PERSPECTIVE :

NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETER UNLESS
OTHERWISE NOTED.
2. ALL LEVELS ARE IN METERS UNLESS
OTHERWISE NOTED.
3. THIS SHOULD BE READ IN ACCORDANCE WITH
STRUCTURAL AND MEP DRAWINGS.
4. VERIFY ALL THE DIMENSIONS PRIOR TO
EXECUTION.

BUILDING (B+G+13+R)

KEY PLAN

SHOP DRAWING

LEGEND & SYMBOL - ELECTRICAL

W/P

W/P

W/P
SMDB-1F SMDB-1F SMDB-1F SPARE
71.60 KW 71.60 KW 71.60 KW 16.00 KW

W/P
4C,70 mm² Cu/XLPE/SWA/PVC+

4C,70 mm² Cu/XLPE/SWA/PVC+


4C,70mm² Cu/XLPE/SWA/PVC+

1C,35 mm² AS ECC.


1C,35mm² AS ECC.

1C,35mm² AS ECC.

W/P
4C 70mm2 XLPE/SWA/PVC

+1C 35mm2 ECC

W/P

DB-101 DB-102 DB-103 DB-104


CABLE GLAND 15.13 KW 20.67 KW 20.67 KW 15.13 KW
(TYPICAL)

160A,TP 160A,TP 160A,TP 40A,TP 160A TP 160A TP

4C,10mm² Cu/XLPE/SWA/PVC+

4C,16mm² Cu/XLPE/SWA/PVC+

4C,16mm² Cu/XLPE/SWA/PVC+

4C,10mm² Cu/XLPE/SWA/PVC+
MCCB MCCB MCCB MCCB MCCB
25KA 25KA 25KA 25KA 25 kA

1C,10mm² AS ECC.

1C,16mm² AS ECC.

1C,16mm² AS ECC.

1C,10mm² AS ECC.
70 KVAR MULTI STEP AUTOMATIC
R Y B CAP. BANK
SWITCHING CAPACITOR BANK
WITH REACTIVE POWER
E-BAR
400A TP REGULATOR
FORM-2, TYPE-2
MCCB
REV DESCRIPTION DATE DRW BY CHKD
35KA
NON AUTO

40A,TP 63A,TP 63A,TP 40A,TP


MCCB MCCB MCCB MCCB
25KA 25KA 25KA 25KA
4C.300 mm2 XLPE/SWA/PVC
1C.150mm2 PVC Y/G AS ECC
1 2 3 4
5A
500V V SS
A SS
KWH METERS
CT 400/5A KWH ON NON-COMBUSTIBLE 160A,TP ISO. BLOCK: PLOT NO.:

WOODEN BOARD AS PER AL KARAMA


R Y B
5A 3180133
DEWA REQUIREMENT T.C.L: 71.60 KW INDICATION LAMPS

400A TP CABLE GLAND TO AS-BUILT


BS 6121 (TYPICAL)
MCCB PROPOSED G+3 BUILDING ON
35 KA W/P IP55 KWH
E-BAR

SMDB-TYPICAL PLOT NO 3180133 (RC1_p_s/4) AT


4C,70mm² Cu/XLPE/SWA/PVC+
METER CABINET 1C,35mm² AS ECC. AL KARAMA, DUBAI, UAE.

BY DEWA

MR. SAIF MUBARAK SAIF


MDB-2: ALRIYAMI

INCOMER
FROM DEWA

SINGLE LINE DIAGRAM -1


Architectural & Engineering Consultants
P.O. BOX 22543, DUBAI, UAE TEL: 04-2942889 FAX:04-2942890
E-MAIL : egecdxb@eim.ae Web : www.ecogreenuae.ae

Karnafuly Electromechanical
Works L.L.C
P.O Box: 237788
KARNAFULY E-mail:karnafuly12@gmail.com

SINGLE LINE DIAGRAM -1

PROJECT NO. DRAWN BY: CHECKED BY: DATE:

J 07 / 22 OMOR ENG. KAMRUL 06.09.2023

DRAWING NO. SCALE / SHEET

EP-201 REVISION
00
SHEET SIZE : A1
PERSPECTIVE :

NOTES:
1. ALL DIMENSIONS ARE IN MILLIMETER UNLESS
OTHERWISE NOTED.
2. ALL LEVELS ARE IN METERS UNLESS
OTHERWISE NOTED.
3. THIS SHOULD BE READ IN ACCORDANCE WITH
STRUCTURAL AND MEP DRAWINGS.
4. VERIFY ALL THE DIMENSIONS PRIOR TO
EXECUTION.

