Preliminary Proposal of LNG Truck Loading Skid

Project location: Karachi, Pakistan


Date: 24 June 2022 Rev: 01

PRELIMINARY QUOTATION

of

DESIGN, SUPPLY, DELIVERY, COMMISSIONING,

TRANSPORTATION, TESTING, INSPECTION

for

LNG TRUCK LOADING SKID

JIANGSU CHANGLONG PETROCHEMICAL EQUIPMENT CO., LTD.

-----The Professional Manufacturer of Liquid Loading and Unloading System and Jetty Product

sales@cclpec.com
www.cclpec.co
m

Fuxin Road No.19-2, Zhangjiagang City, China. www.cclpec.com


1 / 32
Preliminary Proposal of LNG Truck Loading Skid
Project location: Karachi, Pakistan
Date: 24 June 2022 Rev: 01

Dear Mr. Zia,

Many thanks for your enquiry. We are pleased to provide you with our preliminary proposal.

CCLPEC is a professional manufacturer of Truck/Train/ISO Tank loading arm and Metering system, Marine loading
arm, Gangway and Quick release hook.

CCLPEC is the subsidiary of FURUISE which is the Chinese Stock listed company and the products include ISO tank,
LNG cylinder, LNG Marine vessel, Regasification skid and so on. The products of FURUISE group covers the whole
LNG industry chain.

CCLPEC factory and workshop

Fuxin Road No.19-2, Zhangjiagang City, China. www.cclpec.com


2 / 32
Preliminary Proposal of LNG Truck Loading Skid
Project location: Karachi, Pakistan
Date: 24 June 2022 Rev: 01

For the loading skid and control system, especially for LNG loading skid we share more than 85% in China
domestic market. We have worked for more than 20 LNG Receiving Terminals in China.

CCLPEC LNG Truck Loading Skid for China LNG Terminals

a.CCLPEC LNG Truck Loading Skid for CNPC (Tangshan) b.CCLPEC LNG TLS for SINOPEC (Beihai)

c. RGT-2 TERMINAL PROJECT AT PENGERANG d. LNG ISO TANK PROJECT IN BINTULU, MALAYSIA

Fuxin Road No.19-2, Zhangjiagang City, China. www.cclpec.com


3 / 32
Preliminary Proposal of LNG Truck Loading Skid
Project location: Karachi, Pakistan
Date: 24 June 2022 Rev: 01

Since CCLPEC delivered the first skid in Y2013, now there are more than 1000 sets of our LNG loading skid servicing
our client worldwide. We are honored to supply 12 sets LNG ISO tank loading skid and SCADA system (including
weighbridge and accessories) for Bintulu project in Malaysia in Y2019, 2 sets of LNG double Truck loading skid for
Pengerang project in Malaysia in Y2020, and 2 sets LNG ISO tank metering and loading skid for Durango, Mexico in
Y2021.

We not only provide LNG metering and loading skid, we also can provide the local control system and SCADA
system for the loading station. All the control system and loading skids will realize the automatic quantitative
truck/ISO tank filling and queue system to help the operator and driver to save time and reduce maloperation. The
friendly interface on the local controller (batch controller) will display the loading process and guide the operator
to load the tank. CCLPEC modified the LNG Loading Control System for CNPC Dalian and Jiangsu LNG receiving
terminal in China, which improved the loading efficiency and shorten the loading time.

We sincerely look forward to working with you for benefit our client for this project with safe, cost-saving and
time-saving way. If you have any question, please do not hesitate to contact us.

Thanks & Kind Regards.

Geng

Please contact me with the following information, and you will get reply within 24 hours.

Jiangsu Changlong Petrochemical Equipment Co., Ltd.


Contact: Wang Geng Email: geng.wang@cclpec.com
Cc: Jin Fengli Wendy Email: wendyjin@cclpec.com
Cc: Yu Longyan Emy Email: emyyu@cclpec.com Tel: +86-21-
6317 7319 www.cclpec.com

Content
1 Project Information and Work Scope...........................................................................................6
1.1 Scope of Supply...............................................................................................................................................6
1.2 Scope of Service...............................................................................................................................................6
2 Preliminary Quotation.................................................................................................................8
2.1 Base Quotation...............................................................................................................................................8
2.2 Optional Quotation.........................................................................................................................................9
2.3 Terms and schedule of payment..................................................................................................................10
2.4 Delivery Schedule......................................................................................................................................... 10

Fuxin Road No.19-2, Zhangjiagang City, China. www.cclpec.com


4 / 32
Preliminary Proposal of LNG Truck Loading Skid
Project location: Karachi, Pakistan
Date: 24 June 2022 Rev: 01

3 Design and Manufacture of Standards.......................................................................................11


