Preliminary Quotation of Design, Supply, Delivery, Commissioning, Transportation, Testing, Inspection For LNG Truck Loading Skid
Preliminary Quotation of Design, Supply, Delivery, Commissioning, Transportation, Testing, Inspection For LNG Truck Loading Skid
PRELIMINARY QUOTATION
of
for
-----The Professional Manufacturer of Liquid Loading and Unloading System and Jetty Product
sales@cclpec.com
www.cclpec.co
m
Many thanks for your enquiry. We are pleased to provide you with our preliminary proposal.
CCLPEC is a professional manufacturer of Truck/Train/ISO Tank loading arm and Metering system, Marine loading
arm, Gangway and Quick release hook.
CCLPEC is the subsidiary of FURUISE which is the Chinese Stock listed company and the products include ISO tank,
LNG cylinder, LNG Marine vessel, Regasification skid and so on. The products of FURUISE group covers the whole
LNG industry chain.
For the loading skid and control system, especially for LNG loading skid we share more than 85% in China
domestic market. We have worked for more than 20 LNG Receiving Terminals in China.
a.CCLPEC LNG Truck Loading Skid for CNPC (Tangshan) b.CCLPEC LNG TLS for SINOPEC (Beihai)
c. RGT-2 TERMINAL PROJECT AT PENGERANG d. LNG ISO TANK PROJECT IN BINTULU, MALAYSIA
Since CCLPEC delivered the first skid in Y2013, now there are more than 1000 sets of our LNG loading skid servicing
our client worldwide. We are honored to supply 12 sets LNG ISO tank loading skid and SCADA system (including
weighbridge and accessories) for Bintulu project in Malaysia in Y2019, 2 sets of LNG double Truck loading skid for
Pengerang project in Malaysia in Y2020, and 2 sets LNG ISO tank metering and loading skid for Durango, Mexico in
Y2021.
We not only provide LNG metering and loading skid, we also can provide the local control system and SCADA
system for the loading station. All the control system and loading skids will realize the automatic quantitative
truck/ISO tank filling and queue system to help the operator and driver to save time and reduce maloperation. The
friendly interface on the local controller (batch controller) will display the loading process and guide the operator
to load the tank. CCLPEC modified the LNG Loading Control System for CNPC Dalian and Jiangsu LNG receiving
terminal in China, which improved the loading efficiency and shorten the loading time.
We sincerely look forward to working with you for benefit our client for this project with safe, cost-saving and
time-saving way. If you have any question, please do not hesitate to contact us.
Geng
Please contact me with the following information, and you will get reply within 24 hours.
Content
1 Project Information and Work Scope...........................................................................................6
1.1 Scope of Supply...............................................................................................................................................6
1.2 Scope of Service...............................................................................................................................................6
2 Preliminary Quotation.................................................................................................................8
2.1 Base Quotation...............................................................................................................................................8
2.2 Optional Quotation.........................................................................................................................................9
2.3 Terms and schedule of payment..................................................................................................................10
2.4 Delivery Schedule......................................................................................................................................... 10
This proposal is for the Design, Supply, Delivery, Installation, Transportation, Testing, Inspection and
Commissioning of LNG loading skid.
Project Information:
Client: LNGFlex
CCLPEC provide all the piping, tubing, valves, fittings, instruments, cables, and other installation materials in the
boundary area, include:
LNG loading arms, include breakaway couplings, liquid arms, vapor return arms etc.
Metering skid, includes pipelines, frames, pressure gauge, ball valves, check valves, flow control valves, mass
flow meter, safety valves, shutdown valves etc.
Local control system, includes batch controller, explosion-proof junction box, earthing/ground device and
accessories, ex emergency stop button, ex audio & visual alarm.
PC management and Loading control system, includes control cabinet and accessories (terminals, tray,
slideway), workstation (LCD), communication server, surge protection device, printer, IC card reader, IC card,
business management software, loading operation monitoring software, Industry configuration software.
Surface treatment, inspection and test, painting, packing and delivery, pre-commissioning, and
commissioning.
Road tanker driver identification and communication system (SCADA system, optional)
Packing;
2 Preliminary Quotation
7 FAT (Factory Acceptance Test), Third party inspection cost is 2 sets 1,000 2,000
excluded.
5) ASTM A370 Standard Test Methods and Definitions for Mechanical Testing of Steel Products.
6) EN 1473 Installation and Equipment for Liquefied Natural Gas –Design of Onshore Installations.
8) ISO 8501 Preparation of Steel Substructures Before Application of Paints and Related Products.
10) ISO 1461 Hot dip galvanized coatings on fabricated iron and steel articles --Specifications and test methods.
11) ISO 14713 Protection against corrosion of iron and steel in structures-Zinc and aluminum coatings–
Guidelines.
12) NFPA 59A Standard for the Production, Storage and Handling of Liquefied Natural Gas
13) BSEN 1474 Installation and equipment for liquefied natural gas - Design and testing of marine transfer
systems - Design and testing of transfer arms
Notes:
1) Addition to the mentioned international code and standards in the engineering of the project, CCLPEC will
comply with some Chinese code and standards, but those code and standards will be submitted to client for
approval before using.
3) CCLPEC will also strictly comply with all the Specification of this project.
