LOT 3

PROJECT TITLE : PROPOSED LANDBANK ROSARIO (CEZ) BRANCH RENOVATION


LOCATION : CAVITE EXPORT PROCESSING ZONE COMPOUND, ROSARIO, CAVITE
SUBJECT : DETAILED ESTIMATE

SCOPE OF WORKS DETAILED ESTIMATE

Qty Unit Unit Cost Total Cost


1,461,569.32
VII. AIR-CONDITIONING UNITS (ACU)
a. Supply of the following:
a.1 5.0 TR Floor Mounted, 3 phase (Inverter) 1.00 unit/s 254,419.64 254,419.64
a.2 5.0 TR Floor Mounted, 3 phase (Inverter) 1.00 unit/s 254,419.64 254,419.64
a.3 3.0 TR Ceiling Mounted (Inverter) 3.00 unit/s 118,150.00 354,450.00
a.4 2.0 TR Wall Mounted (Inverter) 1.00 unit/s 40,583.04 40,583.04
b. Installation, Testing and Commissioning Cost 1.00 lot 155,000.00 155,000.00
c. Dismantling of existing units 4.00 sets 15,000.00 60,000.00
1,118,872.32