4 Date Sheet.................................................................................................................................12
4.1 On-site Public Data.......................................................................................................................................12
4.2 Process Data Sheet.......................................................................................................................................12
4.3 Material Description of Loading Skid............................................................................................................12
4.4 Material Description of Loading Arm.............................................................................................................13
4.5 Nozzle List of Loading Skid.............................................................................................................................13
5 Technical Description.................................................................................................................14
5.1 LNG Truck Loading Arm.................................................................................................................................14
5.1.1 Swivel Joint..........................................................................................................................................15
5.1.2 Spring Balance Cylinder.......................................................................................................................16
5.1.3 Breakaway Coupling............................................................................................................................16
5.1.4 Dry Break Coupler (optional)...............................................................................................................17
5.2 General of LNG Loading Skid.........................................................................................................................18
5.3 PC Management and Control System...........................................................................................................20
5.4 Loading Process............................................................................................................................................20
6 General Arrangement & Layout (typical)...................................................................................22
7 Interface (typical)......................................................................................................................24
8 P&ID (typical)............................................................................................................................25
9 Main Component and Sub-Vendor List......................................................................................26
10 Plan for Training and supervision of Installation, Commissioning.............................................27
11 Validity Period of Proposal.......................................................................................................28
12 Aftersales Service.....................................................................................................................28
13 Refence List for latest 3 years...................................................................................................29

1 Project Information and Work Scope

This proposal is for the Design, Supply, Delivery, Installation, Transportation, Testing, Inspection and
Commissioning of LNG loading skid.

Project Information:

Project Location: Karachi, Pakistan

Client: LNGFlex

Sub-vendor: Jiangsu Changlong Petrochemical Equipment Co., Ltd.

Fuxin Road No.19-2, Zhangjiagang City, China. www.cclpec.com


5 / 32
Preliminary Proposal of LNG Truck Loading Skid
Project location: Karachi, Pakistan
Date: 24 June 2022 Rev: 01

1.1 Scope of Supply

CCLPEC provide all the piping, tubing, valves, fittings, instruments, cables, and other installation materials in the
boundary area, include:

 LNG loading arms, include breakaway couplings, liquid arms, vapor return arms etc.

 Metering skid, includes pipelines, frames, pressure gauge, ball valves, check valves, flow control valves, mass
flow meter, safety valves, shutdown valves etc.

 Local control system, includes batch controller, explosion-proof junction box, earthing/ground device and
accessories, ex emergency stop button, ex audio & visual alarm.

 PC management and Loading control system, includes control cabinet and accessories (terminals, tray,
slideway), workstation (LCD), communication server, surge protection device, printer, IC card reader, IC card,
business management software, loading operation monitoring software, Industry configuration software.

 Surface treatment, inspection and test, painting, packing and delivery, pre-commissioning, and
commissioning.

 Road tanker driver identification and communication system (SCADA system, optional)

1.2 Scope of Service

 Design, Engineering, manufacture and procurement of equipment and materials;


 Fabrication at workshop as complete assembly ready for installation at the site;

 Inspection & testing in factory and site;

 Surface preparation & painting;

 Packing;

 Supply of comprehensive documentation;

 Supply of spare parts for start-up, pre-commissioning, and commissioning;

 Supply of spare parts for 2 years; (optional)

 Material certificates and mechanical guarantee if needed;

 Special tools for normal operation and commissioning;

 Preparation for shipment, packing and supply;

 Installation supervising, training, functional testing, and commissioning at site;

Fuxin Road No.19-2, Zhangjiagang City, China. www.cclpec.com


6 / 32
Preliminary Proposal of LNG Truck Loading Skid
Project location: Karachi, Pakistan
Date: 24 June 2022 Rev: 01

 Complete book including mechanic catalog and inspection book

Fuxin Road No.19-2, Zhangjiagang City, China. www.cclpec.com


7 / 32
Preliminary Proposal of LNG Truck Loading Skid
Project location: Karachi, Pakistan
Date: 24 June 2022 Rev: 01

2 Preliminary Quotation

2.1 Base Quotation


Unit Price Total Price
No. Description Qty.
(USD) (USD)

LNG loading skid and loading arm with 100m3/h flowrate,


including:

 3” LNG loading arm and vapor return arm, with


breakaway coupling, flange connection.

 3” LNG pipeline, 3” vapor return pipeline, vent line and N2


purging line for loading skid.
1 1 set 292,308 292,308
 Cryogenic manual valves, pressure and temperature
transmitter, mess flow meter, flow control valve, safety
valves, shut-off valves, pressure gauge, etc.

 Batch controller with build-in card reader, IC card,


explosion proof junction box, earthing/ground device EX
emergency stop button, EX audio & visual alarm, and
other accessories

LNG loading skid and loading arm with 80m3/h flowrate,


including:

 2” LNG loading arm and vapor return arm, with


breakaway coupling, flange connection.

 3” LNG pipeline, 3” vapor return pipeline, vent line and N2


purging line for loading skid.
2 1 set 284,615 284,615
 Cryogenic manual valves, pressure and temperature
transmitter, mess flow meter, flow control valve, safety
valves, shut-off valves, pressure gauge, etc.

