Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

4TH BASEMENT C50, C25, COLUMNS


1 20-Jan-2013 DB16/111-AB-S02-0006 1.11 AB 1110-111-LB4-AB-S-3013 ST 0 Jameel C 22-Jan-2013
DETAILS SHEET 2 OF 16

FIRE PROTECTION SYSTEM AS BUILT


2 3-Dec-2013 111/AB-M03-0001 1.11 AB 1110-111-LB3-AB-P-PL-105007 ME 0 Khusro D 16-Dec-2013
LAYOUT BASMENT LEVEL 03

FIRE PROTECTION SYSTEM AS BUILT


3 3-Dec-2013 111/AB-M03-0002 1.11 AB 1110-111-LB3-AB-P-PL-105004 ME 0 Khusro D 16-Dec-2013
LAYOUT BASMENT LEVEL 04

5TH BASMENT COLUMN STARTER


4 26-Dec-2013 111/AB-S02-0011 1.11 AB 1110-111-LB5-AB-S-3000 ST 0 Jameel D 27-Jan-2014
BARS SHEET 1 OF 6

5TH BASMENT COLUMN STARTER


5 26-Dec-2013 111/AB-S02-0012 1.11 AB 1110-111-LB5-AB-S-3001 ST 0 Jameel D 27-Jan-2014
BARS SHEET 2 OF 6

5TH BASMENT COLUMN STARTER


6 26-Dec-2013 111/AB-S02-0013 1.11 AB 1110-111-LB5-AB-S-3002 ST 0 Jameel D 27-Jan-2014
BARS SHEET 3 OF 6

5TH BASMENT COLUMN STARTER


7 26-Dec-2013 111/AB-S02-0014 1.11 AB 1110-111-LB5-AB-S-3003 ST 0 Jameel D 27-Jan-2014
BARS SHEET 4 OF 6

5TH BASMENT COLUMN STARTER


8 26-Dec-2013 111/AB-S02-0015 1.11 AB 1110-111-LB5-AB-S-3004 ST 0 Jameel D 27-Jan-2014
BARS SHEET 5 OF 6

5TH BASMENT COLUMN STARTER


9 26-Dec-2013 111/AB-S02-0016 1.11 AB 1110-111-LB5-AB-S-3005 ST 0 Jameel D 27-Jan-2014
BARS SHEET 6 OF 6

4TH BASMENT COLUMN STARTER


10 26-Dec-2013 111/AB-S02-0017 1.11 AB 1110-111-LB5-AB-S-3006 ST 0 Jameel D 27-Jan-2014
BARS SHEET 1 OF 22

4TH BASMENT COLUMN STARTER


11 26-Dec-2013 111/AB-S02-0019 1.11 AB 1110-111-LB5-AB-S-3050 ST 0 Jameel D 27-Jan-2014
BARS SHEET 1 OF 1

Page 1 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

5TH BASEMENT FOUNDATION PLAN


12 30-Dec-2013 111/AB-S01-0021 1.11 AB 1110-111-LB5-AB-S-1000 ST 0 Jameel D 27-Jan-2014
LAYOUT

5TH BASEMENT FOUNDATION


13 30-Dec-2013 111/AB-S01-0022 1.11 AB 1110-111-LB5-AB-S-1001 ST 0 Jameel D 27-Jan-2014
ADDITION REINFORCEMENT

5TH BASEMENT FOUNDATION


14 30-Dec-2013 111/AB-S01-0023 1.11 AB 1110-111-LB5-AB-S-1002 ST 0 Jameel D 27-Jan-2014
ADDITION REINFORCEMENT

5TH BASEMENT FOUNDATION


15 30-Dec-2013 111/AB-S01-0024 1.11 AB 1110-111-LB5-AB-S-1003 ST 0 Jameel D 27-Jan-2014
ADDITION REINFORCEMENT

5TH BASEMENT FOUNDATION DETAIL


16 30-Dec-2013 111/AB-S01-0025 1.11 AB 1110-111-LB5-AB-S-1004 ST 0 Jameel D 27-Jan-2014
SHEET 1 OF 2

5TH BASEMENT FOUNDATION DETAIL


17 30-Dec-2013 111/AB-S01-0026 1.11 AB 1110-111-LB5-AB-S-1005 ST 0 Jameel D 27-Jan-2014
SHEET 2 OF 2

5TH BASEMENT SOUTH WALLS


18 30-Dec-2013 111/AB-S01-0027 1.11 AB 1110-111-LB5-AB-S-2000 ST 0 Jameel D 27-Jan-2014
LAYOUT

5TH BASEMENT SOUTH WALLS


19 30-Dec-2013 111/AB-S01-0028 1.11 AB 1110-111-LB5-AB-S-4000 ST 0 Jameel D 27-Jan-2014
STARTES BARS SHEET 1 OF 3

5TH BASEMENT SOUTH WALLS


20 30-Dec-2013 111/AB-S01-0029 1.11 AB 1110-111-LB5-AB-S-4001 ST 0 Jameel D 27-Jan-2014
STARTES BARS SHEET 2 OF 3

5TH BASEMENT SOUTH WALLS


21 30-Dec-2013 111/AB-S01-0030 1.11 AB 1110-111-LB5-AB-S-4002 ST 0 Jameel D 27-Jan-2014
STARTES BARS SHEET 3 OF 3

SOUTH CORE ELEVATION LEVEL B5


22 30-Dec-2013 111/AB-S01-0031 1.11 AB 1110-111-LB5-AB-S-4025 ST 0 Jameel D 27-Jan-2014
TO B2 SHEET 1 OF 1

Page 2 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

23 30-Dec-2013 111/AB-S01-0032 1.11 AB 1110-111-LB5-AB-S-8000 5TH BASEMENT STAIR CASE DETAILS ST 0 Jameel D 27-Jan-2014

4TH BASMENT COLUMN STARTER


24 30-Dec-2013 111/AB-S02-0018 1.11 AB 1110-111-LB5-AB-S-3007 ST 0 Jameel D 27-Jan-2014
BARS SHEET 2 OF 22

GROUNDING & LIGHTING


25 2-Jan-2014 111/AD-E03-0067 1.11 AB 1110-111-LB1-AB-S-6101-A PROTECTION SYSTEM LAYOUT EL 4 Franco B
TIOWER 1 ROOF LEVEL

5TH BASEMENT COLUMN DETAIL


26 6-Jan-2014 111/AB-S01-0020 1.11 AB 1110-111-LB5-AB-S-3051 ST 0 Jameel D 27-Jan-2014
SHEET 1 OF 1

4TH BASMENT FOUNDATION DETAILS


27 6-Jan-2014 111/AB-S02-0033 1.11 AB 1110-111-LB4-AB-S-1006 ST 0 Jameel D 10-Feb-2014
SHEET 1 OF 6

4TH BASMENT FOUNDATION DETAILS


28 6-Jan-2014 111/AB-S02-0034 1.11 AB 1110-111-LB4-AB-S-1007 ST 0 Jameel D 10-Feb-2014
SHEET 2 OF 6

4TH BASMENT FOUNDATION DETAILS


29 6-Jan-2014 111/AB-S02-0035 1.11 AB 1110-111-LB4-AB-S-1008 ST 0 Jameel D 10-Feb-2014
SHEET 3 OF 6

4TH BASMENT FOUNDATION DETAILS


30 6-Jan-2014 111/AB-S02-0036 1.11 AB 1110-111-LB4-AB-S-1009 ST 0 Jameel D 10-Feb-2014
SHEET 4 OF 6

4TH BASMENT FOUNDATION DETAILS


31 6-Jan-2014 111/AB-S02-0037 1.11 AB 1110-111-LB4-AB-S-1010 ST 0 Jameel D 10-Feb-2014
SHEET 5 OF 6

4TH BASMENT FOUNDATION DETAILS


32 6-Jan-2014 111/AB-S02-0038 1.11 AB 1110-111-LB4-AB-S-1011 ST 0 Jameel D 10-Feb-2014
SHEET 6 OF 6

4TH BASMENT RETAINING WALL


33 6-Jan-2014 111/AB-S03-0039 1.11 AB 1110-111-LB4-AB-S-1012 REINFORCEMENT FROM B4 TO B2 ST 0 Jameel D 10-Feb-2014
SHEET 1 OF 2

Page 3 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

4TH BASMENT RETAINING WALL


34 6-Jan-2014 111/AB-S03-0040 1.11 AB 1110-111-LB4-AB-S-1013 REINFORCEMENT FROM B2 TO B2 ST 0 Jameel D 10-Feb-2014
SHEET 2 OF 2

RETAINING WALL REINFORCEMENT


FROM 4TH BASMENT TO GROUND
35 6-Jan-2014 111/AB-S03-0041 1.11 AB 1110-111-LB4-AB-S-1014 ST 0 Jameel D 10-Feb-2014
LEVEL FOUNDATION DETAIL SHEET
OF 2
RETAINING WALL REINFORCEMENT
FROM 4TH BASMENT TO GROUND
36 6-Jan-2014 111/AB-S03-0042 1.11 AB 1110-111-LB4-AB-S-1015 ST 0 Jameel D 10-Feb-2014
LEVEL FOUNDATION DETAIL SHEET 2
OF 2

4TH BASEMENT COLUMN DETAIL


37 13-Jan-2014 111/AB-S02-0044 1.11 AB 1110-111-LB4-AB-S-5001 ST 0 Jameel D 15-Feb-2014
SHEET 2 OF 2

4TH BASEMENT COLUMN DETAIL


38 13-Jan-2014 111/AB-S02-0045 1.11 AB 1110-111-LB4-AB-S-5002 ST 0 Jameel D 15-Feb-2014
SHEET 1 OF 2

4TH BASEMENT COLUMN DETAIL


39 13-Jan-2014 111/AB-S02-0046 1.11 AB 1110-111-LB4-AB-S-5003 ST 0 Jameel D 15-Feb-2014
SHEET 2 OF 2

4TH BASEMENT COLUMN DETAIL


40 13-Jan-2014 111/AB-S03-0043 1.11 AB 1110-111-LB4-AB-S-5000 ST 0 Jameel D 15-Feb-2014
SHEET 1 OF 2

4TH BASEMENT COLUMN DETAIL


41 13-Jan-2014 111/AB-S03-0047 1.11 AB 1110-111-LB4-AB-S-5004 ST 0 Jameel D 15-Feb-2014
SHEET 1 OF 2

4TH BASEMENT COLUMN DETAIL


42 13-Jan-2014 111/AB-S03-0048 1.11 AB 1110-111-LB4-AB-S-5005 ST 0 Jameel D 15-Feb-2014
SHEET 2 OF 2

4TH BASEMENT COLUMN DETAIL


43 13-Jan-2014 111/AB-S03-0049 1.11 AB 1110-111-LB4-AB-S-5006 ST 0 Jameel D 15-Feb-2014
SHEET 1 OF 2

4TH BASEMENT COLUMN DETAIL


44 13-Jan-2014 111/AB-S03-0050 1.11 AB 1110-111-LB4-AB-S-5007 ST 0 Jameel D 15-Feb-2014
SHEET 2 OF 2

Page 4 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

LEVEL 14 CONNECTION DETAILS


45 13-Jan-2014 111/AB-S03-0692 1.11 AB 1110-111-LB4-AB-S-7047 ST 0 Jameel B 27-Jan-2014
SHEET 1

LEVEL 14 CONNECTION DETAILS


46 13-Jan-2014 111/AB-S03-0693 1.11 AB 1110-111-LB4-AB-S-7048 ST 0 Jameel B 27-Jan-2014
SHEET 2

LEVEL 14 CONNECTION DETAILS


47 13-Jan-2014 111/AB-S03-0695 1.11 AB 1110-111-LB4-AB-S-7050 ST 1 Jameel B 27-Jan-2014
SHEET 4

LEVEL 15 CONNECTION DETAILS


48 13-Jan-2014 111/AB-S03-0698 1.11 AB 1110-111-LB4-AB-S-7053 ST 1 Jameel B 27-Jan-2014
SHEET 1

LEVEL 15 CONNECTION DETAILS


49 13-Jan-2014 111/AB-S03-0699 1.11 AB 1110-111-LB4-AB-S-7054 ST 1 Jameel B 27-Jan-2014
SHEET 2

3RD BASMENT FLOOR CONCRETE


50 8-Feb-2014 111-SD-S03-0051 1.11 AB 1110-111-LB3-AB-S-5009 ST 0 Jameel A 16-Mar-2014
LAYOUT SHEET 2 OF 2

3RD BASMENT FLOOR BOTTOM


51 8-Feb-2014 111-SD-S03-0052 1.11 AB 1110-111-LB3-AB-S-5011 ST 0 Jameel A 16-Mar-2014
REINFORCEMENT SHEET 2 OF 2

3RD BASMENT FLOOR TOP


52 8-Feb-2014 111-SD-S03-0053 1.11 AB 1110-111-LB2-AB-S-5013 ST 0 Jameel A 16-Mar-2014
REINFORCEMENT SHEET 2 OF 2

3RD BASMENT FLOOR ADDITIONAL


53 8-Feb-2014 111-SD-S03-0054 1.11 AB 1110-111-LB3-AB-S-5015 ST 0 Jameel A 16-Mar-2014
REINFORCEMENT SHEET 2 OF 2

54 8-Feb-2014 111-SD-S03-0055 1.11 AB 1110-111-LB2-AB-S-5018 3RD BASMENT DETAILS SHEET 3 OF 3 ST 0 Jameel A 16-Mar-2014

2RD BASMENT FLOOR COCRETE


55 8-Feb-2014 111-SD-S03-0056 1.11 AB 1110-111-LB2-AB-S-5019 ST 0 Jameel A 16-Mar-2014
LAYOUT

Page 5 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

2RD BASMENT FLOOR ADDITIONAL


56 8-Feb-2014 111-SD-S03-0057 1.11 AB 1110-111-LB2-AB-S-5020 ST 0 Jameel A 16-Mar-2014
REINFORCEMENT SHEET 2 OF 2

2RD BASMENT FLOOR ADDITIONAL


57 8-Feb-2014 111-SD-S03-0058 1.11 AB 1110-111-LB2-AB-S-5021 ST 0 Jameel A 16-Mar-2014
REINFORCEMENT SHEET 1 OF 2

2RD BASMENT FLOOR TOP


58 8-Feb-2014 111-SD-S03-0059 1.11 AB 1110-111-LB2-AB-S-5022 ST 0 Jameel A 16-Mar-2014
REINFORCEMENT SHEET 2 OF 2

2RD BASMENT FLOOR TOP


59 8-Feb-2014 111-SD-S03-0060 1.11 AB 1110-111-LB2-AB-S-5023 ST 0 Jameel A 16-Mar-2014
REINFORCEMENT SHEET 1 OF 2

2RD BASMENT FLOOR TOP


60 8-Feb-2014 111-SD-S03-0061 1.11 AB 1110-111-LB2-AB-S-5024 ST 0 Jameel A 16-Mar-2014
REINFORCEMENT SHEET 2 OF 2

2RD BASMENT FLOOR ADDITIONAL


61 8-Feb-2014 111-SD-S03-0062 1.11 AB 1110-111-LB2-AB-S-5026 ST 0 Jameel A 16-Mar-2014
REINFORCEMENT SHEET 2 OF 2

2RD BASMENT FLOOR DETAIL SHEET 3


62 8-Feb-2014 111-SD-S03-0063 1.11 AB 1110-111-LB2-AB-S-5029 ST 0 Jameel A 16-Mar-2014
OF 5

2RD BASMENT FLOOR DETAIL SHEET 4


63 8-Feb-2014 111-SD-S03-0064 1.11 AB 1110-111-LB2-AB-S-5030 ST 0 Jameel A 16-Mar-2014
OF 5

2RD BASMENT FLOOR DETAIL SHEET 5


64 8-Feb-2014 111-SD-S03-0065 1.11 AB 1110-111-LB2-AB-S-5031 ST 0 Jameel A 16-Mar-2014
OF 5

2RD BASMENT FLOOR DETAIL


65 8-Feb-2014 111-SD-S03-5060 1.11 AB 1110-111-LB2-AB-S-5060 ST 0 Jameel A 16-Mar-2014
SECONDARY SLAB LAYOUTS

COLUMN DETAILS C25,C40 AT


66 12-Feb-2014 111-SD-S02-0067 1.11 AB 1110-111-LB3-AB-S-3028 BASMENT 03 AND BASMENT 02 SHEET ST 0 Jameel A 16-Mar-2014
1

Page 6 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

COLUMN DETAILS C41,C42 AT


67 12-Feb-2014 111-SD-S02-0068 1.11 AB 1110-111-LB3-AB-S-3029 ST 0 Jameel A 15-Mar-2014
BASMENT 03 AND 2 SHEET 2

COLUMN C13,C14 C15 AT B4,B3,B2


68 12-Feb-2014 111-SD-S02-0069 1.11 AB 1110-111-LB3-AB-S-3030 ST 0 Jameel A 15-Mar-2014
SHEET 3

COLUMN C24,C50 C47 AT B3,B2,B1


69 12-Feb-2014 111-SD-S02-0070 1.11 AB 1110-111-LB3-AB-S-3031 ST 0 Jameel B 15-Mar-2014
SHEET 4

COLUMN DETAILS C16,C17 C1AT


70 12-Feb-2014 111-SD-S02-0071 1.11 AB 1110-111-LB3-AB-S-3032 BASMENT 03 AND BASMENT 02 SHEET ST 0 Jameel B 15-Mar-2014
5

COLUMN DETAILS C35,C36 AT


71 12-Feb-2014 111-SD-S02-0072 1.11 AB 1110-111-LB3-AB-S-3033 ST 0 Jameel B 15-Mar-2014
B3,B2 ,B1 SHEET 6

COLUMN DETAILS C43,C44 C45 AT


72 12-Feb-2014 111-SD-S02-0073 1.11 AB 1110-111-LB3-AB-S-3034 BASMENT 03 AND BASMENT 02 SHEET ST 0 Jameel A 15-Mar-2014
7

COLUMN DETAILS C51,C52 C53 AT


73 12-Feb-2014 111-SD-S02-0074 1.11 AB 1110-111-LB3-AB-S-3035 ST 0 Jameel A 15-Mar-2014
BASMENT 02 SHEET 8

COLUMN DETAILS C57,C58 C59AT


74 12-Feb-2014 111-SD-S02-0075 1.11 AB 1110-111-LB3-AB-S-3036 ST 0 Jameel A 16-Mar-2014
BASMENT 02 SHEET 9

COLUMN DETAILS C46,C48 C49AT


75 12-Feb-2014 111-SD-S02-0076 1.11 AB 1110-111-LB3-AB-S-3037 ST 0 Jameel A 18-Mar-2014
BASMENT 03 AND 2 SHEET 10

IST BASMENT FLOOR TOP


76 17-Feb-2014 111-SD-S02-0077 1.11 AB 1110-111-LB1-AB-S-5032 ST 0 Jameel A 18-Mar-2014
REINFORCEMENT SHEET 1 OF 2

77 17-Feb-2014 111-SD-S02-0078 1.11 AB 1110-111-LB1-AB-S-5033 CONCRET LAYOUT ST 0 Jameel A 18-Mar-2014

Page 7 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

IST BASMENT FLOOR TOP


78 17-Feb-2014 111-SD-S02-0079 1.11 AB 1110-111-LB1-AB-S-5035 ST 0 Jameel A 18-Mar-2014
REINFORCEMENT SHEET 2 OF 2

IST BASMENT FLOOR TOP


79 17-Feb-2014 111-SD-S02-0080 1.11 AB 1110-111-LB1-AB-S-5036 ST 0 Jameel A 18-Mar-2014
REINFORCEMENT SHEET 1 OF 2

IST BASMENT FLOOR TOP


80 17-Feb-2014 111-SD-S02-0081 1.11 AB 1110-111-LB1-AB-S-5037 ST 0 Jameel A 18-Mar-2014
REINFORCEMENT SHEET 2 OF 2

1st basment floor additional reinforcement


81 17-Feb-2014 111-SD-S02-0082 1.11 AB 1110-111-LB1-AB-S-5038 ST 0 Jameel A 18-Mar-2014
sheet 1 of 2

1st basment floor additional reinforcement


82 17-Feb-2014 111-SD-S02-0083 1.11 AB 1110-111-LB1-AB-S-5039 ST 0 Jameel A 18-Mar-2014
sheet 2 of 2

83 17-Feb-2014 111-SD-S02-0084 1.11 AB 1110-111-LB1-AB-S-5040 1ST BASMENT FLOOR DETAILS section ST 0 Jameel A 18-Mar-2014

1ST BASMENT FLOOR DETAILS SHEET


84 17-Feb-2014 111-SD-S02-0085 1.11 AB 1110-111-LB1-AB-S-5041 ST 0 Jameel A 18-Mar-2014
1

1ST BASMENT FLOOR DETAILS SHEET


85 17-Feb-2014 111-SD-S02-0086 1.11 AB 1110-111-LB1-AB-S-5042 ST 0 Jameel A 18-Mar-2014
2

1ST BASMENT FLOOR DETAILS SHEET


86 17-Feb-2014 111-SD-S02-0087 1.11 AB 1110-111-LB1-AB-S-5043 ST 0 Jameel A 18-Mar-2014
3 OF 4

L18 LINK BEAMS DETAILS SHEET 1 OF


87 23-Feb-2014 111-SD-S02-0729 1.11 AB 1110-111-LB1-AB-S-6543 ST 0 Jameel B 1-Feb-2014
1

5TH BASMENT COLUMNS STARTER


88 26-Feb-2014 111-SD-S02-0011 1.11 AB 1110-111-LB5-AB-S-3000 ST 1 Jameel A 27-Mar-2014
BARS SHEET 1 OF 6

Page 8 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

5TH BASMENT COLUMNS STARTER


89 26-Feb-2014 111-SD-S02-0012 1.11 AB 1110-111-LB5-AB-S-3001 ST 1 Jameel A 27-Mar-2014
BARS SHEET 2 OF 6

5TH BASMENT FOUNDATION PLAN


90 26-Feb-2014 111-SD-S02-0021 1.11 AB 1110-111-LB5-AB-S-1000 ST 0 Jameel A 27-Mar-2014
LAYOUT

5TH BASMENT FOUNDATION BOTTOM


91 26-Feb-2014 111-SD-S02-0022 1.11 AB 1110-111-LB5-AB-S-1001 ST 0 Jameel A 27-Mar-2014
REINFORCEMENT

5TH BASMENT FOUNDATION DETAILS


92 26-Feb-2014 111-SD-S02-0025 1.11 AB 1110-111-LB5-AB-S-1004 ST 0 Jameel A 27-Mar-2014
SHEET 1 OF 2

5TH BASMENT FOUNDATION DETAILS


93 26-Feb-2014 111-SD-S02-0026 1.11 AB 1110-111-LB5-AB-S-1005 ST 0 Jameel A 27-Mar-2014
SHEET 2 OF 2

5TH BASMENT COLUMN AND WALLS


94 26-Feb-2014 111-SD-S02-0027 1.11 AB 1110-111-L00-AB-S-2000 ST 0 Jameel A 27-Mar-2014
LAYOUT

95 26-Feb-2014 111-SD-S02-0098 1.11 AB 1110-111-L00-AB-S-5059 LEVEL 00 DETAILS OF SLAB SHEET 3 ST 0 Jameel A 27-Mar-2014

96 26-Feb-2014 111-SD-S02-0099 1.11 AB 1110-111-L00-AB-S-5067 LEVEL 00 DETAILS OF SLAB SHEET ST 0 Jameel A 27-Mar-2014

97 26-Feb-2014 111-SD-S02-0100 1.11 AB 1110-111-L00-AB-S-5068 LEVEL 00 DETAILS OF SLAB SHEET 5 ST 0 Jameel A 27-Mar-2014

5TH BASMENT COLUMNS STARTER


98 26-Feb-2014 111-SD-S03-0013 1.11 AB 1110-111-L00-AB-S-3002 ST 1 Jameel A 27-Mar-2014
BARS SHEET 3 OF 6

SLAB LEVEL L00 BOTTOM


99 26-Feb-2014 111-SD-S03-0088 1.11 AB 1110-111-L00-AB-S-5049 REINFORCEMENT PLAN VERTICAL ST 0 Jameel A 27-Mar-2014
DIRECTION |(B2) PART (A)

Page 9 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

SLAB LEVEL L00 BOTTOM


100 26-Feb-2014 111-SD-S03-0089 1.11 AB 1110-111-L00-AB-S-5050 REINFORCEMENT PLAN VERTICAL ST 0 Jameel D 27-Mar-2014
DIRECTION |(B2) PART (B)

SLAB LEVEL L00 TOP


101 26-Feb-2014 111-SD-S03-0090 1.11 AB 1110-111-L00-AB-S-5051 REINFORCEMENT PLAN VERTICAL ST 0 Jameel A 27-Mar-2014
DIRECTION |(T1) PART (1A

SLAB LEVEL L00 TOP


102 26-Feb-2014 111-SD-S03-0091 1.11 AB 1110-111-L00-AB-S-5052 REINFORCEMENT PLAN VERTICAL ST 0 Jameel A 27-Mar-2014
DIRECTION |(T1) PART (B)

SLAB LEVEL L00 TOP


103 26-Feb-2014 111-SD-S03-0092 1.11 AB 1110-111-L00-AB-S-5053 REINFORCEMENT PLAN VERTICAL ST 0 Jameel A 27-Mar-2014
DIRECTION |(T2) PART (A)

SLAB LEVEL L00 TOP


104 26-Feb-2014 111-SD-S03-0093 1.11 AB 1110-111-L00-AB-S-5054 REINFORCEMENT PLAN VERTICAL ST 0 Jameel A 27-Mar-2014
DIRECTION |(T2) PART (B)

SLAB LEVEL L00 ADDITIONAL


105 26-Feb-2014 111-SD-S03-0094 1.11 AB 1110-111-L00-AB-S-5055 ST 0 Jameel A 27-Mar-2014
REINFORCEMENT PLANPART (A)

SLAB LEVEL L00 ADDITIONAL


106 26-Feb-2014 111-SD-S03-0095 1.11 AB 1110-111-L00-AB-S-5056 ST 0 Jameel A 27-Mar-2014
REINFORCEMENT PLANPART (B)

107 26-Feb-2014 111-SD-S03-0096 1.11 AB 1110-111-L00-AB-S-5057 LEVEL L00DETAILS OF SLAB SHEET 1 ST 0 Jameel A 27-Mar-2014

108 26-Feb-2014 111-SD-S03-0097 1.11 AB 1110-111-L00-AB-S-5058 LEVEL L00 DETAILS OF SLAB SHEET 2 ST 0 Jameel A 27-Mar-2014

5TH BASMENT FOUNDATION


109 26-Feb-2014 111-SD-S03-0102 1.11 AB 1110-111-L00-AB-S-1003 ST 0 Jameel A 27-Mar-2014
ADDITIONAL REINFORCEMENT

LEVEL 01 TOP REINFORCEMENR


110 3-Mar-2014 111-AB-S03-0111 1.11 AB 1110-111-L01-AB-S-5073 ST 0 Jameel A 2-Apr-2014
SHEET 1 OF 2

Page 10 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

LEVEL 01 TOP REINFORCEMENR


111 3-Mar-2014 111-AB-S03-0112 1.11 AB 1110-111-L01-AB-S-5074 ST 0 Jameel D 2-Apr-2014
SHEET 2 OF 2

112 3-Mar-2014 111-SD-S02-0106 1.11 AB 1110-111-L01-AB-S-5066 LEVEL 01 DETAILS SHEET 4 ST 0 Jameel D 2-Apr-2014

113 3-Mar-2014 111-SD-S02-0107 1.11 AB 1110-111-L01-AB-S-5069 LEVEL 01 DETAILS SHEET 5 ST 0 Jameel D 2-Apr-2014

LEVEL 01 ADDITIONAL
114 3-Mar-2014 111-SD-S02-0108 1.11 AB 1110-111-L01-AB-S-5070 ST 0 Jameel A 2-Apr-2014
REINFORCEMENR SHEET 1 OF 2

LEVEL 01 BOTTOM REINFORCEMENR


115 3-Mar-2014 111-SD-S02-0109 1.11 AB 1110-111-L01-AB-S-5071 ST 0 Jameel D 2-Apr-2014
SHEET 1 OF 2

LEVEL 1 CONCRETE LAYOUT SHEET 1


116 3-Mar-2014 111-SD-S03-0101 1.11 AB 1110-111-L01-AB-S-5061 ST 0 Jameel A 2-Apr-2014
OF 2

LEVEL 1 CONCRETE LAYOUT SHEET 2


117 3-Mar-2014 111-SD-S03-0102 1.11 AB 1110-111-L01-AB-S-5062 ST 0 Jameel D 2-Apr-2014
OF 2

118 3-Mar-2014 111-SD-S03-0103 1.11 AB 1110-111-L01-AB-S-5063 LEVEL 01 DETAILS SHEET 1 ST 0 Jameel D 2-Apr-2014

119 3-Mar-2014 111-SD-S03-0104 1.11 AB 1110-111-L01-AB-S-5064 LEVEL 01 DETAILS SHEET 2 ST 0 Jameel D 2-Apr-2014

