12 11 10 9 8 7 6 5 4 3 2 1

(V) (V)

11EGD00BR010-C1E1-25mm
Set @ 13 barg GENERAL NOTES :
AA
900 - FOR SYMBOLS AND LEGENDS SEE DRAWING: M6J-YA-00001 THROUGH M6J-YA-00007.
H

AA752

AA753
(V)

11EGD00BR008-C1E1-20mm

11EGD00BR002-C1E1-40mm
- WHERE REQUIRED, VENTS AND DRAINS SHALL BE ARRANGED AT HIGH AND LOW POINTS OF

HOT WAT ER RE TURN


HOT WAT ER S UPP LY
(V) TO LDO
STORAGE TANKS LINES. THEY WILL BE ARRANGED ACCORDING TO "ENGINEERING DESIGN STANDARD FOR
CG CG CG CG 00EGD00BR032-C1E1-100mm
001A 001B 002A 002B M6-EG-00002 DRAIN/VENT CONNECTIONS", IQ360-000-3DS-P72G-00007. THEY WILL BE SHOWN ON ISOMETRIC
XG01 XG02 XG01 XG02 (G-4) DRAWINGS AND WILL NOT BE SHOWN ON P&IDs. SPECIAL CASES WHERE VENTS/DRAINS NEED

AA753

AA855
TO BE SEAL WELDED, DRAIN/VENT VALVES NEED TO BE REMOVED, WILL BE SPECIFICALLY

AA752
CG CG CG CG
001A 001B 002A 002B INDICATED ON P&IDs.
TP TP TP
ZSO ZSC 03 05 04 ZSO ZSC
M6-QL-00004 -ALL THE PROCESS DRAINS EXCEPT FILTERING SKID’S WILL BE ROUTED TO GM-2, OWT-14.
11EGT00AC001
(G-9 , H-5)
TP LDO HEATING TP - ALL THE REQUIREMENT FOR PROVIDING THERMAL INSULATION AND TRACE HEATING SHALL BE
01 TP 02
H, L
BASED ON DOCUMENT “DQR/00/K/K-----EK26/DM/001”
AA001
11EGD00BR004-C1E1-100mm 06 11EGD00BR005-C1E1-100mm AA002 CT
ENKA MOE MOE ENKA H, L (V) 002
CT XQ01 TI
001
XQ01
11EGD00BR002-C1E1-40mm
TI 11EGD00BR011-C1D1-25mm
(V) (V) ENKA MOE MOE ENKA
FROM LDO
GAS TURBINE LDO CT

AA756
CT
STORAGE TANKS 001 002
FORWARDING PUMP SKID

AA750

AA751
TIT TIT
M6-EG-00002
G UNIT 11
AA003
(F-4) TP
11EGD00BR001-C1E1-150mm TP
TP 402-1 404-1

AA853
401-1

AA850

AA851
150 x 100

AA858
(REFER TO GAS TURBINE LDO

00GMA00BR004-C1D1-100mm
VENDOR DRAWING: CG CG FILTERING SKID TP
003A 003B
250x150 LATER) TP UNIT 11 405-1 M6-EN-00010

00EGD00BR032-C1E1-100mm
ZSO ZSC
403-1 (H-3)
(REFER TO VENDOR DRAWING: TO CO FILTERING SKID
CG CG LATER)
003A 003B 11EGD00BR006-C1E1-50mm
XG02 XG01 TP TP
11EGD00BR009-C1E1-25mm 406-1 407-1
50x25

AA852
12EGD00BR010-C1E1-25mm
AA Set @ 13 barg

AA852
900
(V)
11EGD00BR012-C1E1-25mm REFERENCES :
00EGD00BR017-C1E1-250mm

(V) M6-EN-00010

12EGD00BR008-C1E1-20mm

12EGD00BR002-C1E1-40mm
HOT WAT ER RE TURN
HOT WAT ER S UPP LY
(V) (G-12) - DQR/00/K/GMA --- EN/FD/002 (IQ360-000-M6-GM-00002)
CG CG CG CG
AA705