 Batch controller with build-in card reader, IC card,


explosion proof junction box, earthing/ground device EX
emergency stop button, EX audio & visual alarm, and
other accessories

Fuxin Road No.19-2, Zhangjiagang City, China. www.cclpec.com


8 / 32
Preliminary Proposal of LNG Truck Loading Skid
Project location: Karachi, Pakistan
Date: 24 June 2022 Rev: 01

Unit Price Total Price


No. Description Qty.
(USD) (USD)

PC loading management and monitoring system, for 1


station up to 12 sets of loading skids, including:
Monitoring workstation, server, printers, card readers,
3 control cabinet and accessories, surge protection device, 1 set 80,645 80,645
business management software, loading operation
monitoring software etc.

Supply of deemed necessary for the safety storage,


4 transportation, and installation of the equipment, e.g., 1 lot Included Included
tools, lifting ears etc.

5 Spare parts for start-up, pre- 1 set Included Included


commissioning, and commissioning

6 Testing and Inspection (ITP) 1 lot Included Included

7 FAT (Factory Acceptance Test), Third party inspection cost is 2 sets 1,000 2,000
excluded.

8 Reports, Final Documentation 1 lot 8,000 8,000

9 Packing and delivery to Shanghai Port 2 sets 320 640

Total FOB Price in USD 668,208

2.2 Optional Quotation


No. Description Qty. Rate USD Amount in USD

3” Dry break couplers (female) for LNG arm and vapor


1 1 lot To be confirm To be confirm
arm
2” Dry break couplers (female) for LNG arm and vapor
2 1 lot To be confirm To be confirm
arm

3 Spare parts for 2 years operation 1 set To be confirm To be confirm

Overseas Onshore/offshore daily working rate


1 person /
4  Technical personnel service to commissioning, 600 -
day
assistance and supervise, maintenance;

No. Description Qty. Rate USD Amount in USD

Fuxin Road No.19-2, Zhangjiagang City, China. www.cclpec.com


9 / 32
Preliminary Proposal of LNG Truck Loading Skid
Project location: Karachi, Pakistan
Date: 24 June 2022 Rev: 01

 Transportation and Accommodation cost paid by


client;

5 Onsite Training To be confirm To be confirm

6 Third Party Inspection To be confirm To be confirm

2.3 Terms and schedule of payment

 All quotation prices are based on FOB Shanghai price.

 Terms of payment shall be as below (negotiable):

30% by TT upon singed PO;

40% by TT upon unpriced PO for main material;

20% by TT upon after FAT;

10% by TT upon delivery Shanghai Port.

2.4 Delivery Schedule

The estimated manufacture schedule is about 6 months ex-work.

3 Design and Manufacture of Standards


Loading skid should meet or exceed the following (but not limited to) the latest version of the specification and
the standard. If several specifications and standards apply to the same situation, the most stringent specifications
should be followed. If there are conflicts with the relevant specifications and standards, it should be submitted to
the buyer and approved by the buyer in writing.

1) SME codes Section II: Materials

Section V – Non-Destructive Examination

Section VIII Division 1 - Pressure Vessels

Section IX - Welding Qualifications

2) ASME B 31.3 Chemical Plant and Petroleum Refinery Piping

3) ANSI B 36.19 Stainless Steel Pipe.

Fuxin Road No.19-2, Zhangjiagang City, China. www.cclpec.com


10 / 32
Preliminary Proposal of LNG Truck Loading Skid
Project location: Karachi, Pakistan
Date: 24 June 2022 Rev: 01

4) ANSI B 16.5 Steel Pipe Flanges and Flanged Fittings

5) ASTM A370 Standard Test Methods and Definitions for Mechanical Testing of Steel Products.

6) EN 1473 Installation and Equipment for Liquefied Natural Gas –Design of Onshore Installations.

7) EN 10204 Metallic Products-types of Inspection Documents.

8) ISO 8501 Preparation of Steel Substructures Before Application of Paints and Related Products.

9) ISO 10497 Testing of Valves; Fire Type - Testing Requirements

10) ISO 1461 Hot dip galvanized coatings on fabricated iron and steel articles --Specifications and test methods.

11) ISO 14713 Protection against corrosion of iron and steel in structures-Zinc and aluminum coatings–
Guidelines.

12) NFPA 59A Standard for the Production, Storage and Handling of Liquefied Natural Gas

13) BSEN 1474 Installation and equipment for liquefied natural gas - Design and testing of marine transfer
systems - Design and testing of transfer arms

14) ISPM-15 Regulation of wood packaging material in international trade.

Notes:

1) Addition to the mentioned international code and standards in the engineering of the project, CCLPEC will
comply with some Chinese code and standards, but those code and standards will be submitted to client for
approval before using.

2) CCLPEC will comply with local compulsory laws and rules

3) CCLPEC will also strictly comply with all the Specification of this project.