120 3-Mar-2014 111-SD-S03-0105 1.11 AB 1110-111-L01-AB-S-5065 LEVEL 01 DETAILS SHEET 3 ST 0 Jameel A 2-Apr-2014

LEVEL 01 BOTTOM REINFORCEMENR


121 3-Mar-2014 111-SD-S03-0110 1.11 AB 1110-111-L01-AB-S-5072 ST 0 Jameel D 2-Apr-2014
SHEET 2 OF 2

Page 11 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

LEVEL 1 ADDITIONAL
122 3-Mar-2014 111-SD-S03-0113 1.11 AB 1110-111-L01-AB-S-5075 ST 0 Jameel D 2-Apr-2014
REINFORCEMENT SHEET 2 OF 2

LEVEL 02 DETAILS REINFORCEMENT


123 10-Mar-2014 111-AB-S03-0114 1.11 AB 1110-111-L02-AB-S-5076 ST 0 Jameel A 12-Apr-2014
SHEET 1 OF 2

LEVEL 02 DETAILS REINFORCEMENT


124 10-Mar-2014 111-AB-S03-0115 1.11 AB 1110-111-L02-AB-S-5077 ST 0 Jameel A 12-Apr-2014
SHEET 2 OF 2

LEVEL 02 DETAILS REINFORCEMENT


125 10-Mar-2014 111-AB-S03-0116 1.11 AB 1110-111-L02-AB-S-5078 ST 0 Jameel A 12-Apr-2014
SHEET 1

LEVEL 02 additional REINFORCEMENT


126 10-Mar-2014 111-AB-S03-0117 1.11 AB 1110-111-L02-AB-S-5079 ST 0 Jameel A 12-Apr-2014
SHEET 1 OF 2

LEVEL 02 bottom REINFORCEMENT


127 10-Mar-2014 111-AB-S03-0118 1.11 AB 1110-111-L02-AB-S-5080 ST 0 Jameel A 12-Apr-2014
SHEET 1 OF 2

LEVEL 02 REINFORCEMENT SHEET 2


128 10-Mar-2014 111-AB-S03-0119 1.11 AB 1110-111-L02-AB-S-5081 ST 0 Jameel D 12-Apr-2014
OF 2

LEVEL 02 REINFORCEMENT SHEET 1


129 10-Mar-2014 111-AB-S03-0120 1.11 AB 1110-111-L01-AB-S-5082 ST 0 Jameel A 12-Apr-2014
OF 2

LEVEL 02 TOP REINFORCEMENT


130 10-Mar-2014 111-AB-S03-0121 1.11 AB 1110-111-L01-AB-S-5083 ST 0 Jameel A 12-Apr-2014
SHEET 2 OF 2

LEVEL 02 ADDITIONAL OF SLAB


131 10-Mar-2014 111-AB-S03-0122 1.11 AB 1110-111-L01-AB-S-5084 ST 0 Jameel D 12-Apr-2014
SOUTH SHEAR LINKS SHEET 2 OF 2

LEVEL 02 TDETAILS OF SLAB SOUTH


132 10-Mar-2014 111-AB-S03-0123 1.11 AB 1110-111-L01-AB-S-5085 ST 0 Jameel A 12-Apr-2014
SHEAR LINKS SHEET 2

Page 12 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

LEVEL 01 TDETAILS OF SLAB SOUTH


133 10-Mar-2014 111-AB-S03-0124 1.11 AB 1110-111-L01-AB-S-5086 ST 0 Jameel A 12-Apr-2014
SHEAR LINKS SHEET 3

LEVEL 02 DETAILS OF SLAB SOUTH


134 10-Mar-2014 111-AB-S03-0125 1.11 AB 1110-111-L02-AB-S-5087 ST 0 Jameel A 12-Apr-2014
SHEAR LINKS SHEET 4

DRAINGE AS BUILT LAYOUT TOWER 1


135 13-Mar-2014 111-AB-M01-0003 1.11 AB 1110-111-L15-AB-P-DRG-111122 ME 0 Franco D 20-Mar-2014
LEVEL 3 OFFICE

DRAINGE AS BUILT LAYOUT TOWER 1


136 13-Mar-2014 111-AB-M01-0004 1.11 AB 1110-111-L15-AB-P-DRG-111123 ME 0 Franco D 20-Mar-2014
LEVEL 4 OFFICE

DRAINGE AS BUILT LAYOUT TOWER 1


137 13-Mar-2014 111-AB-M01-0005 1.11 AB 1110-111-L15-AB-P-DRG-111124 ME 0 Franco D 20-Mar-2014
LEVEL 5 OFFICE

DRAINGE AS BUILT LAYOUT TOWER 1


138 13-Mar-2014 111-AB-M01-0006 1.11 AB 1110-111-L15-AB-P-DRG-111125 ME 0 Franco D 20-Mar-2014
LEVEL 6 OFFICE

DRAINGE AS BUILT LAYOUT TOWER 1


139 13-Mar-2014 111-AB-M01-0007 1.11 AB 1110-111-L15-AB-P-DRG-111126 ME 0 Franco D 2-Apr-2014
LEVEL 7 OFFICE

DRAINGE AS BUILT LAYOUT TOWER 1


140 13-Mar-2014 111-AB-M01-0008 1.11 AB 1110-111-L15-AB-P-DRG-111127 ME 0 Franco D 2-Apr-2014
LEVEL 8 OFFICE

DRAINGE AS BUILT LAYOUT TOWER 1


141 13-Mar-2014 111-AB-M01-0009 1.11 AB 1110-111-L15-AB-P-DRG-111128 ME 0 Franco D 2-Apr-2014
LEVEL 9 OFFICE

DRAINGE AS BUILT LAYOUT TOWER 1


142 13-Mar-2014 111-AB-M01-0010 1.11 AB 1110-111-L15-AB-P-DRG-111129 ME 0 Franco D 2-Apr-2014
LEVEL 10 OFFICE

DRAINGE AS BUILT LAYOUT TOWER 1


143 13-Mar-2014 111-AB-M01-0011 1.11 AB 1110-111-L15-AB-P-DRG-111130 ME 0 Franco D 2-Apr-2014
LEVEL 11 OFFICE

Page 13 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

DRAINGE AS BUILT LAYOUT TOWER 1


144 13-Mar-2014 111-AB-M01-0012 1.11 AB 1110-111-L15-AB-P-DRG-111131 ME 0 Franco D 2-Apr-2014
LEVEL 12 OFFICE

DRAINGE AS BUILT LAYOUT TOWER 1


145 13-Mar-2014 111-AB-M01-0013 1.11 AB 1110-111-L15-AB-P-DRG-111133 ME 0 Franco D 2-Apr-2014
LEVEL 14 OFFICE

DRAINGE AS BUILT LAYOUT TOWER 1


146 13-Mar-2014 111-AB-M01-0014 1.11 AB 1110-111-L15-AB-P-DRG-111134 ME 0 Franco D 2-Apr-2014
LEVEL 15 OFFICE

LEVEL 03 BOTTOM REINFORCEMENT


147 16-Mar-2014 111-AB-S02-0127 1.11 AB 1110-111-L03-AB-S-5089 ST 0 Jameel A 17-Apr-2014
SHEET 2 OF 2

LEVEL 03 BOTTOM REINFORCEMENT


148 16-Mar-2014 111-AB-S02-0128 1.11 AB 1110-111-L03-AB-S-5090 ST 0 Jameel A 17-Apr-2014
SHEET 1 OF 1

LEVEL 03 CONCRETE LAYOUT SHEET 1


149 16-Mar-2014 111-AB-S03-0126 1.11 AB 1110-111-L03-AB-S-5088 ST 0 Jameel A 17-Apr-2014
OF 2

LEVEL 03 TOP REINFORCEMENT


150 16-Mar-2014 111-AB-S03-0132 1.11 AB 1110-111-L03-AB-S-5094 ST 0 Jameel A 17-Apr-2014
SHEET 1 OF 2

LEVEL 03 BOTTOM REINFORCEMENT


151 16-Mar-2014 111-AB-S03-0133 1.11 AB 1110-111-L03-AB-S-5095 ST 0 Jameel A 17-Apr-2014
SHEET 2 OF 2

LEVEL 03 TOP REINFORCEMENT


152 16-Mar-2014 111-AB-S03-0134 1.11 AB 1110-111-L03-AB-S-5096 ST 0 Jameel A 17-Apr-2014
SHEET 1 OF 2

LEVEL 03 TOP REINFORCEMENT


153 16-Mar-2014 111-AB-S03-0135 1.11 AB 1110-111-L03-AB-S-5097 ST 0 Jameel A 17-Apr-2014
SHEET 2 OF 2

LEVEL 03 CONCRETE LAYOUT SHEET 1


154 16-Mar-2014 111-AB-S03-0136 1.11 AB 1110-111-L03-AB-S-5098 ST 0 Jameel A 17-Apr-2014
OF 2

Page 14 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

2RD BASMENT FLOOR DETAIL SHEET 4


155 16-Mar-2014 111-AB-S03-0137 1.11 AB 1110-111-L03-AB-S-5099 ST 0 Jameel A 17-Apr-2014
OF 5

LEVEL 10 BOTTOM REINFORCEMENT


156 16-Mar-2014 111-AB-S03-0588 1.11 AB 1110-111-L10-AB-S-5179 ST 0 Jameel A 17-Apr-2014
SHEET 2 OF 2

157 25-Mar-2014 111-SD-S02-0138 1.11 AB 1110-111-L04-AB-S-5301 ESCALATOR PIT ADJUSMENT ST 0 Jameel D 24-Apr-2014

158 25-Mar-2014 111-SD-S02-0139 1.11 AB 1110-111-L04-AB-S-5100 LEVEL 04 level 17 typical slab details ST 0 Jameel A 23-Apr-2014

LEVEL 04 CONCRETE
159 25-Mar-2014 111-SD-S02-0140 1.11 AB 1110-111-L04-AB-S-5101 ST 0 Jameel A 24-Apr-2014
REINFORCEMENT SHEET 1 OF 2

LEVEL 04 CONCRETE
160 25-Mar-2014 111-SD-S03-0141 1.11 AB 1110-111-L04-AB-S-5102 ST 0 Jameel A 24-Apr-2014
REINFORCEMENT SHEET 2 OF 2

LEVEL 04 ADDITIONAL
161 25-Mar-2014 111-SD-S03-0142 1.11 AB 1110-111-L04-AB-S-5103 ST 0 Jameel A 24-Apr-2014
REINFORCEMENT SHEET 2 OF 2

162 25-Mar-2014 111-SD-S03-0143 1.11 AB 1110-111-L04-AB-S-5104 LEVEL 04 LINKS SHEET 1 ST 0 Jameel A 24-Apr-2014

163 25-Mar-2014 111-SD-S03-0144 1.11 AB 1110-111-L04-AB-S-5105 LEVEL 04 LINKS SHEET 2 ST 0 Jameel A 24-Apr-2014

LEVEL 04 BOTTOM REINFORCEMENT


164 25-Mar-2014 111-SD-S03-0145 1.11 AB 1110-111-L04-AB-S-5106 ST 0 Jameel A 24-Apr-2014
SHEET 3

LEVEL 04 BOTTOM REINFORCEMENT


165 25-Mar-2014 111-SD-S03-0146 1.11 AB 1110-111-L04-AB-S-5107 ST 0 Jameel A 24-Apr-2014
SHEET 4

Page 15 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

LEVEL 04 BOTTOM REINFORCEMENT


166 25-Mar-2014 111-SD-S03-0147 1.11 AB 1110-111-L04-AB-S-5108 ST 0 Jameel A 24-Apr-2014
SHEET 1 OF 2

LEVEL 04 BOTTOM REINFORCEMENT


167 25-Mar-2014 111-SD-S03-0148 1.11 AB 1110-111-L04-AB-S-5109 ST 0 Jameel A 24-Apr-2014
SHEET 2 OF 2

LEVEL 04 TOP REINFORCEMENT


168 25-Mar-2014 111-SD-S03-0149 1.11 AB 1110-111-L04-AB-S-5110 ST 0 Jameel A 23-Apr-2014
SHEET 1 OF 2

LEVEL 04 TOP REINFORCEMENT


169 25-Mar-2014 111-SD-S03-0150 1.11 AB 1110-111-L04-AB-S-5111 ST 0 Jameel A 24-Apr-2014
SHEET 2 OF 2

LEVEL 04 ADDITIONAL
170 25-Mar-2014 111-SD-S03-0151 1.11 AB 1110-111-L04-AB-S-5112 ST 0 Jameel A 24-Apr-2014
REINFORCEMENT SHEET 1 OF 2

MAN HOLE (NORTH TOWER)


171 29-Mar-2014 111-SD-S03-0731 1.11 AB 1110-111-L04-AB-S-7891 CONCRETE AND REINFORCEMENT ST 0 Jameel B 2-Apr-2014
DETAILS SHEET 2 OF 2

5TH BASMENT COLUMN STARTER


172 30-Mar-2014 111/AB-S02-0014 1.11 AB 1110-111-LB5-AB-S-3003 ST 1 Jameel D 24-Apr-2014
BARS SHEET 4 OF 6

5TH BASMENT COLUMN STARTER


173 30-Mar-2014 111/AB-S02-0015 1.11 AB 1110-111-LB5-AB-S-3004 ST 1 Jameel D 24-Apr-2014
BARS SHEET 5 OF 6

5TH BASMENT COLUMN STARTER


174 30-Mar-2014 111/AB-S02-0016 1.11 AB 1110-111-LB5-AB-S-3005 ST 1 Jameel D 24-Apr-2014
BARS SHEET 6 OF 6

5TH BASMENT COLUMN STARTER


175 30-Mar-2014 111/AB-S02-0019 1.11 AB 1110-111-LB5-AB-S-3050 ST 1 Jameel D 24-Apr-2014
BARS SHEET 1 OF 1

5TH BASMENT COLUMN DETAIL


176 30-Mar-2014 111/AB-S02-0020 1.11 AB 1110-111-LB5-AB-S-3051 ST 1 Jameel D 24-Apr-2014
SHEET 1 OF 1

Page 16 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

5TH BASMENT COLUMN DETAIL


177 30-Mar-2014 111/AB-S02-0028 1.11 AB 1110-111-LB5-AB-S-4000 ST 1 Jameel D 24-Apr-2014
SHEET 1 OF 3

5TH BASMENT COLUMN DETAIL


178 30-Mar-2014 111/AB-S02-0029 1.11 AB 1110-111-LB5-AB-S-4001 ST 1 Jameel D 24-Apr-2014
SHEET 2 OF 3

5TH BASMENT COLUMN DETAIL


179 30-Mar-2014 111/AB-S02-0030 1.11 AB 1110-111-LB5-AB-S-4002 ST 1 Jameel D 24-Apr-2014
SHEET 3 OF 3

SOUTH CORE ELEVATION LEVEL B5


180 30-Mar-2014 111/AB-S02-0031 1.11 AB 1110-111-LB5-AB-S-4025 ST 1 Jameel D 24-Apr-2014
TO B2 SHEET 1 OF 1

181 30-Mar-2014 111/AB-S02-0032 1.11 AB 1110-111-LB5-AB-S-8000 5TH BASMENT COLUMN DETAILS ST 1 Jameel D 24-Apr-2014

LEVEL 05 CONNECTION DETAILS


182 31-Mar-2014 111-AB-S02-0163 1.11 AB 1110-111-L05-AB-S-5124 ST 0 Jameel A 23-Apr-2014
SHEET 3

WATER SUPPLY SYSTEM AS BUILT


183 31-Mar-2014 111-SD-M01-0015 1.11 AB 1110-111-L16-AB-P-WSS-211122 ME 0 Franco D 13-Apr-2014
LAYOUT TOWER 1 LEVEL 3 OFFICE

WATER SUPPLY SYSTEM AS BUILT


184 31-Mar-2014 111-SD-M01-0016 1.11 AB 1110-111-L16-AB-P-WSS-211123 ME 0 Franco D 13-Apr-2014
LAYOUT TOWER 1 LEVEL 4 OFFICE

WATER SUPPLY SYSTEM AS BUILT


185 31-Mar-2014 111-SD-M01-0017 1.11 AB 1110-111-L16-AB-P-WSS-211124 ME 0 Franco D 13-Apr-2014
LAYOUT TOWER 1 LEVEL 5 OFFICE

WATER SUPPLY SYSTEM AS BUILT


186 31-Mar-2014 111-SD-M01-0018 1.11 AB 1110-111-L16-AB-P-WSS-211125 ME 0 Franco D 13-Apr-2014
LAYOUT TOWER 1 LEVEL 6 OFFICE

WATER SUPPLY SYSTEM AS BUILT


187 31-Mar-2014 111-SD-M01-0019 1.11 AB 1110-111-L16-AB-P-WSS-211126 ME 0 Franco D 13-Apr-2014
LAYOUT TOWER 1 LEVEL 7 OFFICE

Page 17 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

WATER SUPPLY SYSTEM AS BUILT


188 31-Mar-2014 111-SD-M01-0020 1.11 AB 1110-111-L16-AB-P-WSS-211128 ME 0 Franco D 13-Apr-2014
LAYOUT TOWER 1 LEVEL 9 OFFICE

WATER SUPPLY SYSTEM AS BUILT


189 31-Mar-2014 111-SD-M01-0021 1.11 AB 1110-111-L16-AB-P-WSS-211129 ME 0 Franco D 13-Apr-2014
LAYOUT TOWER 1 LEVEL 10 OFFICE

WATER SUPPLY SYSTEM AS BUILT


190 31-Mar-2014 111-SD-M01-0022 1.11 AB 1110-111-L16-AB-P-WSS-211130 ME 0 Franco D 13-Apr-2014
LAYOUT TOWER 1 LEVEL 12 OFFICE

WATER SUPPLY SYSTEM AS BUILT


191 31-Mar-2014 111-SD-M01-0023 1.11 AB 1110-111-L16-AB-P-WSS-211131 ME 0 Franco D 20-Apr-2014
LAYOUT TOWER 1 LEVEL 12 OFFICE

WATER SUPPLY SYSTEM AS BUILT


192 31-Mar-2014 111-SD-M01-0024 1.11 AB 1110-111-L16-AB-P-WSS-211133 ME 0 Franco D 20-Apr-2014
LAYOUT TOWER 1 LEVEL 14 OFFICE

MAN HOLE (NORTH TOWER)


193 31-Mar-2014 111-SD-M01-0025 1.11 AB 1110-111-L16-AB-P-WSS-211134 CONCRETE AND REINFORCEMENT ME 0 Franco D 20-Apr-2014
DETAILS SHEET 2 OF 2

MAN HOLE (NORTH TOWER)


194 31-Mar-2014 111-SD-M01-0026 1.11 AB 1110-111-L16-AB-P-WSS-211135 CONCRETE AND REINFORCEMENT ME 0 Franco D 20-Apr-2014
DETAILS SHEET 2 OF 2

LEVEL 05 BOTTOM REINFORCEMENT


195 31-Mar-2014 DB16/111-AB-S02-0152 1.11 AB 1110-111-L05-AB-S-5113 ST 0 Jameel D 24-Apr-2014
SHEET 1 OF 2

LEVEL 05 BOTTOM REINFORCEMENT


196 31-Mar-2014 DB16/111-AB-S02-0153 1.11 AB 1110-111-L05-AB-S-5114 ST 0 Jameel D 24-Apr-2014
SHEET 2 OF 2

LEVEL 05 BOTTOM REINFORCEMENT


197 31-Mar-2014 DB16/111-AB-S02-0154 1.11 AB 1110-111-L05-AB-S-5115 ST 0 Jameel A 23-Apr-2014
SHEET 4

LEVEL 05 BOTTOM REINFORCEMENT


198 31-Mar-2014 DB16/111-AB-S02-0155 1.11 AB 1110-111-L05-AB-S-5116 ST 0 Jameel A 23-Apr-2014
SHEET 1 OF 2

Page 18 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

LEVEL 05 BOTTOM REINFORCEMENT


199 31-Mar-2014 DB16/111-AB-S02-0156 1.11 AB 1110-111-L05-AB-S-5117 ST 0 Jameel A 23-Apr-2014
SHEET 2 OF 2

LEVEL 05 TOP REINFORCEMENT


200 31-Mar-2014 DB16/111-AB-S02-0158 1.11 AB 1110-111-L05-AB-S-5119 ST 0 Jameel A 23-Apr-2014
SHEET 2 OF 2

LEVEL 05 ADDITIONAL
201 31-Mar-2014 DB16/111-AB-S02-0159 1.11 AB 1110-111-L05-AB-S-5120 ST 0 Jameel A 23-Apr-2014
REINFORCEMENT SHEET 1 OF 2

LEVEL 05 SLAB DETAIL SHER LIKS


202 31-Mar-2014 DB16/111-AB-S02-0160 1.11 AB 1110-111-L05-AB-S-5121 ST 0 Jameel D 24-Apr-2014
SHEET 1

LEVEL 05 SLAB DETAIL SHER LIKS


203 31-Mar-2014 DB16/111-AB-S02-0161 1.11 AB 1110-111-L05-AB-S-5122 ST 0 Jameel A 23-Apr-2014
SHEET 1

LEVEL 05 SLAB DETAIL SHER LIKS


204 31-Mar-2014 DB16/111-AB-S02-0162 1.11 AB 1110-111-L05-AB-S-5123 ST 0 Jameel A 23-Apr-2014
SHEET 2

LEVEL 06 CONCRET LAYOUT SHEET 1


205 7-Apr-2014 SD-S02-0165 1.11 AB 1110-111-L06-AB-S-5125 ST 0 Jameel A 10-May-2014
OF 2

LEVEL 06 CONCRET LAYOUT SHEET 2


206 7-Apr-2014 SD-S02-0166 1.11 AB 1110-111-L06-AB-S-5126 ST 0 Jameel A 10-May-2014
OF 2

LEVEL 06 CONCRET LAYOUT SHEET 1


207 7-Apr-2014 SD-S02-0167 1.11 AB 1110-111-L06-AB-S-5128 ST 0 Jameel A 10-May-2014
OF 2

LEVEL 06 CONCRET LAYOUT SHEET 2


208 7-Apr-2014 SD-S02-0168 1.11 AB 1110-111-L06-AB-S-5129 ST 0 Jameel A 10-May-2014
OF 2

LEVEL 06 TOP REINFORCEMENT


209 7-Apr-2014 SD-S02-0169 1.11 AB 1110-111-L06-AB-S-5131 ST 0 Jameel A 10-May-2014
SHEET 2 OF 2

Page 19 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

LEVEL 06 ADDITIONAL
210 7-Apr-2014 SD-S02-0170 1.11 AB 1110-111-L06-AB-S-5132 ST 0 Jameel A 10-May-2014
REINFORCEMENT SHEET 2 OF 2

LEVEL 06 ADDITIONAL
211 7-Apr-2014 SD-S02-0171 1.11 AB 1110-111-L06-AB-S-5133 ST 0 Jameel A 8-May-2014
REINFORCEMENT SHEET 2 OF 2

LEVEL 06 SLAB DETAILS SHEAR LINKS


212 7-Apr-2014 SD-S02-0172 1.11 AB 1110-111-L06-AB-S-5134 ST 0 Jameel A 8-May-2014
SHEET 1

LEVEL 06 SLAB DETAILS SHEAR LINKS


213 7-Apr-2014 SD-S02-0173 1.11 AB 1110-111-L06-AB-S-5136 ST 0 Jameel A 8-May-2014
SHEET 3

LEVEL 06 SLAB DETAILS SHEAR LINKS


214 7-Apr-2014 SD-S02-0174 1.11 AB 1110-111-L06-AB-S-5137 ST 0 Jameel A 8-May-2014
SHEET 4

LEVEL 06 SLAB DETAILS SHEAR LINKS


215 7-Apr-2014 SD-S02-0175 1.11 AB 1110-111-L06-AB-S-5127 ST 0 Jameel D 8-May-2014
SHEET 4

LEVEL 07 CONCRETE LAYOUT SHEET 1


216 7-Apr-2014 SD-S02-0176 1.11 AB 1110-111-L06-AB-S-5138 ST 0 Jameel A 8-May-2014
OF 2

LEVEL 07 CONCRETE LAYOUT SHEET 2


217 7-Apr-2014 SD-S02-0177 1.11 AB 1110-111-L06-AB-S-5139 ST 0 Jameel A 8-May-2014
OF 2

LEVEL 07 CONCRETE LAYOUT SHEET 1


218 7-Apr-2014 SD-S02-0178 1.11 AB 1110-111-L06-AB-S-5140 ST 0 Jameel A 8-May-2014
OF 2

LEVEL 07 CONCRETE LAYOUT SHEET 2


219 7-Apr-2014 SD-S02-0179 1.11 AB 1110-111-L06-AB-S-5141 ST 0 Jameel A 8-May-2014
OF 2

LEVEL 07 TOP REINFORCEMENT


220 7-Apr-2014 SD-S02-0180 1.11 AB 1110-111-L06-AB-S-5142 ST 0 Jameel A 10-May-2014
LAYOUT SHEET 1 OF 2

Page 20 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

LEVEL 07 TOP REINFORCEMENT


221 7-Apr-2014 SD-S02-0181 1.11 AB 1110-111-L06-AB-S-5143 ST 0 Jameel A 10-May-2014
LAYOUT SHEET 2 OF 2

LEVEL 07 ADDITIONAL
222 7-Apr-2014 SD-S02-0182 1.11 AB 1110-111-L06-AB-S-5144 REINFORCEMENT LAYOUT SHEET 1 ST 0 Jameel A 10-May-2014
OF 2

LEVEL 07 ADDITIONAL
223 7-Apr-2014 SD-S02-0183 1.11 AB 1110-111-L06-AB-S-5145 REINFORCEMENT LAYOUT SHEET 2 ST 0 Jameel A 10-May-2014
OF 2

LEVEL 07 SLAB DETAILS SHEAR LINKS


224 7-Apr-2014 SD-S02-0184 1.11 AB 1110-111-L06-AB-S-5146 ST 0 Jameel A 10-May-2014
SHEET 1

LEVEL 07 SLAB DETAILS SHEAR LINKS


225 7-Apr-2014 SD-S02-0185 1.11 AB 1110-111-L06-AB-S-5147 ST 0 Jameel A 10-May-2014
SHEET 1

LEVEL 07 SLAB DETAILS SHEAR LINKS


226 7-Apr-2014 SD-S02-0186 1.11 AB 1110-111-L06-AB-S-5148 ST 0 Jameel A 10-May-2014
SHEET 3

LEVEL 01 AS BUILT OF SLAB EDGE


227 10-Apr-2014 SD-S02-0187 1.11 AB 1110-111-L06-AB-S-9023 ST 0 Jameel C 10-Apr-2014
FOR SKYWALK

LEVEL 07 SLAB DETAILS SHEAR LINKS


228 14-Apr-2014 SD-S02-0188 1.11 AB 1110-111-L06-AB-S-5149 ST 0 Jameel A 10-May-2014
SHEET 4

LEVEL 08 SLAB DETAILS SHEAR LINKS


229 14-Apr-2014 SD-S02-0189 1.11 AB 1110-111-L06-AB-S-5150 ST 0 Jameel A 10-May-2014
SHEET 4

230 14-Apr-2014 SD-S02-0190 1.11 AB 1110-111-L06-AB-S-5151 LEVEL 08 SLAB concrete layout sheet 2 of 2 ST 0 Jameel A 10-May-2014

231 14-Apr-2014 SD-S02-0191 1.11 AB 1110-111-L06-AB-S-5152 LEVEL 08 SLAB concrete layout sheet 1 of 2 ST 0 Jameel A 10-May-2014

Page 21 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

232 14-Apr-2014 SD-S02-0192 1.11 AB 1110-111-L06-AB-S-5153 LEVEL 08 SLAB concrete layout sheet 2 of 2 ST 0 Jameel A 10-May-2014

233 14-Apr-2014 SD-S02-0193 1.11 AB 1110-111-L06-AB-S-5154 LEVEL 08 SLAB concrete layout sheet 1 of 2 ST 0 Jameel A 10-May-2014

234 14-Apr-2014 SD-S02-0194 1.11 AB 1110-111-L06-AB-S-5155 LEVEL 08 SLAB concrete layout sheet 2 of 2 ST 0 Jameel A 10-May-2014

235 14-Apr-2014 SD-S02-0195 1.11 AB 1110-111-L06-AB-S-5156 LEVEL 08 SLAB concrete layout sheet 1 of 2 ST 0 Jameel A 10-May-2014

236 14-Apr-2014 SD-S02-0196 1.11 AB 1110-111-L06-AB-S-5157 LEVEL 08 SLAB concrete layout sheet 2 of 2 ST 0 Jameel A 10-May-2014

237 14-Apr-2014 SD-S02-0197 1.11 AB 1110-111-L06-AB-S-5158 LEVEL 08 SLAB concrete layout sheet 1 ST 0 Jameel A 10-May-2014

238 14-Apr-2014 SD-S02-0198 1.11 AB 1110-111-L06-AB-S-5159 LEVEL 08 SLAB concrete layout sheet 2 ST 0 Jameel A 10-May-2014

239 14-Apr-2014 SD-S02-0199 1.11 AB 1110-111-L06-AB-S-5160 LEVEL 08 SLAB concrete layout sheet 3 ST 0 Jameel A 10-May-2014

240 14-Apr-2014 SD-S02-0200 1.11 AB 1110-111-L06-AB-S-5161 LEVEL 08 SLAB concrete layout sheet 1 of 2 ST 0 Jameel A 10-May-2014

241 14-Apr-2014 SD-S02-0201 1.11 AB 1110-111-L06-AB-S-5162 LEVEL 09 SLAB concrete layout sheet 2 of 2 ST 0 Jameel A 10-May-2014

242 14-Apr-2014 SD-S02-0202 1.11 AB 1110-111-L06-AB-S-5163 LEVEL 09 SLAB concrete layout sheet 1 of 2 ST 0 Jameel A 10-May-2014

Page 22 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

243 14-Apr-2014 SD-S02-0203 1.11 AB 1110-111-L06-AB-S-5164 LEVEL 09 SLAB concrete layout sheet 2 of 2 ST 0 Jameel A 10-May-2014

244 14-Apr-2014 SD-S02-0204 1.11 AB 1110-111-L06-AB-S-5165 LEVEL 09 SLAB concrete layout sheet 1 of 2 ST 0 Jameel A 10-May-2014

245 14-Apr-2014 SD-S02-0205 1.11 AB 1110-111-L06-AB-S-5166 LEVEL 09 SLAB concrete layout sheet 2 of 2 ST 0 Jameel A 10-May-2014

246 14-Apr-2014 SD-S02-0206 1.11 AB 1110-111-L06-AB-S-5167 LEVEL 09 SLAB concrete layout sheet 1 of 2 ST 0 Jameel A 10-May-2014

247 14-Apr-2014 SD-S02-0207 1.11 AB 1110-111-L06-AB-S-5168 LEVEL 09 SLAB concrete layout sheet 2 of 2 ST 0 Jameel A 10-May-2014

248 14-Apr-2014 SD-S02-0208 1.11 AB 1110-111-L06-AB-S-5169 LEVEL 09 SLAB concrete layout sheet 1 ST 0 Jameel A 10-May-2014

249 14-Apr-2014 SD-S02-0209 1.11 AB 1110-111-L06-AB-S-5170 LEVEL 09 SLAB concrete layout sheet 2 ST 0 Jameel A 10-May-2014

250 14-Apr-2014 SD-S02-0210 1.11 AB 1110-111-L06-AB-S-5171 LEVEL 09 SLAB concrete layout sheet 3 ST 0 Jameel A 10-May-2014

251 14-Apr-2014 SD-S02-0211 1.11 AB 1110-111-L06-AB-S-5172 LEVEL 09 SLAB concrete layout sheet 4 ST 0 Jameel B 10-May-2014

252 14-Apr-2014 SD-S02-0212 1.11 AB 1110-111-L06-AB-S-5173 level 09 slab details ST 0 Jameel B 10-May-2014

253 16-Apr-2014 SD-S02-0129 1.11 AB 1110-111-L06-AB-S-5091 LEVEL 03 SHEAR LINKS SHEET 1 ST 0 Jameel D 19-Apr-2014

Page 23 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

254 16-Apr-2014 SD-S02-0130 1.11 AB 1110-111-L03-AB-S-5092 LEVEL 03 SHEAR LINKS SHEET 2 ST 0 Jameel D 19-Apr-2014

255 16-Apr-2014 SD-S02-0131 1.11 AB 1110-111-L03-AB-S-5093 LEVEL 03 SHEAR LINKS SHEET 3 ST 0 Jameel D 19-Apr-2014

LEVEL 11 SLAB DETAILS SHEAR LINK


256 26-Apr-2014 111/SD-S02-0213 1.11 AB 1110-111-L11-AB-S-5181 ST 0 Jameel A 15-May-2014
SHEET 2.

