OBSERVATIONS ON PLOT PLAN, DETAILED

DRAWING AND AS-BUILT SURVEY


TABLE OF CONTENTS

1 INTRODUCTION ........................................................................................................ 1

2 OBSERVATIONS ...................................................................................................... 2

ANNEXURE – I COMPARISION OF FOUNDATION DETAILED DRAWING AND


PLOT PLAN

ANNEXURE - II COMPARISION OF SITE MEASUREMENT SURVEY AND PLOT


PLAN

ANNEXURE – III PLOT PLAN COORDINATES MARKING AS PER MEASUREMENT


SURVEY

ANNEXURE - IV REFERENCE DOCUMENTS


1- INTRODUCTION:

This document represents the comparison of locations and coordinates of equipment. It


is observed during review of documents that equipment and pipe sleeper’s coordinates
are contradicting in Unit Plot Plan Produced Water Treatment (Reference Drawing No.
GB1082-MSK-240-CV-GA-002 (Revision: D), SITE MEASURMENT SURVEY
(Reference Drawing No. GB1516-SAC-240-CV-RP-0001) and Detailed Drawings of
Equipment’s (Reference are mentioned as follows:
1. CHEMICAL INJECTION PACKAGE CPF BADRA FOUNDATION PLAN DRAWING
(U-24001 TO U-24005) [GB1082-MSK-240-CV-PL-007 (Revision: IFC-0)]
2. RECOVERD OIL FOUNDATION (V-24001) ARRANGEMENT PLAN (PWT)
[GB1082-MSK-240-CV-PL-009 (Revision: IFC-0)]
3. PRODUCED WATER TREATMENT PLATFORM FOUNDATION LAYOUT PLAN
(PWT) (U-24101) GB1082-MSK-241-CV-PL-003 (Revision: IFC-0)
4. HCU FEED PUMP FOUNDATION PLAN P-24410 A-B [GB1082-MSK-244-CV-PL-
001 (Revision: IFC-0)]
5. PIPE RACK STEEL STRUCTURE PLAN (PWT) [GB1082-MSK-240-CS-PL-002
(Revision: RE IFC-2)]
6. MARKING SCHEME & PIPE SLEEPER DETAIL DRAWING FOR PWT AREA
[GB1082-MSK-240-CV-GA-005 (Revision: RE IFC-2)]
In this document detail drawings are referred as drawings mentioned above from 1
to 6 and Plot plan is referred as Unit Plot Plan Produced Water Treatment and As
built is referred as Site measurement Survey.

Client : GAZPROM
EPC Contractor : SUHOOL AZMER COMPANY
Consultant : PETROCHEMICAL ENGINEERING CONSULTANTS
2- OBSERVATIONS:

The comparison is done to check the affirmation of layout of equipment to the Plot Plan, as it
is necessary to first freeze or fix the plot plan as in order to continue further working. Locations
of equipment must be as per layout otherwise there will be future challenges in piping
construction. Errors observed in comparison are mention as follows in accordance with
equipment.

1.) CHEMICAL INJECTION PACKAGE CPF BADRA FOUNDATION PLAN DRAWING (U-
24001 TO U-24005):
 There is an error of 5 mm in shorter dimension of foundation in plot plan.
 The coordinates vary by 11 mm in east direction and 4 mm in north direction.
 The difference in coordinates of points shown in measurement survey and plot
plan have difference of 509.5 mm max in east and 153.3 max in north also there
is difference in TOC (Top of Concrete) mentioned in detail drawings and TOC
mentioned in measurement survey of 302 mm.

2.) RECOVERD OIL FOUNDATION (V-24001) ARRANGEMENT PLAN (PWT)


 Dimension have 3 mm error as it plotted on plan and in detail drawing.
 East coordinate varies by 101 mm at point P32 and North coordinate Varies by
733.1 mm at point P30. The error between TOC of measurement survey and of
detail drawing is of 302 mm

3.) PRODUCED WATER TREATMENT PLATFORM FOUNDATION LAYOUT PLAN (PWT)


(U-24101):
 There is an error of 1 mm in dimension shown in plot plan and in detail drawing.
 Coordinates of points shown in measurement survey and plot plan have too
much difference of 304.2 mm max in east and 1196.1 max in north also there
is difference in TOC (Top of Concrete) mentioned in detail drawings and TOC
mentioned in measurement survey of 362 mm.

4.) HCU FEED PUMP FOUNDATION PLAN P-24410 A-B:


 There is an error of 2 mm in dimension shown in plot plan and in detail drawing.
 HCU feed pump foundation varies by 63.7 max value in east coordinate and
59.4 max value in north coordinate, difference of elevation in as built and detail
drawing is of 162 mm.

5.) PIPE RACK PWT AREA:


 Pipe rack longer dimension differ from detail drawing by 3 mm.
 Pipe rack foundation have 25mm difference of elevation in TOC while difference
of northing is 491.9 maximum and in easting 166.3 mm maximum.

6.) MARKING SCHEME & PIPW SLEEPER DETAIL DRAWING FOR PWT AREA:
 Dimensions of pipe sleeper represent correctly in plot plan but coordinate of
pipe sleeper local coordinate varies which is represented in Annexure-I.
 Pipe sleepers foundation have their coordinate varies from 75.6 mm to 1621.0
mm in east and 7.6 mm to 1686.5 in north.
Detailed comparison of Detail Drawings and Plot plan is shown in Annexure-I. Detailed
comparison of coordinates and elevations of points marked in Measurement survey drawing
and Plot plan is attached as Annexure-II.
ANNEXURE - I
COMPARISION OF FOUNDATION DETAILED DRAWING AND PLOT PLAN

PLOT PLAN DETAIL DRAWING

CHEMICAL INJECTION PACKAGE CPF


Unit Plot Plan Produced Water Treatment
BADRA FOUNDATION PLAN DRAWING (U- DIFFERENCE DIFFERENCE IN DIFFERENCE
(Reference Drawing No. GB1082-MSK-240-
NAME OF EQUIPEMENT / PIPE 24001 TO U-24005) GB1082-MSK-240-CV- IN EAST IN NORTH
REMARKS CV-GA-002 (Revision: D) DIMENSION COORDINATE COORDINATE
SLEEPER PL-007 (Revision IFC-0)
(MM) (MM) (MM)
COORDINATES COORDINATES

East North DIMENSIONS East North DIMENSIONS


Coordinate Coordinate Coordinate Coordinate
EQUIPEMENTS
CHEMICAL INJECTION PACKAGE CPF BADRA 767.575 467.57 767.575 467.57 0 0
ERROR IN DIMENSION &
FOUNDATION PLAN DRAWING (U-24001 TO 14250x3705 14260x3710 5
COORDINATES 781.824 463.864 781.835 463.86 11 4
U-24005)

RECOVERD OIL FOUNDATION (V-24001) ERROR IN DIMENSION IS NOT 777 449.13 777 449.13 0 0
5650x9107 5650x9110 3
ARRANGEMENT PLAN (PWT) MATCH
771.35 440.023 771.35 440.023 0 0
PRODUCED WATER TREATMENT PLATFORM 805.975 466.08 805.975 466.08 0 0
ERROR IN DIMENSION &
FOUNDATION LAYOUT PLAN (PWT) (U- 12650x11156 12650x11155 1
COORDINATES
24101) 793.325 454.925 793.325 454.925 0 0