4 Date Sheet

4.1 On-site Public Data


Conditions Outdoor, Karachi
Hazardous area classification Class 1, Zone 1. Group IIA, T3
Ambient temperature To be confirm
Relative humidity To be confirm
Earthquake Zoning To be confirm

4.2 Process Data Sheet


Fluid LNG BOG

Fuxin Road No.19-2, Zhangjiagang City, China. www.cclpec.com


11 / 32
Preliminary Proposal of LNG Truck Loading Skid
Project location: Karachi, Pakistan
Date: 24 June 2022 Rev: 01

Design temperature °C -165/+65 -165/+65


Operation temperature °C -162/AMB -100/AMB
Design pressure MPaG 1.6 0.35/1.59
Operation pressure MPaG 0.4 0.4
Design flow rate m3/h 80 / 100 -
3
Density Kg/m 424.7-469.5 1.3-3.7
Pipeline diameter of loading skid Inch 3 3

4.3 Material Description of Loading Skid


LNG Pipeline SS304/304L

BOG Pipeline SS304/304L

Flange SS304/304L
LNG and BOG Pipeline
Valve body SS304

Metal hose SS304

Bolts and nuts A320 B8M CL2/A194 Grade 8MA

Structure A36/A53/A106

4.4 Material Description of Loading Arm


LNG loading arm SS304/304L

Vapor return arm SS304/304L

Flange 304L, 316L

Steel Structure A36/A53/A106

Bolts and Nuts ASTM A320 B8 CL2/A194 Grade 8

Inner ring SS304L

Outer ring SS304L


Swivel Joint
Flange SS304L

Steel ball 9Cr18

Fuxin Road No.19-2, Zhangjiagang City, China. www.cclpec.com


12 / 32
Preliminary Proposal of LNG Truck Loading Skid
Project location: Karachi, Pakistan
Date: 24 June 2022 Rev: 01

Sealing PTFE+301

4.5 Nozzle List of Loading Skid


Liquid Phase Connection DN80-150 RF ASME B16.5

Gas Phase Connection DN80-150 RF ASME B16.5

LNG Recirculation DN25-150 RF ASME B16.5

LNG Drain DN50-150 RF ASME B16.5

Vent Line Connection DN25-150 RF ASME B16.5

N2 Purge Line Connection DN25-150 RF ASME B16.5

Instrument Air Line Connection DN25-150 RF ASME B16.5

5 Technical Description

5.1 LNG Truck Loading Arm

The mechanical part of rigid loading arm is mainly composed of the Riser, Inboard arm, Outboard arm, Spring
Cylinder Balance System and Locking System, breakaway coupling, dry break coupler (optional), N2 purging line,
swivel joint (with N2 dry line) and the vapor return arm.

Fig 5.1-1 3D Model LNG Truck Loading Arm

Fuxin Road No.19-2, Zhangjiagang City, China. www.cclpec.com


13 / 32
Preliminary Proposal of LNG Truck Loading Skid
Project location: Karachi, Pakistan
Date: 24 June 2022 Rev: 01

Fig 5.1-2 LNG Truck Loading Arm in CCLPEC workshop

Fig 5.1-3 CCLPEC LNG TLA on site

Fuxin Road No.19-2, Zhangjiagang City, China. www.cclpec.com


14 / 32
Preliminary Proposal of LNG Truck Loading Skid
Project location: Karachi, Pakistan
Date: 24 June 2022 Rev: 01

5.1.1 Swivel Joint

Fig 5.1-4 CCLPEC Swivel Joint

 The swivel joint applied the dynamic seal technology which is applied on the liquid. Avoid deformation or da
mage to the seal surface.
 The swivel joint is the key component and Changlong owned the patent of it. The swivel joint is widely used
in loading arm.
 The steel balls installed at different raceways can afforded higher bending moment and strength. The swivel
joint’s working life could be extended.
 The steel balls are inserted from the end of the ring instead from the radius. Convenient for the
maintenance.

5.1.2 Spring Balance Cylinder

 The principle of spring balance system is according to moment balance.

 The balance system can be adjusted to keep balance according to actual situation.

 The arms shall be counter balanced by compression spring assembly, torsion spring box.

 The arm shall stay in balancing state at any place in working range.

Fuxin Road No.19-2, Zhangjiagang City, China. www.cclpec.com


15 / 32
Preliminary Proposal of LNG Truck Loading Skid
Project location: Karachi, Pakistan
Date: 24 June 2022 Rev: 01

Fig 5.1-5 The cross-section drawn of spring cylinder

5.1.3 Breakaway Coupling

The coupling is installed on the outboard arm of truck loading arm. It can effectively prevent pipeline from
damage in emergency and prevent pull away accidents, protects terminal and loading/unloading equipment and
eliminated unwanted products release.

Fig 5.1-6 Breakaway Coupling

 The breakaway coupling adopts plate structure.

 When pulled off, the coupling can automatically close in a very short moment to prevent LNG from leaking.

 In case of emergency, it is no necessary to disconnect the arms connected to the LNG tank truck, the driver

can directly and the coupling will automatically break away and close to ensure safety.

 Adopting welding type to make it light and easy to operate.

