Worksheet For Irregular Channel Estrada (Central) : Project Description

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 10

Estrada (central)

Worksheet for Irregular Channel

Project Description
Project File c:\felipe\calcul~1\proyec~1\guena.fm2
Worksheet Estrada (central)
Flow Element Irregular Channel
Method Manning's Formula
Solve For Water Elevation

Input Data
Channel Slope 0.010000 m/m
Elevation range: 100.09 m to 110.00 m.
Station (m) Elevation (m) Start Station End Station Roughness
-36.99 108.00 -36.99 24.63 0.035
-36.88 108.00
-32.58 107.23
-30.71 107.00
-27.84 106.64
-22.82 106.00
-22.65 105.98
-18.51 105.00
-16.19 104.45
-16.14 104.44
-16.12 104.44
-16.00 104.42
-13.71 104.00
-8.54 103.05
-8.51 103.00
-7.99 102.00
-7.67 101.38
-6.88 101.10
-6.82 101.00
-6.25 100.09
-3.97 100.10
0.00 100.38
2.55 100.56
2.63 100.56
2.68 100.57
2.71 100.56
2.79 100.61
3.73 101.00
6.13 102.00
7.63 102.63
7.69 103.00
7.72 103.20
7.74 104.00
7.78 105.00
7.82 106.00
7.83 106.29
11.42 106.44
11.62 106.45
11.72 106.46
16.35 107.00
18.15 107.21
19.78 107.30

Dec 6, 2009 None FlowMaster v4.1c


10:08:05 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 2
Estrada (central)
Worksheet for Irregular Channel
20.91 107.44
21.67 108.00
21.86 108.14
22.48 108.66
23.03 109.00
24.63 110.00
Discharge 356.01 m³/s

Results
Wtd. Mannings Coefficient 0.035
Water Surface Elevation 104.69 m
Flow Area 69.65 m²
Wetted Perimeter 29.10 m
Top Width 24.96 m
Depth 4.60 m
Critical Water Elev. 104.64 m
Critical Slope 0.010496 m/m
Velocity 5.11 m/s
Velocity Head 1.33 m
Specific Energy 106.02 m
Froude Number 0.98
Full Flow Capacity 2488.90 m³/s
Flow is subcritical.

Dec 6, 2009 None FlowMaster v4.1c


10:08:05 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 2 of 2
Estrada (central)
Cross Section for Irregular Channel

Project Description
Project File c:\felipe\calcul~1\proyec~1\guena.fm2
Worksheet Estrada (central)
Flow Element Irregular Channel
Method Manning's Formula
Solve For Water Elevation

Section Data
Wtd. Mannings Coefficient 0.035
Channel Slope 0.010000 m/m
Water Surface Elevation 104.69 m
Discharge 356.01 m³/s

110.0

109.0

108.0

107.0
(m)

106.0
Elevation

105.0

104.0

103.0

102.0

101.0

100.0
-40.0 -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0
Station (m)

Dec 6, 2009 None FlowMaster v4.1c


10:08:56 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
Estrada (central)
Plotted Curves for Irregular Channel

Project Description
Project File c:\felipe\calcul~1\proyec~1\guena.fm2
Worksheet Estrada (central)
Flow Element Irregular Channel
Method Manning's Formula
Solve For Water Elevation

Constant Data
Discharge 356.01 m³/s

Input Data
Minimum Maximum Increment
Channel Slope 0.005000 0.020000 0.001000 m/m

Water Elevation vs Channel Slope

105.4

105.2
Water Elevation (m)

105.0

104.8

104.6

104.4

104.2

104.0

103.8
0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018
Channel Slope (m/m)

Dec 6, 2009 None FlowMaster v4.1c


10:10:09 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
Estrada (central)
Plotted Curves for Irregular Channel

Project Description
Project File c:\felipe\calcul~1\proyec~1\guena.fm2
Worksheet Estrada (central)
Flow Element Irregular Channel
Method Manning's Formula
Solve For Water Elevation

Constant Data
Channel Slope 0.010000 m/m

Input Data
Minimum Maximum Increment
Discharge 0.00 400.00 10.00 m³/s

Water Elevation vs Discharge


105.0

104.5

104.0
Water Elevation (m)

103.5

103.0

102.5

102.0

101.5

101.0

100.5
0.0 50.0 100.0 150.0 200.0 250.0 300.0 350.0 400.0
Discharge (m³/s)

Dec 6, 2009 None FlowMaster v4.1c


10:11:04 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
Estrada (canal)
Worksheet for Irregular Channel

