Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Key plan

NOTES:
1. THIS DRAWING ISSUE HAS BEEN CHECKED AND APPROVED IN
ACCORDANCE WITH THE ONE QUALITY MANAGEMENT SYSTEM.
2. FOR GENERAL NOTES, SYMBOLS AND ABBREVIATIONS, REFER TO
DRAWING 19016-WD-GNseries
3. ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE STATED.
4. ALL DRAWINGS HAVE TO BE READ IN CONJUNCTION WITH ALL
RELEVANT ARCHITECTURAL, STRUCTURAL AND SERVICES
ENGINEER'S DRAWINGS AND SPECIFICATIONS.
5. DO NOT SCALE OFF THIS DRAWING.

TW +1.986 TW +1.986 FG -0.114 FG -0.114


TW -0.064 TW -0.064 TK +0.032
MH
CB CB

TW -0.064
CB CB CB CB CB CB CB CB CB CB CB CB CB
TW +1.986
FL -2.359 FG -0.114

SLOPE 2 %
SLOPE 2 %
SLOPE 2 %
SLOPE 2 %
TW -0.064 FL -4.87 TW -0.064

SLOPE 2 %
FL -4.87 FL -4.87 FL -4.81 FL -4.87 MH
TW +0.182
CB
TK -2.299 FL -4.75 FL -4.75 FG -0.143
FL -2.239 FL -2.299 TK -4.81 FL -4.81 TK -4.81
EFH-14
EFH-15 EFH-16

FG +0.50 TW +0.55 FL -4.75

EP-2
TK -2.089 EFH-13

EFH-17

TW+1.0
TK -4.60 FL -4.75

SLOPE 1 %
FG +0.95
CB

FL -0.04 TW +0.55 TS +1.0


FL -1.103 TK -1.043 TK -2.35 TW -0.064 FL -0.118 (HP) TK +0.032

EP-1
CB TK -0.833
FL -1.043 FL -0.983 620 900 X 15 =13500
TS +0.55 405 905

FL -2.49

50 150

150
45
TS +1.0
420

50
200 230
TS +0.55

350

350
1050

1055
340

1135
350

350

1205
200
325

50

50
280

240 160
100

120
R300

FG +0.50

250

200
R540
1000
635 900 X 9 =8100

685
1000 1000

WL +0.75

1500

1490
EFH-12

TW+0.55

3000
TK +0.032
MH
FL +0.006
R2580

865 X 11 =9540
BP +0.72

10290
8950
8240
R1490

200
250 1400
150

3000

3000
R1250

FFL 0.10 FG -0.018


R1040

TW +1.986
R800

TK -0.154 FL 0.10

7985
18330
TW +1.986 FG -0.114

3000
FL +0.45 TS +0.55 .056
EFH-01

TK +0
CB

1480
TK -0.064
MH TK +0.056 870

MH

1195
3000

100

1120
FL 0.00 BL +0.72

50

1050
350
330

FRL -0.214 FRL -0.154 FRL -0.094 TS +0.55


8 =7200

MH
900 X 875

350
BK -0.239
530

200

50
EFH-10
865

280
MH

240
160

200
BK -0.239

340
605

715
TK -0.064 MH

200
MH

1050
FG -0.114
CB

230
154

0
TK -0.064 0.986

R54
R300

CB

50
TK -0.

165
FL -0.214 +0.10
MH

350
CB CB

TK -0.064 RP-01 FG -0.114 SLOPE 1 %


CB 14 =12600

FL -0.214 TW +

350
900 X

MH
BK -0.239
CB
EFH-11

50 150
CB

FL
MH
RP-02 .064
CB MH MH

%
FL 0.10 54
CB
SLOPE 2 %

MH

FL -0.1 TW -0
MH MH CB

PE0.63
65
.55
SLOPE 2 %

645

CB

TK -0.064
45

TK +0.056
TS +0 -0.214
SLOPE 2 %

FL+0.03 FL -0.214 164


BK -0.239 239 FRL FG -0.
MH
SLOPE 2 % BK -0.094 FL +0.10 . 056 - 0. 214
0 TK -0. .60

SLO
TK +0.03 TK + .094 B K
064
TK -0.
SLOPE 2 %

MH

BK -0 RP-061.986 FRL -0
MH MH CB

.986
MH

FG-0.02 TK +0.056
CB

TW +0

%

W+

2%
CB
EFH-02

TK +0.03 TK +0.056
CB

214 +1.986 T
MH

E1.13
FL -0.12 FL 0.10 10 . 14
TK +0.03 BK -0.094 HP -0.094 L +0. L - 0 - 0. 1

SLOPE
CB
CB
BK -0.145 CB
BK -0.094 F FR TW MH FG . 60
TK +0.056
BK -0.145 FRL -0
CB

TK +0.056

SLOP
CB

BK -0.094(HP) E5%
FG-0.02 BK -0.094 REFERENCE SSL-+0.00 (249.721) SLOP

10%
CB CB
MH

%
FL-0.239 FL +0 .056

1
LEVEL .10
FL +0 TK +0 94 .986

SLOPE
MH
FL 0.10

SLOPE
HP -0.094 .10 14 1 5
TK +0.03 0 FL -0.2 TW + CB

FRL -0
.4
FL 0.10 BK .

