Site Deliveries:
• AL 4-Sta. 7+233 • Manual Dewatering in S. Torres (Supervisor) 3-Painter 20-Helper 1-Genset 25KVA LKPH7045
AL4-Sta. 7+233 A. Aroyo(Supervisor) 2-Gas Tester 4/15-Ventilation& Lights
• Manual Hauling and R. Edgar (Foreman 1-First Aider 1-6Wheeler Labor Haul
sandbagging of mud in 2-Watchman (MAE 4987)
AL4-Sta. 7+233 2-Watchman
• Cleaning inside pipes of AL (Nightshift)
4-Sta. 7+233
TOTAL 3 3 27
Photo
Photo Photo
• Manual Hauling and sandbagging of mud in AL4- • Manual Hauling and sandbagging of mud in AL4-
Sta. 7+233 Sta. 7+233
Photo Photo
• Manual Hauling and sandbagging of mud in AL4- • Cleaning inside pipes of AL 4-Sta. 7+233
Sta. 7+233
Rev. 9– 22 June 2021 2
SITE DAILY REPORT DCBWSP
DAVAO CITY BULK WATER SUPPLY PROJECT
07 August 2023 Davao City, Philippines
WITCO Construction & Development Corp. Working/Shift Hours: 0600H to 1500H
Prepared by: Sherkin Torres Extended Hours: 1500H to 1800H
Photo
• AL 4-Sta. 7+233: Genset 25KVA LKPH7045 • AL 4-Sta. 7+233: Genset 25KVA LKPH7045
Photo Photo
• AL 4-Sta. 7+233: Genset 25KVA LKPH7045 • 6Wheeler Labor Haul: MAE 4987
Photo Photo