERVICES FOR REVIEW / UPDATION


OF DESIGN AND CONSTRUCTION SUPERVISION OF
1.200

FILLING BAZ ALI SMALL DAM, DISTRICT KURRAM


TITLE:
0.150 0.150 BAZ ALI SMALL DAM
DISTRICT KURRAM
1.000 5.000 1.000
75 mm PCC (1:3:6) CL INTAKE TOWER PLAN & X-SECTION
CL D DRAWN DESIGNED CHECKED APPROVED SCALE DATE

SECTIONAL ELEVATION D-D (ON PLAN A-A & B-B) PLAN B-B Faisal A. Arshad I. Zeeshan S. Khurshid Z. Shown JUN,2022

SCALE: 1:75 SCALE: 1:45 DRG.No:- BAD-CD-IC-05 SHEET:- 1 OF 2 SUB SH.- ----

147
00
11
40

3+0
11
60

INTAKE TOWER DAM ACCESS ROAD


1150 NOTES:

1147.5
.5
1142
0

1140.0
00
0+
1152.5

MAIN CANAL

1137.5
1149.5

1150
1147.5

0+090
1145.0
1142

11
STABILIZING

BASIN
1142.5

0.0
114
1. ALL DIMENSION AND LEVELS ARE IN METER UNLESS

60
1135.0

1137.5

1175
OTHERWISE STATED.
1133.0

U/S 1135
MAIN

/S
U
DAM 2.5
113

1155 EXISTING TRACK 3+


5 00

NULL
/S
D
.0
1133
0 0
D/S 0 2+5
50
1131.0
1135.0

1140.0

EXISTING KACHA 0+

11

6+000
A
30
5.0
113

.5
1137 1132
0.0
114

.5
R10.00

1155.0

1150.0
TRACK

1145 .5
1152.5

.0

1142
1147.5
NU
LL 11
1170 11
A 60 CANAL / DISTY.
1150 45
FLOW

-0+150
A
-0+140
0
-0+13
0
-0+12
0

0
1170
-0+11
0
APP NNE.00

4+00
-0+10
CHA 147
EL.1

11
ROA L

0
-0+09

AREA = 43.46 ha

1 +0 0
0
CH

-0+08

0
0
CH
55
-0+07

CHACKBANDI
OA L 0
SPILLW
PR NE

0
-0+06
AP AN 50 .00 BUND AY PROTECTION
CH -0+0 47 L/S
. 11 40 PROTEC

0
EL -0+0 L/S TOP TION BUND

00
30 EL. 1154.50
-0+0
20
SPILLW -0+0

50
4+50
AY PROTE 10
BUND CTION -0+0
R/S 00 EST

SPILLWAY
0+0CR
EE 10

2+
OG 0+0 1135.00

11
20 IN
0+0 G BAS

1127.50
LLIN 30

1130.00
STI 0+0 40 1125.00

ON 1132.50

1125.50
0+0 APR
PROTECT
R/S TOP ION BUND NE 50 1124.50

EL. 1154.50 STO 0+0 1130.00

60
SPILLW
AY
0+0 EXCAVAT
ION
EXTENTS
1125.00 CULTIVATED
AREA

00
0+000
70
0+0

0+010

0
1127.50

1124.0
80

1+5
0+020
0+0 1122.50

0+030

1123.50
CH

90

1124.50
EXI EL

0+040
0+0 1126.00

0+050
ANN

0+060
00
T

0+070

0+080

0+090

0+100
1130.00

0+110

0+120

0+130
0+1
10 PROTECTION GABION
WALL CREST EL. 1125.50
0+1
0+1
20

11
00
30

1123.00
0+1
1124.50
40
1127.50

1125.00

25

1122.50
1125.50

EXCAVAT

0+0
11

0+1

1124.00
ION 3
4

EXTENTS 50

1123.50
0+1

6
5
60
1129.00

1125.00

0+1

6+5
70 2 1127.50
75

0+1

50
EXCAV

EXISTING HOUSES
80
0+1
D ATION
1126.00

190 EL. 1125.0 AT


1130.00
12

0+
0

5+
0

11
20

1122.50
0+

00
210

30

1132.50

7
0+

9
20

GR
0+2
05

00
1135.00
11

5+50
00

AVE
112
0
BAZ ALI
DISTY-1

YAR
PROTECTION VILLAGE
20
GRAVE YARD
GABION WALL 11

D
HOUSES A
L
11
40
AREA = 62.34 ha NUL
45
11

00
0+5 7+000
PROPOSED REALIGNED HOUSE NALLA
KACHA TRACK
15
35

11 15
1130

NULLA
11
11

1160
5 AREA = 55.82 ha
112

11
MOUNTAIN 1110

55
MINOR NALLA
MAIN CANAL
0 0
1+0
EXISTING TRACK ROAD/ TRACK
MOUNTAIN
7+500
0
HOUSES 1 10
5
110
AREA = 68.48 ha

11
CONTOUR MAJOR

25
0
109 20
11
DISTY-2

0
50
0 CONTOUR MINOR
50 11

2+
35
1+ 1115

00
11
00
OUTLET
11
2+0
8+000
15

11
05
5
109
AREA=47.89 ha 1100
NU

0
MOUNTAIN

50
LL
110

0+
90
0

10
0
50
8+
0 200 400 600 800 1000 m
1+500
HOUSES

0
0+00
1+0
00
SCALE

REFERENCE DRAWINGS :-

0
00
85

10
10

9+

80
HOUSES
BAD-CD-GEN-01 BAD-CD-IR-01 TO 18

0
80

50
DRAWING IS RELEASED
10

1070

9+
5
HOUSES 08
1
FOR CONSTRUCTION
NU

1085
HOUSES
LL

AREA = 104.82 ha 75
A

10
5
106

0
REV. DATE BY DESCRIPTION CHKD. CERT. APPR.
107 NO.
CLIENT:
EXISTING ROAD PSU SMALL DAM SECTION MERGED AREAS
IRRIGATION DEPARTMENT . KPK.
AREA = 123.34 ha
CONSULTANTS: A J.V OF

65
10
AREA = 98.01 ha
REHMAN HABIB CONSULTANTS (PVT) LTD.
60
10
CASCADE GROUP
OF ENGINEERING & CONSULTANTS

5
105
IN ASSOCIATION WITH:
ENGINEERING & TECHNICAL ASSOCIATES
PROJECT:
CONSULTANCY SERVICES FOR REVIEW / UPDATION
OF DESIGN AND CONSTRUCTION SUPERVISION OF
BAZ ALI SMALL DAM, DISTRICT KURRAM
TITLE: BAZ ALI SMALL DAM
DISTRICT KURRAM
CHACKBANDI LAYOUT PLAN

DRAWN DESIGNED CHECKED APPROVED SCALE DATE


Usman Y. Arshad I. Zeeshan S. Khurshid Z. Shown JUN,2022

DRG.No:- BAD-CD-IR-02 SHEET:- SUB SH.- ----