Fuxin Road No.19-2, Zhangjiagang City, China. www.cclpec.com


16 / 32
Preliminary Proposal of LNG Truck Loading Skid
Project location: Karachi, Pakistan
Date: 24 June 2022 Rev: 01

Fig 5.1-7 Breakaway test in workshop

5.1.4 Dry Break Coupler (optional)

Dry break coupler has automatic sealing mechanism, the end of pipeline can be sealed when connection between
loading arm and tanker is accidentally disconnected. When female end of dry-break coupler (on loading arm)
connects to male end (on tanker), the valve inside dry-break coupler is still closed, until a further rotation, the
valve opens, loading operation can be carried out. When male and female end of dry break coupler are separated,
valves at both ends will automatically closed, thereby
achieving a leak-free loading operation.

 Material: Stainless Steel, Seal: PTFE

 Available with ANSI150 Flange or NPT female.

Other connections also available.

 Sizes: 1”, 1-1/2”, 2”, 2-1/2”, 3”, 4”and 6”.

5.2 General of LNG Loading Skid

The LNG loading and metering skid integrates controller, process pipeline and instruments into one skid. The skid
is mainly composed of liquid pipeline, vapor pipeline, venting pipeline, liquid collecting pipeline, cold circulation
line, nitrogen purging line and instrument airline.

Fuxin Road No.19-2, Zhangjiagang City, China. www.cclpec.com


17 / 32
Preliminary Proposal of LNG Truck Loading Skid
Project location: Karachi, Pakistan
Date: 24 June 2022 Rev: 01

The LNG liquid pipeline is usually equipped with flowmeter, flow control valve, pneumatic shut-off valve, pressure
transmitter, temperature transmitter, and then connected to LNG rigid loading arm. The vapor return pipeline is
usually equipped with pneumatic shut-off valve, pressure transmitter and temperature transmitter, and then
connected to vapor return arm. And both the liquid pipeline and vapor return pipeline are equipped with safety
valves to release the pressure in system. The system is also equipped with electrostatic alarm controller and
grounding devices to ensure reliable grounding during filling. The specialized LNG batch controller is installed for
collecting all the signals of control valve, flowmeter, pressure and temperature transmitters, grounding to monitor
the filling progress and perform actions according to the process and business requirements.

Fuxin Road No.19-2, Zhangjiagang City, China. www.cclpec.com


18 / 32
Preliminary Proposal of LNG Truck Loading Skid
Project location: Karachi, Pakistan
Date: 24 June 2022 Rev: 01

Fig 5.2-1 3D Model of loading skid & loading arm

Fig 5.2-2 LNG loading skid in CCLPEC workshop

Fuxin Road No.19-2, Zhangjiagang City, China. www.cclpec.com


19 / 32
Preliminary Proposal of LNG Truck Loading Skid
Project location: Karachi, Pakistan
Date: 24 June 2022 Rev: 01

Fig 5.2-3 loading skid on site


5.3 PC Management and Control System
The PC control system is mainly composed of business station, monitoring station, control cabinet and other
accessories. The PC Management and Control system is to monitor the skid operation status and the information
of temperature, pressure, flow rate, setting volume and real volume. It can collect the important data of each skid
with safe and easy management.

Fig5.3-1 Architecture

5.4 Loading Process


The entire process from the arrival of the truck tank to settlement of the loading truck is called ‘one time’ Business
Operation Process, and consists of a series of operations or states. It can be divided into several stages: admission
of truck, billing generation, loading preparation, loading and completion, and business settlement.

Different management requirements and positions will generate different loading business processes, which need
to be discussed in detail engineering design stage.

Fuxin Road No.19-2, Zhangjiagang City, China. www.cclpec.com


20 / 32
Preliminary Proposal of LNG Truck Loading Skid
Project location: Karachi, Pakistan
Date: 24 June 2022 Rev: 01

Fig5.4-1 Proposed routine loading and business process

Fuxin Road No.19-2, Zhangjiagang City, China. www.cclpec.com


21 / 32
Preliminary Proposal of LNG Truck Loading Skid
Project location: Karachi, Pakistan
Date: 24 June 2022 Rev: 01

6 General Arrangement & Layout (typical)

Fuxin Road No.19-2, Zhangjiagang City, China. www.cclpec.com


22 / 32
Preliminary Proposal of LNG Truck Loading Skid
Project location: Karachi, Pakistan
Date: 24 June 2022 Rev: 01

Fuxin Road No.19-2, Zhangjiagang City, China. www.cclpec.com


23 / 32
Preliminary Proposal of LNG Truck Loading Skid
Project location: Karachi, Pakistan
Date: 24 June 2022 Rev: 01

7 Interface (typical)

Fuxin Road No.19-2, Zhangjiagang City, China. www.cclpec.com


24 / 32
Preliminary Proposal of LNG Truck Loading Skid
Project location: Karachi, Pakistan
Date: 24 June 2022 Rev: 01

8 P&ID (typical)

Fuxin Road No.19-2, Zhangjiagang City, China. www.cclpec.com


25 / 32
Preliminary Proposal of LNG Truck Loading Skid
Project location: Karachi, Pakistan
Date: 24 June 2022 Rev: 01