HCU FEED PUMP FOUNDATION PLAN 767.471 437.995 767.471 437.995 0 0


ERROR IN COORDINATES 6400x4400 6400x4400 2
P-24410 A-B
771.870 431.593 771.871 431.595 1 2
ERROR IN DIMENSION &
PIPE RACK FOR PWT AREA 785.497 479.000 15003x1000 784.497 479.000 15000x1000 3 1000 0
COORDINATES
MARKING SCHEME & PIPE SLEEPER DETAIL DRAWING FOR PWT AREA
SL-001 ERROR IN COORDINATES 730.554 469.599 2000x300 730.555 469.858 2000x300 - 1 259
SL-002 ERROR IN COORDINATES 730.554 466.599 2000x300 730.555 466.585 2000x300 - 1 14
SL-003 ERROR IN COORDINATES 730.554 463.599 2000x300 730.555 463.585 2000x300 - 1 14
SL-004 ERROR IN COORDINATES 730.554 460.699 2000x300 730.555 460.685 2000x300 - 1 14
SL-005 ERROR IN COORDINATES 730.554 458.199 2000x300 730.555 458.185 2000x300 - 1 14
SL-006 ERROR IN COORDINATES 732.449 456.949 2500x300 732.460 456.950 2500x300 - 11 1
SL-007 ERROR IN COORDINATES 734.949 456.949 2500x300 734.960 456.950 2500x300 - 11 1
SL-008 ERROR IN COORDINATES 737.949 456.949 2500x300 737.960 456.950 2500x300 - 11 1
SL-009 ERROR IN COORDINATES 740.949 456.949 2500x300 740.960 456.950 2500x300 - 11 1
SL-010 ERROR IN COORDINATES 743.949 456.949 2500x300 743.960 456.950 2500x300 - 11 1
SL-011 ERROR IN COORDINATES 745.499 456.949 745.495 456.950 - 4 1
SL-012 ERROR IN COORDINATES 748.499 456.949 748.495 456.950 - 4 1
SL-013 ERROR IN COORDINATES 751.499 456.949 751.495 456.950 - 4 1
SL-014 ERROR IN COORDINATES 754.499 456.949 754.495 456.950 - 4 1
CULVERT CULVERT
SL-015 ERROR IN COORDINATES 757.499 456.949 757.495 456.950 - 4 1
SL-016 ERROR IN COORDINATES 760.499 456.949 760.495 456.950 - 4 1
SL-017 ERROR IN COORDINATES 763.499 456.949 763.495 456.950 - 4 1
SL-018 ERROR IN COORDINATES 764.999 456.949 765.005 456.950 - 6 1
SL-019 ERROR IN COORDINATES 767.147 456.949 2500x300 767.000 456.950 2500x300 - 147 1
SL-020 ERROR IN COORDINATES 770.299 456.949 2500x300 770.150 456.950 2500x300 - 149 1
SL-021 ERROR IN COORDINATES 773.299 456.949 2500x300 773.305 456.950 2500x300 - 6 1
SL-022 ERROR IN COORDINATES 776.299 456.949 2500x300 776.305 456.950 2500x300 - 6 1
SL-023 ERROR IN COORDINATES 779.299 456.949 2500x300 779.305 456.950 2500x300 - 6 1
SL-024 ERROR IN COORDINATES 782.299 456.949 2500x300 782.305 456.950 2500x300 - 6 1
SL-025 ERROR IN COORDINATES 785.599 465.149 3400x300 785.600 465.300 3400x300 - 1 151
SL-026 ERROR IN COORDINATES 785.599 462.149 3400x300 785.600 462.300 3400x300 - 1 151
SL-027 ERROR IN COORDINATES 785.599 459.149 3400x300 785.600 459.300 3400x300 - 1 151
SL-028 ERROR IN COORDINATES 785.599 456.149 3400x300 785.600 456.300 3400x300 - 1 151
SL-029 ERROR IN COORDINATES 785.599 454.149 3400x300 785.600 454.290 3400x300 - 1 141
SL-030 ERROR IN COORDINATES 785.599 451.149 3400x300 785.600 451.300 3400x300 - 1 151
SL-031 ERROR IN COORDINATES 785.599 448.149 3400x300 785.600 448.300 3400x300 - 1 151
SL-032 ERROR IN COORDINATES 785.599 445.149 3400x300 785.600 445.300 3400x300 - 1 151
SL-033 ERROR IN COORDINATES 785.599 442.149 3400x300 785.600 442.300 3400x300 - 1 151
SL-034 ERROR IN COORDINATES 785.599 439.149 3400x300 785.600 439.300 3400x300 - 1 151
SL-035 ERROR IN COORDINATES 785.599 436.149 3400x300 785.600 436.300 3400x300 - 1 151
SL-036 ERROR IN COORDINATES 785.599 433.149 3400x300 785.600 433.300 3400x300 - 1 151
SL-037 ERROR IN COORDINATES 785.799 428.649 3400x300 785.600 430.300 3400x300 - 199 1651
SL-038 ERROR IN COORDINATES 781.769 438.448 950x300 783.465 438.450 950x300 - 1696 2
SL-039 ERROR IN COORDINATES 778.275 438.448 950x300 778.270 438.450 950x300 - 5 2
SL-040 ERROR IN COORDINATES 775.275 438.448 950x300 775.270 438.450 950x300 - 5 2
SL-041 ERROR IN COORDINATES 772.26 438.448 950x300 772.770 438.450 950x300 - 510 2
SL-042 NOT MENTION 729.010 438.450 750x300 - - -
ANNEXURE – II
COMPARISION OF SITE MEASUREMENT SURVEY AND PLOT PLAN

