On Bottom Stability For Swampy Area: 1.0 INPUT
On Bottom Stability For Swampy Area: 1.0 INPUT
This spreadsheet performs the specific gravity calculation of the pipe with reference to seawater to determine
vertical stability / buoyancy of the pipe during installation.
1.0 INPUT
LOAD CASE : INSTALLATION
Case Description
Concrete Water Absorption
Steel OD Do := 114.30 mm
Corrosion Allowance tcorr := 0 mm
Steel WT tnom := 6.02 mm
-3
Steel Density ρs := 7850kg m
Field Joint Density -3
ρfj := 1400kg m
Nominal Pipe Joint Length Ljt := 12.2m
Concrete Cutback Length Lcb := 250mm
Concrete Water Absorption Water_abs := 4%
Corrosion Coating Thickness t cc := 3 mm
Thermal Insulation Thickness tins := 0mm
-3
Corrosion Coating Density ρcc := 1400 kg m
-3
Thermal Insulation Density ρins := 800 kg m
-3
Concrete Coating Density ρco := 3043.5 kg m
-3
Contents Density Properties ρc := 1025 kg m
Page 1 of 9
Environmental Data
-3
Seawater Density ρw := 1025 kg m
-5 2 -1
ν := 1 10 m s
Seawater Kinematic Viscosity
2.0 CALCULATION
Pipeline Diameter
Di := Do - 2 ( tnom - tcorr)
Corroded Internal Pipeline Diameter
Dcc := Do + 2t cc
External Corrosion Coat Diameter
Dins := Dcc + 2tins
Thermal Insulation Coat Diameter
Dco := Dins + 2 t wc
Concrete Coat Diameter
Dt := Dco
Total Outside Diameter
(includes marine growth during operation)
Dins - Dcc
π 2 2
Ainsc :=
Thermal Insulation Area 4
Dco - Dins
π 2 2
Concrete Coating Area Aco :=
4
π
( Dt) ρw g
2
Buoyancy Wb :=
4
Page 2 of 9
Submerged Weight (content) Wabs + Wc + Ws + Wcc + Wco + Wfj
Wsub_calc := - Wb
Ljt
(Wsub_empty + Wb) ρw
Pipeline Density ρpipe_empty :=
Wb
( Wsub_calc + Wb) ρw
ρpipe_calc :=
Wb
3.0 RESULTS
Pipeline Specific Gravity
ρpipe_empty
Pipeline Empty (for pulling activity) SGpipe_empty :=
ρw
SGpipe_empty = 1.513
ρpipe_calc
Pipeline Flooded by Water (for hydrotest purpose) SGpipe_calc :=
ρw
SGpipe_calc = 2.235