257 26-Apr-2014 111/SD-S02-0214 1.11 AB 1110-111-L11-AB-S-5184 LEVEL 11 CONCRETE LAYOUT ST 0 Jameel A 15-May-2014

258 26-Apr-2014 111/SD-S02-0215 1.11 AB 1110-111-L11-AB-S-5185 LEVEL 11 BOTTOM REINFORCEMENT ST 0 Jameel A 15-May-2014

259 26-Apr-2014 111/SD-S02-0216 1.11 AB 1110-111-L11-AB-S-5186 LEVEL 11 top REINFORCEMENT ST 0 Jameel A 15-May-2014

LEVEL 11 ADDITIONAL
260 26-Apr-2014 111/SD-S02-0217 1.11 AB 1110-111-L11-AB-S-5187 ST 0 Jameel A 15-May-2014
REINFORCEMENT

261 26-Apr-2014 111/SD-S02-0218 1.11 AB 1110-111-L11-AB-S-5188 LEVEL 11 SLAB SHEAR LINKS SHEET 1 ST 0 Jameel A 15-May-2014

262 26-Apr-2014 111/SD-S02-0219 1.11 AB 1110-111-L11-AB-S-5189 LEVEL 12 SLAB SHEAR LINKS SHEET 1 ST 0 Jameel A 18-May-2014

263 26-Apr-2014 111/SD-S02-0220 1.11 AB 1110-111-L11-AB-S-5190 LEVEL 12 BOTTOM REINFORCEMENT ST 0 Jameel A 18-May-2014

264 26-Apr-2014 111/SD-S02-0221 1.11 AB 1110-111-L11-AB-S-5191 LEVEL 12 BOTTOM REINFORCEMENT ST 0 Jameel A 18-May-2014

Page 24 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

265 26-Apr-2014 111/SD-S02-0222 1.11 AB 1110-111-L11-AB-S-5192 LEVEL 12 BOTTOM REINFORCEMENT ST 0 Jameel A 18-May-2014

LEVEL 12 DETAIL SHEAR LINKS SHEET


266 26-Apr-2014 111/SD-S02-0223 1.11 AB 1110-111-L11-AB-S-5193 ST 0 Jameel A 18-May-2014
1

LEVEL 12 DETAIL SHEAR LINKS SHEET


267 26-Apr-2014 111/SD-S02-0224 1.11 AB 1110-111-L11-AB-S-5194 ST 0 Jameel A 18-May-2014
2

268 26-Apr-2014 111/SD-S02-0225 1.11 AB 1110-111-L11-AB-S-5195 LEVEL 13 CONCRETE LAYOUT ST 0 Jameel D 15-May-2014

269 26-Apr-2014 111/SD-S02-0226 1.11 AB 1110-111-L11-AB-S-5196 LEVEL 13 BOTTOM REINFORCEMENT ST 0 Jameel A 18-May-2014

270 26-Apr-2014 111/SD-S02-0227 1.11 AB 1110-111-L11-AB-S-5197 LEVEL 13 REINFORCEMENT ST 0 Jameel A 18-May-2014

LEVEL 13 ADDITIONAL
271 26-Apr-2014 111/SD-S02-0228 1.11 AB 1110-111-L11-AB-S-5198 ST 0 Jameel A 18-May-2014
REINFORCEMENT

272 26-Apr-2014 111/SD-S02-0229 1.11 AB 1110-111-L14-AB-S-5199 LEVEL 14 CONCRETE LAYOUT ST 0 Jameel A 15-May-2014

273 26-Apr-2014 111/SD-S02-0230 1.11 AB 1110-111-L14-AB-S-5200 LEVEL 14 BOTTOM REINFORCEMENT ST 0 Jameel A 15-May-2014

274 26-Apr-2014 111/SD-S02-0231 1.11 AB 1110-111-L14-AB-S-5201 LEVEL 14 TOP REINFORCEMENT ST 0 Jameel A 15-May-2014

LEVEL 14 ADDITIONAL
275 26-Apr-2014 111/SD-S02-0232 1.11 AB 1110-111-L14-AB-S-5202 ST 0 Jameel D 15-May-2014
REINFORCEMENT

Page 25 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

LEVEL 14 SLAB DETAILS SHEAR LINKS


276 26-Apr-2014 111/SD-S02-0233 1.11 AB 1110-111-L14-AB-S-5203 ST 0 Jameel D 15-May-2014
SHEET 1

LEVEL 14 SLAB DETAILS SHEAR LINKS


277 26-Apr-2014 111/SD-S02-0234 1.11 AB 1110-111-L14-AB-S-5204 ST 0 Jameel A 15-May-2014
SHEET 2

278 26-Apr-2014 111/SD-S02-0235 1.11 AB 1110-111-L14-AB-S-5210 LEVEL 16 BOTTOM REINFORCEMENT ST 0 Jameel A 15-May-2014

279 26-Apr-2014 111/SD-S02-0236 1.11 AB 1110-111-L14-AB-S-5211 LEVEL 16 BOTTOM REINFORCEMENT ST 0 Jameel A 15-May-2014

280 26-Apr-2014 111/SD-S02-0237 1.11 AB 1110-111-L14-AB-S-5212 LEVEL 16 TOP REINFORCEMENT ST 0 Jameel A 15-May-2014

LEVEL 16 ADDITIONAL
281 26-Apr-2014 111/SD-S02-0238 1.11 AB 1110-111-L14-AB-S-5213 ST 0 Jameel A 15-May-2014
REINFORCEMENT

LEVEL 16 SLAB DETAILS SHEAR LINKS


282 26-Apr-2014 111/SD-S02-0239 1.11 AB 1110-111-L14-AB-S-5214 ST 0 Jameel A 15-May-2014
SHEET 1

LEVEL 16 SLAB DETAILS SHEAR LINKS


283 26-Apr-2014 111/SD-S02-0240 1.11 AB 1110-111-L14-AB-S-5215 ST 0 Jameel A 15-May-2014
SHEET 2

284 26-Apr-2014 111/SD-S02-0241 1.11 AB 1110-111-L14-AB-S-5216 LEVEL 17 BOTTOM REINFORCEMENT ST 0 Jameel C 15-May-2014

285 26-Apr-2014 111/SD-S02-0242 1.11 AB 1110-111-L14-AB-S-5217 LEVEL 17 BOTTOM REINFORCEMENT ST 0 Jameel A 15-May-2014

286 26-Apr-2014 111/SD-S02-0243 1.11 AB 1110-111-L14-AB-S-5218 LEVEL 17 TOP REINFORCEMENT ST 0 Jameel A 15-May-2014

Page 26 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

LEVEL 17 ADDITIONAL
287 26-Apr-2014 111/SD-S02-0244 1.11 AB 1110-111-L14-AB-S-5219 ST 0 Jameel A 15-May-2014
REINFORCEMENT

LEVEL 17 SLAB DETAILS SHEAR LINKS


288 26-Apr-2014 111/SD-S02-0245 1.11 AB 1110-111-L14-AB-S-5220 ST 0 Jameel A 15-May-2014
SHEET 1

LEVEL 17 SLAB DETAILS SHEAR LINKS


289 26-Apr-2014 111/SD-S02-0246 1.11 AB 1110-111-L14-AB-S-5221 ST 0 Jameel A 15-May-2014
SHEET 2

290 26-Apr-2014 111/SD-S02-0247 1.11 AB 1110-111-L14-AB-S-5222 LEVEL 17 BOTTOM REINFORCEMENT ST 0 Jameel A 15-May-2014

5TH BASMENT COLUMN DETAILS


291 17-May-2014 AB-S02-0001 1.11 AB 1110-111-LB4-AB-S-3008 ST 1 Jameel A 31-May-2014
SHEET 1 OF 4

4TH BASMENT C50 C25 COLUMN


292 17-May-2014 AB-S02-0005 1.11 AB 1110-111-LB4-AB-S-3012 ST 1 Jameel A 31-May-2014
DETAILS SHEET 1 OF 16

4TH BASMENT C50 C25 COLUMN


293 17-May-2014 AB-S02-0006 1.11 AB 1110-111-LB4-AB-S-3013 ST 1 Jameel A 31-May-2014
DETAILS SHEET 2 OF 16

4TH BASMENT C50 C25 COLUMN


294 17-May-2014 AB-S02-0007 1.11 AB 1110-111-LB4-AB-S-3014 ST 1 Jameel A 31-May-2014
DETAILS SHEET 3 OF 16

4TH BASMENT C50 C25 COLUMN


295 17-May-2014 AB-S02-0008 1.11 AB 1110-111-LB4-AB-S-3015 ST 1 Jameel A 31-May-2014
DETAILS SHEET 4 OF 16

4TH BASMENT C50 C25 COLUMN


296 17-May-2014 AB-S02-0009 1.11 AB 1110-111-LB4-AB-S-3016 ST 1 Jameel A 31-May-2014
DETAILS SHEET 5 OF 16

4TH BASMENT C50 C25 COLUMN


297 17-May-2014 AB-S02-0010 1.11 AB 1110-111-LB4-AB-S-3017 ST 1 Jameel A 31-May-2014
DETAILS SHEET 6 OF 16

Page 27 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

4TH BASEMENTS COLUMMNS DETAILS


298 17-May-2014 AB-S02-0248 1.11 AB 1110-111-LB4-AB-S-3018 ST 1 Jameel A 31-May-2014
SHEET 13 OF 22

4TH BASEMENTS COLUMMNS DETAILS


299 17-May-2014 AB-S02-0249 1.11 AB 1110-111-LB4-AB-S-3019 ST 1 Jameel A 31-May-2014
SHEET 14 OF 22

4TH BASEMENTS COLUMMNS DETAILS


300 17-May-2014 AB-S02-0250 1.11 AB 1110-111-LB4-AB-S-3020 ST 1 Jameel A 31-May-2014
SHEET 15 OF 22

4TH BASEMENTS COLUMMNS DETAILS


301 17-May-2014 AB-S02-0251 1.11 AB 1110-111-LB4-AB-S-3021 ST 1 Jameel A 31-May-2014
SHEET 16 OF 22

4TH BASEMENTS COLUMMNS DETAILS


302 17-May-2014 AB-S02-0252 1.11 AB 1110-111-LB4-AB-S-3022 ST 1 Jameel A 31-May-2014
SHEET 17 OF 22

4TH BASEMENTS COLUMMNS DETAILS


303 17-May-2014 AB-S02-0253 1.11 AB 1110-111-LB4-AB-S-3023 ST 1 Jameel A 31-May-2014
SHEET 18 OF 22

4TH BASMENT COLUMN DETAILS


304 17-May-2014 AB-S02-0254 1.11 AB 1110-111-LB4-AB-S-3024 ST 0 Jameel A 31-May-2014
SHEET 19 OF 22

4TH BASMENT COLUMN DETAILS


305 17-May-2014 AB-S02-0255 1.11 AB 1110-111-LB4-AB-S-3025 ST 1 Jameel A 31-May-2014
SHEET 20 OF 22

4TH BASMENT COLUMN DETAILS


306 17-May-2014 AB-S02-0256 1.11 AB 1110-111-LB4-AB-S-3026 ST 1 Jameel A 31-May-2014
SHEET 21 OF 22

4TH BASMENT COLUMN DETAILS


307 17-May-2014 AB-S02-0257 1.11 AB 1110-111-LB4-AB-S-3027 ST 1 Jameel A 31-May-2014
SHEET 22 OF 22

4TH BASMENT NORTH WALLS


308 17-May-2014 AB-S02-0265 1.11 AB 1110-111-LB4-AB-S-4010 ST 1 Jameel A 31-May-2014
DETAILS SHEET 2 OF 3

Page 28 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

4TH BASMENT NORTH WALLS


309 17-May-2014 AB-S02-0266 1.11 AB 1110-111-LB4-AB-S-4011 ST 1 Jameel A 31-May-2014
DETAILS SHEET 3 OF 3

NORTH CORE ELEVATION LEVEL B4


310 17-May-2014 AB-S02-0267 1.11 AB 1110-111-LB4-AB-S-4012 ST 1 Jameel A 31-May-2014
TO B2 SHEET 1 0F 2.

TYPICAL CORE & SHEAR WALL


311 17-May-2014 AB-S02-0268 1.11 AB 1110-111-LB4-AB-S-4013 ST 1 Jameel A 31-May-2014
DETAILS SHEET 2 0F 2.

4TH BASMENT COLUMN DETAILS


312 17-May-2014 AB-S02-0269 1.11 AB 1110-111-LB4-AB-S-3009 ST 0 Jameel A 31-May-2014
SHEET 4 OF 22

4TH BASMENT COLUMN DETAILS


313 17-May-2014 AB-S02-0270 1.11 AB 1110-111-LB4-AB-S-3010 ST 0 Jameel A 31-May-2014
SHEET 5 OF 22

4TH BASMENT COLUMN DETAILS


314 17-May-2014 AB-S02-0271 1.11 AB 1110-111-LB4-AB-S-3011 ST 0 Jameel A 31-May-2014
SHEET 6 OF 22

4TH BASMENT NORTH WALLS


315 17-May-2014 SD-S02-0258 1.11 AB 1110-111-LB4-AB-S-4003 ST 1 Jameel A 31-May-2014
DETAILS SHEET 1 OF 6

4TH BASMENT NORTH WALLS


316 17-May-2014 SD-S02-0259 1.11 AB 1110-111-LB4-AB-S-4004 ST 1 Jameel A 31-May-2014
DETAILS SHEET 2 OF 6

4TH BASMENT NORTH WALLS


317 17-May-2014 SD-S02-0260 1.11 AB 1110-111-LB4-AB-S-4005 ST 1 Jameel A 31-May-2014
DETAILS SHEET 3 OF 6

4TH BASMENT NORTH WALLS


318 17-May-2014 SD-S02-0261 1.11 AB 1110-111-LB4-AB-S-4006 ST 1 Jameel D 31-May-2014
DETAILS SHEET 4 OF 6

4TH BASMENT NORTH WALLS


319 17-May-2014 SD-S02-0262 1.11 AB 1110-111-LB4-AB-S-4007 ST 1 Jameel A 31-May-2014
DETAILS SHEET 5 OF 6

Page 29 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

4TH BASMENT NORTH WALLS


320 17-May-2014 SD-S02-0263 1.11 AB 1110-111-LB4-AB-S-4008 ST 1 Jameel A 31-May-2014
DETAILS SHEET 6 OF 6

4TH BASMENT NORTH WALLS


321 17-May-2014 SD-S02-0264 1.11 AB 1110-111-LB4-AB-S-4009 ST 1 Jameel A 31-May-2014
DETAILS SHEET 1 OF 3

1ST BASMENT REFLECTED CELING


322 21-May-2014 AB-G01-0564 1.11 AB 1110-111-LB4-AB-S-07004A AR 0 Jameel B 18-Jun-2014
PLAN PART SHEET 2 OF 4

1ST BASMENT REFLECTED CELING


323 21-May-2014 AB-G01-0565 1.11 AB 1110-111-LB4-AB-S-07004B AR 0 Jameel B 18-Jun-2014
PLAN PART SHEET 3 OF 4

1ST BASMENT REFLECTED CELING


324 21-May-2014 AB-G01-0566 1.11 AB 1110-111-LB4-AB-S-07004C AR 0 Jameel B 18-Jun-2014
PLAN PART SHEET 4 OF 4

LEVEL 00 & LEVEL 01 NORTH CORE


325 28-May-2014 AB-G01-0272 1.11 AB 1110-111-L00-AB-S-4036 WALLS REINFORCEMENT SECTION ST 0 Jameel A 7-Jun-2014
ELEVATION .

LEVEL 00 & LEVEL 01 NORTH CORE


326 28-May-2014 AB-G01-0273 1.11 AB 1110-111-L00-AB-S-4037 WALLS REINFORCEMENT SECTION ST 0 Jameel A 7-Jun-2014
ELEVATION .

LEVEL 00 & LEVEL 01 NORTH CORE


327 28-May-2014 AB-G01-0274 1.11 AB 1110-111-L00-AB-S-4038 WALLS REINFORCEMENT SECTION ST 0 Jameel A 7-Jun-2014
ELEVATION SHEET 1

LEVEL 00 & LEVEL 01 NORTH CORE


328 28-May-2014 AB-G01-0275 1.11 AB 1110-111-L00-AB-S-4039 WALLS REINFORCEMENT SECTION ST 0 Jameel A 7-Jun-2014
ELEVATION .

IST BASMENT WALLS


329 28-May-2014 AB-G01-0276 1.11 AB 1110-111-L00-AB-S-4040 REINFORCEMENT SECTION ST 0 Jameel A 7-Jun-2014
ELEVATION (NORTH)

LEVEL 02 & LEEVEL 03 NORTH CORE


330 28-May-2014 AB-G01-0277 1.11 AB 1110-111-L02-AB-S-4053 WALLS REINFORCEMENT SECTION ST 0 Jameel A 7-Jun-2014
ELEVATION SHEET 1

Page 30 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

LEVEL 02 & LEEVEL 03 NORTH CORE


331 28-May-2014 AB-G01-0278 1.11 AB 1110-111-L02-AB-S-4054 WALLS REINFORCEMENT SECTION ST 0 Jameel A 7-Jun-2014
ELEVATION

LEVEL 02 & LEEVEL 03 NORTH CORE


332 28-May-2014 AB-G01-0279 1.11 AB 1110-111-L02-AB-S-4055 WALLS REINFORCEMENT SECTION ST 0 Jameel A 7-Jun-2014
ELEVATION SHEET 2

LEVEL 02 & LEEVEL 03 NORTH CORE


333 28-May-2014 AB-S03-0280 1.11 AB 1110-111-L02-AB-S-4056 WALLS REINFORCEMENT SECTION ST 0 Jameel A 7-Jun-2014
ELEVATION .

LEVEL 02,LEEVEL 03 NORTH CORE


334 28-May-2014 AB-S03-0281 1.11 AB 1110-111-L02-AB-S-4057 WALLS REINFORCEMENT SECTION ST 0 Jameel A 7-Jun-2014
ELEVATION .

LEVEL 04,5,6 & LEEVEL 03 NORTH


335 28-May-2014 AB-S03-0282 1.11 AB 1110-111-L02-AB-S-4068 CORE WALLS REINFORCEMENT ST 0 Jameel A 7-Jun-2014
SECTION ELEVATION .

LEVEL 04,5,6 NORTH WALLS


336 28-May-2014 AB-S03-0283 1.11 AB 1110-111-L04-AB-S-4069 REINFORCEMENT SECTION ST 0 Jameel A
ELEVATION .

LEVEL 04,5,6 NORTH WALLS


337 28-May-2014 AB-S03-0284 1.11 AB 1110-111-L04-AB-S-4070 REINFORCEMENT SECTION ST 0 Jameel A
ELEVATION . Sheet 3

LEVEL 04,5,6 NORTH WALLS


338 28-May-2014 AB-S03-0285 1.11 AB 1110-111-L04-AB-S-4071 REINFORCEMENT SECTION ST 0 Jameel A
ELEVATION .

LEVEL 04,5,6 NORTH WALLS


339 28-May-2014 AB-S03-0286 1.11 AB 1110-111-L04-AB-S-4072 REINFORCEMENT SECTION ST 0 Jameel A
ELEVATION .

LEVEL 07,8,9,10,11 NORTH coreWALLS


340 28-May-2014 AB-S03-0287 1.11 AB 1110-111-L04-AB-S-4074 REINFORCEMENT SECTION ST 0 Jameel A
ELEVATION .

LEVEL 07,8,9,10,11 NORTH coreWALLS


341 28-May-2014 AB-S03-0288 1.11 AB 1110-111-L02-AB-S-4085 REINFORCEMENT SECTION ST 0 Jameel D
ELEVATION .

Page 31 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

LEVEL 07,8,9,10,11 NORTH CORE


342 28-May-2014 AB-S03-0289 1.11 AB 1110-111-L02-AB-S-4086 WALLS REINFORCEMENT SECTION ST 0 Jameel D
ELEVATION .SHEET 3

LEVEL 07,8,11 NORTH CORE WALLS


343 28-May-2014 AB-S03-0290 1.11 AB 1110-111-L02-AB-S-4087 REINFORCEMENT SECTION ST 0 Jameel D
ELEVATION .

LEVEL 07,8,11 NORTH CORE WALLS


344 28-May-2014 AB-S03-0291 1.11 AB 1110-111-L02-AB-S-4088 REINFORCEMENT SECTION ST 0 Jameel D
ELEVATION .

LEVEL12,13,14 NORTH CORE WALLS


345 28-May-2014 AB-S03-0292 1.11 AB 1110-111-L02-AB-S-4100 REINFORCEMENT SECTION ST 0 Jameel D
ELEVATION .

LEVEL12,13,14 NORTH CORE WALLS


346 28-May-2014 AB-S03-0293 1.11 AB 1110-111-L02-AB-S-4101 REINFORCEMENT SECTION ST 0 Jameel D
ELEVATION .

LEVEL12,13,14 NORTH CORE WALLS


347 28-May-2014 AB-S03-0294 1.11 AB 1110-111-L02-AB-S-4102 REINFORCEMENT SECTION ST 0 Jameel D
ELEVATION SHEET 5

LEVEL12,13,14 NORTH CORE WALLS


348 28-May-2014 AB-S03-0295 1.11 AB 1110-111-L02-AB-S-4103 REINFORCEMENT SECTION ST 0 Jameel D
ELEVATION

LEVEL15,16,17 NORTH CORE WALLS


349 28-May-2014 AB-S03-0296 1.11 AB 1110-111-L02-AB-S-4106 REINFORCEMENT SECTION ST 0 Jameel D
ELEVATION

LEVEL15,16,17 NORTH CORE WALLS


350 28-May-2014 AB-S03-0297 1.11 AB 1110-111-L02-AB-S-4107 REINFORCEMENT SECTION ST 0 Jameel D
ELEVATION

LEVEL15,16,17 NORTH CORE WALLS


351 28-May-2014 AB-S03-0298 1.11 AB 1110-111-L02-AB-S-4108 REINFORCEMENT SECTION ST 0 Jameel D
ELEVATION SHEET 6

IST BASMENT FLOOR COLUMN


352 28-May-2014 AB-S03-0299 1.11 AB 1110-111-L02-AB-S-3053 ST 0 Jameel D
DETAILS SHEET 2

Page 32 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

COLUMN DETAILS FROM BASMENT 03


353 28-May-2014 AB-S03-0300 1.11 AB 1110-111-L02-AB-S-3041 ST 0 Jameel D
TO B1 LEVEL SHEET 3 OF 5

COLUMN DETAILS FROM BASMENT 03


354 28-May-2014 AB-S03-0301 1.11 AB 1110-111-L02-AB-S-3042 ST 0 Jameel D
TO B1 LEVEL SHEET 4 OF 5

COLUMN DETAILS FROM BASMENT 03


355 28-May-2014 AB-S03-0302 1.11 AB 1110-111-L02-AB-S-3043 ST 0 Jameel D
TO B1 LEVEL SHEET 5 OF 5

COLUMN DETAILS FROM BASMENT 3


356 28-May-2014 AB-S03-0303 1.11 AB 1110-111-L02-AB-S-3044 ST 0 Jameel D
TO BASMENT 1 SHEET 1 OF 6

NORTH WALLS DETAILS FROM 3RD


357 28-May-2014 AB-S03-0304 1.11 AB 1110-111-L02-AB-S-4016 BASMENT UP TO GROUND LEVEL ST 0 Jameel D
SHEET 1 OF 2

LEVEL 01 AS BUILT OF SLAB EDGE


358 29-May-2014 SD-S02-0187 1.11 AB 1110-111-L06-AB-S-9023 ST 1 Jameel D 15-Apr-2014
FOR SKYWALK

LEVEL 01 AS BUILT OF SLAB EDGE


359 12-Jun-2014 SD-S02-0187 1.11 AB 1110-111-L01-AB-S-9023 ST 2 Jameel A 22-Jun-2012
FOR SKYWALK

5TH BASMENT COLUMN DETAILS


360 12-Jun-2014 SD-S02-0305 1.11 AB 1110-111-L01-AB-S-3045 ST 0 Jameel A 19-Jun-2012
SHETTE 2 OF 6

5TH BASMENT COLUMN DETAILS


361 12-Jun-2014 SD-S02-0306 1.11 AB 1110-111-L01-AB-S-3046 ST 0 Jameel D 19-Jun-2012
SHETTE 3 OF 6

5TH BASMENT COLUMN DETAILS


362 12-Jun-2014 SD-S02-0307 1.11 AB 1110-111-L01-AB-S-3047 ST 0 Jameel D 19-Jun-2012
SHETTE 4 OF 6

5TH BASMENT COLUMN DETAILS


363 12-Jun-2014 SD-S02-0308 1.11 AB 1110-111-L01-AB-S-3048 ST 0 Jameel D 19-Jun-2012
SHETTE 6 OF 6

Page 33 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

5TH BASMENT COLUMN DETAILS


364 12-Jun-2014 SD-S02-0309 1.11 AB 1110-111-L01-AB-S-3049 ST 0 Jameel D 19-Jun-2012
SHETTE 6 OF 6

5TH BASMENT COLUMN DETAILS


365 12-Jun-2014 SD-S02-0310 1.11 AB 1110-111-L01-AB-S-3051 ST 0 Jameel D 19-Jun-2012
SHETTE 1 OF 1

1ST BASMENT FLOOR COLUMN


366 12-Jun-2014 SD-S02-0311 1.11 AB 1110-111-L01-AB-S-3054 ST 0 Jameel A 19-Jun-2012
DETAILS SHEET 3

1ST BASMENT FLOOR COLUMN


367 12-Jun-2014 SD-S02-0312 1.11 AB 1110-111-L01-AB-S-3055 ST 0 Jameel A 19-Jun-2012
DETAILS SHEET 4

1ST BASMENT FLOOR COLUMN


368 12-Jun-2014 SD-S02-0313 1.11 AB 1110-111-L01-AB-S-3067 ST 0 Jameel D 19-Jun-2012
DETAILS (C96,C74) SHEET 3

L00 & 01 COLUMN DETAILS C79,78,77


369 12-Jun-2014 SD-S02-0314 1.11 AB 1110-111-L01-AB-S-3072 ST 0 Jameel D 19-Jun-2012
SHEET 1

LEVELS 00 COLUMNS DETAILS


370 12-Jun-2014 SD-S02-0314 1.11 AB 1110-111-L01-AB-S-3072 ST 1 Jameel A 12-Jun-2012
(C80,C81, C82) SHEET 1

L00 COLUMN DETAILS C79,78,77 SHEET


371 12-Jun-2014 SD-S02-0315 1.11 AB 1110-111-L01-AB-S-3073 ST 0 Jameel D 19-Jun-2012
2

LEVELS 00 COLUMNS DETAILS


372 12-Jun-2014 SD-S02-0315 1.11 AB 1110-111-L01-AB-S-3073 ST 1 Jameel A 12-Jun-2012
(C79,C78 C77) SHEET 2

L01 & L02 COLUMN DETAILS C85,86,87


373 12-Jun-2014 SD-S02-0316 1.11 AB 1110-111-L01-AB-S-3074 ST 0 Jameel D 19-Jun-2012
SHEET 1

L01 & L02 COLUMN DETAILS C85,86,87


374 12-Jun-2014 SD-S02-0316 1.11 AB 1110-111-L01-AB-S-3074 ST 1 Jameel A 12-Jun-2012
SHEET 1

Page 34 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

L01 & L02 COLUMN DETAILS C01,41


375 12-Jun-2014 SD-S02-0317 1.11 AB 1110-111-L01-AB-S-3075 ST 0 Jameel D 19-Jun-2012
SHEET 2

L01 & L02 COLUMN DETAILS C85,86,87


376 12-Jun-2014 SD-S02-0317 1.11 AB 1110-111-L01-AB-S-3075 ST 1 Jameel A 12-Jun-2012
SHEET 2

L01 & L02 COLUMN DETAILS C01,41


377 12-Jun-2014 SD-S02-0318 1.11 AB 1110-111-L01-AB-S-3076 ST 0 Jameel D 19-Jun-2012
SHEET 3

L01 & L02 COLUMN DETAILS C01 C40


378 12-Jun-2014 SD-S02-0318 1.11 AB 1110-111-L01-AB-S-3076 ST 1 Jameel A 12-Jun-2012
C41 SHEET 3

L01 & L02 COLUMN DETAILS C42,47 50


379 12-Jun-2014 SD-S02-0319 1.11 AB 1110-111-L01-AB-S-3077 ST 0 Jameel D 19-Jun-2012
SHEET 5

L01 & L02 COLUMN DETAILS C42,47 50


380 12-Jun-2014 SD-S02-0319 1.11 AB 1110-111-L01-AB-S-3077 ST 1 Jameel A 12-Jun-2012
SHEET 5

;LEVEL 1,2 COLUMN DETAILS


381 12-Jun-2014 SD-S02-0320 1.11 AB 1110-111-L01-AB-S-3078 ST 0 Jameel D 19-Jun-2012
C88,89,C25A SHEET 5

L01 & L02 COLUMN DETAILS C88 C89


382 12-Jun-2014 SD-S02-0320 1.11 AB 1110-111-L01-AB-S-3078 ST 1 Jameel A 12-Jun-2012
C25A SHEET 5

;LEVEL 1,2 COLUMN DETAILS C25,C36,


383 12-Jun-2014 SD-S02-0321 1.11 AB 1110-111-L01-AB-S-3079 ST 0 Jameel D 19-Jun-2012
SHEET 6.