PLOT PLAN
As per SITE MEASUREMENT SURVEY
[Reference Drawing No.
Reference Document Number: DIFFERENCE (mm)
GB1082-MSK-240-CV-GA-002
GB1516-SAC-240-CV-RP-0001
(Revision: D)]
East (M) North (M) TOC (M) Dimension East (M) North (M) TOC (M) East North TOC
Foundation Name S.No
Coordinate Coordinate Elevation (mm) Coordinate Coordinate Elevation Coordinate Coordinate Elevatio
P1 805.9228 466.1201 805.9755 466.0792 52.7 40.9
P2 799.6434 466.1412 799.6505 466.0792 7.1 62.0
P3 793.2293 466.1181 793.3255 466.0792 96.2 38.9
P4 793.2289 460.7903 12707.6x 793.3255 460.5012 96.6 289.1
PWT SKID 98.738 99.10 362
P5 793.2161 454.9279 11192.2 793.3255 454.9232 109.4 4.7
P6 799.9547 454.9137 799.6505 454.9232 304.2 9.5
P7 805.9009 454.9311 805.9755 454.9232 74.6 7.9
P8 805.9311 459.3051 805.9755 460.5012 44.4 1196.1
P9 782.2507 468.1226 782.3296 468.0724 78.9 50.2
P10 774.3710 468.1283 774.6996 468.0724 328.6 55.9
P11 766.9928 468.1312 767.0696 468.0724 76.8 58.8
P12 766.9869 463.3759 767.0696 463.3624 82.7 13.5
P13 774.5305 463.3682 774.6996 463.3624 169.1 5.8
P14 782.2522 463.3700 782.3296 463.3624 77.4 7.6
15263.8x
CHEMICAL INJECTION SKID P15 782.2521 465.5641 98.648 782.3296 465.7174 98.95 77.5 153.3 302
4746.7
P16 781.7949 463.8567 781.8246 463.8649 29.7 8.2
P17 781.8067 467.6092 781.8246 467.5699 17.9 39.3
P18 774.1901 467.6141 774.6996 467.5699 509.5 44.2
P19 774.6558 463.8508 774.6996 463.8649 43.8 14.1
P20 767.5209 463.8597 767.5746 463.8649 53.7 5.2
P21 767.5267 467.6210 767.5746 467.5699 47.9 51.1
P22 777.4253 449.6684 777.4995 449.6314 74.2 37.0
P23 774.2647 449.6669 774.1745 449.6314 90.2 35.5
P24 770.7672 449.6715 770.8495 449.6314 82.3 40.1
P25 770.7622 439.5385 770.8495 439.5214 87.3 17.1
P26 777.4231 439.5359 777.4995 439.5214 76.4 14.5
P27 777.4255 444.1505 777.4995 444.5764 74.0 425.9
P28 776.9267 445.3095 6663.1x 776.9995 444.5764 72.8 733.1
OIL RECOVERY 98.648 98.95 302
P29 774.2580 449.1664 10129.9 774.1745 449.1299 83.5 36.5
P30 776.9248 449.1751 776.9995 449.1299 74.7 45.2
P31 771.2552 449.1677 771.3495 449.1299 94.3 37.8
P32 771.2485 440.0275 771.3495 440.0229 101.0 4.6
P33 774.0771 440.0310 774.1745 440.0229 97.4 8.1
P34 774.1829 439.5408 774.1745 439.5214 8.4 19.4
P35 776.9168 440.0250 776.9995 440.0229 82.7 2.1
P36 771.8316 438.0435 771.8705 437.9932 38.9 50.3
P37 767.4235 438.0526 4424.8x 767.4705 437.9932 47.0 59.4
HCU PUMP 98.738 98.90 162
P38 767.4068 431.6329 6410.6 767.4705 431.5932 63.7 39.7
P39 771.8214 431.6354 771.8705 431.5932 49.1 42.2
P40 784.6409 471.2436 784.6976 471.2002 56.7 43.4
P41 786.2596 471.8360 1611.9x 786.2976 471.8002 38.0 35.8
PIPE RACK CROSS ROAD 98.80 98.775 25
P42 786.2052 486.8359 589.6 786.2346 486.7352 29.4 100.7
P43 784.5933 486.2463 784.7596 486.7382 166.3 491.9
P44 779.7925 470.1897 780.2996 468.9699 507.1 1219.8
P45 778.3767 468.7779 778.8996 467.5699 522.9 1208.0
P46 776.9873 470.2084 777.4996 468.9699 512.3 1238.5
P47 775.5829 468.7809 776.0996 467.5699 516.7 1211.0
P48 774.1850 468.7737 1399.4x 774.6996 467.5699 514.6 1203.8
Chemical Pits 98.863 98.863 0.0
P49 772.7890 470.1914 1427.5 773.2996 468.9699 510.6 1221.5
P50 771.3828 468.7817 771.8996 467.5699 516.8 1211.8
P51 769.9678 470.2005 770.4996 468.9699 531.8 1230.6
P52 768.5726 468.7709 769.0996 467.5699 527.0 1201.0
P53 767.1732 470.1984 767.6996 468.9699 526.4 1228.5
COMPARISION OF SITE MEASUREMENT SURVEY AND PLOT PLAN

As per SITE MEASUREMENT SURVEY PLOT PLAN


Reference Document Numbe: [Reference Drawing No. DIFFERENCE (mm)
GB1516-SAC-240-CV-RP-0001 GB1082-MSK-240-CV-GA-002 (Revision: D)]

East (M) North (M) TOC (M) Dimensions East (M) North (M) TOC (M) Dimensions East North TOC
PIPE SLEEPERS #
Coordinate Coordinate Elevation (mm) Coordinate Coordinate Elevation (mm) Coordinate Coordinate Elevation
240-SL-019 766.7676 456.9777 99.008 2500x300 767.147 456.949 99.00 2500x300 379.4 28.7 8.0
240-SL-020 769.9303 457.0015 99.003 2500x300 770.299 456.949 99.00 2500x300 368.7 52.5 3.0
240-SL-021 773.0707 456.9985 99.013 2500x300 773.299 456.949 99.00 2500x300 228.3 49.5 13.0
240-SL-022 776.0754 456.9732 99.008 2500x300 776.299 456.949 99.00 2500x300 223.6 24.2 8.0
240-SL-023 779.0852 456.9869 99.003 2500x300 779.299 456.949 99.00 2500x300 213.8 37.9 3.0
240-SL-024 782.0694 456.9612 99.008 2500x300 782.299 456.949 99.00 2500x300 229.6 12.2 8.0
240-SL-025 785.5234 465.3454 98.998 3400x300 785.599 465.149 99.00 3400x300 75.6 196.4 2.0
240-SL-026 785.5197 462.3526 99.003 3400x300 785.599 462.149 99.00 3400x300 79.3 203.6 3.0
240-SL-027 785.5182 459.3463 99.003 3400x300 785.599 459.149 99.00 3400x300 80.8 197.3 3.0
240-SL-028 785.5342 456.3507 99.008 3400x300 785.599 456.149 99.00 3400x300 64.8 201.7 8.0
240-SL-029 785.5162 454.3364 99.003 3400x300 785.599 454.149 99.00 3400x300 82.8 187.4 3.0
240-SL-030 785.4806 451.3417 99.003 3400x300 785.599 451.149 99.00 3400x300 118.4 192.7 3.0
240-SL-031 785.5041 448.337 99.008 3400x300 785.599 448.149 99.00 3400x300 94.9 188.0 8.0
240-SL-032 785.5104 445.3467 99.003 3400x300 785.599 445.149 99.00 3400x300 88.6 197.7 3.0
240-SL-033 785.5038 442.3361 99.003 3400x300 785.599 442.149 99.00 3400x300 95.2 187.1 3.0
240-SL-034 785.5149 439.3285 99.008 3400x300 785.599 439.149 99.00 3400x300 84.1 179.5 8.0
240-SL-035 785.5095 436.3335 99.008 3400x300 785.599 436.149 99.00 3400x300 89.5 184.5 8.0
240-SL-036 785.5145 433.3301 99.003 3400x300 785.599 433.149 99.00 3400x300 84.5 181.1 3.0
240-SL-037 785.5292 430.3355 98.998 3400x300 785.799 428.649 99.00 3400x300 269.8 1686.5 2.0
240-SL-038 783.39 438.4662 98.803 950x300 781.769 438.448 98.80 950x300 1621.0 18.2 3.0
240-SL-039 778.2191 438.4643 98.803 950x300 778.275 438.448 98.80 950x300 55.9 16.3 3.0
240-SL-040 775.2157 438.4556 98.798 950x300 775.275 438.448 98.80 950x300 59.3 7.6 2.0
240-SL-041 772.875 438.4779 98.803 950x300 772.269 438.448 98.80 950x300 606.0 29.9 3.0
ANNEXURE – III
FOUNDATIONS COORDINATES LAYOUT
SLEEPERS COORDINATES LAYOUT
ANNEXURE – IV
EPC FOR INSTALLATION OF PWT, CPF
BADRA, REPUBLIC OF IRAQ
SITE MEASUREMENT SURVEY

Doc. No.: GB1516-SAC-240-CV-RP-0001 Rev.: B Page 1 of 5

DOCUMENT DETAILS
EMPLOYER CONTRACT NO. : 1516-23-BD-850-00

PROJECT TITLE : EPC for Installation of PWT, Republic of Iraq

EMPLOYER : Gazprom Neft Badra B.V.


