SAUDIARAMCO.

NOTES:

21. ALL BURIED PIPELINE UP TO 8 METERS BEYOND 1. ALL DIMENSIONS ARE IN METERS UNLESS OTHERWISE
THE POINT OF EXIST FROM THE GROUND OR THE NOTED.
FIRST SUPPORT SHALL BE EXTERNALLY FBE COATED.
2. DISTANCES TO POWER POLE STRUCTURES WERE
22. RIGHT OF WAY (ROW) SHALL BE CONSTRUCTED AS PER DETERMINED AS PER SAES-B-064.
SAES-L-450 PARA 7.2 ALONG THE ENTIRE PIPELINE
3. BURIED PIPELINES SHALL BE EXTERNALLY FUSION
SAND PILE, ROCK PILE AND DEBRIS ALONG THE (ROW)
BONDED EPOXY (FBE) COATED IN ACCORDANCE WITH

OF
SHALL BE CLEARED AND DISPOSED BY CONSTRUCTION
SAUDI ARAMCO ENGINEERING STANDARD SAES-H-002.
CONTRACTOR.

CONSENT
4. CATHODIC PROTECTION INSTALLATION SHALL BE IN
23. CONTRACTOR SHALL FIELD VERIFY ALL ELEVATIONS
ACCORDANCE WITH SAES-X-400.
AND ANGLES BEFORE FABRICATION AND INSTALLATION.

24. THE MINIMUM EARTH COVER OF PIPELINE SHALL BE 5. UNLESS OTHERWISE NOTED, ALL MARL ROAD

1.2 METERS AT ROAD CROSSING AND 0.9 METERS CROSSINGS, ASPHALT ROAD CROSSINGS, SHALL

AT CAMEL CROSSINGS. BE OPEN CUT AS PER APPLICABLE STANDARDS.

TTEN
600

200

600

000

400

800

200

600

000
25. THE PIPE COVER SHALL BE 900MM, ELSEWHERE 6. ALL EXCAVATION OF FOREIGN LINE CROSSINGS &
UNLESS OTHERWISE INDICATED. UTILITY CROSSINGS SHALL BE DONE BY HAND

WRI
EXCAVATION. CROSSINGS SHALL BE UNDER THE

309

307

307

308

308

308

309

309

310
26. THE PIPE ELEVATIONS SHOWN ARE REFERRED TO EXISTING LINES AND ABOVE THE EXISTING LINES
PIPE TOP ELEVATIONS UNLESS OTHERWISE INDICATED. ON SABKHA AREAS UNLESS OTHERWISE NOTED.

E
E

THE
27. RADIOGRAPHY OF WELD TO BE PERFORMED IN
7. CONSTRUCTION CONTRACTOR TO INSTALL WARNING
ACCORDANCE WITH SAES-W-012 AND RADIOGRAPHY
SIGNS AT ROAD CROSSINGS.
SUB CONTRACTOR'S APPROVED PROCEDURES AND

THOUT
TECHNIQUES. 8. CONSTRUCTION CONTRACTOR SHALL INSTALL
N 2 708 800 KILOMETER MARKERS AS PER STD DWG NO. AB-036907
28. FOR CAMEL/ROAD/RAIL CROSSING, PIPELINE
AND AD-036973 AT EVERY KILOMETER STATION OF

WI
PROTECTION SHALL BE PROVIDED BY PROTECTIVE
THE PIPELINE, AT ROAD CROSSING (WITHIN 10 METERS
BERM WHICH SHALL EXTENDED FOR A DISTANCE OF
OF THE ROAD ON BOTH SIDES) DEFLECTIONS,
AT LEAST 15 METERS FROM THE EDGE OF

NG
AND JUNCTIONS.
8

CAMEL/ROAD CROSSING AND 30 METERS FROM THE

DRAWI
HRDH-611
K
P
K P
P
N 2 708 600 P
K

EDGE OF ASPHALT ROAD. THE BERM SHALL PROVIDE 9. ALL CONSTRUCTION WORK SHALL BE IN ACCORDANCE
8
K
P
K P
P
8

AT LEAST 1 METER COVER OVER THE TOP OF PIPE. WITH SAES-L-650.


8

P
8
8

8 8 T
T
8

29. CONSTRUCTION CONTRACTOR SHALL IDENTIFY THE SOIL 10.CONSTRUCTION CONTRACTOR TO INSTALL PIPELINE
0F1
8 8
8
8 T 8 8
T T T T T T

P
T T
o{ o

TYPE PRIOR TO CONSTRUCTION.


