T843603001V0F1
T843603001V0F1
NOTES:
21. ALL BURIED PIPELINE UP TO 8 METERS BEYOND 1. ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE
THE POINT OF EXIST FROM THE GROUND OR THE NOTED.
FIRST SUPPORT SHALL BE EXTERNALLY FBE COATED.
2. DISTANCES TO POWER POLE STRUCTURES WERE
22. RIGHT OF WAY (ROW) SHALL BE CONSTRUCTED AS PER DETERMINED AS PER SAES-B-064.
SAES-L-450 PARA 7.2 ALONG THE ENTIRE PIPELINE
3. BURIED PIPELINES SHALL BE EXTERNALLY FUSION
SAND PILE, ROCK PILE AND DEBRIS ALONG THE (ROW)
BONDED EPOXY (FBE) COATED IN ACCORDANCE WITH
OF
SHALL BE CLEARED AND DISPOSED BY CONSTRUCTION
SAUDI ARAMCO ENGINEERING STANDARD SAES-H-002.
CONTRACTOR.
CONSENT
4. CATHODIC PROTECTION INSTALLATION SHALL BE IN
23. CONTRACTOR SHALL FIELD VERIFY ALL ELEVATIONS
ACCORDANCE WITH SAES-X-400.
AND ANGLES BEFORE FABRICATION AND INSTALLATION.
24. THE MINIMUM EARTH COVER OF PIPELINE SHALL BE 5. UNLESS OTHERWISE NOTED, ALL MARL ROAD
1.2 METERS AT ROAD CROSSING AND 0.9 METERS CROSSINGS, ASPHALT ROAD CROSSINGS, SHALL
TTEN
600
200
600
000
400
800
200
600
000
25. THE PIPE COVER SHALL BE 900MM, ELSEWHERE 6. ALL EXCAVATION OF FOREIGN LINE CROSSINGS &
UNLESS OTHERWISE INDICATED. UTILITY CROSSINGS SHALL BE DONE BY HAND
WRI
EXCAVATION. CROSSINGS SHALL BE UNDER THE
309
307
307
308
308
308
309
309
310
26. THE PIPE ELEVATIONS SHOWN ARE REFERRED TO EXISTING LINES AND ABOVE THE EXISTING LINES
PIPE TOP ELEVATIONS UNLESS OTHERWISE INDICATED. ON SABKHA AREAS UNLESS OTHERWISE NOTED.
E
E
THE
27. RADIOGRAPHY OF WELD TO BE PERFORMED IN
7. CONSTRUCTION CONTRACTOR TO INSTALL WARNING
ACCORDANCE WITH SAES-W-012 AND RADIOGRAPHY
SIGNS AT ROAD CROSSINGS.
SUB CONTRACTOR'S APPROVED PROCEDURES AND
THOUT
TECHNIQUES. 8. CONSTRUCTION CONTRACTOR SHALL INSTALL
N 2 708 800 KILOMETER MARKERS AS PER STD DWG NO. AB-036907
28. FOR CAMEL/ROAD/RAIL CROSSING, PIPELINE
AND AD-036973 AT EVERY KILOMETER STATION OF
WI
PROTECTION SHALL BE PROVIDED BY PROTECTIVE
THE PIPELINE, AT ROAD CROSSING (WITHIN 10 METERS
BERM WHICH SHALL EXTENDED FOR A DISTANCE OF
OF THE ROAD ON BOTH SIDES) DEFLECTIONS,
AT LEAST 15 METERS FROM THE EDGE OF
NG
AND JUNCTIONS.
8
DRAWI
HRDH-611
K
P
K P
P
N 2 708 600 P
K
EDGE OF ASPHALT ROAD. THE BERM SHALL PROVIDE 9. ALL CONSTRUCTION WORK SHALL BE IN ACCORDANCE
8
K
P
K P
P
8
P
8
8
8 8 T
T
8
29. CONSTRUCTION CONTRACTOR SHALL IDENTIFY THE SOIL 10.CONSTRUCTION CONTRACTOR TO INSTALL PIPELINE
0F1
8 8
8
8 T 8 8
T T T T T T
P
T T
o{ o
S
MOVEMENT INDICATOR AT THE VERTICAL AND
THI
8
N 2 708 400
P
oo
$ $
o o oo
o
T
COMPOSITE BENDS AS PER SAES-L-450.
{
o $
N 2 708 400
$
$ $
$
30. MAGNESIUM ANODE AND CP TEST STATION HAS BEEN
P
$
3 K
INCLUDED IN CP PACKAGE.