L01 & L02 COLUMN DETAILS C25 C36


384 12-Jun-2014 SD-S02-0321 1.11 AB 1110-111-L01-AB-S-3079 ST 1 Jameel A 12-Jun-2012
SHEET 6

;LEVEL 1,2 COLUMN DETAILS


385 12-Jun-2014 SD-S02-0322 1.11 AB 1110-111-L01-AB-S-3080 ST 0 Jameel D 19-Jun-2012
C29,C29A,C60,C30,C31,C32, SHEET 7.

Page 35 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

L01 & L02 COLUMN DETAILS C29


386 12-Jun-2014 SD-S02-0322 1.11 AB 1110-111-L01-AB-S-3080 ST 1 Jameel A 12-Jun-2012
C29A,C60,C30,C31,C32 SHEET 7

;LEVEL 1,2 COLUMN DETAILS


387 12-Jun-2014 SD-S02-0323 1.11 AB 1110-111-L01-AB-S-3081 ST 0 Jameel D 19-Jun-2012
C64,C65,65,66, SHEET 8

;LEVEL 1,2 COLUMN DETAILS


388 12-Jun-2014 SD-S02-0323 1.11 AB 1110-111-L01-AB-S-3081 ST 1 Jameel A 12-Jul-2012
C64,C65,65,66, SHEET 8

;LEVEL 1,2 COLUMN DETAILS C93,C94


389 12-Jun-2014 SD-S02-0324 1.11 AB 1110-111-L01-AB-S-3082 ST 0 Jameel D 19-Jun-2012
SHEET 9

;LEVEL 1,2 COLUMN DETAILS C93,C94


390 12-Jun-2014 SD-S02-0324 1.11 AB 1110-111-L01-AB-S-3082 ST 1 Jameel A 12-Jun-2012
SHEET 9

LEVEL 01 CORE WALLS


391 12-Jun-2014 SD-S02-0327 1.11 AB 1110-111-L01-AB-S-4042 ST 1 Jameel A 12-Jun-2012
REINFORCEMENT (SOUTH)

LEVEL 00 & L1 WALLS


392 12-Jun-2014 SD-S02-0334 1.11 AB 1110-111-L01-AB-S-3051 REINFORCEMENT SECTION ST 0 Jameel D 19-Jun-2012
ELEVATION (SOUTH

LEVEL 15 16 17 NORTH CORE WALLS


393 12-Jun-2014 SD-S02-0384 1.11 AB 1110-111-L01-AB-S-4109 REINFORCEMENT SECTION ST 1 Jameel A 12-Jun-2012
ELEVATION

LEVEL 15, LEVEL 16 & LEVEL 17


NORTH CORE WALLS
394 12-Jun-2014 SD-S02-0385 1.11 AB 1110-111-L01-AB-S-4110 ST 1 Jameel A 12-Jun-2012
REINFORCEMENT SECTIONAL
ELEVATION SHEET 5

LEVEL 17 NORTH CORE WALLS


395 12-Jun-2014 SD-S02-0386 1.11 AB 1110-111-L01-AB-S-4111 ST 1 Jameel A 12-Jun-2012
REINFORCEMENT LAYOUT.

BASMENT 01 CORE WALLS


396 12-Jun-2014 SD-S02-0387 1.11 AB 1110-111-L01-AB-S-4019 ST 1 Jameel A 12-Jun-2012
REINFORCEMENT LAYOUT (NORTH)

Page 36 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

IST BASEMENT WALLS


397 12-Jun-2014 SD-S02-0388 1.11 AB 1110-111-L01-AB-S-4027 REINFOCEMENT SECTION ELEVATION ST 1 Jameel A 12-Jun-2012
(NORTH) SHEET 1 OF 3

1ST BASMENT WALLS


398 12-Jun-2014 SD-S02-0389 1.11 AB 1110-111-L01-AB-S-4029 REINFORCEMENT SECTION ST 1 Jameel A 12-Jun-2012
ELEVATION (NORTH ) SHEET 2 OF 3

1ST BASMENT WALLS


399 12-Jun-2014 SD-S02-0390 1.11 AB 1110-111-L01-AB-S-4031 REINFORCEMENT SECTION ST 1 Jameel A 12-Jun-2012
ELEVATION (NORTH) SHEET 3 OF 3

1ST BASMENT FLOOR NORTH CORE


400 12-Jun-2014 SD-S02-0391 1.11 AB 1110-111-L01-AB-S-4032 ST 1 Jameel A 12-Jun-2012
WALLS OPENING

2ND BASMENT FLOOR NORTH CORE


401 12-Jun-2014 SD-S02-0392 1.11 AB 1110-111-L01-AB-S-4021 ST 1 Jameel A 12-Jun-2012
WALLS DETAILS SHEET 1 OF 2

2ND BASMENT FLOOR NORTH CORE


402 12-Jun-2014 SD-S02-0393 1.11 AB 1110-111-L01-AB-S-4022 ST 1 Jameel A 12-Jun-2012
WALLS DETAILS SHEET 2 OF 2

BASMENT 02 CORE WALLS


403 12-Jun-2014 SD-S02-0394 1.11 AB 1110-111-L01-AB-S-4023 ST 1 Jameel A 12-Jun-2012
REINFORCEMENT LAYOUT (SOUTH)

LB2 SOUTH COREWALL SECTION


404 12-Jun-2014 SD-S02-0395 1.11 AB 1110-111-L01-AB-S-4035 ST 1 Jameel A 12-Jun-2012
REINFORCEMENT DETAILS.

3RD BASMENT SOUTH WALLS


405 12-Jun-2014 SD-S02-0396 1.11 AB 1110-111-L01-AB-S-4018 ST 1 Jameel A 12-Jun-2012
DETAILS SHEET 1 OF 3

LB4 & 3RD BASEMENT SOUTH WALLS


406 12-Jun-2014 SD-S02-0398 1.11 AB 1110-111-L01-AB-S-4024 ST 1 Jameel A 12-Jun-2012
DETAILS

3RD BASEMENT SOUTH WALLS


407 12-Jun-2014 SD-S02-0398 1.11 AB 1110-111-L01-AB-S-4019 ST 1 Jameel A 12-Jun-2012
DETAILS SHEET 2 OF 3

Page 37 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

GENRAL ARRANGEMENT AB BUILT


408 14-Jun-2014 111/SD-G01-0001 1.11 AB 1110-111-LB2-AB-A-01003 AR 0 Jameel A 2-Oct-2014
2ND BASMENT PLAY KEY PLAN 1 OF 4

GENRAL ARRANGEMENT AB BUILT


409 14-Jun-2014 111/SD-G01-0002 1.11 AB 1110-111-LB2-AB-A-01003A AR 0 Jameel A 2-Oct-2014
2ND BASMENT PLAY KEY PLAN 2 OF 4

GENRAL ARRANGEMENT AB BUILT


410 14-Jun-2014 111/SD-G01-0003 1.11 AB 1110-111-LB2-AB-A-01003B AR 0 Jameel A 2-Oct-2014
2ND BASMENT PLAY KEY PLAN 3 OF 4

GENRAL ARRANGEMENT AB BUILT


411 14-Jun-2014 111/SD-G01-0004 1.11 AB 1110-111-LB2-AB-A-01003C AR 0 Jameel A 2-Oct-2014
2ND BASMENT PLAY KEY PLAN 4 OF 4

GENRAL ARRANGEMENT AB BUILT


412 14-Jun-2014 111/SD-G01-0005 1.11 AB 1110-111-LB2-AB-A-01001 AR 0 Jameel A 2-Oct-2014
2ND BASMENT PLAY KEY PLAN 1 OF 4

GENRAL ARRANGEMENT AB BUILT


413 14-Jun-2014 111/SD-G01-0006 1.11 AB 1110-111-LB2-AB-A-01001A AR 0 Jameel A 2-Oct-2014
2ND BASMENT PLAY KEY PLAN 2 OF 4

GENRAL ARRANGEMENT AB BUILT


414 14-Jun-2014 111/SD-G01-0007 1.11 AB 1110-111-LB2-AB-A-01001B AR 0 Jameel A 2-Oct-2014
2ND BASMENT PLAY KEY PLAN 2 OF 4

GENRAL ARRANGEMENT AB BUILT


415 14-Jun-2014 111/SD-G01-0008 1.11 AB 1110-111-LB2-AB-A-01001C AR 0 Jameel A 2-Oct-2014
2ND BASMENT PLAY KEY PLAN 4 OF 4

CMU COORDINATE AS BUILT PLAN


416 14-Jun-2014 111/SD-G01-0009 1.11 AB 1110-111-LB2-AB-A-01100 5TH BASEMENT KEY PLAN SHEET 1 OF AR 0 Jameel A 2-Oct-2014
4

CMU COORDINATE AS BUILT PLAN


417 14-Jun-2014 111/SD-G01-0010 1.11 AB 1110-111-LB2-AB-A-01100A 5TH BASEMENT KEY PLAN SHEET 2 OF AR 0 Jameel A 2-Oct-2014
4

CMU COORDINATE AS BUILT PLAN


418 14-Jun-2014 111/SD-G01-0011 1.11 AB 1110-111-LB2-AB-A-01100B 5TH BASEMENT KEY PLAN SHEET 3 OF AR 0 Jameel A 2-Oct-2014
4

Page 38 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

CMU COORDINATE AS BUILT PLAN


419 14-Jun-2014 111/SD-G01-0012 1.11 AB 1110-111-LB2-AB-A-01100C 5TH BASEMENT KEY PLAN SHEET 4 OF AR 0 Jameel A 2-Oct-2014
4

LEVEL 04 NORTH CORE WALLS


420 25-Jun-2014 111/AB-S03-0359 1.11 AB 1110-111-L04-AB-S-4058 ST 0 Jameel A
REINFORCEMENT LAYOUT

LEVEL 04, LEVEL 05, LEVEL 06 SOUTH


421 25-Jun-2014 111/AB-S03-0360 1.11 AB 1110-111-L04-AB-S-4074 CORE WALLS REINFORCEMENT ST 0 Jameel A
SECTIONAL ELEVATION

LEVEL 04, LEVEL 05, LEVEL 06 SOUTH


422 25-Jun-2014 111/AB-S03-0361 1.11 AB 1110-111-L04-AB-S-4075 CORE WALLS REINFORCEMENT ST 0 Jameel A
SECTIONAL ELEVATION

LEVEL 04, LEVEL 05, LEVEL 06 SOUTH


423 25-Jun-2014 111/AB-S03-0362 1.11 AB 1110-111-L04-AB-S-4076 CORE WALLS REINFORCEMENT ST 0 Jameel A
SECTIONAL ELEVATION

LEVEL 04, LEVEL 05, LEVEL 06 SOUTH


424 25-Jun-2014 111/AB-S03-0363 1.11 AB 1110-111-L04-AB-S-4077 CORE WALLS REINFORCEMENT ST 0 Jameel A
SECTIONAL ELEVATION

LEVEL 04, LEVEL 05, LEVEL 06 SOUTH


425 25-Jun-2014 111/AB-S03-0364 1.11 AB 1110-111-L04-AB-S-4078 CORE WALLS REINFORCEMENT ST 0 Jameel A
SECTIONAL ELEVATION

LEVEL 04, LEVEL 05, LEVEL 06 SOUTH


426 25-Jun-2014 111/AB-S03-0365 1.11 AB 1110-111-L04-AB-S-4079 CORE WALLS REINFORCEMENT ST 0 Jameel A
SECTIONAL ELEVATION

LEVEL 05 NORTH CORE WALLS


427 25-Jun-2014 111/AB-S03-0366 1.11 AB 1110-111-L05-AB-S-4067 ST 0 Jameel A
REINFORCEMENT LAYOUT

LEVEL 05 SOUTH CORE WALLS


428 25-Jun-2014 111/AB-S03-0367 1.11 AB 1110-111-L05-AB-S-4073 ST 0 Jameel A
REINFORCEMENT LAYOUT

LEVEL 06 SOUTH CORE WALLS


429 25-Jun-2014 111/AB-S03-0368 1.11 AB 1110-111-L06-AB-S-4080 ST 0 Jameel A
REINFORCEMENT LAYOUT

Page 39 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

LEVEL 06 NORTH CORE WALLS


430 25-Jun-2014 111/AB-S03-0369 1.11 AB 1110-111-L06-AB-S-4082 ST 0 Jameel A
REINFORCEMENT LAYOUT

LEVEL 07 SOUTH CORE WALLS


431 25-Jun-2014 111/AB-S03-0370 1.11 AB 1110-111-L07-AB-S-4081 ST 0 Jameel A
REINFORCEMENT LAYOUT

LEVEL 07 NORTH CORE WALLS


432 25-Jun-2014 111/AB-S03-0371 1.11 AB 1110-111-L07-AB-S-4083 ST 0 Jameel A
REINFORCEMENT LAYOUT

LEVEL 07, LEVEL 08, LEVEL 09 SOUTH


433 25-Jun-2014 111/AB-S03-0372 1.11 AB 1110-111-L07-AB-S-4091 CORE WALLS REINFORCEMENT ST 0 Jameel A
SECTIONAL ELEVATION

LEVEL 07, LEVEL 08, LEVEL 09 SOUTH


434 25-Jun-2014 111/AB-S03-0373 1.11 AB 1110-111-L07-AB-S-4092 CORE WALLS REINFORCEMENT ST 0 Jameel A
SECTIONAL ELEVATION

LEVEL 07, LEVEL 08, LEVEL 09 SOUTH


435 25-Jun-2014 111/AB-S03-0374 1.11 AB 1110-111-L07-AB-S-4093 CORE WALLS REINFORCEMENT ST 0 Jameel A
SECTIONAL ELEVATION

LEVEL 07, LEVEL 08, LEVEL 09 SOUTH


436 25-Jun-2014 111/AB-S03-0375 1.11 AB 1110-111-L07-AB-S-4094 CORE WALLS REINFORCEMENT ST 0 Jameel D
SECTIONAL ELEVATION

LEVEL 07, LEVEL 08, LEVEL 09 SOUTH


437 25-Jun-2014 111/AB-S03-0376 1.11 AB 1110-111-L07-AB-S-4095 CORE WALLS REINFORCEMENT ST 0 Jameel A
SECTIONAL ELEVATION

LEVEL 07, LEVEL 08, LEVEL 09 SOUTH


438 25-Jun-2014 111/AB-S03-0377 1.11 AB 1110-111-L07-AB-S-4096 CORE WALLS REINFORCEMENT ST 0 Jameel A
SECTIONAL ELEVATION

LEVEL 08 SOUTH CORE WALLS


439 25-Jun-2014 111/AB-S03-0378 1.11 AB 1110-111-L08-AB-S-4090 ST 0 Jameel A
REINFORCEMENT LAYOUT

LEVEL 09 SOUTH CORE WALLS


440 25-Jun-2014 111/AB-S03-0379 1.11 AB 1110-111-L09-AB-S-4097 ST 0 Jameel A
REINFORCEMENT LAYOUT

Page 40 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

LEVEL 11 & LEVEL 12 (TYPICAL)


441 25-Jun-2014 111/AB-S03-0380 1.11 AB 1110-111-L11-AB-S-4105 NORTH CORE WALLS ST 0 Jameel A
REINFORCEMENT LAYOUT

LEVEL 12, LEVEL 13 & LEVEL 14


NORTH CORE WALLS
442 25-Jun-2014 111/AB-S03-0381 1.11 AB 1110-111-L12-AB-S-4104 ST 0 Jameel A
REINFORCEMENT SECTIONAL
ELEVATION

LEVEL 13 NORTH CORE WALLS


443 25-Jun-2014 111/AB-S03-0382 1.11 AB 1110-111-L13-AB-S-4098 ST 0 Jameel A
REINFORCEMENT LAYOUT

LEVEL 14 UP TO LEVEL 16 (TYPICAL)


444 25-Jun-2014 111/AB-S03-0383 1.11 AB 1110-111-L14-AB-S-4099 NORTH CORE CORE WALLS ST 0 Jameel A
REINFORCEMENT LAYOUT

;LEVEL 1,2 COLUMN DETAILS


445 2-Jul-2014 111/AB-S03-0322 1.11 AB 1110-111-L01-AB-S-3080 ST 1 Jameel A
C29,C29A,C60,C30,C31,C32, SHEET 7.

LEVEL 00 , L01 COLUMN DETAILS


446 2-Jul-2014 111/AB-S03-0323 1.11 AB 1110-111-L01-AB-S-3081 ST 1 Jameel A
C64,C65,C66 SHEET 8.

LEVEL 01 , L02 COLUMN DETAILS C93 ,


447 2-Jul-2014 111/AB-S03-0324 1.11 AB 1110-111-L01-AB-S-3082 ST 1 Jameel A
C94 SHEET 8.

LEVEL 01 CORE WALLS


448 2-Jul-2014 111/AB-S03-0327 1.11 AB 1110-111-L01-AB-S-4042 ST 1 Jameel D
REINFORCEMENT (SOUTH)

L00 COLUMN DETAILS C79,78,77 SHEET


449 2-Jul-2014 SD-S02-0315 1.11 AB 1110-111-L01-AB-S-3073 ST 0 Jameel D
2

L00 COLUMN DETAILS C79,78,77 SHEET


450 2-Jul-2014 SD-S02-0315 1.11 AB 1110-111-L01-AB-S-3072 ST 0 Jameel D
1

L01 & L02 COLUMN DETAILS C85,86,87


451 2-Jul-2014 SD-S02-0316 1.11 AB 1110-111-L01-AB-S-3074 ST 0 Jameel D
SHEET 1

Page 41 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

L01 & L02 COLUMN DETAILS C01,41


452 2-Jul-2014 SD-S02-0317 1.11 AB 1110-111-L01-AB-S-3075 ST 0 Jameel D
SHEET 2

L01 & L02 COLUMN DETAILS C01,41


453 2-Jul-2014 SD-S02-0318 1.11 AB 1110-111-L01-AB-S-3076 ST 0 Jameel D
SHEET 3

L01 & L02 COLUMN DETAILS C42,47 50


454 2-Jul-2014 SD-S02-0319 1.11 AB 1110-111-L01-AB-S-3077 ST 0 Jameel D
SHEET 5

;LEVEL 1,2 COLUMN DETAILS


455 2-Jul-2014 SD-S02-0320 1.11 AB 1110-111-L01-AB-S-3078 ST 0 Jameel D
C88,89,C25A SHEET 5

;LEVEL 1,2 COLUMN DETAILS C25,C36,


456 2-Jul-2014 SD-S02-0321 1.11 AB 1110-111-L01-AB-S-3079 ST 0 Jameel D
SHEET 6.

LEVEL 15 16 17 NORTH CORE WALLS


457 2-Jul-2014 SD-S02-0384 1.11 AB 1110-111-L01-AB-S-4109 REINFORCEMENT SECTION ST 1 Jameel D
ELEVATION

LEVEL 15, LEVEL 16 & LEVEL 17


NORTH CORE WALLS
458 2-Jul-2014 SD-S02-0385 1.11 AB 1110-111-L01-AB-S-4110 ST 0 Jameel D
REINFORCEMENT SECTIONAL
ELEVATION SHEET 5

LEVEL 17 NORTH CORE WALLS


459 2-Jul-2014 SD-S02-0386 1.11 AB 1110-111-L01-AB-S-4111 ST 0 Jameel D
REINFORCEMENT LAYOUT

BASMENT 01 CORE WALLS


460 2-Jul-2014 SD-S02-0387 1.11 AB 1110-111-L01-AB-S-4019 ST 0 Jameel D
REINFORCEMENT LAYOUT (NORTH)

IST BASEMENT WALLS


461 2-Jul-2014 SD-S02-0388 1.11 AB 1110-111-L01-AB-S-4027 REINFOCEMENT SECTION ELEVATION ST 0 Jameel D
(NORTH) SHEET 1 OF 3

IST BASEMENT WALLS


462 2-Jul-2014 SD-S02-0389 1.11 AB 1110-111-L01-AB-S-4029 REINFOCEMENT SECTION ELEVATION ST 0 Jameel D
(NORTH) SHEET 2 OF 3

Page 42 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

IST BASEMENT WALLS


463 2-Jul-2014 SD-S02-0390 1.11 AB 1110-111-L01-AB-S-4031 REINFOCEMENT SECTION ELEVATION ST 0 Jameel D
(NORTH) SHEET 3 OF 3

IST BASMENT FLOOR NORTH CORE


464 2-Jul-2014 SD-S02-0391 1.11 AB 1110-111-L01-AB-S-4032 ST 0 Jameel D
WALLS OPENING

IST BASMENT FLOOR NORTH CORE


465 2-Jul-2014 SD-S02-0392 1.11 AB 1110-111-L01-AB-S-4021 ST 0 Jameel D
WALLS OPENING

2ND BASMENT FLOOR NORTH CORE


466 2-Jul-2014 SD-S02-0393 1.11 AB 1110-111-L01-AB-S-4022 ST 0 Jameel D
WALLS DETAILS SHEET 2 OF 2

BASMENT 02 CORE WALLS


467 2-Jul-2014 SD-S02-0394 1.11 AB 1110-111-L01-AB-S-4023 ST 0 Jameel D
REINFORCEMENT LAYOUT (SOUTH)

LB2 SOUTH COREWALL SECTION


468 2-Jul-2014 SD-S02-0395 1.11 AB 1110-111-L01-AB-S-4025 ST 0 Jameel D
REINFORCEMENT DETAILS.

3RD BASMENT SOUTH WALLS


469 2-Jul-2014 SD-S02-0396 1.11 AB 1110-111-L01-AB-S-4018 ST 0 Jameel D
DETAILS SHEET 1 OF 3

3RD BASMENT SOUTH WALLS


470 2-Jul-2014 SD-S02-0397 1.11 AB 1110-111-L01-AB-S-4019 ST 0 Jameel D
DETAILS SHEET 2 OF 3

LB4 & 3RD BASEMENT SOUTH WALLS


471 2-Jul-2014 SD-S02-0398 1.11 AB 1110-111-L01-AB-S-4024 ST 0 Jameel D
DETAILS

CABLE CONTAINMENT AS BUILT


472 6-Jul-2014 111/AB-E11-0001 1.11 AB 1110-111-L04-AB-E-CRL-611224 EL 0 Franco D 20-Aug-2014
LAOUT TOWER 1 04 OFFICE.

CABLE CONTAINMENT AS BUILT


473 6-Jul-2014 111/AB-E11-0002 1.11 AB 1110-111-L04-AB-E-CRL-611225 EL 0 Franco D 20-Aug-2014
LAOUT TOWER 1 05 OFFICE.

Page 43 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

CABLE CONTAINMENT AS BUILT


474 6-Jul-2014 111/AB-E11-0003 1.11 AB 1110-111-L04-AB-E-CRL-611226 EL 0 Franco D 20-Aug-2014
LAOUT TOWER 1 06 OFFICE.

CABLE CONTAINMENT AS BUILT


475 6-Jul-2014 111/AB-E11-0004 1.11 AB 1110-111-L04-AB-E-CRL-611227 EL 0 Franco D 20-Aug-2014
LAOUT TOWER 1 07 OFFICE.

CABLE CONTAINMENT AS BUILT


476 6-Jul-2014 111/AB-E11-0005 1.11 AB 1110-111-L04-AB-E-CRL-611228 EL 0 Franco D 20-Aug-2014
LAOUT TOWER 1L 08 OFFICE.

CABLE CONTAINMENT AS BUILT


477 6-Jul-2014 111/AB-E11-0006 1.11 AB 1110-111-L04-AB-E-CRL-611229 EL 0 Franco D 20-Aug-2014
LAOUT TOWER L l09 OFFICE.

CABLE CONTAINMENT AS BUILT


478 6-Jul-2014 111/AB-E11-0007 1.11 AB 1110-111-L04-AB-E-CRL-611230 EL 0 Franco D 20-Aug-2014
LAOUT TOWER 1 L10 OFFICE.

CABLE CONTAINMENT AS BUILT


479 6-Jul-2014 111/AB-E11-0008 1.11 AB 1110-111-L04-AB-E-CRL-611231 EL 0 Franco D 20-Aug-2014
LAOUT TOWER 1 L11 OFFICE.

CABLE CONTAINMENT AS BUILT


480 6-Jul-2014 111/AB-E11-0009 1.11 AB 1110-111-L04-AB-E-CRL-611232 EL 0 Franco D 20-Aug-2014
LAOUT TOWER 1 L12 OFFICE.

CABLE CONTAINMENT AS BUILT


481 6-Jul-2014 111/AB-E11-0010 1.11 AB 1110-111-L04-AB-E-CRL-611234 EL 0 Franco D 20-Aug-2014
LAOUT TOWER 1 L14 OFFICE.

CABLE CONTAINMENT AS BUILT


482 6-Jul-2014 111/AB-E11-0011 1.11 AB 1110-111-L04-AB-E-CRL-610241 EL 0 Franco D 20-Aug-2014
LAOUT TOWER 2 L14 OFFICE.

CABLE CONTAINMENT AS BUILT


483 6-Jul-2014 111/AB-E11-0012 1.11 AB 1110-111-L05-AB-E-CRL-610241 EL 0 Franco D 20-Aug-2014
LAOUT TOWER 2 L15 OFFICE.

CABLE CONTAINMENT AS BUILT


484 6-Jul-2014 111/AB-E11-0013 1.11 AB 1110-111-L05-AB-E-CRL-610242 EL 0 Franco D 20-Aug-2014
LAOUT TOWER 2 L15 OFFICE.