Project Description
Project File c:\felipe\calcul~1\proyec~1\guena.fm2
Worksheet Estrada (canal)
Flow Element Irregular Channel
Method Manning's Formula
Solve For Water Elevation

Input Data
Channel Slope 0.010000 m/m
Elevation range: 111.06 m to 116.73 m.
Station (m) Elevation (m) Start Station End Station Roughness
-24.65 114.43 -24.65 15.21 0.035
-23.23 114.25
-22.37 114.22
-21.12 114.18
-18.01 114.53
-17.34 114.26
-16.97 114.00
-15.77 113.17
-15.58 113.00
-14.40 112.00
-14.34 111.95
-13.28 111.75
-12.85 111.50
-12.74 111.45
-10.75 111.43
-9.53 111.31
-8.18 111.21
-6.34 111.06
-5.19 111.11
-3.00 111.29
-0.74 111.37
0.00 111.41
1.06 111.46
2.10 111.48
3.22 111.40
3.89 111.46
4.96 112.00
5.00 112.02
6.70 112.63
8.56 112.93
9.49 113.00
10.06 113.04
12.18 113.61
13.80 114.00
14.24 114.11
14.59 114.22
14.67 114.30
14.89 114.41
14.97 114.84
14.99 115.00
15.12 116.00
15.21 116.73

Dec 6, 2009 None FlowMaster v4.1c


10:12:19 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 2
Estrada (canal)
Worksheet for Irregular Channel
Discharge 356.01 m³/s

Results
Wtd. Mannings Coefficient 0.035
Water Surface Elevation 114.53 m
Flow Area 80.05 m²
Wetted Perimeter 41.22 m
Top Width 39.54 m
Depth 3.47 m
Critical Water Elev. 114.53 m
Critical Slope 0.010039 m/m
Velocity 4.45 m/s
Velocity Head 1.01 m
Specific Energy 115.54 m
Froude Number 1.00
Full Flow Capacity 1138.27 m³/s
Flow is subcritical.
Flow is divided.
Water elevation exceeds lowest end station by 0.10 m.

Dec 6, 2009 None FlowMaster v4.1c


10:12:19 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 2 of 2
Estrada (canal)
Cross Section for Irregular Channel

Project Description
Project File c:\felipe\calcul~1\proyec~1\guena.fm2
Worksheet Estrada (canal)
Flow Element Irregular Channel
Method Manning's Formula
Solve For Water Elevation

Section Data
Wtd. Mannings Coefficient 0.035
Channel Slope 0.010000 m/m
Water Surface Elevation 114.53 m
Discharge 356.01 m³/s

117.0
116.5
116.0
115.5
115.0
(m)

114.5
Elevation

114.0
113.5

113.0
112.5
112.0
111.5
111.0
-25.0 -20.0 -15.0 -10.0 -5.0 0.0 5.0 10.0 15.0 20.0
Station (m)

Dec 6, 2009 None FlowMaster v4.1c


10:13:12 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
Estrada (canal)
Plotted Curves for Irregular Channel

Project Description
Project File c:\felipe\calcul~1\proyec~1\guena.fm2
Worksheet Estrada (canal)
Flow Element Irregular Channel
Method Manning's Formula
Solve For Water Elevation

Constant Data
Discharge 356.01 m³/s

Input Data
Minimum Maximum Increment
Channel Slope 0.005000 0.020000 0.001000 m/m

Water Elevation vs Channel Slope

115.0
Water Elevation (m)

114.8

114.6

114.4

114.2

114.0

113.8
0.004 0.006 0.008 0.01 0.012 0.014 0.016 0.018
Channel Slope (m/m)

Dec 6, 2009 None FlowMaster v4.1c


10:14:15 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1
Estrada (canal)
Plotted Curves for Irregular Channel

Project Description
Project File c:\felipe\calcul~1\proyec~1\guena.fm2
Worksheet Estrada (canal)
Flow Element Irregular Channel
Method Manning's Formula
Solve For Water Elevation

Constant Data
Channel Slope 0.010000 m/m

Input Data
Minimum Maximum Increment
Discharge 0.00 400.00 10.00 m³/s

Water Elevation vs Discharge


115.0

114.5
Water Elevation (m)

114.0

113.5

113.0

112.5

112.0

111.5
0.0 50.0 100.0 150.0 200.0 250.0 300.0 350.0 400.0
Discharge (m³/s)

Dec 6, 2009 None FlowMaster v4.1c


10:15:03 Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666 Page 1 of 1