DB-LL DB-SHOP-1 DB-SHOP-2 DB-GYM TRANSPER PUMP FIRE PUMP DISEL PUMP JOCKY PUMP SMDB-R DB-TELEPHONE DB-PH SPARE BUILDING (B+G+13+R)

28.88KW 17.00 KW 44.00 KW 17.00KW 4.50 KW 15.00 KW 1.50 KW 3..00 KW 41.95 KW 9.55 KW 16.59 KW 35.47 KW

KEY PLAN

4C,16mm² Cu/XLPE/SWA/PVC+

4C,10mm² Cu/XLPE/SWA/PVC+

4C,35mm² Cu/XLPE/SWA/PVC+

4C,10mm² Cu/XLPE/SWA/PVC+

4C,10mm² Cu/XLPE/SWA/PVC+

4C,50mm² Cu/XLPE/SWA/PVC+

4C,10mm² Cu/XLPE/SWA/PVC+

2C,10mm² Cu/XLPE/SWA/PVC+
4C,6mm² Cu/XLPE/SWA/PVC+

4C,4mm² Cu/XLPE/SWA/PVC+

4C,6mm² Cu/XLPE/SWA/PVC+
SHOP DRAWING

1C,16mm² AS ECC.

1C,10mm² AS ECC.

1C,16mm² AS ECC.

1C,10mm² AS ECC.

1C,10mm² AS ECC.

1C,25mm² AS ECC.

1C,10mm² AS ECC.

1C,10mm² AS ECC.
1C,6mm² AS ECC.

1C,4mm² AS ECC.

1C,6mm² AS ECC.
LEGEND & SYMBOL - ELECTRICAL

63A,TP 40A,TP 100A,TP 40A,TP 20A,TP 40A,TP 20A,TP 20A,TP 125A,TP 32A,TP 40A,TP 100A,TP
MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB MCCB
25KA 25KA 25KA 25KA 25KA 25KA 25KA 25KA 25KA 25KA 25KA 25KA

W/P

W/P

W/P

4C 70mm2 XLPE/SWA/PVC W/P

+1C 35mm2 ECC

W/P

160A TP 160A TP
W/P
MCCB
25 kA

70 KVAR MULTI STEP AUTOMATIC


R Y B CAP. BANK
E-BAR SWITCHING CAPACITOR BANK
400A TP
FORM-2, TYPE-2
MCCB WITH REACTIVE POWER
35KA REGULATOR
DB-ROOF FAHU-1 FAHU-CU-1 LIFT
NON AUTO 10.95 KW 8.00 KW 17.00 KW 6.00 KW

REV DESCRIPTION DATE DRW BY CHKD


63A ISO 40A ISO 32A ISO

4C,10mm² Cu/XLPE/SWA/PVC+

4C,16mm² Cu/XLPE/SWA/PVC+

4C,10mm² Cu/XLPE/SWA/PVC+

4C,10mm² Cu/XLPE/SWA/PVC+
4C.300 mm2 XLPE/SWA/PVC
1C.150mm2 PVC Y/G AS ECC

1C,10mm² AS ECC.

1C,16mm² AS ECC.

1C,10mm² AS ECC.

1C,10mm² AS ECC.
MDB-1
KWH METERS
CT 400/5A KWH ON NON-COMBUSTIBLE BLOCK: PLOT NO.:
WOODEN BOARD AS PER AL KARAMA
DEWA REQUIREMENT 3180133
400A TP 40A,TP 32A,TP 63A,TP 32A,TP AS-BUILT
MCCB MCCB MCCB MCCB
MCCB 25KA 25KA 25KA 25KA PROPOSED G+3 BUILDING ON
35 KA PLOT NO 3180133 (RC1_p_s/4) AT
W/P IP55 KWH
E-BAR

AL KARAMA, DUBAI, UAE.


METER CABINET 1 2 3 4
5A
500V V SS

A SS

BY DEWA 125A,TP ISO. MR. SAIF MUBARAK SAIF


ALRIYAMI
5A
R Y B
MDB-1: T.C.L: 41.95 KW INDICATION LAMPS

CABLE GLAND TO
BS 6121 (TYPICAL)

INCOMER
FROM DEWA SMDB-ROOF
4C,50mm² Cu/XLPE/SWA/PVC+
1C,25mm² AS ECC.

Architectural & Engineering Consultants


P.O. BOX 22543, DUBAI, UAE TEL: 04-2942889 FAX:04-2942890
E-MAIL : egecdxb@eim.ae Web : www.ecogreenuae.ae

SINGLE LINE DIAGRAM -2


Karnafuly Electromechanical
Works L.L.C
P.O Box: 237788
KARNAFULY E-mail:karnafuly12@gmail.com

SINGLE LINE DIAGRAM -2

PROJECT NO. DRAWN BY: CHECKED BY: DATE:

J 07 / 22 OMOR ENG. KAMRUL 06.09.2023

DRAWING NO. SCALE / SHEET

EP-202 REVISION
00
SHEET SIZE : A1