4 Date Sheet
Flange SS304/304L
LNG and BOG Pipeline
Valve body SS304
Structure A36/A53/A106
Sealing PTFE+301
5 Technical Description
The mechanical part of rigid loading arm is mainly composed of the Riser, Inboard arm, Outboard arm, Spring
Cylinder Balance System and Locking System, breakaway coupling, dry break coupler (optional), N2 purging line,
swivel joint (with N2 dry line) and the vapor return arm.
The swivel joint applied the dynamic seal technology which is applied on the liquid. Avoid deformation or da
mage to the seal surface.
The swivel joint is the key component and Changlong owned the patent of it. The swivel joint is widely used
in loading arm.
The steel balls installed at different raceways can afforded higher bending moment and strength. The swivel
joint’s working life could be extended.
The steel balls are inserted from the end of the ring instead from the radius. Convenient for the
maintenance.
The balance system can be adjusted to keep balance according to actual situation.
The arms shall be counter balanced by compression spring assembly, torsion spring box.
The arm shall stay in balancing state at any place in working range.
The coupling is installed on the outboard arm of truck loading arm. It can effectively prevent pipeline from
damage in emergency and prevent pull away accidents, protects terminal and loading/unloading equipment and
eliminated unwanted products release.
When pulled off, the coupling can automatically close in a very short moment to prevent LNG from leaking.
In case of emergency, it is no necessary to disconnect the arms connected to the LNG tank truck, the driver
can directly and the coupling will automatically break away and close to ensure safety.
Dry break coupler has automatic sealing mechanism, the end of pipeline can be sealed when connection between
loading arm and tanker is accidentally disconnected. When female end of dry-break coupler (on loading arm)
connects to male end (on tanker), the valve inside dry-break coupler is still closed, until a further rotation, the
valve opens, loading operation can be carried out. When male and female end of dry break coupler are separated,
valves at both ends will automatically closed, thereby
achieving a leak-free loading operation.
The LNG loading and metering skid integrates controller, process pipeline and instruments into one skid. The skid
is mainly composed of liquid pipeline, vapor pipeline, venting pipeline, liquid collecting pipeline, cold circulation
line, nitrogen purging line and instrument airline.
The LNG liquid pipeline is usually equipped with flowmeter, flow control valve, pneumatic shut-off valve, pressure
transmitter, temperature transmitter, and then connected to LNG rigid loading arm. The vapor return pipeline is
usually equipped with pneumatic shut-off valve, pressure transmitter and temperature transmitter, and then
connected to vapor return arm. And both the liquid pipeline and vapor return pipeline are equipped with safety
valves to release the pressure in system. The system is also equipped with electrostatic alarm controller and
grounding devices to ensure reliable grounding during filling. The specialized LNG batch controller is installed for
collecting all the signals of control valve, flowmeter, pressure and temperature transmitters, grounding to monitor
the filling progress and perform actions according to the process and business requirements.
Fig5.3-1 Architecture
Different management requirements and positions will generate different loading business processes, which need
to be discussed in detail engineering design stage.
7 Interface (typical)
8 P&ID (typical)
12 Aftersales Service
1) CCLPEC will provide quality guarantee: the warranty period will be 18 months from the date of delivery or 12
months from the date of receiving, whichever is earlier.
2) Any damage caused by the quality of the equipment itself during the warranty period. We shall be
responsible for repairing free of charge until the performance meets the requirements.
3) Periodic calling for feedback during the warranty period: once or twice every year, clients can feedback the
conditions of our products and give evaluations to us, we will keep the feedback and attach it to the user
files, as the reference material for future maintenance.
5) Aftersales service time: clients can contact us at any time via real-time telephone for emergency
maintenance and email for normal maintenance, we will response within 12hours or arrange maintenance
team within 48 hours.
6) No matter inside or outside the warranty period, we will provide free telephone consultation service, you can
contact:
www.cclpec.com.
CCLPEC has provided more than 1000 sets of LNG loading/unloading skids to customers worldwide.
Note: if not specified, all skids equip with loading arms, quantitative loading control system, PC monitoring and
business system.
Delivery Project
No. Project Name Buyer Products and Quantity
Date Site
Inner Mongolia Wanrui Sichuan Jereh Hengri Natural LNG Quantitative Loading
Natural Gas Co., Ltd. Handles Gas Engineering Co., Ltd. System 3sets
2 1 million square natural gas Heavy Hydrocarbon Mar-19 China
liquefaction projects per day
Quantitative Loading System
1sets
Hangzhou Foster-Zhanjiang Hangzhou Fusida Cryogenic LNG loading skid 1set
Baoyue Gas Co., Ltd. Gas Equipment Co., Ltd
3 production from coke oven gas Apr-19 China
in Zhanjiang circular economy
120 million f/a project of Inner Mongolia Hengkun LNG Meter loading skid
methane production from Chemical Co., Ltd.
Renovation Project of Crude Inner Mongolia Hengkun LNG Loading Skid 1set
Benzene Automatic Loading Chemical Co., Ltd.
7 Jul-19 China
System in Inner Mongolia
Hengkun Chemical Co., Ltd.
Delivery Project
No. Project Name Buyer Products and Quantity
Date Site
Ningbo Juhua New Materials Juhua Group -Material and Ethylene loading skid
8 Co., Ltd. 50,000 tons/year Equipment Branch of Jul-19 China
npropanol project
Delivery Project
No. Project Name Buyer Products and Quantity
Date Site
Delivery Project
No. Project Name Buyer Products and Quantity
Date Site