CONTRACTOR : Suhool Azmer Company. Ltd
CONTRACT JOB NO. : SAC
PROJECT DOCUMENT NO. : GB1516-SAC-240-CV-RP-0001
REVISION NO. : B No. of pages: 5

DOCUMENT DESCRIPTION : Site Measurement Survey

REVISION DETAILS

B Issued for Approval 25/08/2023 Mohammed Redha Ossama. B.H Bassim Qassim
A Issued for Review 25/07/2023 Mohammed Redha Ossama. B.H Bassim Qassim

REV DESCRIPTION DATE PRPD CHKD APPD


EPC FOR INSTALLATION OF PWT, CPF
BADRA, REPUBLIC OF IRAQ
SITE MEASUREMENT SURVEY

Doc. No.: GB1516-SAC-240-CV-RP-0001 Rev.: B Page 2 of 5

REVISION RECORD

Rev. Para. Revision Description


A Issued for Review

B Issued for Approval

Hold No Para. Description of Hold


KEY PLAN
M88 E 941.246
N 760.038
H 102.452
E 798.244
N 732.995
295-BAP-001

T.O.G. +100.450 T.O.G. +100.450 T.O.G. +100.450

T.O.F. +98.150
T.O.F. +98.150 B.O.F. +97.650

291-STR-01-D 291-STR-01-E
B.O.F. +97.650
291-STR-01-C
GB090-2614-291-CV-GA-2041
GB090-2614-291-CV-GA-2031 GB090-2614-291-CV-GA-2021_0

t.o.c 98.150
b.o.f 97.650 T.O.G. +100.450 T.O.G. +100.450 T.O.G. +100.450
T.O.G. +100.450

t.o.g. 100.475 t.o.g. 100.475 t.o.g. 100.475 t.o.g. 100.475


B.O.F. +98.150
T.O.F. +97.650
T.O.F. +98.150 T.O.F. +98.150
B.O.F. +97.650 B.O.F. +97.650

H 102.607
98500
F-29502A F-29502B

U-29502
B.O.F -- 98.80
T.O.G 100.475 B.O.F -- 98.80
T.O.G 100.475

F-29502A F-29502A
291-PR-04

BenchMark
U-29104 T.O.G - 100.475
B.O.F - 98.80
T.O.G - 100.475
B.O.F - 98.80

98500 T.O.G. +100.450


T.O.F. +100.300 T.O.F. +100.300

E 798.247
t.o.g 100.300
GB090-2614-291-CV-GA-2001
291-STR-01-A T.O.F. +98.250
B.O.F. +97.650 291-STR-01-B
P-29102A
b.o.f 97.500
GB090-2614-291-CV-GA-2011_0
291-PR-01-SR-01
GB090-2614-291-CV-GA-1501_0

291-ST-01
T.O.G. - 100.450
B.O.F. - 99.150
T.O.F. +100.300 T.O.F. +100.300

t.o.g 100.450 T.O.F. +98.250 T.O.F. +98.250

GB090-2614-291-CV-GA-3001 B.O.F. +97.650 B.O.F. +97.650

T-29101
t.o.c 98.150 t.o.c 98.150 t.o.c 98.150
P-29102B t.o.c 98.150 b.o.f 97.650 b.o.f 97.650 b.o.f 97.650
b.o.f 97.650

HE-29510A HE-29510B
T.O.G. +100.450

98500 T.O.G. - 100.450


B.O.F. - 99.150 T.O.F. +98.250

N 724.701
B.O.F. +97.650

t.o.c 98.150 t.o.c 98.150


b.o.f 97.650 b.o.f 97.650

P12
V-29504
T.O.G. +100.450 T.O.G. +100.450
T.O.C. - 96.285 T.O.C. - 96.86 T.O.C. - 97.09

B.O.F. - 95.785 B.O.F. - 96.59 T.O.F. +98.250 T.O.F. +98.250


B.O.F. +97.650 B.O.F. +97.650

H 103.820
P9 P13 P13 P11 P11 P11 P11 P11

T.O.G 99.950

T.O.G 100.300 T.O.G 100.300

212-AT-19007 T.O.G 100.300

toc 100.450 T.O.F 97.200

291-PR-02-A

PIPERACK 200-PR-03-A
P9
T.O.G 99.950

P13 P13 P11 P11 P11 P11 P11


T.O.F 97.200

291-STR-04 S-29501 T.O.G - 100.45 T.O.G - 100.45

212-PR-01-D
M-29102A M-29102B M-29102C

291-PR-01-SR-02 P-29503A P-29503B P-29505A P-29505B


T.O.G. - 100.45

B.O.F. - 97.65
T.O.C. 98.05 T.O.G 100.420

V-29103 t.o.g. 100.45


t.o.g. 100.45 t.o.g. 100.45 t.o.g. 100.45 t.o.g. 100.45 t.o.g. 100.45 T.O.G - 100.45 T.O.G - 100.45 T.O.C 97.750
B.O.F - 97.65
T.O.C 98.15 B.O.F 97.250
T.O.G. - 100.45

B.O.F. - 98.65
T.O.C. 99.05

P-29504A
t.o.c. 98.15
b.o.f. 97.65

t.o.c. 98.25
T.O.G 99.950 b.o.f. 97.65
b.o.f. 98.25
t.o.c. 97.65 b.o.f. 98.25
t.o.c. 97.65 b.o.f. 98.25
t.o.c. 97.65

T.O.F 97.200
GB090-2614-291-CV-GA-2301

t.o.g. 100.45 t.o.g. 100.45 t.o.g. 100.45 t.o.g. 100.45 T.O.G 100.420
t.o.g. 100.45 t.o.g. 100.45

T.O.C 97.900
B.O.F 97.400
b.o.f. 98.15
t.o.c. 97.65

C-29501 C-29502

P-29504B
T.O.G 99.950 T.O.G.100.450 T.O.C. 100.450

T.O.F 97.200

T.O.C.98.200
B.O.F 97.000

t.o.g. 100.45 t.o.g. 100.45 t.o.g. 100.45 t.o.g. 100.45 t.o.g. 100.45 t.o.g. 100.45
C-29501
t.o.c. 98.25
b.o.f. 98.25
t.o.c. 97.65 b.o.f. 97.65 b.o.f. 98.25
t.o.c. 97.65 B.O.F. 96.700
t.o.c. 98.15 T.O.C. 97.500 T.O.G 100.420
b.o.f. 97.65

b.o.f. 98.35
t.o.c. 97.65
T.O.G. - 100.45

B.O.F. - 98.65
T.O.C. 99.05
T.O.G. - 100.45 T.O.G. - 100.45

T.O.G. - 100.45 T.O.G. - 100.45


C-29502 T.O.C 97.900
B.O.F 97.400

B.O.F. - 98.65
T.O.C. 99.05 B.O.F. - 98.65
T.O.C. 99.05

291-STR-04_1 U-29103
T.O.G 99.950
HE-29103/4/5

T.O.F 97.100 102.759 102.931

t.o.g 102.624 t.o.g 102.790

T.O.G. - 100.45 T.O.G. - 100.45


T.O.G. - 100.45 T.O.G. - 100.45 T.O.G. - 100.45 T.O.G - 100.45
B.O.F. - 98.65
T.O.C. 99.05 B.O.F - 98.65
291-PR-05 A
B.O.F. - 98.65
T.O.C. 99.05