9 Main Component and Sub-Vendor List


No. Description Model Sub-vendor

LNG loading arm and loading skid

1 Dry coupler (optional) DN50 & DN80, 150LB KLAW/Manntek

2 Break-away coupling DN50 & DN80, 150LB CCLPEC

3 Swivel Joint DN50 & DN80, 150LB CCLPEC

4 Ball valve DN25 150LB Putork/BOTELI

5 Check valve DN25 150LB Furui

6 Check valve DN80 150LB Furui

7 Cryogenic safety valve DN20xDN25 150LB Furui

8 Cryogenic ball valve DN25 150LB Furui

9 Cryogenic ball valve DN50 150LB Furui

10 Cryogenic ball valve DN80 150LB Furui

11 Mess flow meter DN80 150LB E+H/Krohne

12 Flow control valve DN80 150LB Furui

13 Pneumatic shut off valve DN80 150LB Furui

14 Temperature transmitter Range:-196~65℃ Rosement/E+H/ Honeywell

15 Pressure transmitter Range:0 ~ 2Mpa Rosement/E+H/ Honeywell

16 Pressure transmitter Range:0 ~ 1Mpa Rosement/E+H/ Honeywell

17 Pressure gauge Range:0 ~ 1Mpa WIKA

18 surface finish and painting Jotun/PPG

Site Electrical Equipment

1 Batch controller Explosion proof Yangyuan

2 Junction Box Explosion proof Warom / Hexlon

3 DC Power Supply 24VDC 3A Hengfu / Mingwei

4 220V AC Thunder Protection Module CZLB Shanghai Chenzhu

Fuxin Road No.19-2, Zhangjiagang City, China. www.cclpec.com


26 / 32
Preliminary Proposal of LNG Truck Loading Skid
Project location: Karachi, Pakistan
Date: 24 June 2022 Rev: 01

No. Description Model Sub-vendor

5 RS485 Thunder Protection Module CZLB Shanghai Chenzhu

6 Audible and Visual Alarm BBJ Warom

7 Emergency Stop Button BZC Warom

8 Cable Four/Six -Core Yuandong

10 Plan for Training and supervision of Installation, Commissioning


In order to ensure the normal use of truck loading skid, we have developed training and instruction plan as
follows: (The following days are only the minimum time needed, to ensure the completion of the work, the time
can be adjusted)

Item Days Personnel Arrangements Description


1. Basic knowledge of loading skid.
Arrange 1 mechanical 2. Structure, working principle, operation process of
Training in CCL 1-3 engineer for customer truck loading arm.
factory days training 3. Routine maintenance.
4. Regularly inspected, maintained, and repaired.

1. Guiding and supervise the lifting and installation of


Installation 2-4 1 mechanical engineer, 1
TLS
Instructions days coordinator.
2. Guiding interface pipe connection
1. Assist for final commissioning of the overall
1 mechanical engineer, 1 performance of loading skid.
On-site 2-4
coordinator to site to
Commissioning days
supervise commissioning

1. Professional technical skills about loading skid.


2. Installation procedure
3. Professional knowledge of safe and efficient
operation.
3 1 mechanical engineer, 1 4. Description of spare parts, replacement method of
Training on site days coordinator easily worn parts.
5. Daily inspection, maintenance, and regular
maintenance methods
Start-up 2 1 mechanical engineer, 1 mechanical engineers instruct the operation of truck
Instructions days coordinator loading arm

Fuxin Road No.19-2, Zhangjiagang City, China. www.cclpec.com


27 / 32
Preliminary Proposal of LNG Truck Loading Skid
Project location: Karachi, Pakistan
Date: 24 June 2022 Rev: 01

11 Validity Period of Proposal


This proposal remains valid and open for acceptance for a period of ninety (90) days after purchaser’s receiving of
this proposal. Vendor may extend the validity period considering purchaser’s requirement.

12 Aftersales Service

1) CCLPEC will provide quality guarantee: the warranty period will be 18 months from the date of delivery or 12
months from the date of receiving, whichever is earlier.

2) Any damage caused by the quality of the equipment itself during the warranty period. We shall be
responsible for repairing free of charge until the performance meets the requirements.

3) Periodic calling for feedback during the warranty period: once or twice every year, clients can feedback the
conditions of our products and give evaluations to us, we will keep the feedback and attach it to the user
files, as the reference material for future maintenance.

4) CCLPEC provides lifelong maintenance services for the product we sell.

5) Aftersales service time: clients can contact us at any time via real-time telephone for emergency
maintenance and email for normal maintenance, we will response within 12hours or arrange maintenance
team within 48 hours.

6) No matter inside or outside the warranty period, we will provide free telephone consultation service, you can
contact:

 Email: sales@cclpec.com (for normal maintenance).

 Tel: +86-21-63177319 (for emergency maintenance).

 www.cclpec.com.

13 Refence List for latest 3 years

CCLPEC has provided more than 1000 sets of LNG loading/unloading skids to customers worldwide.