001A 001B 002A 002B - DQR/00/K/K-----EK26/DM/001


F XG01 XG02 XG01 XG02

AA755
AA754
CG CG CG CG
001A 001B 002A 002B
TP TP TP
ZSO ZSC 03 05 04 ZSO ZSC M6-QL-00004
12EGT00AC001 (E-9 , F-5)
TP LDO HEATING TP
AA805

01 02 H, L
TP CT
AA001 12EGD00BR004-C1E1-100mm 06 12EGD00BR005-C1E1-100mm AA002 002
H, L
CT XQ01 TI
ENKA MOE MOE ENKA (V)
001
XQ01 TI 12EGD00BR002-C1E1-40mm
12EGD00BR011-C1D1-25mm
(V) (V)
ENKA MOE
CT CT
GAS TURBINE LDO 001 002
MOE ENKA
AA753
00EGD00BR017-C1E1-250mm

AA751
AA750
FORWARDING PUMP SKID TIT TIT
12EGD00BR001-C1E1-150mm TP 12EGD00BR003-C1E1-150mm
TP UNIT 12 TP
402-2 404-2
401-2
150 x 100

AA850

AA851
AA852

AA854
GAS TURBINE LDO
(REFER TO FILTERING SKID

00GMA00BR004-C1D1-100mm
E VENDOR DRAWING:
CG CG
(V) TP 12EGD00BR007-S1E1-80mm
003A 003B UNIT 12 M6-EN-00010
LATER) 405-2
TP ZSO ZSC (F-3)

AA752
403-2 (REFER TO VENDOR DRAWING:
CG
TO CO FILTERING SKID
CG
LATER)
003A 003B 12EGD00BR006-C1E1-50mm
XG02 XG01 TP TP
12EGD00BR009-C1E1-25mm 406-2 407-2
50x25

AA855
13EGD00BR010-C1E1-25mm

Set @ 13 barg
AA

AA853
900 12EGD00BR012-C1E1-25mm
M6-EN-00010
(V)

13EGD00BR008-C1E1-20mm

13EGD00BR002-C1E1-40mm
(E-12)
HOT WAT ER S UPP LY

HOT WAT ER RE TURN

(V)
CG CG CG CG
001A 001B 002A 002B

AA756
XG01 XG02 XG01 XG02
AA181

LO
CG CG CG CG
AA755

001A 001B 002A 002B


00EGD00BR020-C1E1-80mm

TP TP TP
D ZSO ZSC 03 05 04
ZSO ZSC
M6-QL-00004
13EGT00AC001
LDO HEATING (D-9 , E-5)
TP TP
01 TP 02 H, L
H, L 13EGD00BR004-C1E1-100mm 06 13EGD00BR005-C1E1-100mm CT
ENKA MOE MOE ENKA CT AA001 AA002
002
001 XQ01 TI
XQ01 TI
(V)
13EGD00BR011-C1D1-25mm 13EGD00BR002-C1E1-40mm
TO LDO TRANSFER (V) (V) (V)
CT
PUMPS SKID GAS TURBINE LDO 001 CT
ENKA MOE MOE ENKA Revision History
002
M6-EG-00003 FORWARDING PUMP SKID TIT

AA750

AA751

AA752
AA754

TIT
(B-12) UNIT 13
13EGD00BR001-C1E1-150mm 13EGD00BR003-C1E1-150mm
TP TP TP 01 24.05.2019 NY CYO AA YT ISSUED FOR USE
401-3 402-3 404-3 GAS TURBINE LDO
150 x 100 (REFER TO FILTERING SKID 00 01.08.2017 NY CYO AA HS ISSUED FOR USE