B.O.F. - 98.65
T.O.C. 99.05
291-ST-02 T.O.G 100.420

T.O.C 97.900
B.O.F 97.400

t.o.g. 100.45 t.o.g. 100.45 t.o.g. 100.45 t.o.g. 100.45 t.o.g. 100.45

291-PR-05-B
T.O.G. - 100.30 T.O.G. - 100.30 T.O.G. - 100.30

GB090-2614-291-CV-GA-1331
B.O.F. - 98.40
T.O.C. 98.90 B.O.F. - 98.40
T.O.C. 98.90 B.O.F. - 98.40
T.O.C. 98.90
T.O.C 97.900
B.O.F 97.400
T.O.C 97.900
t.o.g. 100.45 t.o.g. 100.45 t.o.g. 100.45 t.o.g. 100.45 t.o.g. 100.45 B.O.F 97.400

V-26703

291-PR-03-B
291-STR-06 t.o.c. 98.25
b.o.f. 97.65
t.o.c. 98.25
b.o.f. 97.65
t.o.c. 98.25
b.o.f. 97.65
b.o.f. 98.35
t.o.c. 97.65

t.o.g. 100.45
t.o.g. 100.45 t.o.g. 100.45

t.o.c. 98.15 t.o.c. 98.15t.o.g.


98.15
b.o.f. 97.65 b.o.f. 97.65

T.O.G - 101.20 T.O.G - 101.20

B.O.F - 98.65 B.O.F - 98.65

B.O.F 97.400
T.O.C 97.900
T.O.C 97.900
B.O.F 97.400

291-STR-03
GB090-2614-291-CV-GA-2201 U-29101

F-29101A/B F-29101A/B
104.277 104.036 104.036 104.050 104.016

100.450 100.450
100.450 100.450

B.O.F -- 97.650
T.O.G 100.490 B.O.F -- 97.650
T.O.G 100.490

274-PR-04
GB090-2614-274-CV-GA-1401
A B

M83 BM GPNB
274-PR-03
GB090-2614-274-CV-GA-1101

GB090-2614-291-CV-GA-1321
291-PR-03-A
97.6

E 798.239
t.o.g. 100.050

292-STR-01-D
GB090-2614-292-CV-GA-2031
292-STR-01-E
GB090-2614-292-CV-GA-2041
292-STR-01-C
GB090-2614-291-CV-GA-2021_0 296-BAP-001

SS-000-04
t.o.g. 100.075 t.o.g. 100.075 t.o.g. 100.075 t.o.g. 100.075

t.o.g 101.397 t.o.g 101.397 t.o.g 101.602 t.o.g 101.562 t.o.g 100.050
F-29602A F-29602B

t.o.g 101.765

U-29602
b.o.f. 98.250

N 636.993
t.o.c 98.050
b.o.f 97.250

T.O.G. +99.900

GB090-2614-292-CV-GA-1411
T.O.G. +100.050

292-PR-04-B
292-STR-01-B
P-29202A
GB090-2614-292-CV-GA-2011_0
292-PR-01-SR-01
GB090-2614-292-CV-GA-1501_0
B.O.F. -- 98.750
T.O.G. 100.050

P-29202B

T.O.G. +100.050

Name E N
B.O.F. -- 98.750
T.O.G. 100.050

T.O.G. - 100.05 T.O.G. - 100.05

ELEVATION
T.O.C. - 97.65 T.O.C. - 97.65

H 102.191
HE-29610A HE-29610B

V-29604 T.O.G 99.900

T.O.G. - 100.05
T.O.F 97.600
B.O.F 97.100

292-PR-04-A
GB090-2614-292-CV-GA-1401

T.O.G 99.900 T.O.G 99.900 T.O.G 99.900 T.O.G 99.900 T.O.G 99.900 T.O.G 99.900

T.O.F 97.800 T.O.F 97.900 T.O.F 97.800 T.O.F 97.800 T.O.F 97.800 T.O.F 98.100
B.O.F 97.100 B.O.F 96.900 B.O.F 97.100 B.O.F 97.100 B.O.F 97.100 B.O.F 97.100

R31-14
292-STR-04 S-29601 T.O.G - 100.05 T.O.G - 100.05

T.O.G. - 100.05 292-PR-01-SR-02


P-29603A P-29603B P-29605A P-29605B
B.O.F. - 97.25
T.O.C. 97.65

V-29203
t.o.g. 100.45 t.o.g. 100.45 t.o.g. 100.45 t.o.g. 100.45 t.o.g. 100.45 t.o.g. 100.45 T.O.G - 100.05 T.O.G - 100.05
T.O.C - 97.75
T.O.G. - 100.05 B.O.F - 97.25
1 292-ST-02
B.O.F. - 98.25
T.O.C. 98.65
292-STR-02 GB090-2614-292-CV-GA-3101
P-29604A
t.o.c. 98.15
b.o.f. 97.65
GB090-2614-292-CV-GA-2101
t.o.c. 98.25
b.o.f. 97.65
t.o.c. 98.25 t.o.c. 98.25 t.o.c. 98.25
b.o.f. 97.65 b.o.f. 97.65 b.o.f. 97.65

GB090-2614-291-CV-GA-2301

t.o.g. 100.45 t.o.g. 100.45 t.o.g. 100.45 t.o.g. 100.45 t.o.g. 100.45 t.o.g. 100.45

t.o.c. 98.15
b.o.f. 97.65

P-29604B
T.O.G.100.050 T.O.C. 100.050

T.O.C.97.250
B.O.F 96.750

t.o.g. 100.45
C-29601

E 732.990
t.o.g. 100.45 t.o.g. 100.45 t.o.g. 100.45 t.o.g. 100.45 t.o.g. 100.45

t.o.c. 98.25 b.o.f. 98.25


t.o.c. 97.65 t.o.c. 98.25 B.O.F. 96.450
b.o.f. 97.65 b.o.f. 97.65 T.O.C. 97.250
b.o.f. 98.15
t.o.c. 97.65

M83 798.239 636.993 102.191


t.o.c. 98.35
T.O.G. - 100.05 T.O.G. - 100.05 T.O.G. - 100.05 b.o.f. 97.65

T.O.C. - 98.65
B.O.F. - 98.25
T.O.G. - 100.05 T.O.G. - 100.05 C-29602
B.O.F. - 98.25
T.O.C. 98.65 B.O.F. - 98.25
T.O.C. 98.65

