LAYOUT PABRIK

PT.DHARMASRAYA LESTARINDO
POHON SAWIT -
HYDRANT 9
KOTAK P3K 15
Kolam no.12
P=37 m T=63m Kolam no.13 Bak Control
APAR 33
Kolam no.10 SUNGAI

Jalan Pabrik
L=35 m P=74 m T=7 m KOTO BALAI
Kolam no.8 Kolam no.9
P=52 m T=4 m
L=26 m
V=3600 m³ L=45 m
P=75 m T=4 m P=37 m T=6 m V=23000 m³
V=4600 m³
L=65 m L=20 m
V=21061 m³ V=4464 m³ Kolam no.11
P=77 m T=4 m
L=17 m
Jalur Tamu
Kolam no.6
V=5200 m³
Pagar Pabrik
P=81 m T=4 m Kolam no.4
L=67 m P=45 m T= 4m
V=9200 m³ L=41 m
V=6956 m³

Kolam No.3
P=98 m t=2 m
L=79 m
Kolam no.7
P=77 m T=3 m V=12750 m³
L=70 m
V=14560 m³
Kolam Lumpur

Kolam no.5
P=52 m T=4 m
L=39 m Kolam no.2 Kolam no.1
V=7180 m³³ P=79 m T=3 m P=36 m T=4 m
L=12 m L=6 m
V=3300m³ V=840 m³

E1011 E1012 E1011 E1012 E1011 E1012


TPS. BESI BEKAS

ST. PENGIRIMAN
Despatch
Tank

BAK FAT FIT


E1011 E1012 E1011 E1012 E1011 E1012 Vol. 270
KUMPUL
TITIK

D1
FAN ST KERNEL

D 01 D 02 D 03 D 04 D 05 D 06 D2

BST 2
Station Bunker
kernel
BST Kernel
TOC

R.Despatch
ST Boiler
E1011 E1012 E1013 E1014 E1015 E1016

Station Press Station Clarification


BST 1 BST SOFTE
E1022 E1021 E1020 E1019 E1018 E1017 CPKO NER
Tungku
KUMPUL

Bakar
TITIK

ST Bunch
Station Engine Room Station Thressing Press
FEED
TANK
E1023 E1024 E1025 E1026 E1027 E1028
Mechanical
Workshop

L.B3
G. Material

G.BStore
Mushola

E1035 E1034 E1033 E1032 E1031 E1030 G. Calsium G. PKE ST KCP

3
Electric
Workshop

oli
G.
ST.Sterilizer
Loadimg Ramp Discharge Conveyor

Labor R1 R2 R3 R4 R5
PARKIR
Pos Security
Loadimg Ramp

G. Tanggap
TITIK Darurat WTP
KUMPUL
Sortasi CHI
MN
EY
Tanki Air
Baku
Tanki Air
Bersih
Water Basin
JembatanTimbang 1 & 2 ST. TOC
CONDENSATE
TOILET

Kantor Kantor baru


Administrasi

WATER INTEK
PARKIR
GH

CM
C 06 C 05 C 04 C 03 C 02 C 01