11.CONSTRUCTION CONTRACTOR SHALL CONSTRUCT
P
HRDH-611
0+
300
S
FROM
U
31. CONSTRUCTION CONTRACTOR TO IDENTIFY ANY RIG
T
M
P
E
CAMEL CROSSINGS AT 1 KM SPACING ALONG THE
P
3'
307
°3
0+
75 K
40
CROSSING REQUIRED OVER THE PIPELINE AND CROSSING
0
200
T
PROPOSED PIPELINE UNLESS MARL ROAD EXIST.
0+
50
8
0
CONTRACTOR SHALL LOCATE THE CAMEL CROSSINGS
T
P
K -
N 2 708 200
0
0
REPRESENTATIVE PRIOR TO THE CONSTRUCTION. AND SUBMIT A PROPOSAL FOR SAUDI ARAMCO
B
6
NED
+
S
U
R
0
P
R
O
M
N
W
P
P
IT
-
8
T
P
0
K 0
OBTAI
7
3
CAMEL CROSSINGS.
+
6
0
7
m
°
E
-
1
7 m
.6
T
'2
307
0
-
2
"
400
8
T
0
0
P
12.CONSTRUCTION CONTRACTOR SHALL FIELD VERIFY
K
+8
0
N 2 708 000 m
1. ALL UTM COORDINATES ARE IN METERS UNLESS THE ORIGINAL VERTICAL PROFILE OF THE PIPELINE
T
N 2 708 000
00
8 0
+9
OTHERWISE NOTED. THE AMOUNT OF COVER , THE LOCATION AND DEGREE
T
C 8
m
K
BE
T
-
T
P
2. LUP MUST BE RENEWED OR CANCELLED IF THE SITE
T
8 -
T
TA-843603.002 8
1+00
0
E
8
T
307
HAS NOT BEEN USED BEFORE ERC DATE OF THE SAES-L-650.
PART,SHALL
T
600
8
T
RELATED BUDGET ITEM.
13.UNLESS OTHERWISE NOTED MINIMUM RADIUS OF
T
1+100
N 2 707 800
T
8
3. ALL EXCAVATION AND BACKFILL ACTIVITIES SHALL PREFORMED FIELD BENDS SHALL BE 105 METERS
ROW
T
m
E
BE CONDUCTED IN ACCORDANCE WITH SAES-A-114.
308
8
307
1+20
0
200
HORIZONTAL BENDS.
C
1+226.
800
42 -
44
4. HYDROTEST FLUID DISPOSAL SHALL BE CONDUCTED
194
T
308
m
8.45m
°28
000
'36"
N 2 707 600 1 +30
IN ACCORDANCE WITH SAEP-327. 14.PIPELINE WELDING AND NDT TO BE PERFORMED
T
8 0
1+30
C 0
8
N 2 707 600
AS PER SAES-W-012.
448
194
T
5. ALL INERT CONSTRUCTION DEBRIS GENERATED DURING
m
K
.45m
°28
-
P
-
N
m
'36"
m -
I
P
15.CONSTRUCTION CONTACTOR SHALL CHECK ANY
T
8
K
1+40
0 CONSTRUCTION OF THIS PROJECT SHALL BE DISPOSED
P
OF IN A CLASS III LANDFILL IN ACCORDANCE WITH EXISTING BURIED PIPELINES, UTILITIES ETC. PRIOR
FULL,OR
ROW
P
$ -
3
TO EXCAVATION.
8
T
P
N 2 707 400 1+50
0
E
-
P
T
K K
m 8
-
P
9
T
8
m
P
- K
P
-
1
STATIONS, MLVs ETC.PRIOR TO THE START OF
- 8
C
8" HRDH-611 F/L
T
P
K
8
C
6. COMPLY WITH SAES-O-202, PARAGRAPH 4.12 FOR CONSTRUCTION, DEMOLITION, FABRICATION &
N
P
I
m
P
1
+
7
0
0
PIPE PENETRATIONS. INSTALLATION AS REQUIRED.
E
m
K
307
ON
C
?
P
0
-
m P
80
K
- -
REPRODUCTI
1+
P
K PRIOR ANY ACTIVITIES PENETRATION THE EXISTING 18.TOPOGRAPHIC SURVEY DATA IS SUPPLIED BY
T
P
0
8
90
FENCE.
+
SAUDI ARAMCO AND CONSIDER TO BE
T
P
K
T
P
RELIED-UPON INFORMATION.
T
00
8. THE MAXIMUM EXCAVATION DEPTH 1.2 UNDER
2+
K
N 2 707 000 P
E
T
308
P
THE FENCE.
0
10
000
2+
P
T
P 9. A TEMPORARY EXCLUSION FENCE SHALL BE
(ELASTIC BEND) PER 30m OF PIPELINE SHALL BE
K
0
8
T
20
ERECTED PRIOR EXCAVATION UNDER FENCE IF THE
2+
P
m
P
0.898m.