292-Str-04
HE-29203 U-29203
SATELLITE CONTROL CENTER-5 BL-000-21 102.359 102.525

t.o.g 102.224 t.o.g 102.390

T.O.G. - 100.05 T.O.G. - 100.05


T.O.G. - 100.05 T.O.G. - 100.05 T.O.G. - 100.05
B.O.F. - 98.25
T.O.C. 98.65 B.O.F -- 98.25
T.O.G 100.05
T.O.C. - 98.65
B.O.F. - 98.25
B.O.F. - 98.25
T.O.C. 98.65

t.o.g. 100.45 t.o.g. 100.45 t.o.g. 100.45 t.o.g. 100.45 t.o.g. 100.45

N 622.326
292-STR-06 P1

GB090-2614-292-CV-GA-2501 t.o.g. 100.45 t.o.g. 100.45 t.o.g. 100.45 t.o.g. 100.45 t.o.g. 100.45

b.o.f. 98.25
t.o.c. 97.65 b.o.f. 98.25
t.o.c. 97.65 b.o.f. 98.25
t.o.c. 97.65
t.o.c. 98.35
b.o.f. 97.65

t.o.g 100.050

t.o.g. 100.45 t.o.g. 100.45


t.o.g. 100.45

b.o.f. 98.15
t.o.c. 97.65 b.o.f. 98.15
t.o.c. 97.65

T.O.G - 100.80 T.O.G - 100.80

B.O.F - 98.25 P1 B.O.F - 98.25

U-29201

100.152
F-29201A/B F-29201A/B bolt 103.488 bolt 103.488
bolt 103.770

bolt 103.767

t.o.g 103.877 t.o.g 103.636 t.o.g 103.636 t.o.g 103.650 t.o.g 103.616

t.o.g 99.500 t.o.g 99.500

t.o.c 97.000
b.o.f 96.500

292-PR-02-B
GB090-2614-292-CV-GA-1111
B.O.F -- 97.250
T.O.G 100.090 B.O.F -- 97.250
T.O.G 100.090

T.O.G 99.550

T.O.G 99.550

T.O.G 99.550

T.O.G 99.550

T.O.G 99.550

T.O.G 99.550
T.O.F 97.500

T.O.F 97.500

T.O.F 97.500

T.O.F 97.500

T.O.F 97.500

T.O.F 97.500
t.o.g 99.500 t.o.g 99.500

t.o.c 97.100
b.o.f 96.500

R31-14 732.990 622.326 99.938

GB090-2614-256-CV-GA-1011
256-PR-01-A
t.o.g 99.500 t.o.g 99.500
V-26401

b.o.f 96.600
t.o.c 96.000

t.o.g 99.500 t.o.g 99.500

T.O.C. 92.11

t.o.c 96.500
b.o.f 96.000

T.O.C. 89.45
B.O.F. 88.55

T.O.C. 99.40

t.o.g. 99.350 t.o.g. 99.350

t.o.c. 97.500
b.o.f. 97.000

T.O.G. - 99.50 T.O.G. - 99.50

T.O.C. - 97.20 T.O.C. - 97.20


B.O.F. - 96.70 B.O.F. - 96.70

TOC 99.125

256-Str-01
HP FLARE KO DRUM V-23101

BM SAC
t.o.g. 99.350 t.o.g. 99.350

t.o.c. 97.500
b.o.f. 97.000 T.O.G. - 99.50 T.O.G. - 99.50

T.O.C. - 97.20 T.O.C. - 97.20


B.O.F. - 96.70 B.O.F. - 96.70

TOC 99.125

toc 99.095

t.o.g. 99.350 t.o.g. 99.350

toc 99.125

t.o.c. 97.500
b.o.f. 97.000
LP FLARE KO DRUM V-23001

GB090-2614-256-CV-GA-1021
toc 99.125
256-PR-01-B

BM: BenchMark
toc 99.095

V-22901

229-GP-020

NAME E N ELEVATION
t.o.g. 99.350 t.o.g. 99.350

t.o.c. 97.500
b.o.f. 97.000

t.o.g. 99.350 t.o.g. 99.350

t.o.c. 97.500
b.o.f. 97.000

t.o.g. 99.350 t.o.g. 99.350

t.o.c. 97.500
b.o.f. 97.000

BM1 786.136 497.746 99.171


t.o.g 99.100 t.o.g 99.150 t.o.g 99.150 t.o.g 99.150 t.o.g 99.150

256-PR-01-D 256-PR-01-C
GB090-2614-256-CV-GA-1041 1

t.o.g 99.100 t.o.g 99.100 t.o.g 99.100

t.o.c 97.500 t.o.c 97.500 t.o.c 97.500 t.o.c 97.500 t.o.c 97.500 t.o.c 97.500 t.o.c 97.500 t.o.c 97.500 t.o.c 97.500

t.o.g. 99.000

t.o.c. 97.100

E=786.136
E=786.076 N=497.746
GB090-2614-256-CV-GA-1051

804.809 465.030 99.186


256-PR-01-E

E=804.809 BM2
4

N=471.379 TOC 98.695


3

TOC 99.100

TOC 99.100
PWT Skid
TOC 99.100

TOC 99.100
TOC 98.70
2

TOC 99.100

TOC 99.100

N=465.030
t.o.g. 99.000

TOC 99.100 TOC 99.100 TOC 99.100

TOC 99.100 TOC 99.100 TOC 99.100 TOC 99.100

Vessel
TOC 99.100 TOC 99.100 TOC 99.100 TOC 99.100

t.o.g 98.850

U-24101
t.o.c 97.100

BM3 794.317 465.026 99.195


t.o.g 98.850
TOC 98.95
tank
t.o.c 97.100

V-24001
t.o.g 98.850

t.o.c 97.100
GB090-2614-256-CV-GA-1061
256-PR-01-F

TOC 98.90

t.o.g 98.850

t.o.c 97.100

HCU Feed Pump

E=794.317 98.913
t.o.g 98.850

t.o.c 97.100

P-24410A/B

N=465.026 BM4 786.076 471.379


t.o.g 98.850

t.o.c 97.100

t.o.g 98.850

t.o.c 97.100

T.O.G 98.650

T.O.C 97.100
B.O.F 96.600

LEGEND
GB090-2614-256-CV-GA-1071
256-PR-01-G

T.O.G 98.650

T.O.C 97.100
B.O.F 96.600

PROPANE SHELTER U-22901


Ignition & control panel
U-23001 & U-23101
Ignition & control panel

98.405

98.405
T.O.G 98.650

PIPE SUPPORTS IN IGNITION PANEL AREA


T.O.C 97.100
B.O.F 96.600

T.O.G 98.650

T.O.C 97.100
B.O.F 96.600

T.O.G 98.650

T.O.C 97.100
B.O.F 96.600

256-PR-01-I
256-PR-01-J

T.O.C. +98.750 T.O.C. +98.750 T.O.C. +98.750 T.O.C. +98.750 T.O.C. +98.750 T.O.C. +98.750 T.O.C. +98.750 T.O.C. +98.750 T.O.C. +98.750 T.O.C. +98.750 T.O.C. +98.750 T.O.C. +98.750 T.O.C. +98.750 T.O.C. +98.750 T.O.C. +98.750

B.O.F. +96.600 B.O.F. +96.600 B.O.F. +96.600 B.O.F. +96.600 B.O.F. +96.600 B.O.F. +96.600 B.O.F. +96.600 B.O.F. +96.600 B.O.F. +96.600 B.O.F. +96.600 B.O.F. +96.600 B.O.F. +96.600 B.O.F. +96.600 B.O.F. +96.600 B.O.F. +96.600