TRUE CALLED
NORTH NORTH
K
17°21'14"
o o

S
MOVEMENT INDICATOR AT THE VERTICAL AND

THI
8

N 2 708 400

P
oo
$ $
o o oo
o

T
COMPOSITE BENDS AS PER SAES-L-450.
{
o $

N 2 708 400
$

$ $
$
30. MAGNESIUM ANODE AND CP TEST STATION HAS BEEN

P
$
3 K

INCLUDED IN CP PACKAGE.
11.CONSTRUCTION CONTRACTOR SHALL CONSTRUCT

P
HRDH-611

0+
300
S

FROM
U
31. CONSTRUCTION CONTRACTOR TO IDENTIFY ANY RIG

T
M
P
E
CAMEL CROSSINGS AT 1 KM SPACING ALONG THE

P
3'

307
°3

0+
75 K

40
CROSSING REQUIRED OVER THE PIPELINE AND CROSSING

0
200

T
PROPOSED PIPELINE UNLESS MARL ROAD EXIST.

0+
50
8

METHOD TO BE AGREED WITH THE ARAMCO SITE

0
CONTRACTOR SHALL LOCATE THE CAMEL CROSSINGS

T
P
K -

N 2 708 200
0
0
REPRESENTATIVE PRIOR TO THE CONSTRUCTION. AND SUBMIT A PROPOSAL FOR SAUDI ARAMCO

B
6

NED
+

S
U

R
0

P
R

O
M
N

W
P
P
IT
-
8

APPROVAL PRIOR TO CONSTRUCTION OF THE

T
P
0
K 0

OBTAI
7

3
CAMEL CROSSINGS.
+

6
0

7
m

°
E
-

CONDITIONS OF THE SUBJECT LUP APPROVAL BY SA:

1
7 m
.6
T

'2
307

0
-

2
"
400
8

T
0
0

P
12.CONSTRUCTION CONTRACTOR SHALL FIELD VERIFY
K
+8
0

N 2 708 000 m

1. ALL UTM COORDINATES ARE IN METERS UNLESS THE ORIGINAL VERTICAL PROFILE OF THE PIPELINE

T
N 2 708 000

00

8 0
+9
OTHERWISE NOTED. THE AMOUNT OF COVER , THE LOCATION AND DEGREE

T
C 8
m
K

BE
T
-

OF ELASTIC AND PREFORMED BENDS AS PER

T
P
2. LUP MUST BE RENEWED OR CANCELLED IF THE SITE

T
8 -

T
TA-843603.002 8
1+00
0

E
8

T
307
HAS NOT BEEN USED BEFORE ERC DATE OF THE SAES-L-650.

PART,SHALL
T
600
8

T
RELATED BUDGET ITEM.
13.UNLESS OTHERWISE NOTED MINIMUM RADIUS OF

T
1+100
N 2 707 800

T
8

3. ALL EXCAVATION AND BACKFILL ACTIVITIES SHALL PREFORMED FIELD BENDS SHALL BE 105 METERS

ROW
T
m

FOR VERTICAL BENDS AND 210 METERS FOR

E
BE CONDUCTED IN ACCORDANCE WITH SAES-A-114.

308
8

307
1+20
0

200
HORIZONTAL BENDS.
C
1+226.

800
42 -

44
4. HYDROTEST FLUID DISPOSAL SHALL BE CONDUCTED

194
T

308
m

8.45m
°28
000

'36"
N 2 707 600 1 +30
IN ACCORDANCE WITH SAEP-327. 14.PIPELINE WELDING AND NDT TO BE PERFORMED

T
8 0
1+30
C 0
8
N 2 707 600

AS PER SAES-W-012.

448
194
T
5. ALL INERT CONSTRUCTION DEBRIS GENERATED DURING
m
K

.45m
°28
-
P
-

N
m

'36"
m -

I
P
15.CONSTRUCTION CONTACTOR SHALL CHECK ANY

T
8

K
1+40
0 CONSTRUCTION OF THIS PROJECT SHALL BE DISPOSED
P

OF IN A CLASS III LANDFILL IN ACCORDANCE WITH EXISTING BURIED PIPELINES, UTILITIES ETC. PRIOR

FULL,OR
ROW
P
$ -

3
TO EXCAVATION.
8

SAES-S-007, "SOLID WASTE LANDFILL STANDARD".

T
P
N 2 707 400 1+50
0
E

OTHER SOLID WASTES GENERATED, IF ANY SHALL BE


307

-
P

T
K K

16. CONSTRUCTION CONTRACTOR SHALL CHECK, SURVEY


600

m 8
-

P
9

DISPOSED OF IN ACCORDANCE WITH GI 430.001 AND

T
8
m

& VERIFY UTM COORDINATES AT FENCE/TIE-INS,


9
-

P
- K

THE SA HAZARDOUS WASTE CODE.