T
DURATION OF THE EXCAVATION WILL LAST MORE
K
SAUDIARAMCO.NO
30
P
2+
N 2 706 800 TA-843603.003 R
O
W
T
20.BURIED PIPELINE CROSSING EACH OTHER SHALL
8
P
K
N 2 706 800 N 2 706 800
E
308
00
P
T
HAVE A MINIMUM CLEARANCE OF 0.6M
+4
10. MAINTAIN CROSSING REQUIREMENTS LISTED IN
2
200
E
K
P
308
T
SAES-L-410 FOR THIS PROPOSED PIPELINE WITH
600
50 0
P 8
2+ 50
0
2+
K
T
P /
G
P
/
L
OTHER PIPELINE.
P C
/
L
m
REFERENCE DRAWINGS
T
K 0
60
2+
P
8
T
N 2 706 600 N 2 706 600 P
K
P
308
T
P 70
0
PIPING AND INSTRUMENT DIAGRAM TA-725153.001
400
2+
K
8
T
SIS TE-843943
8
-
P
K
REQUIREMENTS AND SAUDI ARAMCO CONSTRUCTION
T
80
0 P 8
K
P
0F1
T
N 2 706 400 M
A
P
R
FACILITY PLOT PLAN-RH-CK
OF
L
R
8
P TA-017072.001
N 2 706 400 O
A
D
K
P
K
8
2+
90
0 9
P
T
P
PROPERTY
K
P SHALL BE 9.0M FOR POWER LINES OPERATING ISO PIPING TIE-IN AT HRDH-611 TB-446465.001
T
T
P
3+
00
0
8
K
T
P
m
PK
13. A MINIMUM HORIZONTAL SPACING BETWEEN PIPELINE ISO PIPING TIE-IN AT RH-CK TB-446469.001
T
N 2 706 200 P
8
3+100
AND OVERHEAD POWER LINE FOR ANY VOLTAGE LESS TYPICAL SECTIONS AND TRENCH DETAILS TA-843666
T
THAN 69KV, PARALLEL FOR MORE THAN 1.6 KM TYPICAL CAMEL CROSSING
T
8
8 TA-843667
E
T
UNPAVED ROAD CROSSING DETAIL TA-843668
SOLE
3+200
600
0F1
T
8
14. MAINTAIN AT LEAST 20 METERS DISTANCE FROM TYPICAL UTILITY & STRUCTURE CROSSING TA-843669
N 2 706 000
|
T
N 2 706 000
OVERHEAD POWER LINE POLES AND ANCHORS TO
RTH
T
TRUE H
AN
RT
NO
PL
NO
AP
AP
AP
24
3+300 K
T
NG
THE EDGE OF THE EXCAVATION OF UNDERGROUND
LI
VAI
8
ND
PRE
WI
F
SH
| 8
AP
T
AP
TA-843671
AP
THE
8
8
RH
T
TT
8 -
T -
8 8 T
K
8
8 - 8
T
051.
T8
3+400 T
309
705
2
8
E
N
FE
0F1
T
FE
8
AL
P-
8 3
692
T
AP
HR
DH
8"
AP
F/
L
8
AP
FE
ARE
|
TA-843603.004 T 7°55'08"
HR
DH
8"
F/
L
117 HR
7 DH
8"
T
N 2 705 800
F/
AL L
616
P-
TE-088482
FE
0F1
2000
701
8
8
T
61
1
8"
F/
L
HR
DH
8.
T
5.
8
09
75
0F1
9
T
30
70
2
8
T 8
T
T
N
T
TRANSFORMERS/EQUIPMENT
HEREI
8
T
T
T
REMOTE HEADER
T
BU
m
T
RN
8
0 160 320 480 640 800
PI
RH-CK
T
N 2 705 600
T
8
T
N 2 705 600 8
PROJECT, CONTRACTOR SHALL IDENTIFY EXISTING
T
T
E
8
308
309
8
8
T
NED
CONCERNED ORGANIZATIONS FOR REQUIRED REVIEW
200
8
T
SCALE: 1 : 8000M
AND WORK PERMITS.
T
E
T
309
CONTAI
m
000
8
T
N 2 705 400
REVISION VALIDATION
THIS REVISION NO. 0F1 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
ON
10-02029-0003-000
NFORMATI
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) x REQUIRED (SAUDI ARAMCO)
MMB VKP
11/11/18 11/11/18
I
0F1 11/11/18 RE-ISSUED FOR CONSTRUCTION
THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-02029-0003 CONSTRUCTION UNTIL CERTIFIED AND DATED
AND
DRAWING TYPE
NG
8" HRDH-611 F/L
DRAWI
GAS GATHERING MANFS. F/LINES
S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.
THI
H91 A TA-843603 001 0F1
Saudi Aramco 2615 ENG. (05/05)