T.O.C 98.850

T.O.C 97.100
B.O.F 96.600

5
256-PR-01-K

T.O.C 98.850

T.O.C 97.100
B.O.F 96.600

Tank flare fan air duct

T.O.C 98.850
T.O.C 98.850

T.O.C 97.100
B.O.F 96.600

T.O.C 97.100
B.O.F 96.600

U-22901
T.O.C 98.850

T.O.C 98.850
T.O.C 97.100
B.O.F 96.600
T.O.C 97.100
B.O.F 96.600

U-23101

Project Description
EPC FOR INSTALLATION
OF PWT AND AT CPF
BADRA REPUBLIC OF
IRAQ
Project No. GB1516 Contract No. 1516-23-BD-850-00 Job No. SAC
Drawing Title

Site Measurement Survey

Drawing Sheet Sheets Scale


No.
GB1516-SAC-240-CV-RP-0001 01 03 NTS

This document has been developed by Shuool Azmer Company. Ltd as part of contractual obligations under
contract 1516-23-db-850-00 and is the exclusive property of Gazprom Neft badra B.V. It is to be used for the purpose
for which it is lent and must not be copied or used in any way detrimental to the interest of this company and subject
to returning on demand
KEY PLAN

Centerlines Coordination For Pipe Sleepers

Pipe Sleeper Local Coordinate


PIPE EAST NORTH
S.NO. SLEEPER TAG COORDI COORDI TOC REMARKS
NUMBER NATE NATE
1 240-SL-001 Not Install
2 240-SL-002 Not Install
3 240-SL-003 Not Install
4 240-SL-004 Not Install
NOTES
5 240-SL-005 Not Install
6 240-SL-006 Not Install
7 240-SL-007 Not Install
8 240-SL-008 Not Install SURVEY POINT
9 240-SL-009 Not Install SLEEPER CINTER LINE
10 240-SL-010 Not Install 3.6344

11 240-SL-011 Not Install


12 240-SL-012 Not Install
3.6508

13 240-SL-013 Not Install 3.6379

14 240-SL-014 Not Install


2.4462
15 240-SL-015 Not Install 3.8408 3.8137 3.6490 3.6551 3.6241

16 240-SL-016 Not Install 3.6369

17 240-SL-017 Not Install 3.6491 LEGEND


18 240-SL-018 Not Install
19 240-SL-019 766.7676 456.9777 99.0080 As-built 3.6314

20 240-SL-020 769.9303 457.0015 99.0030 As-built


3.6560

21 240-SL-021 773.0707 456.9985 99.0130 As-built


22 240-SL-022 776.0754 456.9732 99.0080 As-built 3.6524

23 240-SL-023 779.0852 456.9869 99.0030 As-built


3.6371
24 240-SL-024 782.0694 456.9612 99.0080 As-built 2.8418 3.6482 6.2795

25 240-SL-025 785.5234 465.3454 98.9980 As-built 3.6473

26 240-SL-026 785.5197 462.3526 99.0030 As-built


27 240-SL-027 785.5182 459.3463 99.0030 As-built 3.6368

28 240-SL-028 785.5342 456.3507 99.0080 As-built


29 240-SL-029 785.5162 454.3364 99.0030 As-built
30 240-SL-030 785.4806 451.3417 99.0030 As-built
31 240-SL-031 785.5041 448.3370 99.0080 As-built
32 240-SL-032 785.5104 445.3467 99.0030 As-built
33 240-SL-033 785.5038 442.3361 99.0030 As-built
34 240-SL-034 785.5149 439.3285 99.0080 As-built
35 240-SL-035 785.5095 436.3335 99.0080 As-built Project Description
EPC FOR INSTALLATION
36 240-SL-036 785.5145 433.3301 99.0030 As-built OF PWT AND AT CPF
BADRA REPUBLIC OF
37 240-SL-037 785.5292 430.3355 98.9980 As-built IRAQ

38 240-SL-038 783.3900 438.4662 98.8030 As-built Project No. GB1516 Contract No. 1516-23-BD-850-00 Job No. SAC
Drawing Title

39 240-SL-039 778.2191 438.4643 98.8030 As-built


40 240-SL-040 775.2157 438.4556 98.7980 As-built
Site Measurement Survey
41 240-SL-041 772.8757 438.4779 98.8030 As-built
42 240-SL-042 Not Insall
Drawing
No.
GB1516-SAC-240-CV-RP-0001 Sheet Sheets
02 03
Scale
NTS

This document has been developed by Shuool Azmer Company. Ltd as part of contractual obligations under
contract 1516-23-db-850-00 and is the exclusive property of Gazprom Neft badra B.V. It is to be used for the purpose
for which it is lent and must not be copied or used in any way detrimental to the interest of this company and subject
to returning on demand
KEY PLAN

Coordination For Existing Foundations


Founda�on Local Coordinate
EAST
S.NO. NORTH COORDINATE ELEVATION
COORDINATE
1 805.9228 466.1201
2 799.6434 466.1412
3 793.2293 466.1181
43 42
4 793.2289 460.7903
PWT 98.738
5 793.2161 454.9279
6 799.9547 454.9137
7 805.9009 454.9311 CROSS ROAD
8 805.9311 459.3051
9 782.2507 468.1226
10 774.371 468.1283
11 766.9928 468.1312
12 766.9869 463.3759 41
CHEMICAL PIT 40
13 774.5305 463.3682 53 51 49 46 44

14 782.2522 463.37 52 50 48
CHEMICAL 21 47 45
15 782.2521 465.5641 98.648 TOC=98.648 9 PWT SKID
INJECTION 11 18
10 17 3 2 1 SURVEY POINT
16 781.7949 463.8567 U-24101 U-24102 U-24103 U-24104 U-24105
TOC=98.738
15
17 781.8067 467.6092 20 TOC=98.958
19 16 14
18 774.1901 467.6141 12 13 U-24101
CHEMICAL INJECTION SKID
19 774.6558 463.8508
4
20 767.5209 463.8597 8
21 767.5267 467.621
22 777.4253 449.6684
5 6 7
23 774.2647 449.6669
24 770.7672 449.6715
24 TOC=98.648 22
25 770.7622 439.5385 29 23 30
31
26 777.4231 439.5359
27 777.4255 444.1505
TOC=98.943 LEGEND
28 OIL RECOVERY
27
28 776.9267 445.3095
OIL RECOVERY 98.648
29 774.258 449.1664 32 33 35
25
30 776.9248 449.1751 34 26

37 36
31 771.2552 449.1677
HCU PUMP
32 771.2485 440.0275
33 774.0771 440.031 TOC=98.738

34 774.1829 439.5408 38 39

35 776.9168 440.025
36 771.8316 438.0435
37 767.4235 438.0526
HCU PUMP 98.738
38 767.4068 431.6329
39 771.8214 431.6354
40 784.6409 471.2436
41 786.2596 471.836
Cross Road 98.800
42 786.2052 486.8359
43 784.5933 486.2463
44 779.7925 470.1897
45 778.3767 468.7779 Project Description
EPC FOR INSTALLATION
OF PWT AND AT CPF
46 776.9873 470.2084 BADRA REPUBLIC OF
IRAQ
47 775.5829 468.7809
Project No. GB1516 Contract No. 1516-23-BD-850-00 Job No. SAC
48 774.185 468.7737
CHEMICAL PIT 98.863 Drawing Title

49 772.789 470.1914
50 771.3828 468.7817 Site Measurement Survey
51 769.9678 470.2005
52 768.5726 468.7709
Drawing Sheet Sheets Scale
53 767.1732 470.1984 No. GB1516-SAC-240-CV-RP-0001 03 03 NTS