E 1%
CB
CB
CB
- 0 EFH-03

BK -0.145 TK +0.03 FRL -0 MH


114
CB

FL -0.12 214

SLOP
SLOPE 2 %

0.5%
FG -0.
CB

TK -0. .60 5%

.3%
BK -0.145 .154 CB

BK -0.094 (HP) FL -0. TK +0 1 4 SLOPE

1%
FL -0.2

E 1%
TK +0.03 .
BK -0 056 FRL 0
-

LOPE1
FL -0.12 129

SLOPE

SLOPE
FL -0.094 TK +0.056 TW +0.296 .094 239

SLOP
CB MH

.056 .056 BK -0. 64 FG -0.


164

1.3%
FL -0.094

S
TK +0.056 FL +0 TK +0 094
MH
0
TW +1.1 TK -0.
SLOPE 2 %

CB
FRL -0 TS +0.55 8.33 %
CB

BK -0.094 BK -0.

SLOPE
TK -0.064
SLOPE 2 %

FL -0.214 RP-0 TW +1.396 .154 SLOPE 14


FL -0.2
CB MH

BK -0.239 3 .986
TF +0
CB CB
SLOPE 2 %

CB
MH
MH
FL -0.214 TK +0.056 TW +1.65 094 6
CB

TW +0.846 BK -0. +0.98 MH 214


MH
SLOPE 2 %

TK -0. .60
MH CB

.056 249.507
EFH-09 EFH-04

BK -0.094

1.3%
TK +0 .094 TW
CB

4
L -0.21
MH CB

TW +1.986 BK -0.239 FL -0. FL -0.0


64 F 0
R L -
CB CB

FG -0.114 RP21
-04 FRL -0.154 TW +0.55 BK -0 FR

SLOPE
CB
MH
MH MH MH

TK -0.064MH
EFH-08

CB MH
CB
BK -0.239 FL -0.214 BW -0.094 TK +0.056 TW +0.986
MH
249.121

SLOPE 2%

10%
TW +1.1 5%
SLOPE
CB CB CB

UPDATED PARKING LAYOUT

SLOPE 2%
.214
MH
TW +1.986 CB
BK -0.094
TK -0.064 MH FRL -0
EFH-07

MH

SLOPE
MH CB

BK -0.239
CB

FL -0.214 239 .45


FRL -0
CB MH

BK -0. 64
CB
MH CB

TKMH-0.064 BK -0.239 FL -0.214 TK - .


0 0 TW +0.986 249.271
EFH-06

FG -0.114 TW +1.986
MH TK -0.064MH CB

MH
EFH-05

SLOPE2.7
05 20.08.2023 WALKWAY MATERIAL REVISED NP ML VC

%
FRL -0.60 04 14.04.2023 GFC-4 DD ML VC

03 20.03.2023 GFC-3 SD ML VC

02 24.02.2023 GFC-3 AT ML VC

01 20.05.2022 GFC-2 AT ML VC

Rev. Date Description Drn. Chkd. Appd.

LEVEL AND DRAINAGE PLAN LEGEND : DRAINAGE LEGEND : LEVELS Client


A SCALE 1: 450 @A1 / 1: 900 @A3 GODREJ FUND
Proposed Shrub / FRL+0.00 Proposed Road Level by Engineer
Groundcover Area
FL+0.00 Proposed Landscape Floor Finish Level
Proposed Lawn Area
TW+0.00 Proposed Top of Wall Level
Design Institute
Proposed Waterbody TK+0.00 Proposed Top of Kerb Level Architect: FOSTER+PARTNERS

Proposed Pebble bed BK+0.00 Proposed Bottom of Kerb Level

FG+0.00 Proposed Finished Ground Level


Ridge Line
TR+0.00 Proposed Top of Railing Level Issue Status
Proposed Drainage Fall GOOD FOR CONTRUCTION DRAWINGS
TS+0.00 Proposed Top of seat Level Project Title

Proposed Channel Drain


Godrej Centre Gurugram,
TF+0.00 Proposed Top of fence INDIA
Proposed Channel Drain with
WL+0.00 Proposed Level of Water
metal grating
GROUND LEVEL
Proposed Brick Slot Drain BL+0.00 Proposed Bottom of Pool Level LEVEL AND DRAINAGE PLAN

Proposed Channel Drain UFL+0.00 Unfinished Floor Level


Scale at A1 Date Drawn Checked Approved

HP - High point 1:450 15.03.2022 SD PN VC


PD Planter Drain
LP - Low point
Floor Drains

Proposed Catch basin

Proposed circular Manhole for


Room 506, 5/F, Opulent Building, 396-416
drainage Hennessy Road, Hong Kong
T 852 2155 3865 F 852 2155 9588
Earth pits E info@one-landscape.com W www.one-landscape.com

Job No. Drawing No. Rev.


19016 19016-WD-LP201.1 01
Plot date:22 September 2023 11:18:29 Plot style table:ONE-black.ctb User:MADHURA File: \\Dataserver\Projects\INDIA\19016_GCR_Gurugram\05_MAILBOX\02_OUTGOING\Client\20230908_FINAL GFC PACKAGE\CAD\LP Series\Ground\19016_GCR_GFC_LP101.1-401.1 Copyright C

You might also like