Page 44 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

CABLE CONTAINMENT AS BUILT


485 6-Jul-2014 111/AB-E11-0014 1.11 AB 1110-111-L05-AB-E-CRL-610243 EL 0 Franco D 20-Aug-2014
LAOUT TOWER 2 L07 OFFICE.

4TH BASMENT COLUMN DETAILS


486 8-Jul-2014 111/AB-S02-0270 1.11 AB 1110-1.11-LB4-AB-S-3010 ST 1 Jameel A 17-Jul-2014
SHEET 5 OF 22

4TH BASMENT NORTH WALLS


487 8-Jul-2014 AB-S02-0261 1.11 AB 1110-111-LB4-AB-S-4006 ST 1 Jameel A 17-Jul-2014
DETAILS SHEET 4 OF 6

4TH BASMENT SOUTH WALLS DETAILS


488 8-Jul-2014 AB-S02-0265 1.11 AB 1110-111-LB4-AB-S-4010 ST 1 Jameel A 17-Jul-2014
SHEET 2 OF 3

COLUMN DETAILS FROM BASMENT 3


489 8-Jul-2014 AB-S02-0305 1.11 AB 1110-111-LB3-AB-S-3045 ST 1 Jameel A 17-Jul-2014
TO BASMENT 1 SHEET 2 OF 6

COLUMN DETAILS FROM BASMENT 3


490 8-Jul-2014 AB-S02-0306 1.11 AB 1110-111-LB3-AB-S-3046 ST 1 Jameel A 17-Jul-2014
TO BASMENT 1 SHEET 3 OF 6

COLUMN DETAILS FROM BASMENT 3


491 8-Jul-2014 AB-S02-0307 1.11 AB 1110-111-LB3-AB-S-3047 ST 1 Jameel A 17-Jul-2014
TO BASMENT 1 SHEET 4 OF 6

COLUMN DETAILS FROM BASMENT 3


492 8-Jul-2014 AB-S02-0308 1.11 AB 1110-111-LB3-AB-S-3048 ST 1 Jameel A 17-Jul-2014
TO BASMENT 1 SHEET 5 OF 6

COLUMN DETAILS FROM BASMENT 3


493 8-Jul-2014 AB-S02-0309 1.11 AB 1110-111-LB3-AB-S-3049 ST 1 Jameel A 17-Jul-2014
TO BASMENT 1 SHEET 6 OF 6

T5TH BASMENT COLUMN DETAILS


494 8-Jul-2014 AB-S02-0310 1.11 AB 1110-111-LB4-AB-S-3051 ST 1 Jameel A 17-Jul-2014
SHEET 1 OF 1

1ST BASMENT FLOOR COLUMN


495 8-Jul-2014 AB-S02-0313 1.11 AB 1110-111-LB1-AB-S-3067 ST 1 Jameel A 17-Jul-2014
DETAILS (C96,C74) SHEET 3

Page 45 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

LEVEL 01 CORE WALLS


496 8-Jul-2014 AB-S02-0328 1.11 AB 1110-111-L01-AB-S-4043 ST 1 Jameel A 17-Jul-2014
REINFORCEMENT LAYOUT (NORTH)

1ST BASMENT FLOOR COLUMN


497 8-Jul-2014 AB-S02-0347 1.11 AB 1110-111-LB1-AB-S-3058 ST 1 Jameel A 17-Jul-2014
DETAILS SHEET 7

1ST BASMENT FLOOR COLUMN (C29 &


498 8-Jul-2014 AB-S02-0348 1.11 AB 1110-111-LB1-AB-S-3059 ST 1 Jameel A 17-Jul-2014
C29) DETAILS SHEET 8

1ST BASMENT FLOOR COLUMN


499 8-Jul-2014 AB-S02-0349 1.11 AB 1110-111-LB1-AB-S-3061 ST 1 Jameel A 17-Jul-2014
(C60,C61 & C62) DETAILS SHEET 9

1ST BASMENT FLOOR COLUMN


500 8-Jul-2014 AB-S02-0350 1.11 AB 1110-111-LB1-AB-S-3062 ST 1 Jameel A 17-Jul-2014
DETAILS (C25& C75A) SHEET 10

1ST BASMENT FLOOR COLUMN


501 8-Jul-2014 AB-S02-0351 1.11 AB 1110-111-LB1-AB-S-3063 ST 1 Jameel A 17-Jul-2014
DETAILS (C92 & C93) SHEET 11

1ST BASMENT FLOOR COLUMN


502 8-Jul-2014 AB-S02-0352 1.11 AB 1110-111-LB1-AB-S-3064 ST 1 Jameel A 17-Jul-2014
DETAILS (C92 & C93) SHEET 12

1ST BASMENT FLOOR COLUMN


503 8-Jul-2014 AB-S02-0353 1.11 AB 1110-111-LB1-AB-S-3065 ST 1 Jameel A 17-Jul-2014
DETAILS SHEET 13

1ST BASMENT FLOOR COLUMN


504 8-Jul-2014 AB-S02-0354 1.11 AB 1110-111-LB1-AB-S-3066 ST 1 Jameel A 17-Jul-2014
DETAILS (C94 & C95) SHEET 14

1ST BASMENT FLOOR COLUMN


505 8-Jul-2014 AB-S02-0355 1.11 AB 1110-111-LB1-AB-S-3068 ST 1 Jameel A 17-Jul-2014
DETAILS (C92 & C93) SHEET 16

1ST BASMENT FLOOR COLUMN


506 8-Jul-2014 AB-S02-0356 1.11 AB 1110-111-LB1-AB-S-3069 ST 1 Jameel A 17-Jul-2014
DETAILS (C92 & C93) SHEET 16

Page 46 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

1ST BASMENT FLOOR & LVL-01


507 8-Jul-2014 AB-S02-0357 1.11 AB 1110-111-LB1-AB-S-3070 COLUMN DETAILS (C71,C72,C72A ST 1 Jameel A 17-Jul-2014
SHEET 18

1ST BASMENT FLOOR COLUMN


508 8-Jul-2014 AB-S02-0358 1.11 AB 1110-111-LB1-AB-S-3071 ST 1 Jameel A 17-Jul-2014
DETAILS (C71,C72,C72) SHEET 18

1ST BASMENT FLOOR & LVL COLUMN


509 8-Jul-2014 AB-S02-0359 1.11 AB 1110-111-LB1-AB-S-3071 ST 1 Jameel A 17-Jul-2014
DETAILS (C97,C98,C99) SHEET 19

LEVEL 02,LEVEL 03 SOUTH CORE


510 8-Jul-2014 AB-S03-0341 1.11 AB 1110-111-L02-AB-S-4064 WALLS REINFORCEMENT SECTION ST 1 Jameel A 17-Jul-2014
ELEVATION

Lvl 07,lvl 08,Lvl 09 South core walls


511 8-Jul-2014 AB-S03-0375 1.11 AB 1110-111-L07-AB-S-4094 ST 1 Jameel A 17-Jul-2014
reinforcement sectional elevation

512 16-Jul-2014 111/AB-S02-0399 1.11 AB 1110-111-L00-AB-S-8002 Staircase 1 North details & reinforcement ST 0 Jameel A 24-Jul-2014

513 16-Jul-2014 111/AB-S02-0400 1.11 AB 1110-111-L00-AB-S-8003 Typical staircase details upto basement-1 ST 0 Jameel A 24-Jul-2014

Staircase-3 North upto basement-1 detail and


514 16-Jul-2014 111/AB-S02-0401 1.11 AB 1110-111-L00-AB-S-8004 ST 0 Jameel A 24-Jul-2014
reinforcement

2nd basement additional reinforcement l sheet


515 16-Jul-2014 111/AB-S02-0402 1.11 AB 1110-111-LB2-AB-S-4015 ST 0 Jameel A 24-Jul-2014
3 of 3

516 16-Jul-2014 111/AB-S02-0413 1.11 AB 1110-111-LB3-AB-S-5008 3RD BASMENT DETAILS SHEET 1 OF 2 ST 0 Jameel A 24-Jul-2014

517 16-Jul-2014 111/AB-S02-0414 1.11 AB 1110-111-LB3-AB-S-5010 3RD BASMENT DETAILS SHEET 1 OF 2 ST 0 Jameel A 24-Jul-2014

Page 47 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

518 16-Jul-2014 111/AB-S02-0415 1.11 AB 1110-111-LB3-AB-S-5012 3RD BASMENT DETAILS SHEET 1 OF 2 ST 0 Jameel A 24-Jul-2014

519 16-Jul-2014 111/AB-S02-0416 1.11 AB 1110-111-LB3-AB-S-5017 3RD BASMENT DETAILS SHEET 1 OF23 ST 0 Jameel A 24-Jul-2014

520 16-Jul-2014 111/AB-S02-0417 1.11 AB 1110-111-LB3-AB-S-5017 3RD BASMENT DETAILS SHEET 1 OF 3 ST 0 Jameel A 24-Jul-2014

521 16-Jul-2014 111/AB-S02-0418 1.11 AB 1110-111-LB3-AB-S-5017 3RD BASMENT DETAILS SHEET 2 OF 3 ST 0 Jameel A 24-Jul-2014

522 16-Jul-2014 111/AB-S02-0421 1.11 AB 1110-111-LB4-AB-S-8001 4th basment staircase details ST 0 Jameel A 24-Jul-2014

2nd basement additional reinforcement l sheet


523 16-Jul-2014 111/AB-S03-0403 1.11 AB 1110-111-LB2-AB-S-5025 ST 0 Jameel A 24-Jul-2014
1 of 2

524 16-Jul-2014 111/AB-S03-0404 1.11 AB 1110-111-LB2-AB-S-5027 2nd Basement floor detail sheet 1 of 5 ST 0 Jameel A 24-Jul-2014

525 16-Jul-2014 111/AB-S03-0405 1.11 AB 1110-111-LB2-AB-S-5028 2ND BASMENT DETAILS SHEET 2 OF 5 ST 0 Jameel A 24-Jul-2014

526 16-Jul-2014 111/AB-S03-0406 1.11 AB 1110-111-LB3-AB-S-3038 3RD BASMENT DETAILS SHEET 5 OF 5 ST 0 Jameel A 24-Jul-2014

527 16-Jul-2014 111/AB-S03-0407 1.11 AB 1110-111-LB3-AB-S-3039 3RD BASMENT DETAILS SHEET 1 OF 5 ST 0 Jameel A 24-Jul-2014

528 16-Jul-2014 111/AB-S03-0408 1.11 AB 1110-111-LB3-AB-S-3040 3RD BASMENT DETAILS SHEET 2 OF 5 ST 0 Jameel A 24-Jul-2014

Page 48 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

North core wall 3RD BASMENT upto 1st


529 16-Jul-2014 111/AB-S03-0409 1.11 AB 1110-111-LB3-AB-S-0413 ST 0 Jameel A 24-Jul-2014
basement Lvl 1 OF 2

530 16-Jul-2014 111/AB-S03-0410 1.11 AB 1110-111-LB3-AB-S-0414 3RD BASMENT DETAILS SHEET 2 OF 3 ST 0 Jameel A 24-Jul-2014

531 16-Jul-2014 111/AB-S03-0411 1.11 AB 1110-111-LB3-AB-S-0417 3RD BASMENT DETAILS SHEET 2 OF 2 ST 0 Jameel A 24-Jul-2014

532 16-Jul-2014 111/AB-S03-0412 1.11 AB 1110-111-LB3-AB-S-4020 3RD BASMENT DETAILS SHEET 3 OF 3 ST 0 Jameel A 24-Jul-2014

4TH BASMENT COLUMN And walls layout


533 16-Jul-2014 111/SD-S02-0419 1.11 AB 1110-111-LB4-AB-S-2001 ST 0 Jameel A 24-Jul-2014
sheet 1 of 2

4TH BASMENT COLUMN And walls layout


534 16-Jul-2014 111/SD-S02-0420 1.11 AB 1110-111-LB4-AB-S-2002 ST 0 Jameel A 24-Jul-2014
sheet 2 of 2

CMU COORDINATE AS BUILT PLAN


535 22-Jul-2014 AB-G01-0013 1.11 AB 1110-111-L04-AB-A-01109 TYP NORTH TOWER 4-11 ,12 FLOOR AR 0 Hayden A 2-Oct-2014
KEY SHEET 1 0F 3

CMU COORDINATE AS BUILT PLAN


536 22-Jul-2014 AB-G01-0014 1.11 AB 1110-111-L04-AB-A-0014 TYP NORTH TOWER 4-11 ,12 FLOOR AR 0 Hayden A 2-Oct-2014
KEY SHEET 2 0F 3

CMU COORDINATE AS BUILT PLAN


537 22-Jul-2014 AB-G01-0015 1.11 AB 1110-111-L04-AB-A-01109B TYP NORTH TOWER 4-11 ,12 FLOOR AR 0 Hayden A 2-Oct-2014
KEY SHEET 3 0F 3

CMU COORDINATE AS BUILT PLAN


538 22-Jul-2014 AB-G01-0016 1.11 AB 1110-111-L05-AB-A-01110 TYP NORTH TOWER 4-10 ,14-16TH AR 0 Hayden A 2-Oct-2014
FLOOR KEY SHEET 1 0F 3

CMU COORDINATE AS BUILT PLAN


539 22-Jul-2014 AB-G01-0017 1.11 AB 1110-111-L05-AB-A-01110A TYP NORTH TOWER 4-10 ,14-16TH AR 0 Hayden A 2-Oct-2014
FLOOR KEY SHEET 2 0F 3

Page 49 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

CMU COORDINATE AS BUILT PLAN


540 22-Jul-2014 AB-G01-0018 1.11 AB 1110-111-L05-AB-A-01110B TYP NORTH TOWER 4-10 ,14-16TH AR 0 Hayden A 2-Oct-2014
FLOOR KEY SHEET 3 0F 3

Drainage service as built layout Tower-2 Lvl-


541 4-Aug-2014 111/AB-M01-0027 1.11 AB 1110-111-L04-AB-P-DRG-111139 ME 0 Franco D 14-Aug-2014
04 office

Drainage service as built layout Tower-2 Lvl-


542 4-Aug-2014 111/AB-M01-0028 1.11 AB 1110-111-L05-AB-P-DRG-111140 ME 0 Franco D 14-Aug-2014
05 office

Drainage service as built layout Tower-2 Lvl-


543 4-Aug-2014 111/AB-M01-0029 1.11 AB 1110-111-L06-AB-P-DRG-111141 ME 0 Franco D 14-Aug-2014
06 office

Drainage service as built layout Tower-2 Lvl-


544 4-Aug-2014 111/AB-M01-0030 1.11 AB 1110-111-L07-AB-P-DRG-111142 ME 0 Franco D 14-Aug-2014
07 office

545 5-Aug-2014 111/AB-G01-0030 1.11 AB 1110-111-L07-AB-P-DRG-111142 Drainage service as built layout Tower-2 Lv ME 0 Franco D 14-Aug-2014

Slab lvl L00 bottom reinforcement plan


546 5-Aug-2014 111/AB-S03-0089 1.11 AB 1110-111-L00-AB-S-5050 ST 1 Jameel D 13-Aug-2014
vertical direction (B2) Part-B

Typical placing boom reporting and


547 5-Aug-2014 111/AB-S03-0422 1.11 AB 1110-111-L00-AB-S-0005 ST 0 Jameel A 24-Jul-2014
reinforcement details

548 5-Aug-2014 111/AB-S03-0423 1.11 AB 1110-111-L00-AB-S-0006 Typical steel details ST 0 Jameel A 24-Jul-2014

549 5-Aug-2014 111/AB-S03-0424 1.11 AB 1110-111-L00-AB-S-5045 Lvl-L00 concrete layout sheet 1 of 2 ST 0 Jameel D 13-Aug-2014

550 5-Aug-2014 111/AB-S03-0425 1.11 AB 1110-111-L00-AB-S-5046 Lvl L00 concrete layout sheet 2 of 2 ST 0 Jameel D 13-Aug-2014

Page 50 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

1st basement floor retaining wall


551 5-Aug-2014 111/AB-S03-0426 1.11 AB 1110-111-LB1-AB-S-1016 ST 0 Jameel A 24-Jul-2014
reinforcement

1st basement walls reinforcement sectional


552 5-Aug-2014 111/AB-S03-0427 1.11 AB 1110-111-LB1-AB-S-4028 ST 0 Jameel A 24-Jul-2014
elevation (North) sheet 2 of 5

1st basement walls reinforcement sectional


553 5-Aug-2014 111/AB-S03-0428 1.11 AB 1110-111-LB1-AB-S-4030 ST 0 Jameel A 24-Jul-2014
elevation (North) sheet 4 of 5

1st basement floor bottom reinforcement


554 5-Aug-2014 111/AB-S03-0429 1.11 AB 1110-111-LB1-AB-S-4034 ST 0 Jameel A 24-Jul-2014
sheet 1 of 2

555 6-Aug-2014 111/AB-M01-0034 1.11 AB 1110-111-L03-AB-P-WSS-211138 Water supply system as built layout Tower-2 ME 0 Franco D 20-Aug-2014

556 6-Aug-2014 111/AB-M01-0035 1.11 AB 1110-111-L04-AB-P-WSS-211139 Water supply system as built layout Tower-2 ME 0 Franco D 20-Aug-2014

557 6-Aug-2014 111/AB-M01-0036 1.11 AB 1110-111-L05-AB-P-WSS-211140 Water supply system as built layout Tower-2 ME 0 Franco D 20-Aug-2014

558 6-Aug-2014 111/AB-M01-0037 1.11 AB 1110-111-L06-AB-P-WSS-211141 Water supply system as built layout Tower-2 ME 0 Franco D 20-Aug-2014

559 6-Aug-2014 111/AB-M01-0038 1.11 AB 1110-111-L07-AB-P-WSS-211142 Water supply system as built layout Tower-2 ME 0 Franco D 20-Aug-2014

560 6-Aug-2014 111/AB-M01-0039 1.11 AB 1110-111-L08-AB-P-WSS-211143 Water supply system as built layout Tower-2 ME 0 Franco D 20-Aug-2014

561 6-Aug-2014 111/AB-M02-0031 1.11 AB 1110-111-L01-AB-M-VAC-411118 HVAC as built layout master plan 1st floor ME 0 Franco D 20-Aug-2014

Page 51 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

562 6-Aug-2014 111/AB-M03-0032 1.11 AB 1110-111-L03-AB-P-FFS-311122 Fire fighting system as built lauout Tower-1 ME 0 Franco D 20-Aug-2014

563 6-Aug-2014 111/AB-M03-0033 1.11 AB 1110-111-L03-AB-P-FFS-311138 Fire fighting system as built lauout Tower-2 ME 0 Franco D 20-Aug-2014

564 7-Aug-2014 111/AB-G01-0019 1.11 AB 1110-111-L03-AB-A-01108 CMU coordinate As-Built plan 3rd floor key AR 0 Hayden B 11-Oct-2014

565 7-Aug-2014 111/AB-G01-0020 1.11 AB 1110-111-L03-AB-A-01108A CMU coordinate As-Built plan 3rd floor Par AR 0 Hayden B 11-Oct-2014

566 7-Aug-2014 111/AB-G01-0021 1.11 AB 1110-111-L03-AB-A-01108B CMU coordinate As-Built plan 3rd floor Par AR 0 Hayden B 11-Oct-2014

567 7-Aug-2014 111/AB-G01-0022 1.11 AB 1110-111-L03-AB-A-01108C CMU coordinate As-Built plan 3rd floor Par AR 0 Hayden B 11-Oct-2014

568 7-Aug-2014 111/AB-G01-0023 1.11 AB 1110-111-L02-AB-A-01107 CMU coordinate As-Built plan 2nd floor key AR 0 Hayden B 11-Oct-2014

569 7-Aug-2014 111/AB-G01-0024 1.11 AB 1110-111-L02-AB-A-01107A CMU coordinate As-Built plan 2nd floor Par AR 0 Hayden B 11-Oct-2014

570 7-Aug-2014 111/AB-G01-0025 1.11 AB 1110-111-L02-AB-A-01107B CMU coordinate As-Built plan 2nd floor Par AR 0 Hayden B 11-Oct-2014

571 7-Aug-2014 111/AB-G01-0026 1.11 AB 1110-111-L02-AB-A-01107C CMU coordinate As-Built plan 2nd floor Par AR 0 Hayden B 11-Oct-2014

572 16-Aug-2014 111/AB-S02-0019 1.11 AB 1110-111-LB5-AB-S-3050 5th basement columns staircase bars sheet ST 2 Jameel A 23-Aug-2014

Page 52 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

573 16-Aug-2014 111/AB-S02-0430 1.11 AB 1110-111-L01-AB-S-3083 Lvl-01 &, lvl-02 columns details C74 & C ST 0 Jameel A 23-Aug-2014

574 16-Aug-2014 111/AB-S02-0431 1.11 AB 1110-111-L01-AB-S-3084 Lvl-01 &, lvl-02 columns details C38 & C ST 0 Jameel A 23-Aug-2014

575 16-Aug-2014 111/AB-S02-0432 1.11 AB 1110-111-L01-AB-S-3085 Lvl-01 &, lvl-02 columns details C90 & C9 ST 0 Jameel A 23-Aug-2014

576 16-Aug-2014 111/AB-S02-0433 1.11 AB 1110-111-L01-AB-S-3086 Lvl-01 &, lvl-02 columns details C67,C68 ST 0 Jameel A 23-Aug-2014

577 16-Aug-2014 111/AB-S02-0434 1.11 AB 1110-111-L01-AB-S-3087 Lvl-01 &, lvl-02 columns details C97 & C ST 0 Jameel A 23-Aug-2014

578 16-Aug-2014 111/AB-S02-0435 1.11 AB 1110-111-L01-AB-S-3088 Lvl-01 &, lvl-02 columns details C35 & C92 ST 0 Jameel A 23-Aug-2014

579 16-Aug-2014 111/AB-S02-0436 1.11 AB 1110-111-L01-AB-S-3089 Lvl-01 &, lvl-02 columns details C39 & C3 ST 0 Jameel A 23-Aug-2014

580 16-Aug-2014 111/AB-S02-0437 1.11 AB 1110-111-L03-AB-S-3090 Lvl-02 &, lvl-03 & Lvl 04 columns details ST 0 Jameel A 23-Aug-2014

581 16-Aug-2014 111/AB-S02-0438 1.11 AB 1110-111-L03-AB-S-3091 Lvl-02 &, lvl-03 & Lvl-04 columns details ST 0 Jameel A 23-Aug-2014

582 17-Aug-2014 111/AB-S02-0439 1.11 AB 1110-111-LB1-AB-S-3052 Lvl LB1& L00 Column details C90 & C32 ST 0 Jameel A 30-Aug-2014

583 17-Aug-2014 111/AB-S02-0440 1.11 AB 1110-111-LB1-AB-S-4033 1st basement floor South core details sheet ST 0 Jameel A 28-Aug-2014

Page 53 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

584 17-Aug-2014 111/AB-S02-0441 1.11 AB 1110-111-LB1-AB-S-4034 1st basement floor South core details sheet ST 0 Jameel A 28-Aug-2014

585 17-Aug-2014 111/AB-S02-0442 1.11 AB 1110-111-LB1-AB-S-5044 1st basement floor details sheet 4 of 4 ST 0 Jameel A 28-Aug-2014

586 17-Aug-2014 111/AB-S02-0443 1.11 AB 1110-111-LB3-AB-S-3060 4th Basement to Lvl 00 column C33 details ST 0 Jameel A 28-Aug-2014

587 17-Aug-2014 111/AB-S02-0444 1.11 AB 1110-111-LB4-AB-S-7001 4th Basement structural details ST 0 Jameel A 28-Aug-2014

588 17-Aug-2014 111/AB-S02-0445 1.11 AB 1110-111-L03-AB-S-3092 Lvl-02,lvl-3 & Lvl-4 columns details C77 & ST 0 Jameel A 28-Aug-2014

589 17-Aug-2014 111/AB-S02-0446 1.11 AB 1110-111-L03-AB-S-3093 Lvl-02,lvl-3 & Lvl-4 columns details C78 & ST 0 Jameel A 28-Aug-2014

590 17-Aug-2014 111/AB-S02-0447 1.11 AB 1110-111-L03-AB-S-3094 Lvl-03,l Lvl-4 & Lvl-5 columns details C8 ST 0 Jameel A 28-Aug-2014

591 17-Aug-2014 111/AB-S02-0448 1.11 AB 1110-111-L03-AB-S-3095 Lvl-03,l Lvl-4 & Lvl-5columns details C40 ST 0 Jameel A 28-Aug-2014

LEVEL 03, LEVEL 04 & LEVEL 05


592 23-Aug-2014 111/AB-S02-0449 1.11 AB 1110-1.11-L03-AB-S 3096 COLUMNS DETAILS C24,C35,C47 SHEET ST 0 Jameel A 6-Sep-2014
7

LEVEL 03, LEVEL 04 & LEVEL 05


593 23-Aug-2014 111/AB-S02-0450 1.11 AB 1110-1.11-L03-AB-S 3097 COLUMNS DETAILS C25,C36,C50 SHEET ST 0 Jameel A 6-Sep-2014
8

LEVEL 03, LEVEL 04 & LEVEL 05


594 23-Aug-2014 111/AB-S02-0451 1.11 AB 1110-1.11-L03-AB-S 3098 COLUMNS DETAILS C92,C92A,C93,C94 ST 0 Jameel A 6-Sep-2014
SHEET 9

Page 54 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

LEVEL 03, LEVEL 04 & LEVEL 05


COLUMNS DETAILS
595 23-Aug-2014 111/AB-S02-0452 1.11 AB 1110-1.11-L03-AB-S 3099 ST 0 Jameel D 6-Sep-2014
C29,C29A,C90,C95,C96,C97,C98,C99,
SHEET 10

LEVEL 03, LEVEL 04 & LEVEL 05


596 23-Aug-2014 111/AB-S02-0453 1.11 AB 1110-1.11-L03-AB-S 3100 COLUMNS DETAILS C69,C70,C74, ST 0 Jameel A 6-Sep-2014
SHEET 11

LEVEL 03, LEVEL 04 & LEVEL 05


597 23-Aug-2014 111/AB-S02-0454 1.11 AB 1110-1.11-L03-AB-S 3101 COLUMNS DETAILS C67,C68,C72, ST 0 Jameel A 6-Sep-2014
SHEET 12

LEVEL 03, LEVEL 04 & LEVEL 05


598 23-Aug-2014 111/AB-S02-0455 1.11 AB 1110-1.11-L03-AB-S 3102 COLUMNS DETAILS C72A, C91 SHEET ST 0 Jameel A 6-Sep-2014
13

LEVEL 03, LEVEL 04 & LEVEL 05


599 23-Aug-2014 111/AB-S02-0456 1.11 AB 1110-1.11-L03-AB-S 3103 COLUMNS DETAILS C39,, C39A SHEET ST 0 Jameel A 6-Sep-2014
14

LEVEL 03, LEVEL 04 & LEVEL 05


600 23-Aug-2014 111/AB-S02-0457 1.11 AB 1110-1.11-L03-AB-S 3104 ST 0 Jameel A 6-Sep-2014
COLUMNS DETAILS C36,, SHEET 15

LEVEL 05,LEVEL 06 & LEVEL 07


601 23-Aug-2014 111/AB-S02-0458 1.11 AB 1110-1.11-L05-AB-S 3105 ST 0 Jameel A 6-Sep-2014
COLUMNS DETAILS C80,C81,, SHEET 1

LEVEL 05,LEVEL 06 & LEVEL 07


602 23-Aug-2014 111/AB-S02-0459 1.11 AB 1110-1.11-L05-AB-S 3106 ST 0 Jameel A 6-Sep-2014
COLUMNS DETAILS C34,, SHEET 2

LEVEL 05,LEVEL 06 & LEVEL 07


603 23-Aug-2014 111/AB-S02-0460 1.11 AB 1110-1.11-L05-AB-S 3107 ST 0 Jameel A 6-Sep-2014
COLUMNS DETAILS C82 C82A SHEET 3

LEVEL 05,LEVEL 06 LEVEL 07 & LEVEL


604 23-Aug-2014 111/AB-S02-0461 1.11 AB 1110-1.11-L05-AB-S 3108 08 COLUMNS DETAILS C77 C77A ST 0 Jameel A 6-Sep-2014
SHEET 4

LEVEL 05,LEVEL 06 & LEVEL 07


605 23-Aug-2014 111/AB-S02-0462 1.11 AB 1110-1.11-L05-AB-S 3109 ST 0 Jameel A 6-Sep-2014
COLUMNS DETAILS C78, C79A SHEET 5

Page 55 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

LEVEL 06 LEVEL 07 & COLUMNS


606 23-Aug-2014 111/AB-S02-0463 1.11 AB 1110-1.11-L06-AB-S 3110 ST 0 Jameel A 6-Sep-2014
DETAILS C84, C85,C86,C87,C1 SHEET 6

LEVEL 06 LEVEL 07 & COLUMNS


607 23-Aug-2014 111/AB-S02-0464 1.11 AB 1110-1.11-L06-AB-S 3111 ST 0 Jameel A 6-Sep-2014
DETAILS C84, C88,C88A, SHEET 7

LEVEL 06 LEVEL 07 & COLUMNS


608 23-Aug-2014 111/AB-S02-0465 1.11 AB 1110-1.11-L06-AB-S 3112 ST 0 Jameel A 6-Sep-2014
DETAILS C40, C41,,C42, SHEET 8

