The document outlines planned and executed construction volumes for bridges and overpasses on several routes from April 3rd to April 16th. It includes details on piles, foundations, piers, walkways, girders, decks, and beams for Bridges M1, M4, M5, and M6. The volumes planned and executed production are shown in three columns with notes on production from the 10th to the 16th.
The document outlines planned and executed construction volumes for bridges and overpasses on several routes from April 3rd to April 16th. It includes details on piles, foundations, piers, walkways, girders, decks, and beams for Bridges M1, M4, M5, and M6. The volumes planned and executed production are shown in three columns with notes on production from the 10th to the 16th.
The document outlines planned and executed construction volumes for bridges and overpasses on several routes from April 3rd to April 16th. It includes details on piles, foundations, piers, walkways, girders, decks, and beams for Bridges M1, M4, M5, and M6. The volumes planned and executed production are shown in three columns with notes on production from the 10th to the 16th.
works total 1 M1 BRIDGE km 45+208 Piles 88 2 M1 BRIDGE km 45+208 Foundations 12 3 M1 BRIDGE km 45+208 Middle piers 12 4 M4 BRIDGE km 50+816 Pedestrian walkways 4 5 M5 OVERPASS km 51+438 transverse girders 4 6 M5 OVERPASS km 51+438 Bridge deck 1 7 M6 OVERPASS km 54+014 Middle Piers 2 8 M6 OVERPASS km 54+014 Precast girders 18 9 M6 OVERPASS km 54+014 Bearing beams 4 10 M7 OVERPASS km 56+354 Pedestrian walkways 2 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 32 33 Volume of planned works in Volume of executed production from April 3rd of April to 30th of April 20 15 3 2 2 4 4 2 1 0.5 1 1 1 2 2 Volume of executed production from 10th of Description of executed production from 10th of April to April to 16th of April 16th of April 5 Concreted 5 piles.