Volume of planned

No. Bridge Position Operation


works total
1 M1 BRIDGE km 45+208 Piles 88
2 M1 BRIDGE km 45+208 Foundations 12
3 M1 BRIDGE km 45+208 Middle piers 12
4 M1 BRIDGE km 45+208 Abutments 8
5 M1 BRIDGE km 45+208 Bearing beams 12
6 M6 OVERPASS km 54+014 Middle Piers 2
7 M6 OVERPASS km 54+014 Bearing beams 4
8 M7 OVERPASS km 56+354 Pedestrian walkways 2
9 M7 OVERPASS km 56+354 Transition slabs 2
10 M7 OVERPASS km 56+354 Hidroisolation 1
11 M7 OVERPASS km 56+354 Steel guardrail
pedestrian protective
12 M7 OVERPASS km 56+354
fence
13 M7 OVERPASS km 56+354 End slope

protective coating of the


14 M7 OVERPASS km 56+354 concrete surfaces of the
bridge
15 M8 BRIDGE km 56+773 Pedestrian walkways 4
16 M9 OVERPASS km 58+170 Pedestrian walkways 2
17 M10 BRIDGE km 58+641 Hidroisolation 2
18 M10 BRIDGE km 58+641 End slope
19 M12 BRIDGE km 61+300 Hidroisolation 2
pedestrian protective
20 M12 BRIDGE km 61+300
fence
21 M12 BRIDGE km 61+300 Steel guardrail
protective coating of the
22 M12 BRIDGE km 61+300 concrete surfaces of the
bridge
23 M13 BRIDGE km 62+350 Hidroisolation 2
pedestrian protective
24 M13 BRIDGE km 62+350
fence
25 M14 OVERPASS km 62+938 End slope
26 M15 BRIDGE km 63+700 Hidroisolation 2
Volume of planned works in Volume of executed production from
May 1st of May to 28th of May
20 18
2 2
3 3
3 2
2 1
1 1
4 3
1 1
2 2
1 1
100%
100%

50%

50%

2 4
2 1
1 1
100%
1 1

100%

50%

100%

1 1

100%

80%
1 1
Volume of executed production from 15th of Description of executed production from 15th of May to
May to 21st of May 21st of May
5 concreted 5 piles.

2 concreted 2 abutments.
1 concreted 1 bearing beam.

2 concreted 2 bearing beams.

50% End slope finishead 50%

protective coating of the concrete surfaces of the bridge


50%
finishead 50%.

1 Concreted 1 pedestrian walkway.


1 left lane hidroisolation is finishead.
100% End slope finishead 100%.
1 left lane hidroisolation is finishead.

100% Pedestrian protective fence finishead 100%.

protective coating of the concrete surfaces of the bridge


100%
finishead 100%.

100% Pedestrian protective fence finishead 100%.

80% End slope finishead 80%.