This document has been developed by Shuool Azmer Company. Ltd as part of contractual obligations under
contract 1516-23-db-850-00 and is the exclusive property of Gazprom Neft badra B.V. It is to be used for the purpose
for which it is lent and must not be copied or used in any way detrimental to the interest of this company and subject
to returning on demand
AGAIN. To clarify ending the road abruptly as shown on this drawing for all directions. It is now unclear
where and how to connect the new road to the existing roads.
AGAIN. To add: To clarify difference b/w the drain sys. (ditches, pits etc.) shown ihere the one shown in n GB1082-MSK-240-CV-GA-004
- Exact locations and details of connections to existing roads for all directions;
You (ozone and kmsk) MUST provide the COMPLETE detail engineering design and all required details to arrange the plot effectively. All - To indicate existing roads' drawings' ref.## as well.
data & as-built drw. needed were provided in FEED and Contract Annexes & Attachments. Any additional data you need MUST BE in your
Design Basis and your survey reports, and it MUST BE gathered by yourselves (ozone and kmsk). Ask kmsk for the same, and come to site To consider issuance of a separate drw. for all new roads and their connections to the existing ones
and survey as much as you need. This is in response to your absolutely unacceptable useless replies to our comments in CRS attached to (not to overload this drw.), or make it together with the drain sys. drw. (GB1082-MSK-240-CV-GA-004) AGAIN. To replace with drw. ref.# for continuation of the road.
this drw. To incorporate comments here and all yellow-highlighted not incorporated comments on pages 2 to 5.
and reflect the roads therein. What does this GB090 piping drawing have to do with the road?!

AGAIN.
AGAIN. To add missing identification/reference for: AGAIN. To add GB1082 drw. ref.# for continuation of new GB1082 - If it is not storm water ditch, then what are these ditches for? To
- All pits. For example, to indicate in this drw. type of each valve pit (1/1A/2/2A/3) as per GB1082-MSK-240-CV-PL-005. piping line(s) and -CV or -CS- drw. ref.# for its new supports (if any) identify their purpose properly! If it has anything to do with the
Now its is unclear which is which on this drw. If there is other drw showing GA of the pits on the plot, then add its ref.#
drain sys. then reflect them in GB1082-MSK-240-CV-GA-004
- If there is no new OWS catch basins, OWS manholes, OWS cleanouts, CD cleanouts, then remove non-applicable
(see your unclear reply to #9 in the CRS attached, like you do
sheets from GB1082-MSK-240-CV-ST-001. How then is OW drained from PWT area?
not know yourself what the purpose of the ditches);
- Is there no pits other than chemical and valve pits? Why are some pits (seeming drain) To check & show any other new but missing/unshown
- Ditch is missing in the legend.
shown here but not in drain sys. layout GB1082-MSK-240-CV-GA-004? foundations (for pipe-supports etc.) at PWT area To add drw. ref.# - It is still unclear from your unacceptable reply to #9 in the
for continuation CRS attached,Is it 'storm water ditch' as per sh. 21 of the Std.
Indicate pipe-support b/w the new pipe-rack and the adjacent existing pipe- Drw.? There is no other ditches in the Std. Drw. To add location coordinates of all the crossovers
rack. Show them in GB1082-MSK-240-CV-GA-005 as well (now missing). See (like done in HCU plot-plan), which are now missing
- To show ref. drw. # for all 'ditches' in this drw. in this drw. and in GB1082-MSK-240-CV-PL-004, in
these supports in GB1082-MSK-240-PI-GA-003 & GB547-WGK1-240-PI-GA-002. FGL here?
- Where to find coordinates of ditches & pits? To show them or piping GA and they are found nowhere
FGL here? add drw. ref. # where they are shown.

Existing will not be AGAIN. To indicate


sufficient, KMSK will all existing facilities
have to construct To add location coordinates of all the crossovers (like
drawings' ref.## in
this drw. See our
new duct bank done in HCU plot-plan), which are now missing in this
responses to yours
drw. and in GB1082-MSK-240-CV-PL-004, in piping GA
in CRS, #13 on
and they are found nowhere
pg.4 attached: You
must superimpose
and provide a proper
plot-plan(s) showing
everything essential
What is this green on the pipe-rack? for construction and
To add drw. ref.# tie-ins, or provide
Any pipe-support b/w the last re.## of other
pipe-sleeper and the pipe-rack? drawings showing all
required new items
to be constructed.
1. As per GB1082-MSK-240-ELGA-
001 only 240-ETR-005 a Concrete cable trench, other are buried.
2. In legend specified concrete cable trench and not specified as looks buried trench, however drown only buried and not

AGAIN. What do you mean drown concrete. Put buried trench in legend.
FGL here?
Why here is DB for EL by this useless note? Wrong
only but not for IN? note to be modified or
removed. To indicate the
walkway in this drawing or
remove this note. See your
inadequate useless answer
to #16 on pg.4 of CRS
attached

To show all existing piperacks, roads and all other structures nearby
adjacent to PWT area (like done in GB547-WGK1-240-PI-GA-002) To add coordinates in this drw. and in the culvert
drw. (now they are missing in both drws)

To make and issue overall PWT plot-plan(s) & piping GAs, to show
all tie-ins & connections to the existing CPF facilities (E&I, Piping and
all others), including all new routes of pipping lines, their supports FGL here?
Wrong #
etc., (like done, for example, in GB547-WGK1-240-PI-GA-001 and
FGL here?
other GB547 -PI-GA- drawings).
Please note that, for example, GB1082-MSK-240-PI-GA-005 does
not show all new piping lines up to all tie-in points.

1.To Add identification / TAG numbers for Electrical


junction boxes and lighting poles here and/or to EL
GA drawings (they are missing in EL GA drawings).
2. To Add coordinates for Electrical junction box,
lighting pole, safety shower and crossover by table
or whatever (they are missing in other drawings).
To add which pit. This
drw. is not for all pits
but for valve pits only
FGL here?
- To return from Rev. C with
correct #. Why removed?
AGAIN. To add whatever else relevant to
- AGAIN. Never submitted. To
this drawing, for example not limited to:
submit
- GB1082-MSK-240-CV-GA-004;
- All GB1082 PWT Piping layouts;
AGAIN & unanswered in CRS. To - Drawings where exact locations, sizes
and other details for the following are
add drw. ref.# for continuation indicated: all pits, all pipe/cable-rack(s),
duct banks, culverts etc.
To add drw. ref.#
FGL here? for continuation
AGAIN. To replace with drw. ref.# for continuation of the road.
What does this GB090 piping drawing have to do with the road?!

Duct Bank

AGAIN. To add coordinates. To add a detail of


connection of this drw. with the ref. drw.
FGL here?

GPNB Jan 2020

In general some of CRS not incorporated,


See attached CRS. To incorporate all
comments (highlighted yellow)
V

Reviewed by GPNB 25.01.2020


V

Reviewed by GPNB 27.01.2020


TITLE DOC No.

Employer Project Description EPC Contractor ENGG. Contractor

Drawing Title

Drawing Sheet Sheets Rev. Scale


-No.
CAD file:

This document has been developed by Ozone Plant Design Services Pvt. Ltd. as part of
contractual obligations under contract 1082-19-BD-634-00 and is exclusive property of Gazprom
Neft Badra B.V. It is to be used for the purpose which it is lent and must not be copied or used in
any way detrimental to the interest of this company and subject to return on demand.
Drawing Size: ISO A1 (V)