T
8 0
+60
-

P
-
1
STATIONS, MLVs ETC.PRIOR TO THE START OF
- 8

C
8" HRDH-611 F/L
T

P
K

8
C

6. COMPLY WITH SAES-O-202, PARAGRAPH 4.12 FOR CONSTRUCTION, DEMOLITION, FABRICATION &

N
P

I
m

N 2 707 200 N 2 707 200


K

P
1
+
7
0
0
PIPE PENETRATIONS. INSTALLATION AS REQUIRED.
E

m
K
307

ON
C
?
P

17.THE MINIMUM TIE-IN TEMPERATURE IS 70°F.


800

7. NOTIFY THE AREA SECURITY OPERATION IN ADVANCE


K
-

0
-
m P

80
K
- -

REPRODUCTI
1+
P
K PRIOR ANY ACTIVITIES PENETRATION THE EXISTING 18.TOPOGRAPHIC SURVEY DATA IS SUPPLIED BY

T
P

0
8

90
FENCE.

+
SAUDI ARAMCO AND CONSIDER TO BE

T
P
K
T

P
RELIED-UPON INFORMATION.

T
00
8. THE MAXIMUM EXCAVATION DEPTH 1.2 UNDER

2+
K
N 2 707 000 P
E

19.THE MAXIMUM CHANGE OF SLOPE OF THE

T
308

P
THE FENCE.

0
10
000

2+
P

UNDERGROUND PIPELINE WITHOUT PREFORMED BEND

T
P 9. A TEMPORARY EXCLUSION FENCE SHALL BE
(ELASTIC BEND) PER 30m OF PIPELINE SHALL BE
K

0
8

T
20
ERECTED PRIOR EXCAVATION UNDER FENCE IF THE

2+
P
m

P
0.898m.

T
DURATION OF THE EXCAVATION WILL LAST MORE
K

SAUDIARAMCO.NO
30
P

2+
N 2 706 800 TA-843603.003 R
O
W

THAN ONE DAY.

T
20.BURIED PIPELINE CROSSING EACH OTHER SHALL
8

P
K
N 2 706 800 N 2 706 800
E
308

00
P

T
HAVE A MINIMUM CLEARANCE OF 0.6M

+4
10. MAINTAIN CROSSING REQUIREMENTS LISTED IN

2
200

E
K
P

308

T
SAES-L-410 FOR THIS PROPOSED PIPELINE WITH

600

50 0
P 8

2+ 50

0
2+
K

T
P /
G
P
/
L
OTHER PIPELINE.
P C
/
L
m
REFERENCE DRAWINGS

T
K 0
60
2+
P
8

11. DURING CONSTRUCTION PROVISION OF GI-2.100,


DWG. CONTROL FOR J.O. 10-02029-0003 TD-896993

T
N 2 706 600 N 2 706 600 P
K

WORK PERMIT SYSTEM; GI 7.025. HEAVY EQUIPMENT


E

P
308

T
P 70
0
PIPING AND INSTRUMENT DIAGRAM TA-725153.001
400

2+
K
8

OPERATOR TESTING AND CERTIFICATION, EXCAVATION


P

T
SIS TE-843943
8
-

P
K
REQUIREMENTS AND SAUDI ARAMCO CONSTRUCTION

T
80
0 P 8

SAFETY MANUAL SHALL BE OBSERVED. FACILITY PLOT PLAN HRDH-611 BA-323755.001


2+

K
P
0F1

T
N 2 706 400 M
A

P
R
FACILITY PLOT PLAN-RH-CK

OF
L
R
8

P TA-017072.001
N 2 706 400 O
A
D
K

12.THE MINIMUM VERTICAL CLEARANCE OF OVERHEAD

P
K
8

2+
90
0 9

POWER LINE CONDUCTORS AT PIPELINE CROSSINGS PIPING PLAN AT HRDH-611 TA-446463.001

P
T
P

PROPERTY
K

P SHALL BE 9.0M FOR POWER LINES OPERATING ISO PIPING TIE-IN AT HRDH-611 TB-446465.001

T
T
P

3+
00
0
8
K

AT 230KV OR LESS AS PER SAES-B-064. PIPING PLAN AT RH-CK TA-446467.001

T
P
m

PK

13. A MINIMUM HORIZONTAL SPACING BETWEEN PIPELINE ISO PIPING TIE-IN AT RH-CK TB-446469.001

T
N 2 706 200 P
8

3+100
AND OVERHEAD POWER LINE FOR ANY VOLTAGE LESS TYPICAL SECTIONS AND TRENCH DETAILS TA-843666

T
THAN 69KV, PARALLEL FOR MORE THAN 1.6 KM TYPICAL CAMEL CROSSING
T
8
8 TA-843667
E

SHALL BE 30 M. PER SAES-B-064.