00GMA00BR004-C1D1-100mm
AA854

AA853

AA850

AA851

AA852
VENDOR DRAWING: (V) UNIT 13 Rev. Revision Date BY CHK EGS PEM Brief Description
LATER) CG CG TP 13EGD00BR007-S1E1-80mm
TP
003A 003B
405-3
M6-EN-00010 Description Current Version
403-3 00EGD00BR032-C1E1-100mm

AA753
ZSO ZSC (D-3)
(REFER TO VENDOR TO CO FILTERING SKID
DRAWING: LATER) PROJECT
C CG CG
003A 003B TP TP
DHI QAR COMBINED CYCLE
00EGD00BR017-C1E1-250mm

XG02 XG01 406-3 407-3


13EGD00BR009-C1E1-25mm 13EGD00BR006-C1E1-50mm 50x25
POWER PLANT PROJECT

AA855
AA854

NASIRIYAH, IRAQ
14EGD00BR010-C1E1-25mm

Set @ 13 barg
AA 13EGD00BR012-C1E1-25mm
900 M6-EN-00010 OWNER
(C-12)
(V)
14EGD00BR002-C1E1-40mm
14EGD00BR008-C1E1-20mm
HOT WAT ER RE TURN
HOT WAT ER S UPP LY

(V) CG CG
CG CG M
002A 002B E
001A 001B
XG01 XG02
AA757

XG02 XG01

CG CG CG CG
AA756

001A 001B TP TP TP 002A 002B CONTRACTOR NOMINATED SUB CONTRACTOR

ZSO
ZSC 03 05 04 ZSO ZSC GE POWER
M6-QL-00004
14EGT00AC001
LDO HEATING (C-9 , B-5)
TP TP
H, L
B ENKA MOE MOE ENKA
CT
H, L
AA001
01 TP
06
02
14EGD00BR005-C1E1-100mm
CT
14EGD00BR004-C1E1-100mm AA002
002
001
(V) XQ01 TI
XQ01 TI

14EGD00BR002-C1E1-40mm
14EGD00BR011-C1D1-25mm
GAS TURBINE LDO (V) (V) (V) (V)
CT ENKA MOE MOE ENKA MOE Contract Number :
CT
FORWARDING PUMP SKID 001
250x150 002
CONTRACT NO: 1
AA755

AA750

AA753
AA751

AA752

UNIT 14 TIT
TIT
14EGD00BR001-C1E1-150mm
TP TP
AA003 14EGD00BR003-C1E1-150mm TP
401-4 GAS TURBINE LDO Cross Checked
402-4 404-4

00GMA00BR004-C1D1-100mm
150 x 100 (REFER TO FILTERING SKID Department Name Date Signature
AA850
AA855

AA851

AA852

AA853
AA854

VENDOR DRAWING: UNIT 14


LATER) TP (V) TP
14EGD00BR007-S1E1-80mm
CG CG M6-EN-00010
403-4 405-4
003A 003B Replaces Responsible Dept. Document Type Project Document Code
(B-3)
AA754

ZSO ZSC
PROCESS P&ID DQR/00/K/EG---EN/FD/004
14EGD00BR009-C1E1-25mm

(REFER TO VENDOR TO CO FILTERING SKID


DRAWING: LATER)
TP BY CHK EGS PEM Format

SIZE A3 (420x297 mm)


CG CG TP
406-4
003A 003B 14EGD00BR006-C1E1-50mm 50x25 407-4 NY CYO AA YT A3
XG02
AA856

XG01
Nominated Sub Contractor Document Title Document Status Scale :
A
14EGD00BR012-C1E1-25mm
PIPING & INSTRUMENTS DIAGRAM ISSUED FOR USE -
M6-EN-00010
Identification Number
(A-12) LIGHT DISTILLATE OIL SYSTEM -
FORWARDING IQ360-000-M6-EG-00004
00EGD00BR021-C1E1-50mm 00EGD00BR021-C1E1-50mm
M6-EG-00003
TO OWT-14 Rev. Date Lang. Sheet
(B-12) M6-GM-00002/1
(C-9)
01 24.05.2019 EN 1/1