Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

Anexa 1

Manoper
a pret
Manopera total unitar pret total
1 Spart beton 0 200 0.00
9 canalizare 1 2100 2,100.00
10 transport manual pamant, local la 50m, 20 to 0 40 0.00
11 Scara + inchidere soclu cladire 0 0 0.00
Total 2,100.00

Utilaje
1 Picamer 0 300 0.00
2 compactor mecanic 2 zile 2 180 360.00
3 Transport auto la groapa spartura, aditional 20 tone. 1 220 220.00
4 rotopercutor 1 50 50.00
Total Utilaj 630.00

pret
Materiale UNT unitar Total RON
1 pietris 3 100 300.00
5 Membrana cramponata 1 250 250.00
2 Teava canalizare 160/ nisip 143.06
4 teava D25, nisip, ciment 126.69
8 capac camin 119.00
10 benzina compactor 25.00
12 caramida, ciment 34.22
13 nisip 21.80
15 organizare santier, 297.39
20 nisip 27.60
21 nisip 35.36
27 camin apa 1,627.52
Total materiale 3,007.64

Recapitulatie
Manopera 2100 1 2100
Utilaje 630 1 630
Materiale 3008 1 3008
Total General lei 5738
Euro 1,304.01