308

T
UNPAVED ROAD CROSSING DETAIL TA-843668

SOLE
3+200
600

0F1
T
8

14. MAINTAIN AT LEAST 20 METERS DISTANCE FROM TYPICAL UTILITY & STRUCTURE CROSSING TA-843669
N 2 706 000

|
T

N 2 706 000
OVERHEAD POWER LINE POLES AND ANCHORS TO

RTH
T

TRUE H
AN

RT
NO
PL

NO
AP
AP
AP

TYPICAL OVERHEAD POWERLINE CROSSING TA-843670


"
'06 2
°3
8

24
3+300 K
T

NG
THE EDGE OF THE EXCAVATION OF UNDERGROUND
LI
VAI
8

ND
PRE
WI
F
SH

| 8
AP

T
AP

TA-843671
AP

TYPICAL PIPELINE UTILITY CROSSING

THE
8

8
RH

T
TT

POWER CABLES, TELECOMMUNICATIONS,


8
- 8
T
-C

8 -
T -
8 8 T
K

8
8 - 8

TYPICAL MARKER DETAIL TA-843673


T
1

FIBER OPTIC CABLES AND UTILITY PIPES


0F
7
848
857. 45

T
051.

T8
3+400 T
309
705
2

8
E
N

FE

0F1

T
FE

8
AL
P-
8 3

TYPICAL FOR ROCKY & SANDY WADI CROSSING TA-843676


T

692
T

AP

HR
DH
8"
AP

F/
L
8
AP

FE

15. EXCAVATIONS SHALL BE KEPT AT LEAST 3 METERS


8

ARE
|

TA-843603.004 T 7°55'08"

HR
DH
8"
F/
L
117 HR
7 DH
8"
T

N 2 705 800
F/
AL L
616
P-

PIPELINE CONSTRUCTION SPECIFICATION


4

TE-088482
FE

0F1

2000
701
8

8
T
61
1
8"
F/
L
HR
DH

AWAY FROM THE EDGE OF THE CONCRETE


4
440
19
T

8.
T

5.

8
09
75

0F1
9
T

30
70
2

MATERIAL TAKE OFF


E

FOUNDATIONS OF EXISTING POD DISTRIBUTION TO-843603


N

8
T 8
T
T

N
T

TRANSFORMERS/EQUIPMENT

HEREI
8
T

T
T

REMOTE HEADER
T

BU

m
T
RN

16. PRIOR AND DURING IMPLEMENTATION OF THE


8
T

8
0 160 320 480 640 800
PI

RH-CK
T

N 2 705 600
T

8
T

N 2 705 600 8
PROJECT, CONTRACTOR SHALL IDENTIFY EXISTING
T

T
E

8
308

FACILITIES AND ESTABLISH COORDINATION WITH METERS


E
T
800

309

8
8
T

NED
CONCERNED ORGANIZATIONS FOR REQUIRED REVIEW
200

8
T

SCALE: 1 : 8000M
AND WORK PERMITS.
T

E
T

309

CONTAI
m
000

8
T

N 2 705 400

REVISION VALIDATION

THIS REVISION NO. 0F1 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION

REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:

ON
10-02029-0003-000

NFORMATI
DESIGN CERTIFICATION REVIEW FOR KEY DRAWINGS OTHER
(DESIGN AGENCY) x REQUIRED (SAUDI ARAMCO)

ENGG./DATE CERTIFIED BY/DATE CONST. AGENCY/DATE OPERATIONS/DATE BY/DATE

MMB VKP
11/11/18 11/11/18

REV.NO. DATE REVISION DESCRIPTION

I
0F1 11/11/18 RE-ISSUED FOR CONSTRUCTION

THE
JOB ORDER/EWO NO.
THIS REVISION IS NOT TO BE USED FOR
10-02029-0003 CONSTRUCTION UNTIL CERTIFIED AND DATED

SAUDI ARABIAN OIL COMPANY

AND
DRAWING TYPE

PIPELINE ALIGNMENT SHT-DWG IND PRF

NG
8" HRDH-611 F/L

DRAWI
GAS GATHERING MANFS. F/LINES

HARADH SAUDI ARABIA

S
PLANT NO. INDEX DRAWING NUMBER SHT. NO. REV. NO.

THI
H91 A TA-843603 001 0F1
Saudi Aramco 2615 ENG. (05/05)