LEVEL 06 LEVEL 07 & COLUMNS


609 23-Aug-2014 111/AB-S02-0466 1.11 AB 1110-1.11-L06-AB-S 3113 ST 0 Jameel A 6-Sep-2014
DETAILS C24, C35,,C47, SHEET 9

DRAINAGE SERVICE AS BUILT


610 24-Aug-2014 111/AB-M01-0040 1.11 AB 1110-1.11-LB1-AB-P-PL-103013 PL 0 Khusro D 11-Sep-2014
LAYOUT BASEMENT 1 MASTER PLAN

DRAINAGE SERVICE AS BUILT


611 24-Aug-2014 111/AB-M01-0041 1.11 AB 1110-1.11-LB1-AB-P-PL-103011 LAYOUT BASEMENT 1 TOWER 1 PART PL 0 Khusro D 11-Sep-2014
A

DRAINAGE SERVICE AS BUILT


612 24-Aug-2014 111/AB-M01-0042 1.11 AB 1110-1.11-LB1-AB-P-PL-103012 PL 0 Khusro D 11-Sep-2014
LAYOUT BASEMENT 1 TOWER 2 PARTB

5TH BASMENT COLUMN DETAIL


613 31-Aug-2014 111/AB-S02-0002 1.11 AB 1110-111-LB5-AB-S-3009 ST 1 Jameel A 10-Sep-2014
SHEET 2 OF 4

5TH BASMENT COLUMN DETAIL


614 31-Aug-2014 111/AB-S02-0003 1.11 AB 1110-111-LB5-AB-S-3010 ST 1 Jameel A 10-Sep-2014
SHEET 3 OF 4

5TH BASMENT COLUMN DETAIL


615 31-Aug-2014 111/AB-S02-0004 1.11 AB 1110-111-LB5-AB-S-3011 ST 1 Jameel A 10-Sep-2014
SHEET 4 OF 4

5TH BASMENT COLUMN STARTER


616 31-Aug-2014 111/AB-S02-0014 1.11 AB 1110-111-LB5-AB-S-3003 ST 2 Jameel A 10-Sep-2014
BARS SHEET 4 OF 6

Page 56 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

5TH BASMENT COLUMN STARTER


617 31-Aug-2014 111/AB-S02-0015 1.11 AB 1110-111-LB5-AB-S-3004 ST 2 Jameel A 10-Sep-2014
BARS SHEET 5 OF 6

5TH BASMENT COLUMN STARTER


618 31-Aug-2014 111/AB-S02-0016 1.11 AB 1110-111-LB5-AB-S-3005 ST 2 Jameel A 10-Sep-2014
BARS SHEET 6 OF 6

4TH BASMENT COLUMN STARTER


619 31-Aug-2014 111/AB-S02-0017 1.11 AB 1110-111-LB4-AB-S-3056 ST 1 Jameel A 10-Sep-2014
BARS SHEET 1 OF 22

4TH BASMENT COLUMN STARTER


620 31-Aug-2014 111/AB-S02-0018 1.11 AB 1110-111-LB4-AB-S-3007 ST 1 Jameel A 10-Sep-2014
BARS SHEET 2 OF 22

5TH BASMENT COLUMN DETAIL


621 31-Aug-2014 111/AB-S02-0020 1.11 AB 1110-111-LB5-AB-S-3051 ST 2 Jameel A 10-Sep-2014
SHEET 1 OF 1

LEVEL 06 LEVEL 07 & COLUMNS


622 31-Aug-2014 111/AB-S02-0467 1.11 AB 1110-1.11-L06-AB-S-3114 ST 0 Jameel A 10-Sep-2014
DETAILS C25, C25A C36 C50 SHEET 10

LEVEL 06 LEVEL 07 & COLUMNS


623 31-Aug-2014 111/AB-S02-0468 1.11 AB 1110-1.11-L06-AB-S-3115 ST 0 Jameel A 10-Sep-2014
DETAILS C25, C25A C36 C50 SHEET 11

LEVEL 06 LEVEL 07 LEVEL &


624 31-Aug-2014 111/AB-S02-0469 1.11 AB 1110-1.11-L06-AB-S-3116 COLUMNS DETAILS C90, C95 C96 C99 ST 0 Jameel A 10-Sep-2014
SHEET 12

LEVEL 06 LEVEL 07 LEVEL &


625 31-Aug-2014 111/AB-S02-0470 1.11 AB 1110-1.11-L06-AB-S-3117 COLUMNS DETAILS C69 C70 C74 ST 0 Jameel A 10-Sep-2014
SHEET 13

LEVEL 06 LEVEL 07 LEVEL &


626 31-Aug-2014 111/AB-S02-0471 1.11 AB 1110-1.11-L06-AB-S-3118 COLUMNS DETAILS C68 C72 C72 ST 0 Jameel A 10-Sep-2014
SHEET 14

LEVEL 06 LEVEL 07 LEVEL &


627 31-Aug-2014 111/AB-S02-0472 1.11 AB 1110-1.11-L06-AB-S-3119 COLUMNS DETAILS C72A C91 SHEET ST 0 Jameel A 10-Sep-2014
13

Page 57 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

LEVEL 06 LEVEL 07 LEVEL &


628 31-Aug-2014 111/AB-S02-0473 1.11 AB 1110-1.11-L06-AB-S-3120 COLUMNS DETAILS C39A C39A SHEET ST 0 Jameel A 10-Sep-2014
16

COLUMN C24,C50 C47 AT B3,B2,B1


629 31-Aug-2014 111AB-S02-0070 1.11 AB 1110-111-LB3-AB-S-3031 ST 1 Jameel A 10-Sep-2014
SHEET 4

DRAINAGE SERVICE AS BUILT


630 1-Sep-2014 111-AB-M01-0043 1.11 AB 1110-111-LB2-AB-P-PL-103008 LAYOUT BASEMENT 2 TOWER 1 PL 0 Franco D 11-Sep-2014
PARTA

DRAINAGE SERVICE AS BUILT


631 1-Sep-2014 111-AB-M01-0044 AB 1110-111-LB2-AB-P-PL-103009 PL 0 Franco D 11-Sep-2014
LAYOUT BASEMENT 2 TOWER 1 PARTB

DRAINAGE SERVICE AS BUILT


632 1-Sep-2014 111-AB-M01-0045 1.11 AB 1110-111-LB2-AB-P-PL-103010 PL 0 Franco D 11-Sep-2014
LAYOUT BASEMENT 2 MASTER PLAN

5TH BASMENT SOUTH WALLS


633 8-Sep-2014 111/AB-S02-0030 1.11 AB 1110-111-LB5-AB-S-4002 ST 2 Jameel A 16-Sep-2014
STRATER BARS SHEET 3 OF 3

634 8-Sep-2014 111/AB-S02-0032 1.11 AB 1110-111-LB5-AB-S-8000 5TH BASMENT STAIR CASE DETAILS ST 2 Jameel A 16-Sep-2014

LEVEL 08 LEVEL 09 & level 10


635 8-Sep-2014 111/AB-S02-0474 1.11 AB 1110-1.11-L09-AB-S 3121 ST 0 Jameel A 16-Sep-2014
COLUMNS DETAILS C80,C80 SHEET 1

LEVEL 08 LEVEL 09 & level 10


636 8-Sep-2014 111/AB-S02-0475 1.11 AB 1110-1.11-L09-AB-S 3122 ST 0 Jameel A 16-Sep-2014
COLUMNS DETAILS C34 SHEET 2

LEVEL 08 LEVEL 09 & level 10


637 8-Sep-2014 111/AB-S02-0476 1.11 AB 1110-1.11-L09-AB-S 3123 ST 0 Jameel A 16-Sep-2014
COLUMNS DETAILS C82, C82A SHEET 3

LEVEL 09 LEVEL 10 & level 11


638 8-Sep-2014 111/AB-S02-0477 1.11 AB 1110-1.11-L09-AB-S 3124 COLUMNS DETAILS C84 C86 C87 ,C1 ST 0 Jameel A 16-Sep-2014
SHEET 4

Page 58 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

LEVEL 09 LEVEL 10 & level 11


639 8-Sep-2014 111/AB-S02-0478 1.11 AB 1110-1.11-L09-AB-S 3125 ST 0 Jameel A 16-Sep-2014
COLUMNS DETAILS C88 C88A , SHEET 5

LEVEL 09 LEVEL 10 & level 11


640 8-Sep-2014 111/AB-S02-0479 1.11 AB 1110-1.11-L09-AB-S 3126 COLUMNS DETAILS C40 C41 C42, ST 0 Jameel A 16-Sep-2014
SHEET 6

LEVEL 09 LEVEL 10 & level 11


641 8-Sep-2014 111/AB-S02-0480 1.11 AB 1110-1.11-L09-AB-S 3127 COLUMNS DETAILS C24 C35 C 47 ST 0 Jameel A 16-Sep-2014
SHEET 7

LEVEL 09 LEVEL 10 & level 11


642 8-Sep-2014 111/AB-S02-0481 1.11 AB 1110-1.11-L09-AB-S 3128 COLUMNS DETAILS C25 C25A C 36 C50 ST 0 Jameel A 16-Sep-2014
SHEET 8

LEVEL 11 LEVEL 12 & level 13


643 8-Sep-2014 111/AB-S02-0482 1.11 AB 1110-1.11-L09-AB-S 3129 ST 0 Jameel A 16-Sep-2014
COLUMNS DETAILS C80 C81 SHEET 1

LEVEL 11 LEVEL 12 & level 13 L 15


644 8-Sep-2014 111/AB-S02-0483 1.11 AB 1110-1.11-L09-AB-S 3130 ST 0 Jameel A 16-Sep-2014
COLUMNS DETAILS C34 SHEET 2

4TH BASMENT RETAINING WALL


645 8-Sep-2014 111/AB-S03-0039 1.11 AB 1110-111-LB4-AB-S-1012 REINFORCEMENT FROM B4 TO B2 ST 1 Jameel A 16-Sep-2014
SHEET 1 OF 2

4TH BASMENT RETAINING WALL


646 8-Sep-2014 111/AB-S03-0040 1.11 AB 1110-111-LB4-AB-S-1013 REINFORCEMENT FROM B2 TO B2 ST 1 Jameel A 16-Sep-2014
SHEET 2 OF 2

RETAINING WALL REINFORCEMENT


FROM 4TH BASMENT TO GROUND
647 8-Sep-2014 111/AB-S03-0041 1.11 AB 1110-111-LB4-AB-S-1014 ST 1 Jameel A 16-Sep-2014
LEVEL FOUNDATION DETAIL SHEET
OF 2
RETAINING WALL REINFORCEMENT
FROM 4TH BASMENT TO GROUND
648 8-Sep-2014 111/AB-S03-0042 1.11 AB 1110-111-LB4-AB-S-1015 ST 1 Jameel A 16-Sep-2014
LEVEL FOUNDATION DETAIL SHEET 2
OF 2

COLUMN DETAILS C16,C17 C1AT


649 8-Sep-2014 111-SD-S02-0071 1.11 AB 1110-111-LB3-AB-S-3032 BASMENT 03 AND BASMENT 02 SHEET ST 1 Jameel A 17-Sep-2014
5

Page 59 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

COLUMN DETAILS C35,C36 AT


650 8-Sep-2014 111-SD-S02-0072 1.11 AB 1110-111-LB3-AB-S-3033 ST 1 Jameel A 16-Sep-2014
B3,B2 ,B1 SHEET 6

4TH BASEMENT FOUNDATION


651 15-Sep-2014 111/AB-S02-0033 1.11 AB 1110-111-LB4-AB-S-1006 ST 1 Jameel A 17-Sep-2014
DETAILS SHEET 1 OF 6

4TH BASEMENT FOUNDATION


652 15-Sep-2014 111/AB-S02-0034 1.11 AB 1110-111-LB4-AB-S-1007 ST 1 Jameel A 17-Sep-2014
DETAILS SHEET 2 OF 6

4TH BASEMENT FOUNDATION


653 15-Sep-2014 111/AB-S02-0035 1.11 AB 1110-111-LB4-AB-S-1008 ST 1 Jameel A 17-Sep-2014
DETAILS SHEET 3 OF 6

4TH BASEMENT FOUNDATION


654 15-Sep-2014 111/AB-S02-0036 1.11 AB 1110-111-LB4-AB-S-1009 ST 1 Jameel A 17-Sep-2014
DETAILS SHEET 4 OF 6

4TH BASEMENT FOUNDATION


655 15-Sep-2014 111/AB-S02-0037 1.11 AB 1110-111-LB4-AB-S-1010 ST 1 Jameel A 17-Sep-2014
DETAILS SHEET 5 OF 6

4TH BASEMENT FOUNDATION


656 15-Sep-2014 111/AB-S02-0038 1.11 AB 1110-111-LB4-AB-S-1011 ST 1 Jameel A 17-Sep-2014
DETAILS SHEET 6 OF 6

LEVEL 03, LEVEL 04 & LEVEL 05


657 15-Sep-2014 111/AB-S02-0452 1.11 AB 1110-111-L03-AB-S-3099 COLUMNS DETAILS C29, C29A, C89, ST 1 Jameel A 17-Sep-2014
C90, C95, C96, C97, C98, C99 SHEET 10

LEVEL 11, LEVEL 12 & LEVEL 13


658 15-Sep-2014 111/AB-S02-0484 1.11 AB 1110-111-L11-AB-S-3131 ST 0 Jameel A 17-Sep-2014
COLUMNS DETAILS C82, C82A SHEET 3

LEVEL 12, LEVEL 13, LEVEL 14


659 15-Sep-2014 111/AB-S02-0485 1.11 AB 1110-111-L12-AB-S-3132 COLUMNS DETAILS C84, C85, C86, C87, ST 0 Jameel A 17-Sep-2014
C1 SHEET 4

LEVEL 12, LEVEL 13, LEVEL 14


660 15-Sep-2014 111/AB-S02-0486 1.11 AB 1110-111-L12-AB-S-3133 ST 0 Jameel A 17-Sep-2014
COLUMNS DETAILS C88, C88A SHEET 5

Page 60 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

LEVEL 12, LEVEL 13, LEVEL 14


661 15-Sep-2014 111/AB-S02-0487 1.11 AB 1110-111-L12-AB-S-3134 COLUMNS DETAILS C40, C41, C42 ST 0 Jameel A 17-Sep-2014
SHEET 6

LEVEL 12, LEVEL 13, LEVEL 14


662 15-Sep-2014 111/AB-S02-0488 1.11 AB 1110-111-L12-AB-S-3135 COLUMNS DETAILS C24, C35, C47 ST 0 Jameel A 17-Sep-2014
SHEET 7

LEVEL 12, LEVEL 13, LEVEL 14


663 15-Sep-2014 111/AB-S02-0489 1.11 AB 1110-111-L12-AB-S-3136 ST 0 Jameel A 17-Sep-2014
COLUMNS DETAILS C25A, C50 SHEET 8

LEVEL 12, LEVEL 13, LEVEL 14


664 15-Sep-2014 111/AB-S02-0490 1.11 AB 1110-111-L12-AB-S-3137 ST 0 Jameel A 17-Sep-2014
COLUMNS DETAILS C25, C36 SHEET 9

LEVEL 14, LEVEL 15, LEVEL 16


665 15-Sep-2014 111/AB-S02-0491 1.11 AB 1110-111-L14-AB-S-3138 ST 0 Jameel A 17-Sep-2014
COLUMNS DETAILS C80, C81 SHEET 1

LEVEL 14, LEVEL 15, LEVEL 16


666 15-Sep-2014 111/AB-S02-0492 1.11 AB 1110-111-L14-AB-S-3139 ST 0 Jameel A 17-Sep-2014
COLUMNS DETAILS C82, C82A SHEET 2

LEVEL 15, LEVEL 16 COLUMNS


667 15-Sep-2014 111/AB-S02-0493 1.11 AB 1110-111-L15-AB-S-3140 ST 0 Jameel A 17-Sep-2014
DETAILS C84, C85, C86, C87, C1 SHEET 3

LEVEL 15, LEVEL 16 COLUMNS


668 15-Sep-2014 111/AB-S02-0494 1.11 AB 1110-111-L15-AB-S-3141 ST 0 Jameel A 17-Sep-2014
DETAILS C88, C88A SHEET 4

LEVEL 15, LEVEL 16 COLUMNS


669 15-Sep-2014 111/AB-S02-0495 1.11 AB 1110-111-L15-AB-S-3142 ST 0 Jameel A 17-Sep-2014
DETAILS C40, C41, C42 SHEET 5

LEVEL 15, LEVEL 16 COLUMNS


670 15-Sep-2014 111/AB-S02-0496 1.11 AB 1110-111-L15-AB-S-3143 ST 0 Jameel A 17-Sep-2014
DETAILS C24, C35, C47 SHEET 6

LEVEL 15 & LEVEL 16 COLUMNS


671 15-Sep-2014 111/AB-S02-0497 1.11 AB 1110-111-L15-AB-S-3144 ST 0 Jameel A 17-Sep-2014
DETAILS C25A, C50 SHEET 7

Page 61 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

LEVEL 15 & LEVEL 16 COLUMNS


672 15-Sep-2014 111/AB-S02-0498 1.11 AB 1110-111-L15-AB-S-3145 ST 0 Jameel A 17-Sep-2014
DETAILS C25, C36 SHEET 8

LEVEL 06 DETAILS SHEAR LINKS


673 22-Sep-2014 111/AB-S02-0499 1.11 AB 1110-111-L12-L06-AB-S-5135 ST 0 Jameel D 27-Sep-2014
SHEET 2

LEVEL 10 CONCRETE LAYOUT SHEET 1


674 22-Sep-2014 111/AB-S02-0501 1.11 AB 1110-111-L10-AB-S-5174 ST 0 Jameel D 27-Sep-2014
OF 2

LEVEL 10 CONCRETE LAYOUT SHEET 2


675 22-Sep-2014 111/AB-S02-0502 1.11 AB 1110-111-L10-AB-S-5175 ST 0 Jameel D 27-Sep-2014
OF 2

LEVEL 10 BOTTOM REINFORCEMENT


676 22-Sep-2014 111/AB-S02-0503 1.11 AB 1110-111-L10-AB-S-5176 ST 0 Jameel D 27-Sep-2014
SHEET 1 OF 2

LEVEL 10 BOTTOM REINFORCEMENT


677 22-Sep-2014 111/AB-S02-0504 1.11 AB 1110-111-L10-AB-S-5177 ST 0 Jameel D 27-Sep-2014
SHEET 2 OF 2

4TH BASEMENT FLOOR BOTTOM


678 22-Sep-2014 111/AB-S03-0045 1.11 AB 1110-111-L12-LB4-AB-S-5002 ST 1 Jameel D 27-Sep-2014
REINFORCEMENT SHEET 1 OF 2

4TH BASEMENT FLOOR BOTTOM


679 22-Sep-2014 111/AB-S03-0046 1.11 AB 1110-111-L12-LB4-AB-S-5003 ST 1 Jameel D 27-Sep-2014
REINFORCEMENT SHEET 2 OF 2

4TH BASEMENT FLOOR TOP


680 22-Sep-2014 111/AB-S03-0047 1.11 AB 1110-111-LB4-AB-S-5004 ST 1 Jameel D 27-Sep-2014
REINFORCEMENT SHEET 1 OF 2

4TH BASEMENT FLOOR TOP


681 22-Sep-2014 111/AB-S03-0048 1.11 AB 1110-111-LB4-AB-S-5005 ST 1 Jameel D 27-Sep-2014
REINFORCEMENT SHEET 2 OF 2

4TH BASEMENT ADDITIONAL


682 22-Sep-2014 111/AB-S03-0049 1.11 AB 1110-111-L12-LB4-AB-S-5006 ST 1 Jameel D 27-Sep-2014
REINFORCEMENT SHEET 1 OF 2

Page 62 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

4TH BASEMENT ADDITIONAL


683 22-Sep-2014 111/AB-S03-0050 1.11 AB 1110-111-L12-LB4-AB-S-5007 ST 1 Jameel D 27-Sep-2014
REINFORCEMENT SHEET 2 OF 2

LEVEL 10 ADDITIONAL SHEAR


684 22-Sep-2014 111/AB-S03-0500 1.11 AB 1110-111-L18-AB-S-5227 REINFORCEMENT MACHINE ROOM ST 0 Jameel D 27-Sep-2014
SLAB AT ROOF MEZZANINE

LEVEL 10 TOP REINFORCEMENT


685 22-Sep-2014 111/AB-S03-0505 1.11 AB 1110-111-L10-AB-S-5178 ST 0 Jameel D 27-Sep-2014
SHEET 1 OF 2

LEVEL 10 TOP REINFORCEMENT


686 22-Sep-2014 111/AB-S03-0506 1.11 AB 1110-111-L10-AB-S-5179 ST 0 Jameel D 27-Sep-2014
SHEET 2 OF 2

LEVEL 10 REINFORCEMENT SHEET 1


687 22-Sep-2014 111/AB-S03-0507 1.11 AB 1110-111-L10-AB-S-5180 ST 0 Jameel D 27-Sep-2014
OF 2

LEVEL 10 SLAB DETAILS SHEAR LINKS


688 22-Sep-2014 111/AB-S03-0508 1.11 AB 1110-111-L10-AB-S-5182 ST 0 Jameel D 27-Sep-2014
SHEET 1

LEVEL 10 SLAB DETAILS SHEAR LINKS


689 22-Sep-2014 111/AB-S03-0509 1.11 AB 1110-111-L10-AB-S-5183 ST 0 Jameel D 27-Sep-2014
SHEET 2

690 30-Sep-2014 111/AB-S02-0516 1.11 AB 1110-111-L15-AB-S-5205 LEVEL 15 CONCRETE LAYOUT ST 0 Jameel A 18-Oct-2014

LEVEL 15 SLAB DETAILS SHEAR LINKS


691 30-Sep-2014 111/AB-S02-0520 1.11 AB 1110-111-L15-AB-S-5209 ST 0 Jameel A 18-Oct-2014
SHEET 1

SLAB LEVEL L00 BOTTOM


692 30-Sep-2014 111/AB-S02-0528 1.11 AB 1110-111-L00-AB-S-0004 REINFORCEMENT PLAN VERTICAL ST 0 Jameel A 18-Oct-2014
DIRECTION (B2) PART (B)

SLAB LEVEL L00 BOTTOM


693 30-Sep-2014 111/AB-S03-0089 1.11 AB 1110-111-L00-AB-S-5050 REINFORCEMENT PLAN VERTICAL ST 2 Jameel A 18-Oct-2014
DIRECTION (B2) PART (B)

Page 63 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

LEVEL 00 STAIR NO. 1 DETAILS AND


694 30-Sep-2014 111/AB-S03-0510 1.11 AB 1110-111-L00-AB-S-8009 ST 0 Jameel A 18-Oct-2014
REINFORCEMENT

LEVEL 00 STAIR NO. 2


695 30-Sep-2014 111/AB-S03-0511 1.11 AB 1110-111-L00-AB-S-8011 REINFORCEMENT DETAILS SHEET 1 OF ST 0 Jameel A 18-Oct-2014
2

LEVEL 00 STAIR NO. 2


696 30-Sep-2014 111/AB-S03-0512 1.11 AB 1110-111-L00-AB-S-8012 REINFORCEMENT DETAILS SHEET 2 OF ST 0 Jameel A 18-Oct-2014
2

STAIR NO. 3 AT LEVEL 00 DETAILS


697 30-Sep-2014 111/AB-S03-0513 1.11 AB 1110-111-L00-AB-S-8013 ST 0 Jameel A 18-Oct-2014
AND REINFORCEMENT

STAIR NO. 2 AT LEVEL 01 DETAILS


698 30-Sep-2014 111/AB-S03-0514 1.11 AB 1110-111-L01-AB-S-8014 ST 0 Jameel A 18-Oct-2014
AND REINFORCEMENT

STAIR NO. 1 AT LEVEL 01 DETAILS


699 30-Sep-2014 111/AB-S03-0515 1.11 AB 1110-111-L01-AB-S-8016 ST 0 Jameel A 18-Oct-2014
AND REINFORCEMENT

700 30-Sep-2014 111/AB-S03-0517 1.11 AB 1110-111-L15-AB-S-5206 LEVEL 15 BOTTOM REINFORCEMENT ST 0 Jameel A 18-Oct-2014

701 30-Sep-2014 111/AB-S03-0518 1.11 AB 1110-111-L15-AB-S-5207 LEVEL 15 TOP REINFORCEMENT ST 0 Jameel A 18-Oct-2014

LEVEL 15 ADDITIONAL
702 30-Sep-2014 111/AB-S03-0519 1.11 AB 1110-111-L14-AB-S-5208 ST 0 Jameel A 18-Oct-2014
REINFORCEMENT

703 30-Sep-2014 111/AB-S03-0521 1.11 AB 1110-111-L18-AB-S-5223 LEVEL 18 TOP REINFORCEMENT ST 0 Jameel A 18-Oct-2014

704 30-Sep-2014 111/AB-S03-0522 1.11 AB 1110-111-L18-AB-S-5224 LEVEL 18 BOTTOM REINFORCEMENT ST 0 Jameel A 18-Oct-2014

Page 64 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

705 30-Sep-2014 111/AB-S03-0523 1.11 AB 1110-111-L18-AB-S-5225 LEVEL 18 CONCRETE LAYOUT ST 0 Jameel A 18-Oct-2014

LEVEL 18 ADDITIONAL SHEAR


706 30-Sep-2014 111/AB-S03-0524 1.11 AB 1110-111-L18-AB-S-5226 REINFORCEMENT MACHINE ROOM ST 0 Jameel A 18-Oct-2014
SLAB AT ROOF MEZZANINE

LEVEL 10 ADDITIONAL SHEAR


707 30-Sep-2014 111/AB-S03-0525 1.11 AB 1110-111-L18-AB-S-5227 REINFORCEMENT MACHINE ROOM ST 0 Jameel A 18-Oct-2014
SLAB AT ROOF MEZZANINE

SLAB LEVEL L00 BOTTOM


708 30-Sep-2014 111/AB-S03-0526 1.11 AB 1110-111-L00-AB-S-5047 REINFORCEMENT PLAN HORIZONTAL ST 0 Jameel A 18-Oct-2014
DIRECTION (B1) PART (A)

SLAB LEVEL L00 BOTTOM


709 30-Sep-2014 111/AB-S03-0527 1.11 AB 1110-111-L00-AB-S-5048 REINFORCEMENT PLAN HORIZONTAL ST 0 Jameel A 18-Oct-2014
DIRECTION (B1) PART (B)

710 16-Oct-2014 111/AB-S03-0045 1.11 AB 1110-111-LB4-AB-S-5002 4TH BASEMENT FLOOR BOTTOM REINF ST 2 Jameel A 29-Oct-2014

711 16-Oct-2014 111/AB-S03-0046 1.11 AB 1110-111-LB4-AB-S-5003 4TH BASEMENT FLOOR BOTTOM REINF ST 2 Jameel A 29-Oct-2014

712 16-Oct-2014 111/AB-S03-0047 1.11 AB 1110-111-LB4-AB-S-5004 4TH BASEMENT FLOOR TOP REINFORC ST 2 Jameel A 29-Oct-2014

713 16-Oct-2014 111/AB-S03-0048 1.11 AB 1110-111-LB4-AB-S-5005 4TH BASEMENT FLOOR TOP REINFORC ST 2 Jameel A 29-Oct-2014

714 16-Oct-2014 111/AB-S03-0049 1.11 AB 1110-111-LB4-AB-S-5006 4TH BASEMENT FLOOR ADDITIONAL R ST 2 Jameel A 29-Oct-2014

715 16-Oct-2014 111/AB-S03-0050 1.11 AB 1110-111-LB4-AB-S-5007 4TH BASEMENT FLOOR ADDITIONAL R ST 2 Jameel A 29-Oct-2014

Page 65 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

716 16-Oct-2014 111/AB-S03-0529 1.11 AB 1110-111-L00-AB-S-8010 STAIR # 4 AT LEVEL 00 DETAILS AND ST 0 Jameel A 29-Oct-2014

717 16-Oct-2014 111/AB-S03-0530 1.11 AB 1110-111-L02-AB-S-8015 STAIR # 4 AT LEVEL 02 UP TO LEVEL ST 0 Jameel A 29-Oct-2014

718 16-Oct-2014 111/AB-S03-0531 1.11 AB 1110-111-L02-AB-S-8017 STAIR # 1 AT LEVEL 02 UP TO LEVEL ST 0 Jameel A 29-Oct-2014

719 16-Oct-2014 111/AB-S03-0532 1.11 AB 1110-111-L01-AB-S-8018 STAIR # 3 AT LEVEL 01 DETAILS AND ST 0 Jameel A 29-Oct-2014

720 16-Oct-2014 111/AB-S03-0533 1.11 AB 1110-111-L01-AB-S-8019 STAIR # 4 AT LEVEL 01 DETAILS AND ST 0 Jameel A 29-Oct-2014

721 16-Oct-2014 111/AB-S03-0534 1.11 AB 1110-111-L02-AB-S-8020 STAIR # 3 AT LEVEL 02 UP TO LEVEL ST 0 Jameel A 29-Oct-2014

