Republic of the Philippines

Province of Nueva Ecija 09155686067/09556559569


Municipality of Talavera mdrrmtalavera@gmail.com
Municipal Disaster Risk Reduction and Management Office facebook.com/mdrrmo.talavera.3/

SITUATIONAL REPORT
Local Weather Condition / ST KARDING

REGION: III
PROVINCE: NUEVA ECIJA (Talavera)

DATE: September 26, 2022

I. SITUATIONAL OVERVIEW
- Talavera had experienced the onslaught of Super Typhoon Karding and was placed under
TCWS no. 4 until it was lifted at 0200 hours on 26 September (ref. TCB # 18 & 19).
- During the passage of Karding, heavy to intense rainfall with severe winds was observed
and caused significant damage to properties and pre-emptive evacuation in several
Barangays.
- As of 9am today, local weather condition is cloudy with scattered rainshowers.
- As of 9am today wind condition : light to moderate winds
- As of 11:00AM, TCWS in Talavera is lifted
II. PREPAREDNESS MEASURES
- Monitoring PAGASA-DOST weather updates for dissemination within AOR
- Emergency Operation Center and Incident Command System still active
- BDRRMCs/BERTs continuously monitoring situation within their AOR for other possible response
and rescue operations
- Augmentation and deployment of local DRRMC response clusters (MDRRMO, PNP,
BFP,DPWH,NEECO,MSWDO, MEO, MHO )
- Continues road clearing and clean up operations on going within the affected Barangays
- Rescue Vehicle and personnel on standby
III. IMPACTS
a. Flooding None as of this reporting period
Riverside(brgys) – within normal water level now
b. Status of Lifeline All roads and bridges within AOR are now cleared
and passable
With power outage/interruptions
No mobile phone signal outage
With water supply interruption but restored
c. Evacuation Pre-emptive evacuation:
No. of Individuals: 791
No. of families: 218
Status: All returned homeas of 10am
d. Landslides None as of this reporting period
e. Dam Monitoring Minabuyoc Dam - Normal level)
Dimasalang Norte Dam – Normal level

Prepared by: Noted by:

Richard C. Celino
LDRRM Assistant ARCH. DENMARK E. RAMOS
LDRRMO IV