D A B C D A B C: Concrete Beam Rebar Table (Seismic)

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

TIES ZONE ATIES ZONE C

90 DEG HOOK

LARGER DIM OF COL


MAX OF H3/6 OR
(0.457 m MIN)

(TIES NOT SPECIFIED IN SCHEDULE)


VERTICAL COLUMN
REINFORCEMENT

TYPICAL LAP
TIES ZONE B

B
H3

D A B C
LARGER DIM OF COL
MAX OF H3/6 OR
(0.457 m MIN)
TIES ZONE ATIES ZONE CTIES ZONE A

10.670 m

3.500 m 3.670 m 3.500 m


LARGER DIM OF COL

Lc
MAX OF H2/6 OR

A
(0.457 m MIN)

3CB2S1
2CB2S1 3CB2S2
2CB2S2 3CB2S3
2CB2S3
A
4

CONCRETE BEAM REBAR TABLE (SEISMIC)


BEAM HEIGHT

SPAN SECTION SIZEL1 LONGITUDINAL BARS STIRRUPS


L2
TYPICAL
BEAM ID SPAN NO. LENGTH B A L1 L2 D ELEVATIONS
(LC)
(TIES NOT SPECIFIED IN SCHEDULE)

WIDTH DEPTH A B C D
VERTICAL F
COLUMN G H ZONE A ZONE B ZONE C
2.850 m

REINFORCEMENT 12-10 @ 175 MM TYPE


3CB1S2
2CB1S2

3CB1S2
2CB1S2

3CB1S2
2CB1S2

3CB1S2
2CB1S2
2-16 4-16 3-10 @ 175 MM TYPE A
1 2.550 M 250 MM 400 MM - - - - - - - - A ELEVATION 2S
(357) (94) (0.5)
(0.4)
3CB1
12-10 @ 175 MM TYPE
2-16 2-16 4-16 3-10 @ 175 MM TYPE A
TYPICAL LAP

2 2.550 M 250 MM 400 MM - - - - - - - A ELEVATION 2S


TIES ZONE B

(215) (241) (160) (0.4)


d

(0.4)
h

16-10 @ 175 MM TYPE


H2

2-16 4-16 3-10 @ 175 MM TYPE A


1 3.200 M 250 MM 400 MM - - - - - - - - A ELEVATION 3S
(294) (192) (0.4)
(0.3)
3CB2S1
2CB2S1 3CB2S2
2CB2S2 3CB2S3
2CB2S3 16-10 @ 175 MM TYPE
2-16 4-16 3-10 @ 175 MM TYPE A
3CB2 2 3.370 M 250 MM 400 MM - - - - - - - - A ELEVATION 3S
6.300 m

(364) (155) (0.4)


3

(0.3)
G F H 15-10 @ 175 MM TYPE
2-16 2-16 4-16 3-10 @ 175 MM TYPE A
3 3.200 M 250 MM 400 MM - - - - - - - A ELEVATION 3S
(294) (364) (192) (0.4)
(0.3)
77-10 @ 125 MM TYPE
2-16 2-16 4-16 3-10 @ 125 MM TYPE A
3CB3 1 10.670 M 150 MM 300 MM - - - - - - - A ELEVATION 1S
(0) (0) (205) (0.0)
LARGER DIM OF COL

(0.0)
2.850 m

MAX OF H2/6 OR

12-10 @ 175 MM TYPE


3CB1S1
2CB1S1

3CB1S1
2CB1S1

3CB1S1
2CB1S1

3CB1S1
2CB1S1
2-16 4-16 3-10 @ 175
B MM TYPE A
(0.457 m MIN)

ZONE A ZONE B -ZONE C ZONE ZONE


- A
TIES ZONE ATIES ZONE CTIES ZONE A

1 2.550 M 250 MM 400 MM - - - - - - A ELEVATION 2S


(382) (235) (0.7)
(0.6)
2CB1
12-10 @ 175 MM TYPE
2-16 2-16 4-16 3-10 @ 175 MM TYPE A
2 2.550 M 250 MM 400 MM - 1-16 - - - 0.637 M - A ELEVATION 2S
(375) (451) (230) (0.7)
NOTES:
(0.6)
16-10 @ 175 MM TYPE
1.3.200
SEE BEAM 2-16 4-16 3-10 @ 175 MM TYPE A
1 M SCHEDULE FOR STIRRUP
250 MM TYPE AND SPACING.
400 MM 1-16 - - - - 0.800 M - - A ELEVATION 3S
(451) (313) (0.6)
2. ZONE A LENGTH SHALL BE TWICE THE BEAM HEIGHT, h. (0.4)
3CB2S1 2-16
2CB2S1 4-16
3CB2S2
2CB2S2 3CB2S3
2CB2S3
3-10 @ 175 MM TYPE A
16-10 @ 175 MM TYPE
3. THE FIRST STIRRUP IN ZONE A SHALL BE LOCATED 50.8mm MAXIMUM FROM THE FACE OF THE SUPPORT.
2CB2 2 3.370 M 250 MM 400 MM - - 1-16 - - - 0.843 M - A ELEVATION 3S
(475) (287) (0.6)
0.600 m
2

(0.4)
LARGER DIM OF COL

4. LAP SPLICES SHALL NOT BE LOCATED WITHIN THE BEAM/COLUMN JOINT, NOR WITHIN A DISTANCE OF 2H.
15-10 @ 175 MM TYPE
MAX OF H1/6 OR

2-16 AT A MAXIMUM SPACING


5. LAP SPLICES SHALL BE ENCLOSED BY HOOP STIRRUPS 2-16 4-16IS SMALLER.
OF D/4 OR 101.6mm, WHICHEVER 3-10 @ 175 MM TYPE A
(0.457 m MIN)

3 3.200 M 250 MM 400 MM 1-16 1-16 - 3CB3S1 - 0.800 M 0.800 M - A ELEVATION 3S


(451) (475) (313) (0.6)
(0.4)
1

Typical Concrete Beam Elevation 1S


(TIES NOT SPECIFIED IN SCHEDULE)

VERTICAL COLUMN
REINFORCEMENT
TYPICAL LAP
TIES ZONE B
H1

Floor Framing Plan - Story1


Story2 (EL. 1.600
4.600 m)
CLIENT PROJECT
PAGE. DESIGNED
(Scale 1:75)
1 DRAWN NA
LARGER DIM OF COL

CONSULTANT TITLE
MAX OF H1/6 OR

DATE CHECKED
(0.457 m MIN)
TIES ZONE A

TYPICAL CONCRETE BEAM ELEVATION 1S 10/1/2017 APPROVED IS

Concrete Column Typical Elevation - Special

CLIENT PROJECT
PAGE. DESIGNED

1 DRAWN NA

CONSULTANT TITLE
DATE CHECKED

CONCRETE COLUMN TYPICAL ELEVATION -


FLOOR FRAMING PLAN - STORY1
STORY2 (EL. 1.600
4.600 M) 10/1/2017 APPROVED IS
SPECIAL