722 16-Oct-2014 111/AB-S03-0535 1.11 AB 1110-111-L02-AB-S-8021 STAIR # 4 AT LEVEL 02 UP TO LEVEL ST 0 Jameel A 29-Oct-2014

723 16-Oct-2014 111/AB-S03-0536 1.11 AB 1110-111-L08-AB-S-8022 STAIR # 4 AT LEVEL 08 UP TO 09 DE ST 0 Jameel A 29-Oct-2014

724 16-Oct-2014 111/AB-S03-0537 1.11 AB 1110-111-L12-AB-S-8023 STAIR # 1 AT LEVEL 12 AND LEVEL 1 ST 0 Jameel A 29-Oct-2014

725 16-Oct-2014 111/AB-S03-0538 1.11 AB 1110-111-L01-AB-S-8101 LEVEL 01 PLANTER BOX REINFORCEM ST 0 Jameel A 29-Oct-2014

726 16-Oct-2014 111/AB-S03-0539 1.11 AB 1110-111-L02-AB-S-8102 LEVEL 02 TO LEVEL 16 PLANTER BOX ST 0 Jameel A 29-Oct-2014

Page 66 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

727 16-Oct-2014 111/AB-S03-0540 1.11 AB 1110-111-L04-AB-S-4066 LEVEL 04 SOUTH CORE WALLS REIN ST 0 Jameel A 29-Oct-2014

728 16-Oct-2014 111/AB-S03-0541 1.11 AB 1110-111-L06-AB-S-5130 LEVEL 06 TOP REINFORCEMENT SHEET ST 0 Jameel A 29-Oct-2014

729 16-Oct-2014 111/AB-S03-0542 1.11 AB 1110-111-L08-AB-S-4089 LEVEL 08 TO LEVEL 10 (TYPICAL) N ST 0 Jameel A 29-Oct-2014

LEVEL L06 SLAB DETAILS SHEAR


730 20-Oct-2014 111/AB-S02-0499 1.11 AB 1110-111-L06-AB-S-5135 ST 1 Jameel A 8-Nov-2014
LINKS SHEET 2

LEVEL 10 CONCRETE LAYOUT SHEET 1


731 20-Oct-2014 111/AB-S02-0501 1.11 AB 1110-111-L10-AB-S-5174 ST 1 Jameel A 8-Nov-2014
OF 2

LEVEL 10 CONCRETE LAYOUT SHEET 2


732 20-Oct-2014 111/AB-S02-0502 1.11 AB 1110-111-L10-AB-S-5175 ST 1 Jameel A 8-Nov-2014
OF 2

LEVEL L10 SLAB DETAILS SHEAR


733 20-Oct-2014 111/AB-S02-0508 1.11 AB 1110-111-L10-AB-S-5182 ST 1 Jameel A 8-Nov-2014
LINKS SHEET 1

LEVEL L10 SLAB DETAILS SHEAR


734 20-Oct-2014 111/AB-S02-0509 1.11 AB 1110-111-L10-AB-S-5183 ST 1 Jameel A 8-Nov-2014
LINKS SHEET 2

LEVEL L00 CONCRETE LAYOUT SHEET


735 20-Oct-2014 111/AB-S03-0424 1.11 AB 1110-111-L00-AB-S-5045 ST 1 Jameel A 3-Nov-2014
1 of 2

LEVEL L00 CONCRETE LAYOUT SHEET


736 20-Oct-2014 111/AB-S03-0425 1.11 AB 1110-111-L00-AB-S-5046 ST 1 Jameel A 3-Nov-2014
2 OF 2

LEVEL 10 ADDITIONAL SHEAR


737 20-Oct-2014 111/AB-S03-0500 1.11 AB 1110-111-L18-AB-S-5227 REINFORCEMENT MACHINE ROOM ST 1 Jameel A 8-Nov-2014
SLAB AT ROOF MEZZANINE

Page 67 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

LEVEL 10 BOTTOM REINFORCEMENT 1


738 20-Oct-2014 111/AB-S03-0503 1.11 AB 1110-111-L10-AB-S-5176 ST 1 Jameel A 8-Nov-2014
OF 2

LEVEL 10 BOTTOM REINFORCEMENT 2


739 20-Oct-2014 111/AB-S03-0504 1.11 AB 1110-111-L10-AB-S-5177 ST 1 Jameel A 8-Nov-2014
OF 2

LEVEL L10 TOP REINFORCEMENT


740 20-Oct-2014 111/AB-S03-0505 1.11 AB 1110-111-L10-AB-S-5178 ST 1 Jameel A 8-Nov-2014
SHEET 1 OF 2

LEVEL L10 TOP REINFORCEMENT


741 20-Oct-2014 111/AB-S03-0506 1.11 AB 1110-111-L10-AB-S-5179 ST 1 Jameel A 8-Nov-2014
SHEET 2 OF 2

LEVEL L10 ADDITIONAL


742 20-Oct-2014 111/AB-S03-0507 1.11 AB 1110-111-L10-AB-S-5180 ST 1 Jameel A 8-Nov-2014
REINFORCEMENT SHEET 1 OF 2

STAIR NO. 1 AT LEVEL 14 AND 15


743 20-Oct-2014 111/AB-S03-0543 1.11 AB 1110-111-L14-AB-S-8024 ST 0 Jameel A 3-Nov-2014
DETAILS REINFORCEMENT

STAIR NO. 2 AT LEVEL 12 DETAILS


744 20-Oct-2014 111/AB-S03-0544 1.11 AB 1110-111-L12-AB-S-8026 ST 0 Jameel A 3-Nov-2014
REINFORCEMENT

STAIR NO. 2 AT LEVEL 13 DETAILS


745 20-Oct-2014 111/AB-S03-0545 1.11 AB 1110-111-L13-AB-S-8027 ST 0 Jameel A 3-Nov-2014
REINFORCEMENT

746 4-Nov-2014 111/AB-S02-0104 1.11 AB 1110-111-L01-AB-S-5064 1ST FLOOR DETAILS SHEET 2 ST 1 Jameel A 12-Nov-2014

747 4-Nov-2014 111/AB-S02-0106 1.11 AB 1110-111-L01-AB-S-5066 LEVEL 01 DETAILS OF SLAB SHEET 4 ST 1 Jameel A 12-Nov-2014

748 4-Nov-2014 111/AB-S02-0107 1.11 AB 1110-111-L01-AB-S-5069 LEVEL 01 DETAILS OF SLAB SHEET 5 ST 1 Jameel A 12-Nov-2014

Page 68 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

LEVEL 07 SLAB DETAILS SHEAR


749 4-Nov-2014 111/AB-S02-0175 1.11 AB 1110-111-L07-AB-S-5127 ST 1 Jameel C 13-Nov-2014
LINKS SHEET 4

LEVEL 01 BOTTOM REINFORCEMENT


750 4-Nov-2014 111/AB-S03-0109 1.11 AB 1110-111-L01-AB-S-5071 ST 1 Jameel A 13-Nov-2014
SHEET 1 OF 2

LEVEL 01 BOTTOM REINFORCEMENT


751 4-Nov-2014 111/AB-S03-0110 1.11 AB 1110-111-L01-AB-S-5072 ST 1 Jameel A 12-Nov-2014
SHEET 2 OF 2

LEVEL 01 TOP REINFORCEMENT


752 4-Nov-2014 111/AB-S03-0112 1.11 AB 1110-111-L01-AB-S-5074 ST 1 Jameel A 12-Nov-2014
SHEET 2 OF 2

LEVEL 01 ADDITIONAL
753 4-Nov-2014 111/AB-S03-0113 1.11 AB 1110-111-L01-AB-S-5075 ST 1 Jameel A 13-Nov-2014
REINFORCEMENT SHEET 2 OF 2

LEVEL 02 BOTTOM REINFORCEMENT


754 4-Nov-2014 111/AB-S03-0119 1.11 AB 1110-111-L02-AB-S-5081 ST 1 Jameel A 12-Nov-2014
SHEET 2 OF 2

LEVEL 02 ADDITIONAL
755 4-Nov-2014 111/AB-S03-0122 1.11 AB 1110-111-L02-AB-S-5084 ST 1 Jameel A 12-Nov-2014
REINFORCEMENT SHEET 2 OF 2

LEVEL 05 TOP REINFORCEMENT


756 4-Nov-2014 111/AB-S03-0157 1.11 AB 1110-111-L05-AB-S-5118 ST 1 Jameel A 12-Nov-2014
SHEET 1 OF 2

LEVEL 05 ADDITIONAL
757 4-Nov-2014 111/AB-S03-0160 1.11 AB 1110-111-L05-AB-S-5121 ST 1 Jameel A 12-Nov-2014
REINFORCEMENT SHEET 2 OF 2

5TH BASEMENT SOUTH WALLS


758 9-Nov-2014 111/AB-S02-0028 1.11 AB 1110-111-L01-AB-S-4000 ST 2 Jameel A 19-Nov-2014
DETAILS SHEET 1 OF 3

5TH BASEMENT SOUTH WALLS


759 9-Nov-2014 111/AB-S02-0029 1.11 AB 1110-111-LB5-AB-S-4001 ST 2 Jameel A 19-Nov-2014
DETAILS SHEET 2 OF 3

Page 69 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

SOUTH CORE ELEVATION LEVEL B5


760 9-Nov-2014 111/AB-S02-0031 1.11 AB 1110-111-LB5-AB-S-4025 ST 2 Jameel A 19-Nov-2014
TO B2 SHEET 1 OF 1

4TH BASEMENT FLOOR CONCRETE


761 9-Nov-2014 111/AB-S02-0043 1.11 AB 1110-111-LB4-AB-S-5000 ST 1 Jameel A 19-Nov-2014
LAYOUT SHEET 1 OF 2

4TH BASEMENT FLOOR CONCRETE


762 9-Nov-2014 111/AB-S02-0044 1.11 AB 1110-111-LB4-AB-S-5001 ST 1 Jameel A 19-Nov-2014
LAYOUT SHEET 2 OF 2

LEVEL 14 SLAB DETAILS SHEAR


763 9-Nov-2014 111/AB-S02-0233 1.11 AB 1110-111-L14-AB-S-5203 ST 1 Jameel A 19-Nov-2014
LINKS SHEET 1

764 9-Nov-2014 111/AB-S02-0547 1.11 AB 1110-111-LB2-AB-S-1019 TUNNEL CONNECTION DETAILS ST 0 Jameel A 19-Nov-2014

LEVEL 14 ADDITIONAL
765 9-Nov-2014 111/AB-S03-0232 1.11 AB 1110-111-L14-AB-S-5202 ST 1 Jameel A 19-Nov-2014
REINFORCEMENT

1ST BASEMENT FLOOR RETAINING


766 9-Nov-2014 111/AB-S03-0546 1.11 AB 1110-111-LB1-AB-S-1018 ST 0 Jameel A 19-Nov-2014
WALL REINFORCEMENT (SOUTH)

LEVEL 09 TOP REINFORCEMENT


767 9-Nov-2014 111/AB-S03-0548 1.11 AB 1110-111-L09-AB-S-5223 ST 0 Jameel A 19-Nov-2014
SHEET 3 OF 3

LEVEL 01 CONCRETE LAYOUT SHEET 2


768 17-Nov-2014 111/AB-S02-0102 1.11 AB 1110-111-L01-AB-S-5062 ST 1 Jameel A 26-Nov-2014
OF 2

769 17-Nov-2014 111/AB-S02-0103 1.11 AB 1110-111-L01-AB-S-5063 LEVEL 01 DETAILS SHEET 1 ST 1 Jameel A 26-Nov-2014

770 17-Nov-2014 111/AB-S02-0138 1.11 AB 1110-111-L00-AB-S-5301 ESCALATOR PIT ADJUSMENT ST 1 Jameel A 26-Nov-2014

Page 70 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

LEVEL 05 CONCRETE LAYOUT SHEET 1


771 17-Nov-2014 111/AB-S02-0152 1.11 AB 1110-111-L05-AB-S-5113 ST 1 Jameel A 26-Nov-2014
OF 2

LEVEL 05 CONCRETE LAYOUT SHEET 2


772 17-Nov-2014 111/AB-S02-0153 1.11 AB 1110-111-L05-AB-S-5114 ST 1 Jameel D 26-Nov-2014
OF 2

773 17-Nov-2014 111/AB-S02-0225 1.11 AB 1110-111-L13-AB-S-5195 LEVEL 13 CONCRETE LAYOUT ST 1 Jameel D 26-Nov-2014

NORTH WALLS DETAILS FROM 3RD


774 17-Nov-2014 111/AB-S02-0304 1.11 AB 1110-111-LB3-AB-S-4016 BASMENT UP TO GROUND LEVEL ST 1 Jameel D 26-Nov-2014
SHEET 1 OF 2

LB4 & LB3 SOUTH COREWALLS


775 17-Nov-2014 111/AB-S02-0398 1.11 AB 1110-111-LB4-AB-S-4024 ST 1 Jameel D 26-Nov-2014
SECTION REINFORCEMENT DETAILS

1ST BASEMENT FLOOR STAIRS # 2


776 17-Nov-2014 111/AB-S02-0549 1.11 AB 1110-111-LB1-AB-S-8005 ST 0 Jameel D 26-Nov-2014
CONCRETE DETAILS

LEVEL12,13,14 NORTH CORE WALLS


777 17-Nov-2014 111/AB-S03-0293 1.11 AB 1110-111-L12-AB-S-4101 REINFORCEMENT SECTION ST 1 Jameel D 26-Nov-2014
ELEVATION .

LEVEL12,13,14 NORTH CORE WALLS


778 17-Nov-2014 111/AB-S03-0295 1.11 AB 1110-111-L12-AB-S-4103 REINFORCEMENT SECTION ST 1 Jameel D 26-Nov-2014
ELEVATION

LEVEL 00 AND LEVEL 01 WALLS


779 17-Nov-2014 111/AB-S03-0332 1.11 AB 1110-111-L00-AB-S-4049 REINFORCEMENT SECTIONAL ST 1 Jameel D 26-Nov-2014
ELEVATION -SOUTH

LEVEL 02 AND LEVEL 03 SOUTH CORE


780 17-Nov-2014 111/AB-S03-0342 1.11 AB 1110-111-L02-AB-S-4065 WALLS REINFORCEMENT SECTIONAL ST 1 Jameel D 26-Nov-2014
ELEVATION

1ST BASEMENT FLOOR STAIRS # 2


781 17-Nov-2014 111/AB-S03-0550 1.11 AB 1110-111-LB1-AB-S-8006 ST 0 Jameel D 26-Nov-2014
CONCRETE DETAILS

Page 71 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

STAIR # 5 AT 1ST BASEMENT AND


782 17-Nov-2014 111/AB-S03-0551 1.11 AB 1110-111-LB1-AB-S-8007 LEVEL L00 DETAILS AND ST 0 Jameel D 1-Dec-2014
REINFORCEMENT

STAIR # 4 AT 1ST BASEMENT DETAILS


783 17-Nov-2014 111/AB-S03-0552 1.11 AB 1110-111-LB1-AB-S-8008 ST 0 Jameel D 26-Nov-2014
REINFORCEMENT

STAIR # 1 AT LEVEL 16 DETAIL &


784 17-Nov-2014 111/AB-S03-0553 1.11 AB 1110-111-LB1-AB-S-8025 ST 0 Jameel D 26-Nov-2014
REINFORCEMENT

GENERAL ARRANGEMENT AS BUILT


785 22-Nov-2014 111/AB-G01-0027 1.11 AB 1110-111-LGF-AB-A-01005 PLAN GROUND FLOOR KEY PLAN AR 0 Hayden D 18-Dec-2014
SHEET 1 OF 4

GENERAL ARRANGEMENT AS BUILT


786 22-Nov-2014 111/AB-G01-0028 1.11 AB 1110-111-LGF-AB-A-01005A PLAN GROUND FLOOR PART A SHEET AR 0 Hayden D 18-Dec-2014
2 OF 4

GENERAL ARRANGEMENT AS BUILT


787 22-Nov-2014 111/AB-G01-0029 1.11 AB 1110-111-LGF-AB-A-01005B PLAN GROUND FLOOR PART B SHEET 3 AR 0 Hayden D 18-Dec-2014
OF 4

GENERAL ARRANGEMENT AS BUILT


788 22-Nov-2014 111/AB-G01-0030 1.11 AB 1110-111-LGF-AB-A-01005C PLAN GROUND FLOOR PART C SHEET 4 AR 0 Hayden D 18-Dec-2014
OF 4

GENERAL ARRANGEMENT AS BUILT


789 22-Nov-2014 111/AB-G01-0031 1.11 AB 1110-111-L02-AB-A-01007 SECOND FLOOR KEY PLAN SHEET 1 OF AR 0 Hayden D 18-Dec-2014
4

GENERAL ARRANGEMENT AS BUILT


790 22-Nov-2014 111/AB-G01-0032 1.11 AB 1110-111-L02-AB-A-01007A AR 0 Hayden D 18-Dec-2014
SECOND FLOOR PART A SHEET 2 OF 4

GENERAL ARRANGEMENT AS BUILT


791 22-Nov-2014 111/AB-G01-0033 1.11 AB 1110-111-L02-AB-A-01007B AR 0 Hayden D 18-Dec-2014
SECOND FLOOR PART B SHEET 3 OF 4

GENERAL ARRANGEMENT AS BUILT


792 22-Nov-2014 111/AB-G01-0034 1.11 AB 1110-111-L02-AB-A-01007C AR 0 Hayden D 18-Dec-2014
SECOND FLOOR PART C SHEET 4 OF 4

Page 72 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

GENERAL ARRANGEMENT AS BUILT


793 23-Nov-2014 111/AB-G01-0035 1.11 AB 1110-111-L01-AB-A-01006 AR 0 Hayden C 23-Dec-2014
1ST FLOOR KEY PLAN SHEET 1 OF 4

GENERAL ARRANGEMENT AS BUILT


794 23-Nov-2014 111/AB-G01-0036 1.11 AB 1110-111-L01-AB-A-01006A AR 0 Hayden C 23-Dec-2014
1ST FLOOR PART A SHEET 2 OF 4

GENERAL ARRANGEMENT AS BUILT


795 23-Nov-2014 111/AB-G01-0037 1.11 AB 1110-111-L01-AB-A-01006B AR 0 Hayden C 23-Dec-2014
1ST FLOOR PART B SHEET 3 OF 4

GENERAL ARRANGEMENT AS BUILT


796 23-Nov-2014 111/AB-G01-0038 1.11 AB 1110-111-L01-AB-A-01006C AR 0 Hayden C 23-Dec-2014
1ST FLOOR PART C SHEET 4 OF 4

GENERAL ARRANGEMENT AS BUILT


797 23-Nov-2014 111/AB-G01-0039 1.11 AB 1110-111-L03-AB-A-01008 AR 0 Hayden C 23-Dec-2014
3RD FLOOR KEY PLAN SHEET 1 OF 4

GENERAL ARRANGEMENT AS BUILT


798 23-Nov-2014 111/AB-G01-0040 1.11 AB 1110-111-L03-AB-A-01008A AR 0 Hayden C 23-Dec-2014
3RD FLOOR PART A SHEET 2 OF 4

GENERAL ARRANGEMENT AS BUILT


799 23-Nov-2014 111/AB-G01-0041 1.11 AB 1110-111-L03-AB-A-01008B AR 0 Hayden C 23-Dec-2014
3RD FLOOR PART B SHEET 3 OF 4

GENERAL ARRANGEMENT AS BUILT


800 23-Nov-2014 111/AB-G01-0042 1.11 AB 1110-111-L03-AB-A-01008C AR 0 Hayden C 23-Dec-2014
3RD FLOOR PART C SHEET 4 OF 4

GENERAL ARRANGEMENT AS BUILT


801 23-Nov-2014 111/AB-G01-0043 1.11 AB 1110-111-L04-AB-A-01009 PLAN TYP NORTH TOWER 4,11,12TH AR 0 Hayden C 23-Dec-2014
FLOOR KEY PLAN SHEET 1 OF 3

GENERAL ARRANGEMENT AS BUILT


802 23-Nov-2014 111/AB-G01-0044 1.11 AB 1110-111-L04-AB-A-01009A PLAN TYP NORTH TOWER 4,11,12TH AR 0 Hayden C 23-Dec-2014
FLOOR PART A SHEET 2 OF 3

GENERAL ARRANGEMENT AS BUILT


803 23-Nov-2014 111/AB-G01-0045 1.11 AB 1110-111-L04-AB-A-01009B PLAN TYP NORTH TOWER 4,11,12TH AR 0 Hayden C 23-Dec-2014
FLOOR PART B SHEET 3 OF 3

Page 73 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

GENERAL ARRANGEMENT AS BUILT


804 23-Nov-2014 111/AB-G01-0046 1.11 AB 1110-111-L05-AB-A-01010 PLAN TYP NORTH TOWER 5,10,14, 16TH AR 0 Hayden C 23-Dec-2014
FLOOR KEY PLAN SHEET 1 OF 3

GENERAL ARRANGEMENT AS BUILT


805 23-Nov-2014 111/AB-G01-0047 1.11 AB 1110-111-L05-AB-A-01010A PLAN TYP NORTH TOWER 5,10,14, 16TH AR 0 Hayden C 23-Dec-2014
FLOOR PART A SHEET 2 OF 3

GENERAL ARRANGEMENT AS BUILT


806 23-Nov-2014 111/AB-G01-0048 1.11 AB 1110-111-L05-AB-A-01010B PLAN TYP NORTH TOWER 5,10,14, 16TH AR 0 Hayden C 23-Dec-2014
FLOOR PART B SHEET 3 OF 3

GENERAL ARRANGEMENT AS BUILT


807 23-Nov-2014 111/AB-G01-0049 1.11 AB 1110-111-LB1-AB-A-01004 PLAN 1ST BASEMENT KEY PLAN AR 0 Hayden C 23-Dec-2014
SHEET 1 OF 4

GENERAL ARRANGEMENT AS BUILT


808 23-Nov-2014 111/AB-G01-0050 1.11 AB 1110-111-LB1-AB-A-01004A PLAN 1ST BASEMENT PART A SHEET 2 AR 0 Hayden C 23-Dec-2014
OF 4

GENERAL ARRANGEMENT AS BUILT


809 23-Nov-2014 111/AB-G01-0051 1.11 AB 1110-111-LB1-AB-A-01004B PLAN 1ST BASEMENT PART B SHEET 3 AR 0 Hayden C 23-Dec-2014
OF 4

GENERAL ARRANGEMENT AS BUILT


810 23-Nov-2014 111/AB-G01-0052 1.11 AB 1110-111-LB1-AB-A-01004C PLAN 1ST BASEMENT PART C SHEET 4 AR 0 Hayden C 23-Dec-2014
OF 4

GENERAL ARRANGEMENT AS BUILT


811 23-Nov-2014 111/AB-G01-0053 1.11 AB 1110-111-LB5-AB-A-01000 PLAN 5TH BASEMENT KEY PLAN AR 0 Hayden C 23-Dec-2014
SHEET 1 OF 4

GENERAL ARRANGEMENT AS BUILT


812 23-Nov-2014 111/AB-G01-0054 1.11 AB 1110-111-LB5-AB-A-01000A AR 0 Hayden C 23-Dec-2014
5TH BASEMENT PART A SHEET 2 OF 4

GENERAL ARRANGEMENT AS BUILT


813 23-Nov-2014 111/AB-G01-0055 1.11 AB 1110-111-LB5-AB-A-01000B AR 0 Hayden C 23-Dec-2014
5TH BASEMENT PART SHEET 3 OF 4

GENERAL ARRANGEMENT AS BUILT


814 23-Nov-2014 111/AB-G01-0056 1.11 AB 1110-111-LB5-AB-A-01000C AR 0 Hayden C 23-Dec-2014
5TH BASEMENT PART C SHEET 4 OF 4

Page 74 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

CMU COORDINATION AS BUILT PLAN


815 2-Dec-2014 111/AB-G01-0057 1.11 AB 1110-111-L01-AB-A-01106 AR 0 Karim C 23-Dec-2014
IST FLOOR KEY PLAN 1 OF 4

CMU COORDINATION AS BUILT PLAN


816 2-Dec-2014 111/AB-G01-0058 1.11 AB 1110-111-L01-AB-A-01106A AR 0 Karim C 23-Dec-2014
IST FLOOR KEY PLAN 2 OF 4

CMU COORDINATION AS BUILT PLAN


817 2-Dec-2014 111/AB-G01-0059 1.11 AB 1110-111-L01-AB-A-01106B AR 0 Karim C 23-Dec-2014
IST FLOOR KEY PLAN 3 OF 4

CMU COORDINATION AS BUILT PLAN


818 2-Dec-2014 111/AB-G01-0060 1.11 AB 1110-111-L01-AB-A-01106C AR 0 Karim C 23-Dec-2014
IST FLOOR KEY PLAN 4 OF 4

LEVEL 05 CONCRETE LAYOUT SHEET 2


819 6-Dec-2014 111/AB-S02-0153 1.11 AB 1110-111-L05-AB-S-5114 ST 2 Jameel A 18-Dec-2014
OF 2

LEVEL 07 SLAB DETAILS SHEAR


820 6-Dec-2014 111/AB-S02-0175 1.11 AB 1110-111-L07-AB-S-5127 ST 2 Jameel A 18-Dec-2014
LINKS SHEET 4

821 6-Dec-2014 111/AB-S02-0225 1.11 AB 1110-111-L13-AB-S-5195 LEVEL 13 CONCRETE LAYOUT ST 2 Jameel A 18-Dec-2014

NORTH WALLS DETAILS FROM 3RD


822 6-Dec-2014 111/AB-S02-0304 1.11 AB 1110-111-LB3-AB-S-4016 BASMENT UP TO GROUND LEVEL ST 2 Jameel A 18-Dec-2014
SHEET 1 OF 2

LB4 & LB3 SOUTH COREWALLS


823 6-Dec-2014 111/AB-S02-0398 1.11 AB 1110-111-LB4-AB-S-4024 ST 2 Jameel A 18-Dec-2014
SECTION REINFORCEMENT DETAILS

1ST BASEMENT FLOOR STAIRS # 2


824 6-Dec-2014 111/AB-S02-0549 1.11 AB 1110-111-LB1-AB-S-8005 ST 1 Jameel A 18-Dec-2014
CONCRETE DETAILS

LEVEL12,13,14 NORTH CORE WALLS


825 6-Dec-2014 111/AB-S03-0293 1.11 AB 1110-111-L12-AB-S-4101 REINFORCEMENT SECTION ST 2 Jameel A 18-Dec-2014
ELEVATION .

