Below are the activities and events record during the twenty-four (24) hours tour of duty.
TIME EVENTS REMARKS
I. COVID-19 UPDATE:
No update
II. TENANT ISSUE:
No update
III. FIRE, LIFE, SAFETY UPDATE:
No update
IV. SECURITY UPDATES:
V. ENGINEERING UPDATE:
Completed
1000H Conducted inspection of Water leak emanated
from ceiling at L24T1 FCR ·
1015H Replaced busted light at L18T1 MCR and Door
knob at L23T1 MCR ·
1045H Adjusted water pressure at L04T1 PWD CR.
1100H Replaced busted light at L16T2 FCR
1100H Conducted and adjusted Thermostat serving FCU
at L04T2 DELTA SPACE due to hot temperature
reported. ·
1115H Replaced busted light at L04T1 Food Court ·
1130H Installed detached letter "E" Signage at L03T1
Ayala side signage. · 2PM Replaced defective
concealed hinges door closer at L04T1 Food
Court. ·
0230H Replaced busted emergency light at L26T2 and
L23T2 SE Side and Fire EXIT Staircase. ·
1500H Assisted SERVCOM Contractor conducted
troubleshooting of SF B01T2 running operation in
auto mode, done. ·
1530H Rectified Main Door handle at L22T1 DBS Bank. ·
1600H Replaced low battery of urinal at L26T2 MCR. ·
1615H Replaced busted emergency light at B04T2
1630H Installed detached letter "D" Signage at
Basement Parking signage. ·
1700H Fixed Ceiling manhole at L04T2 DELTA SPACE. ·
1815H
Replaced busted EXIT Light at L17T1 SE Side. ·
1920H
Conducted inspection of newly installed Grease
trap at L25T2 STARCOM.
2030H
Assisted CRV Contractor conducted AHU
Preventive Maintenance of L02T1 AHU Room.
2300H
Conducted Testing of ENS Audio and Camera at
B04T1 and B05T1 due to video loss and schedule
for TISSI Inspection. ·
0030H
Done Troubleshoot grounded circuit homerun of
Fan Motor of CT05 Cell 01-03 along with
BBP/CMR Contractor at L29T2. The unit is back to
normal. ·
Monitored CRV Contractor conducted AHU
0100H
Preventive Maintenance at L02T1, L11T2 and
L12T2 AHU Room. ·
Monitored SINOTECH Contractor conducted
0300H
dusty works at L10T1 MARKETROL