Note: if not specified, all skids equip with loading arms, quantitative loading control system, PC monitoring and
business system.
Delivery Project
No. Project Name Buyer Products and Quantity
Date Site

Fuxin Road No.19-2, Zhangjiagang City, China. www.cclpec.com


28 / 32
Preliminary Proposal of LNG Truck Loading Skid
Project location: Karachi, Pakistan
Date: 24 June 2022 Rev: 01

Qingyang Zhonghuan 300,000 Shanxi Aerospace Delin


square LNG liquefaction plant Technology Group Co., Ltd.
1 per day Equipment Supply LNG Loading Skid 2sets Mar-19 China
and Service Contract

Inner Mongolia Wanrui Sichuan Jereh Hengri Natural LNG Quantitative Loading
Natural Gas Co., Ltd. Handles Gas Engineering Co., Ltd. System 3sets
2 1 million square natural gas Heavy Hydrocarbon Mar-19 China
liquefaction projects per day
Quantitative Loading System
1sets
Hangzhou Foster-Zhanjiang Hangzhou Fusida Cryogenic LNG loading skid 1set
Baoyue Gas Co., Ltd. Gas Equipment Co., Ltd
3 production from coke oven gas Apr-19 China
in Zhanjiang circular economy

120 million f/a project of Inner Mongolia Hengkun LNG Meter loading skid
methane production from Chemical Co., Ltd.

4 coke oven gas in Inner Jun-19 China


Mongolia Hengkun Chemical
Co., Ltd.
Technical Renovation Project China Five Rings Engineering Co., LNG Loading skid 8sets
of 1 million Tons of Methanol Ltd
Annually Produced from
5 Aug-19 China
Synthetic Gas of China Coal
Ordos Energy and Chemical
Co., Ltd
LNG ISO Tanks Filling Facility
6 TIGER CLEAN ENERGY LTD LNG Loading Skid 12 SETS Oct-19 Malaysia
in Bintulu, Sarawak, Malaysia

Renovation Project of Crude Inner Mongolia Hengkun LNG Loading Skid 1set
Benzene Automatic Loading Chemical Co., Ltd.
7 Jul-19 China
System in Inner Mongolia
Hengkun Chemical Co., Ltd.

Delivery Project
No. Project Name Buyer Products and Quantity
Date Site
Ningbo Juhua New Materials Juhua Group -Material and Ethylene loading skid
8 Co., Ltd. 50,000 tons/year Equipment Branch of Jul-19 China
npropanol project

LNG ISO-TANK AND BUNKER


Tianjin Guochu Energy LNG ISO-TANK Loading Skid
9 VESSEL /BARGES LOADING Oct-19 Singapore
Development Co.,LTD with Loading Hose 6SETS
FACILITY
10 Coal-to-Natural Gas Phase II Inner Mongolia Huineng Coal LNG truck loading skid Mar-20 China

Fuxin Road No.19-2, Zhangjiagang City, China. www.cclpec.com


29 / 32
Preliminary Proposal of LNG Truck Loading Skid
Project location: Karachi, Pakistan
Date: 24 June 2022 Rev: 01

Project Chemical Co., Ltd 20sets


Madian LNG Emergency Qingdao Energy Huarun Gas Co., LNG Dual skid 2sets
11 Storage and Distribution Ltd. Oct-19 China
Station Project in Jiaozhou
Zhejiang Jiaxing (Pinghu) LNG HQSM Engineering Pte Ltd LNG Dual skid 4sets
Emergency Peak-shaving Beijing branch
12 Oct-19 China
Storage and Transportation
Station Project
Jinan South Caofan LNG Peak CHINA RAILWAY 18TH BUREAU LNG Loading skid 8sets
Regulation Storage and GROUP CO., LTD
13 Nov-19 China
Distribution Station (Phase I)
Project
LNG Truck Loading Facility at United Western Technologies LNG Dual Truck Loading
14 Jan-20 Malaysia
Regas Terminal, Pengerang Pte Ltd Skid 2SETS
Low temperature ethylene
truck loading skid of 1.3
Zhongsha (Tianjin) Ethylene truck loading skid
15 million T / year capacity Mar-20 China
Petrochemical Co., Ltd 4sets
expansion project in
Zhongsha
Tibet Zhongyou constant
Qinshui Haokun coalbed combustion technology
16 LNG loading skid 2sets May-20 China
methane Co., Ltd equipment Co., Ltd

Shizuishan natural gas


emergency storage facilities LNG truck loading skid with
17 Shizuishan Xingze Gas Co., Ltd May-20 China
construction project pump 4sets

Xuwei New Area LNG storage Unloading pump skid 4sets


Jiangsu Weida Construction Co.,
18 and distribution station loading and unloading skid May-20 China
project phase II Ltd sets

2500 cubic meters (water


volume) LNG storage and LNG loading and unloading
China Petroleum Engineering
transportation peak shaving skid; 2sets quantitative
19 Construction Co., Ltd -huabei Aug-20 China
(government gas storage) loading and unloading
area
project in Delingha control and billing

