Professional Documents
Culture Documents
Bridges Progress 22.5-28.5
Bridges Progress 22.5-28.5
50%
50%
2 4
2 1
1 1
100%
1 1
100%
50%
100%
1 1
100%
80%
1 1
Volume of executed production from 15th of Description of executed production from 15th of May to
May to 21st of May 21st of May
5 concreted 5 piles.
2 concreted 2 abutments.
1 concreted 1 bearing beam.