SUBMITTAL REVIEW COMMENTS

SRC No. A18-0393-04-MCC-CM-000-TS-6758-SRC Date: MAY 19, 2023 Page: Page 1 of 2

TO: MEGAWIDE SUEZ CONSORTIUM

ATTN: Mr. FREDERICK TAN CONTRACT: A18-0393-04

SUBMITTAL NO. & A18-0393-04MCC-CM-000-TS-6758


DATE RECEIVED: APRIL 19, 2023 REVIEWED BY: ENGR. PAUL GABY SABILLO
DESCRIPTION: PREQUALIFICATION OF INSTA STRUCTURES - REV. A
SUBMITTAL TYPE: Drawings Method Statement Sample/Catalogue Calculations
Administrative Technical Quality Control Or-Equal/Substitute
1. No Objection by Engineer, the Contractor 4. Not for Project use
can proceed with execution of corresponding
works.
2. No Objection with Minor Comments by 5. Accepted for Information only
Engineer, the Contractor can proceed with
execution of the corresponding works while
addressing the minor comments via
Resubmission.
3. Revise and Resubmit. Engineer disapproves.

CONTRACTOR’S
NO. ENGINEER’S COMMENT
RESPONSE
INSTA STRUCTURES to submit the most recent regulatory compliances for their BIR/SEC
1. registration or provide latest annual payment receipts & Business/Mayor’s Permit which
are not recent as well to submit the latest year.
INSTA STRUCTURES to present the latest registration/certificate including the updated
monthly remittances of the government entities or under the UNIFIED registration (for
2.
the like of Pag-ibig, Philhealth, & SSS) this is to ensure they are giving protection to their
employees, members and beneficiaries as mandated by the local laws & regulations.
INSTA STRUCTURES to provide their lists of clients and projects (on-going or completed)
with a validation chronicles/histories or certification issued by several of their listed
3. projects/clients stating their company is a reputed Home Building contractors for the steel
design, fabrication and erection works particularly in rendering their field of services. (List
of project/s presented is OK but Engineer needs evidence).
QMS manual presented are acceptable however company Organizational Chart of INSTA
4. STRUCTURES has to include brief resumes of the principal or their key personnel’s within
the organization.
The giving of any consent or approval of the drawing/documents shall not in any way relieve the Contractor of any of his
obligations under the Contract or his duty to ensure the correctness, accuracy, or suitability to the matter of thing which is
the subject of the consent or approval.
BLACK & VEATCH – DCCD CONSORTIUM:

PAUL GABY SABILLO/MAY 19, 2023 GARTH BEETOON/MAY 19, 2023


……………………………………………………..…………………………………… ……………………………………………………..……………………………………
PREARED BY (NAME AND DATE) NOTED BY (NAME AND DATE)

_____________________________________________________________________________________________________________________
B&V/DCCD Consortium
Unit C, 6th floor, Kalayaan Building, 164 Salcedo Street, Legazpi Village, Makati City 1229, Philippines
Tel (632) 892 4586 to 97
SUBMITTAL REVIEW COMMENTS
SRC No. A18-0393-04-MCC-CM-000-TS-6758-SRC Date: MAY 19, 2023 Page: Page 2 of 2

MEGAWIDE SUEZ CONSORTIUM ACKNOWLEDGED RECEIPT

……………………………………………………………………………….. …..………………………………………………….. ……………………………….


AUTHORISED BY (NAME AND DATE) SIGNATURE/STAMP DATE

_____________________________________________________________________________________________________________________
B&V/DCCD Consortium
Unit C, 6th floor, Kalayaan Building, 164 Salcedo Street, Legazpi Village, Makati City 1229, Philippines
Tel (632) 892 4586 to 97

You might also like