Delivery Project
No. Project Name Buyer Products and Quantity
Date Site

business card printing


system 1set

Fuxin Road No.19-2, Zhangjiagang City, China. www.cclpec.com


30 / 32
Preliminary Proposal of LNG Truck Loading Skid
Project location: Karachi, Pakistan
Date: 24 June 2022 Rev: 01

LNG unloading skid; 1set


LNG loading and unloading
5000 cubic meters (water skid;2sets quantitative
volume) LNG storage, China Petroleum Engineering loading and unloading
20 transportation and peak Construction Co., Ltd -huabei control and Invoicing Aug-20 China
shaving (government gas area business card printing
storage) project in Golmud system 1set

Add 4sets loading skid at


Guanghui energy LNG Guanghui energy
21 terminal in Lvsi port of comprehensive logistics LNG Loading skid 2sets Aug-20 China
Nantong Port project development Co., Ltd

LNG 21 kinds of loading skid


22 Sinopec Beihai LNG Co., Ltd LNG Loading skid 4sets Jul-20 China
in Beihai

LNG Loading skid 2sets


Rizhao LNG peak shaving and CCCC Tunnel Engineering Bureau LNG unloading skid 1set LNG
23 Nov-20 China
gas storage facilities project Limited unloading combined
skid 3sets
INGENIERÍA BÁSICA
EXTENDIDA
Distribución de Gas Natural
Sirexin (Tianjin) Energy
24 por Medios Distintos a LNG Loading skid 2sets Nov-20 Mexico
Technology Co., Ltd
Ductos. Gomez Palacio,
Durango; México;
(FERROMEX).

HQSM Engineering Pte Ltd Ethylene unloading skid


25 Tarim ethylene project Dec-20 China
Beijing branch 2sets
LNG quantitative loading and
6.25m tamping coking Shanxi Pingyao coal chemical unloading skid 1set; LNG
26 May-21 China
upgrading project (Group) Co., Ltd quantitative loading skid
1set
Lanzhou natural gas
transmission and distribution
project (peak shaving gas Donghua Engineering LNG unloading pump skid
27 Jan-21 China
storage and supply station) Technology Co., Ltd 4sets
project

LNG reserve peak shaving Shandong Chengxin natural gas


28 LNG Loading Skid 2sets Nov-20 China
center project of Zibo City utilization Co., Ltd

Delivery Project
No. Project Name Buyer Products and Quantity
Date Site

Fuxin Road No.19-2, Zhangjiagang City, China. www.cclpec.com


31 / 32
Preliminary Proposal of LNG Truck Loading Skid
Project location: Karachi, Pakistan
Date: 24 June 2022 Rev: 01

Ledu district (including Pingan


and Huzhu gas storage
capacity) 15000 m3 LNG LNG loading and unloading
29 storage and transportation North branch of CNPC skid 2sets ; LNG unloading Mar-21 China
peak shaving (government gas skid 1set
storage) EPC project

Jinan Nan Caofan storage and LNG Loading/unloading skid


distribution station (phase II) CHINA RAILWAY 18TH BUREAU
30 3sets Apr-21 China
project GROUP CO., LTD
LNG unloading skid 3sets
LNG Loading/unloading skid
Zunyi LNG Storage and China Nuclear Industry Fifth
31 2sets Jul-21 China
distribution project Construction Co.,Ltd
LNG loading skid 2sets
China Construction Industrial &
Xianyang LNG storage tank Loading/unloading skid
32 Energy Engineering Group Co., Aug-21 China
Area engineering project 4sets
Ltd
1million m3 / year LNG Ningxia XinkeYuan energy
33 LNG loading skid 3sets Jul-21 China
project utilization Co., Ltd

Golmud phase II 15000 m3


(water volume) LNG storage, China Petroleum Engineering
transportation, and peak LNG Loading/unloading skid
34 Construction Co., Ltd. North Aug-21 China
shaving (government gas 3sets
storage) EPC project China branch

Xuzhou Ganghua LNG reserve LNG Loading/unloading skid


35 base project Xuzhou Town Gas Co., Ltd Sep-21 China
3sets
Handan Fuxing LNG peak LNG Loading/unloading skid
shaving storage and Zhuoheng Construction Group
36 2sets Nov-21 China
distribution station project Co., Ltd
LNG unloading skid 2sets
Shaanxi LNG Reserve
Xi'an LNG emergency reserve LNG Loading/unloading skid
37 transportation and Marketing Mar-22 China
peak shaving project 16sets
Co., Ltd
Beijing gas Tianjin
LNG Loading/unloading skid
38 Nangang LNG emergency Beijing Gas Group Co., Ltd Aug-22 China
reserve terminal project 26sets

Zhejiang Yuhuan Damaiyu HQSM Engineering Co., Ltd.


39 LNG Loading skid 30sets Mar-23 China
LNG terminal Beijing Branch

Fuxin Road No.19-2, Zhangjiagang City, China. www.cclpec.com