Page 75 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

LEVEL12,13,14 NORTH CORE WALLS


826 6-Dec-2014 111/AB-S03-0295 1.11 AB 1110-111-L12-AB-S-4103 REINFORCEMENT SECTION ST 2 Jameel A 18-Dec-2014
ELEVATION

LEVEL 00 AND LEVEL 01 WALLS


827 6-Dec-2014 111/AB-S03-0332 1.11 AB 1110-111-L00-AB-S-4049 REINFORCEMENT SECTIONAL ST 2 Jameel A 18-Dec-2014
ELEVATION -SOUTH

LEVEL 02 AND LEVEL 03 SOUTH CORE


828 6-Dec-2014 111/AB-S03-0342 1.11 AB 1110-111-L02-AB-S-4065 WALLS REINFORCEMENT SECTIONAL ST 2 Jameel A 18-Dec-2014
ELEVATION

1ST BASEMENT FLOOR STAIRS # 2


829 6-Dec-2014 111/AB-S03-0550 1.11 AB 1110-111-LB1-AB-S-8006 ST 1 Jameel A 18-Dec-2014
CONCRETE DETAILS

STAIR # 5 AT 1ST BASEMENT AND


830 6-Dec-2014 111/AB-S03-0551 1.11 AB 1110-111-LB1-AB-S-8007 LEVEL L00 DETAILS AND ST 1 Jameel A 18-Dec-2014
REINFORCEMENT

STAIR # 4 AT 1ST BASEMENT DETAILS


831 6-Dec-2014 111/AB-S03-0552 1.11 AB 1110-111-LB1-AB-S-8008 ST 1 Jameel A 18-Dec-2014
REINFORCEMENT

STAIR # 1 AT LEVEL 16 DETAIL &


832 6-Dec-2014 111/AB-S03-0553 1.11 AB 1110-111-LB1-AB-S-8025 ST 1 Jameel A 18-Dec-2014
REINFORCEMENT

CABLE CONTAINMENT AS BUILT


833 18-Dec-2014 111/AB-E11-0015 1.11 AB 1110-111-L03-AB-E-CRL-611223 EL 0 Franco D 24-Dec-2014
LAYOUT TOWER 1 LEVEL-3 OFFICE

Drainage service as built layout Tower-2 Lvl-


834 18-Dec-2014 111/AB-M01-0027 1.11 AB 1110-111-L04-AB-P-DRG-111139 ME 1 Franco D 5-Jan-2015
04 office

Drainage service as built layout Tower-2 Lvl-


835 18-Dec-2014 111/AB-M01-0028 1.11 AB 1110-111-L05-AB-P-DRG-111140 ME 1 Franco D 5-Jan-2015
05 office

Drainage service as built layout Tower-2 Lvl-


836 18-Dec-2014 111/AB-M01-0029 1.11 AB 1110-111-L06-AB-P-DRG-111141 ME 1 Franco D 5-Jan-2015
06 office

Page 76 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

Drainage service as built layout Tower-2 Lvl-


837 18-Dec-2014 111/AB-M01-0030 1.11 AB 1110-111-L07-AB-P-DRG-111142 ME 1 Franco D 5-Jan-2015
07 office

838 18-Dec-2014 111/AB-M01-0034 1.11 AB 1110-111-L03-AB-P-WSS-211138 Water supply system as built layout Tower-2 ME 1 Franco D 3-Jan-2015

839 18-Dec-2014 111/AB-M01-0035 1.11 AB 1110-111-L04-AB-P-WSS-211139 Water supply system as built layout Tower-2 ME 1 Franco D 3-Jan-2015

Water supply system as built layout


840 18-Dec-2014 111/AB-M01-0036 1.11 AB 1110-111-L05-AB-P-WSS-211140 ME 1 Franco D 4-Jan-2015
Tower-2 Lvl-5 office

841 18-Dec-2014 111/AB-M01-0037 1.11 AB 1110-111-L06-AB-P-WSS-211141 Water supply system as built layout Tower-2 ME 1 Franco D 3-Jan-2015

842 18-Dec-2014 111/AB-M01-0038 1.11 AB 1110-111-L07-AB-P-WSS-211142 Water supply system as built layout Tower-2 ME 1 Franco D 3-Jan-2015

843 18-Dec-2014 111/AB-M01-0039 1.11 AB 1110-111-L08-AB-P-WSS-211143 Water supply system as built layout Tower-2 ME 1 Franco D 3-Jan-2015

DRAINAGE SERVICE AS BUILT


844 18-Dec-2014 111/AB-M01-0040 1.11 AB 1110-1.11-LB1-AB-P-PL-103013 PL 1 Khusro D 25-Jan-2015
LAYOUT BASEMENT 1 MASTER PLAN

DRAINAGE SERVICE AS BUILT


845 18-Dec-2014 111/AB-M01-0041 1.11 AB 1110-1.11-LB1-AB-P-PL-103011 LAYOUT BASEMENT 1 TOWER 1 PART PL 1 Khusro C 25-Jan-2015
A

DRAINAGE SERVICE AS BUILT


846 18-Dec-2014 111/AB-M01-0042 1.11 AB 1110-1.11-LB1-AB-P-PL-103012 PL 1 Khusro C 24-Jan-2015
LAYOUT BASEMENT 1 TOWER 2 PARTB

DRAINGE AS BUILT LAYOUT TOWER 1


847 18-Dec-2014 111-AB-M01-0003 1.11 AB 1110-111-L15-AB-P-DRG-111122 ME 1 Franco D 11-Jan-2015
LEVEL 3 OFFICE

Page 77 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

DRAINGE AS BUILT LAYOUT TOWER 1


848 18-Dec-2014 111-AB-M01-0004 1.11 AB 1110-111-L15-AB-P-DRG-111123 ME 1 Franco D 11-Jan-2015
LEVEL 4 OFFICE

DRAINGE AS BUILT LAYOUT TOWER 1


849 18-Dec-2014 111-AB-M01-0005 1.11 AB 1110-111-L15-AB-P-DRG-111124 ME 1 Franco D 5-Jan-2015
LEVEL 5 OFFICE

DRAINGE AS BUILT LAYOUT TOWER 1


850 18-Dec-2014 111-AB-M01-0006 1.11 AB 1110-111-L15-AB-P-DRG-111125 ME 1 Franco D 5-Jan-2015
LEVEL 6 OFFICE

DRAINGE AS BUILT LAYOUT TOWER 1


851 18-Dec-2014 111-AB-M01-0007 1.11 AB 1110-111-L15-AB-P-DRG-111126 ME 1 Franco D 5-Jan-2015
LEVEL 7 OFFICE

DRAINGE AS BUILT LAYOUT TOWER 1


852 18-Dec-2014 111-AB-M01-0008 1.11 AB 1110-111-L15-AB-P-DRG-111127 ME 1 Franco D 5-Jan-2015
LEVEL 8 OFFICE

DRAINGE AS BUILT LAYOUT TOWER 1


853 18-Dec-2014 111-AB-M01-0009 1.11 AB 1110-111-L15-AB-P-DRG-111128 ME 1 Franco D 5-Jan-2015
LEVEL 9 OFFICE

DRAINGE AS BUILT LAYOUT TOWER 1


854 18-Dec-2014 111-AB-M01-0010 1.11 AB 1110-111-L15-AB-P-DRG-111129 ME 1 Franco D 5-Jan-2015
LEVEL 10 OFFICE

DRAINGE AS BUILT LAYOUT TOWER 1


855 18-Dec-2014 111-AB-M01-0011 1.11 AB 1110-111-L15-AB-P-DRG-111130 ME 1 Franco D 5-Jan-2015
LEVEL 11 OFFICE

DRAINGE AS BUILT LAYOUT TOWER 1


856 18-Dec-2014 111-AB-M01-0012 1.11 AB 1110-111-L15-AB-P-DRG-111131 ME 1 Franco D 5-Jan-2015
LEVEL 12 OFFICE

DRAINGE AS BUILT LAYOUT TOWER 1


857 18-Dec-2014 111-AB-M01-0013 1.11 AB 1110-111-L15-AB-P-DRG-111133 ME 1 Franco D 5-Jan-2015
LEVEL 14 OFFICE

DRAINGE AS BUILT LAYOUT TOWER 1


858 18-Dec-2014 111-AB-M01-0014 1.11 AB 1110-111-L15-AB-P-DRG-111134 ME 1 Franco D 5-Jan-2015
LEVEL 15 OFFICE

Page 78 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

DRAINAGE SERVICE AS BUILT


859 18-Dec-2014 111-AB-M01-0043 1.11 AB 1110-111-LB2-AB-P-PL-103008 LAYOUT BASEMENT 2 TOWER 1 PL 1 Franco D 11-Jan-2015
PARTA

DRAINAGE SERVICE AS BUILT


860 18-Dec-2014 111-AB-M01-0044 AB 1110-111-LB2-AB-P-PL-103009 PL 1 Franco D 11-Jan-2015
LAYOUT BASEMENT 2 TOWER 1 PARTB

DRAINAGE SERVICE AS BUILT


861 18-Dec-2014 111-AB-M01-0045 1.11 AB 1110-111-LB2-AB-P-PL-103010 PL 1 Franco D 11-Jan-2015
LAYOUT BASEMENT 2 MASTER PLAN

WATER SUPPLY SYSTEM AS BUILT


862 18-Dec-2014 111-SD-M01-0023 1.11 AB 1110-111-L16-AB-P-WSS-211131 ME 1 Franco D 18-Jan-2015
LAYOUT TOWER 1 LEVEL 12 OFFICE

WATER SUPPLY SYSTEM AS BUILT


863 18-Dec-2014 111-SD-M01-0024 1.11 AB 1110-111-L16-AB-P-WSS-211133 ME 1 Franco D 18-Jan-2015
LAYOUT TOWER 1 LEVEL 14 OFFICE

MAN HOLE (NORTH TOWER)


864 18-Dec-2014 111-SD-M01-0025 1.11 AB 1110-111-L16-AB-P-WSS-211134 CONCRETE AND REINFORCEMENT ME 1 Franco D 18-Jan-2015
DETAILS SHEET 2 OF 2

MAN HOLE (NORTH TOWER)


865 18-Dec-2014 111-SD-M01-0026 1.11 AB 1110-111-L16-AB-P-WSS-211135 CONCRETE AND REINFORCEMENT ME 1 Franco D 18-Jan-2015
DETAILS SHEET 2 OF 2

866 23-Dec-2014 111/AB-M02-0031 1.11 AB 1110-111-L01-AB-M-VAC-411118 HVAC as built layout master plan 1st floor ME 1 Khusro D 3-Feb-2015

Fire fighting system as built lauout


867 23-Dec-2014 111/AB-M03-0032 1.11 AB 1110-111-L03-AB-P-FFS-311122 ME 1 Khusro D 3-Feb-2015
Tower-1 L-3 office

Fire fighting system as built lauout


868 23-Dec-2014 111/AB-M03-0033 1.11 AB 1110-111-L03-AB-P-FFS-311138 ME 1 Khusro D 3-Feb-2015
Tower-2 L-3 office

WATER SUPPLY SYSTEM AS BUILT


869 28-Dec-2014 111-AB-M01-0015 1.11 AB 1110-111-L03-AB-P-WSS-211122 ME 1 Khusro D 20-Jan-2015
LAYOUT TOWER 1 LEVEL 3 OFFICE

Page 79 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

WATER SUPPLY SYSTEM AS BUILT


870 28-Dec-2014 111-AB-M01-0016 1.11 AB 1110-111-L04-AB-P-WSS-211123 ME 1 Khusro D 20-Jan-2015
LAYOUT TOWER 1 LEVEL 4 OFFICE

WATER SUPPLY SYSTEM AS BUILT


871 28-Dec-2014 111-AB-M01-0017 1.11 AB 1110-111-L05-AB-P-WSS-211124 ME 1 Khusro D 20-Jan-2015
LAYOUT TOWER 1 LEVEL 5 OFFICE

WATER SUPPLY SYSTEM AS BUILT


872 28-Dec-2014 111-AB-M01-0018 1.11 AB 1110-111-L06-AB-P-WSS-211125 ME 1 Khusro D 20-Jan-2015
LAYOUT TOWER 1 LEVEL 6 OFFICE

WATER SUPPLY SYSTEM AS BUILT


873 28-Dec-2014 111-AB-M01-0019 1.11 AB 1110-111-L07-AB-P-WSS-211126 ME 1 Franco D 18-Jan-2015
LAYOUT TOWER 1 LEVEL 7 OFFICE

WATER SUPPLY SYSTEM AS BUILT


874 28-Dec-2014 111-AB-M01-0020 1.11 AB 1110-111-L09-AB-P-WSS-211128 ME 1 Franco D 18-Jan-2015
LAYOUT TOWER 1 LEVEL 9 OFFICE

WATER SUPPLY SYSTEM AS BUILT


875 28-Dec-2014 111-AB-M01-0021 1.11 AB 1110-111-L10-AB-P-WSS-211129 ME 1 Franco D 18-Jan-2015
LAYOUT TOWER 1 LEVEL 10 OFFICE

WATER SUPPLY SYSTEM AS BUILT


876 28-Dec-2014 111-AB-M01-0022 1.11 AB 1110-111-L11-AB-P-WSS-211130 ME 1 Franco D 18-Jan-2015
LAYOUT TOWER 1 LEVEL 11 OFFICE

WATER SUPPLY SYSTEM AS BUILT


877 28-Dec-2014 111-AB-M01-0046 1.11 AB 1110-111-L08-AB-P-WSS-211127 ME 0 Franco D 18-Jan-2015
LAYOUT TOWER 1 LEVEL 8 OFFICE

DRAINAGE SERVICES LAYOUT LEVEL


878 3-Feb-2015 111-AB-M01-0065 1.11 AB 1110-111-L08-AB-P-DRG-111143 ME 0 Khusro D 18-Feb-2015
08 OFFICE TOWER 2

WATER SUPPLY LAYOUT LEVEL 02


879 3-Feb-2015 111-AB-M01-0066 1.11 AB 1110-111-L02-AB-P-WSS-211121 ME 0 Khusro D 18-Feb-2015
OFFICE TOWER 1

WATER SUPPLY LAYOUT LEVEL 02


880 3-Feb-2015 111-AB-M01-0067 1.11 AB 1110-111-L02-AB-P-WSS-211137 ME 0 Khusro D 18-Feb-2015
OFFICE TOWER 2

HVAC DUCTING LAYOUT BASEMENT 2


881 3-Feb-2015 111-AB-M02-0047 1.11 AB 1110-111-LB2-AB-M-D-101002 ME 0 Khusro D 25-Feb-2015
MASTER PLAN

Page 80 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

HVAC DUCTING LAYOUT BASEMENT 2


882 3-Feb-2015 111-AB-M02-0048 1.11 AB 1110-111-LB2-AB-M-D-101002A ME 0 Khusro D 25-Feb-2015
PART PLAN A

HVAC DUCTING LAYOUT BASEMENT 2


883 3-Feb-2015 111-AB-M02-0049 1.11 AB 1110-111-LB2-AB-M-D-101002B ME 0 Khusro D 25-Feb-2015
PART PLAN B

HVAC DUCTING LAYOUT BASEMENT 3


884 3-Feb-2015 111-AB-M02-0050 1.11 AB 1110-111-LB2-AB3-M-D-101002 ME 0 Khusro D 25-Feb-2015
MASTER PLAN

HVAC DUCTING LAYOUT BASEMENT 3


885 3-Feb-2015 111-AB-M02-0051 1.11 AB 1110-111-LB2-AB3-M-D-101002A ME 0 Khusro D 25-Feb-2015
PART PLAN A

HVAC DUCTING LAYOUT BASEMENT 3


886 3-Feb-2015 111-AB-M02-0052 1.11 AB 1110-111-LB2-AB3-M-D-101002B ME 0 Khusro D 25-Feb-2015
PART PLAN B

HVAC DUCTING LAYOUT BASEMENT 4


887 3-Feb-2015 111-AB-M02-0053 1.11 AB 1110-111-LB2-AB4-M-D-101002 ME 0 Khusro D 25-Feb-2015
MASTER PLAN

HVAC DUCTING LAYOUT BASEMENT 4


888 3-Feb-2015 111-AB-M02-0054 1.11 AB 1110-111-LB2-AB4-M-D-101002A ME 0 Khusro D 25-Feb-2015
PART PLAN A

HVAC DUCTING LAYOUT BASEMENT 4


889 3-Feb-2015 111-AB-M02-0055 1.11 AB 1110-111-LB2-AB4-M-D-101002B ME 0 Khusro D 25-Feb-2015
PART PLAN B

BASEMENT 2 HVAC PLANT ROOM


890 3-Feb-2015 111-AB-M02-0056 1.11 AB 1110-111-CHW-AB-M-MP-102103 ME 0 Khusro D 28-Feb-2015
LAYOUT

891 3-Feb-2015 111-AB-M02-0057 1.11 AB 1110-111-LB5-AB-M-D-101001 HVAC DUCTING LAYOUT BASEMENT 5 ME 0 Khusro D 28-Feb-2015

892 3-Feb-2015 111-AB-M02-0058 1.11 AB 1110-111-LB3-AB-M-D-102002 HVAC PIPING LAYOUT BASEMENT 3 ME 0 Khusro D 23-Feb-2015

HVAC PIPING LAYOUT BASEMENT 3


893 3-Feb-2015 111-AB-M02-0059 1.11 AB 1110-111-LB3-AB-M-P-102002A ME 0 Khusro D 23-Feb-2015
PART PLAN A

HVAC PIPING LAYOUT BASEMENT 3


894 3-Feb-2015 111-AB-M02-0060 1.11 AB 1110-111-LB3-AB-M-P-102002B ME 0 Khusro D 23-Feb-2015
PART PLAN B

895 3-Feb-2015 111-AB-M02-0061 1.11 AB 1110-111-LB4-AB-M-P-102002 HVAC PIPING LAYOUT BASEMENT 4 ME 0 Khusro D 23-Feb-2015

HVAC PIPING LAYOUT BASEMENT 4


896 3-Feb-2015 111-AB-M02-0062 1.11 AB 1110-111-LB4-AB-M-P-102002A ME 0 Khusro D 23-Feb-2015
PART PLAN A

HVAC PIPING LAYOUT BASEMENT 4


897 3-Feb-2015 111-AB-M02-0063 1.11 AB 1110-111-LB4-AB-M-P-102002B ME 0 Khusro D 23-Feb-2015
PART PLAN B

Page 81 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

898 3-Feb-2015 111-AB-M02-0064 1.11 AB 1110-111-LB5-AB-M-P-102001 HVAC PIPING LAYOUT BASEMENT 5 ME 0 Khusro D 23-Feb-2015

FIRE FIGHTING SYSTEM LAYOUT


899 3-Feb-2015 111-AB-M03-0068 1.11 AB 1110-111-L08-AB-P-FFS-311127 ME 0 Khusro D 18-Feb-2015
TOWER 1 LEVEL 08 OFFICES

FIRE FIGHTING SYSTEM LAYOUT


900 3-Feb-2015 111-AB-M03-0069 1.11 AB 1110-111-L09-AB-P-FFS-311128 ME 0 Khusro D 18-Feb-2015
TOWER 1 LEVEL 09 OFFICES

AS-BUILT FIRE FIGHTING SYSTEM


901 9-Feb-2015 111/AB-M03-0070 1.11 AB 1110-111-LB2-AB-P-PL-105008 LAYOUT TOWER 1 BASEMENT LEVEL ME 0 Khusro D 18-Feb-2015
02

AS-BUILT FIRE FIGHTING SYSTEM


902 9-Feb-2015 111/AB-M03-0071 1.11 AB 1110-111-LB2-AB-P-PL-105009 LAYOUT TOWER 2 BASEMENT LEVEL ME 0 Khusro D 18-Feb-2015
02

AS-BUILT FIRE FIGHTING SYSTEM


903 9-Feb-2015 111/AB-M03-0072 1.11 AB 1110-111-LB2-AB-P-PL-105010 LAYOUT MASTER PLAN BASEMENT ME 0 Khusro D 18-Feb-2015
LEVEL 02

PUBLIC ADDRESS SYSTEM LAYOUT


904 2-Mar-2015 111/AB-E11-0016 1.11 AB 1110-111-L03-AB-E-PAS-811323 EL 0 Franco C 10-Mar-2015
LEVEL 03 OFFICE TOWER 1

PUBLIC ADDRESS SYSTEM LAYOUT


905 2-Mar-2015 111/AB-E11-0017 1.11 AB 1110-111-L03-AB-E-PAS-811324 EL 0 Franco C 10-Mar-2015
LEVEL 03 OFFICE TOWER 2

PUBLIC ADDRESS SYSTEM LAYOUT


906 2-Mar-2015 111/AB-E11-0018 1.11 AB 1110-111-4F-AB-E-PAS-811325 EL 0 Franco C 10-Mar-2015
LEVEL 04 OFFICE TOWER 1

PUBLIC ADDRESS SYSTEM LAYOUT


907 2-Mar-2015 111/AB-E11-0019 1.11 AB 1110-111-4F-AB-E-PAS-811326 EL 0 Franco C 10-Mar-2015
LEVEL 04 OFFICE TOWER 2

PUBLIC ADDRESS SYSTEM LAYOUT


908 2-Mar-2015 111/AB-E11-0020 1.11 AB 1110-111-5F-AB-E-PAS-811327 EL 0 Franco C 10-Mar-2015
LEVEL 05 OFFICE TOWER 1

PUBLIC ADDRESS SYSTEM LAYOUT


909 2-Mar-2015 111/AB-E11-0021 1.11 AB 1110-111-5F-AB-E-PAS-811328 EL 0 Franco C 10-Mar-2015
LEVEL 05 OFFICE TOWER 2

Page 82 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

PUBLIC ADDRESS SYSTEM LAYOUT


910 2-Mar-2015 111/AB-E11-0022 1.11 AB 1110-111-L06-AB-E-PAS-811329 EL 0 Franco C 10-Mar-2015
LEVEL 06 OFFICE TOWER 1

PUBLIC ADDRESS SYSTEM LAYOUT


911 2-Mar-2015 111/AB-E11-0023 1.11 AB 1110-111-L06-AB-E-PAS-811330 EL 0 Franco C 10-Mar-2015
LEVEL 06 OFFICE TOWER 2

PUBLIC ADDRESS SYSTEM LAYOUT


912 2-Mar-2015 111/AB-E11-0024 1.11 AB 1110-111-L07-AB-E-PAS-811331 EL 0 Franco C 10-Mar-2015
LEVEL 07 OFFICE TOWER 1

PUBLIC ADDRESS SYSTEM LAYOUT


913 2-Mar-2015 111/AB-E11-0025 1.11 AB 1110-111-L07-AB-E-PAS-811332 EL 0 Franco C 10-Mar-2015
LEVEL 07 OFFICE TOWER 2

PUBLIC ADDRESS SYSTEM LAYOUT


914 2-Mar-2015 111/AB-E11-0026 1.11 AB 1110-111-L08-AB-E-PAS-811333 EL 0 Franco C 10-Mar-2015
LEVEL 08 OFFICE TOWER 1

PUBLIC ADDRESS SYSTEM LAYOUT


915 2-Mar-2015 111/AB-E11-0027 1.11 AB 1110-111-L08-AB-E-PAS-811334 EL 0 Franco C 10-Mar-2015
LEVEL 08 OFFICE TOWER 2

PUBLIC ADDRESS SYSTEM LAYOUT


916 2-Mar-2015 111/AB-E11-0028 1.11 AB 1110-111-L09-AB-E-PAS-811335 EL 0 Franco C 10-Mar-2015
LEVEL 09 OFFICE TOWER 1

PUBLIC ADDRESS SYSTEM LAYOUT


917 2-Mar-2015 111/AB-E11-0029 1.11 AB 1110-111-L10-AB-E-PAS-811336 EL 0 Franco C 10-Mar-2015
LEVEL 10 OFFICE TOWER 1

PUBLIC ADDRESS SYSTEM LAYOUT


918 2-Mar-2015 111/AB-E11-0030 1.11 AB 1110-111-L11-AB-E-PAS-811337 EL 0 Franco C 10-Mar-2015
LEVEL 11 OFFICE TOWER 1

PUBLIC ADDRESS SYSTEM LAYOUT


919 2-Mar-2015 111/AB-E11-0031 1.11 AB 1110-111-L12-AB-E-PAS-811338 EL 0 Franco C 10-Mar-2015
LEVEL 12 TOWER 1

CCTV SYSTEM LAYOUT LEVEL 3


920 2-Mar-2015 111/AB-T01-0001 1.11 AB 1110-111-L03-AB-E-CCTV-811418 EL 0 Franco C 10-Mar-2015
PART A

Page 83 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

CCTV SYSTEM LAYOUT LEVEL 3


921 2-Mar-2015 111/AB-T01-0002 1.11 AB 1110-111-L03-AB-E-CCTV-811419 EL 0 Franco C 10-Mar-2015
PART B OFFICE

CCTV SYSTEM LAYOUT LEVEL 4


922 2-Mar-2015 111/AB-T01-0003 1.11 AB 1110-111-L04-AB-E-CCTV-811420 EL 0 Franco C 10-Mar-2015
PART A

CCTV SYSTEM LAYOUT LEVEL 4


923 2-Mar-2015 111/AB-T01-0004 1.11 AB 1110-111-L04-AB-E-CCTV-811421 EL 0 Franco C 10-Mar-2015
PART B

CCTV SYSTEM LAYOUT LEVEL 5


924 2-Mar-2015 111/AB-T01-0005 1.11 AB 1110-111-L05-AB-E-CCTV-811422 EL 0 Franco C 10-Mar-2015
PART A

CCTV SYSTEM LAYOUT LEVEL 5


925 2-Mar-2015 111/AB-T01-0006 1.11 AB 1110-111-L05-AB-E-CCTV-811423 EL 0 Franco C 10-Mar-2015
PART B

CCTV SYSTEM LAYOUT LEVEL 6


926 2-Mar-2015 111/AB-T01-0007 1.11 AB 1110-111-L06-AB-E-CCTV-811424 EL 0 Franco C 10-Mar-2015
PART A

CCTV SYSTEM LAYOUT LEVEL 6


927 2-Mar-2015 111/AB-T01-0008 1.11 AB 1110-111-L06-AB-E-CCTV-811425 EL 0 Franco C 10-Mar-2015
PART B

CCTV SYSTEM LAYOUT LEVEL 7


928 2-Mar-2015 111/AB-T01-0009 1.11 AB 1110-111-L07-AB-E-CCTV-811426 EL 0 Franco C 10-Mar-2015
PART A

CCTV SYSTEM LAYOUT LEVEL 7


929 2-Mar-2015 111/AB-T01-0010 1.11 AB 1110-111-L07-AB-E-CCTV-811427 EL 0 Franco C 10-Mar-2015
PART B OFFICE

CCTV SYSTEM LAYOUT LEVEL 9


930 2-Mar-2015 111/AB-T01-0011 1.11 AB 1110-111-L09-AB-E-CCTV-811430 EL 0 Franco C 10-Mar-2015
PART A

CCTV SYSTEM LAYOUT LEVEL 9


931 2-Mar-2015 111/AB-T01-0012 1.11 AB 1110-111-L09-AB-E-CCTV-811431 EL 0 Franco C 10-Mar-2015
PART B

Page 84 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

CCTV SYSTEM LAYOUT LEVEL 10


932 2-Mar-2015 111/AB-T01-0013 1.11 AB 1110-111-L10-AB-E-CCTV-811432 EL 0 Franco C 10-Mar-2015
PART A

CCTV SYSTEM LAYOUT LEVEL 11


933 2-Mar-2015 111/AB-T01-0014 1.11 AB 1110-111-L11-AB-E-CCTV-811433 EL 0 Franco C 10-Mar-2015
PART A

CCTV SYSTEM LAYOUT LEVEL 12


934 2-Mar-2015 111/AB-T01-0015 1.11 AB 1110-111-L12-AB-E-CCTV-811434 EL 0 Franco C 10-Mar-2015
PART A

AS BUILT TELEPHONE AND DATA


935 9-Mar-2015 111/AB-T05-0016 1.11 AB 1110-1.11-L03-AB-E-TEL-811212 ME 0 Franco D 23-Mar-2015
SYSTEM TOWER 1 LEVEL 3 OFFICE

AS BUILT TELEPHONE AND DATA


936 9-Mar-2015 111/AB-T05-0017 1.11 AB 1110-1.11-L03-AB-E-TEL-811213 ME 0 Franco D 23-Mar-2015
SYSTEM TOWER 2 LEVEL 3 OFFICE

AS BUILT TELEPHONE AND DATA


937 9-Mar-2015 111/AB-T05-0018 1.11 AB 1110-1.11-L04-AB-E-TEL-811214 ME 0 Franco D 23-Mar-2015
SYSTEM TOWER 1 LEVEL 4 OFFICE

AS BUILT TELEPHONE AND DATA


938 9-Mar-2015 111/AB-T05-0019 1.11 AB 1110-1.11-L04-AB-E-TEL-811215 ME 0 Franco D 23-Mar-2015
SYSTEM TOWER 2 LEVEL 4 OFFICE

AS BUILT TELEPHONE AND DATA


939 9-Mar-2015 111/AB-T05-0020 1.11 AB 1110-1.11-L05-AB-E-TEL-811216 ME 0 Franco D 23-Mar-2015
SYSTEM TOWER 1 LEVEL 5 OFFICE

AS BUILT TELEPHONE AND DATA


940 9-Mar-2015 111/AB-T05-0021 1.11 AB 1110-1.11-L05-AB-E-TEL-811217 ME 0 Franco D 23-Mar-2015
SYSTEM TOWER 2 LEVEL 5 OFFICE

AS BUILT TELEPHONE AND DATA


941 9-Mar-2015 111/AB-T05-0022 1.11 AB 1110-1.11-L06-AB-E-TEL-811218 ME 0 Franco D 23-Mar-2015
SYSTEM TOWER 1 LEVEL 6 OFFICE

AS BUILT TELEPHONE AND DATA


942 9-Mar-2015 111/AB-T05-0023 1.11 AB 1110-1.11-L06-AB-E-TEL-811219 ME 0 Franco D 23-Mar-2015
SYSTEM TOWER 2 LEVEL 6 OFFICE

Page 85 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

AS BUILT TELEPHONE AND DATA


943 9-Mar-2015 111/AB-T05-0024 1.11 AB 1110-1.11-L07-AB-E-TEL-811220 ME 0 Franco D 23-Mar-2015
SYSTEM TOWER 1 LEVEL 7 OFFICE

AS BUILT TELEPHONE AND DATA


944 9-Mar-2015 111/AB-T05-0025 1.11 AB 1110-1.11-L08-AB-E-TEL-811222 ME 0 Franco D 23-Mar-2015
SYSTEM TOWER 1 LEVEL 8 OFFICE

AS BUILT TELEPHONE AND DATA


945 9-Mar-2015 111/AB-T05-0026 1.11 AB 1110-1.11-L09-AB-E-TEL-811224 ME 0 Franco D 23-Mar-2015
SYSTEM TOWER 1 LEVEL 9 OFFICE

AS BUILT TELEPHONE AND DATA


946 9-Mar-2015 111/AB-T05-0027 1.11 AB 1110-1.11-L10-AB-E-TEL-811226 ME 0 Franco D 23-Mar-2015
SYSTEM TOWER 1 LEVEL 10 OFFICE

AS BUILT TELEPHONE AND DATA


947 9-Mar-2015 111/AB-T05-0028 1.11 AB 1110-1.11-L11-AB-E-TEL-811227 ME 0 Franco D 23-Mar-2015
SYSTEM TOWER 1 LEVEL 11 OFFICE

AS BUILT TELEPHONE AND DATA


948 9-Mar-2015 111/AB-T05-0029 1.11 AB 1110-1.11-L12-AB-E-TEL-811228 ME 0 Franco D 23-Mar-2015
SYSTEM TOWER 1 LEVEL 12 OFFICE

AS BUILT TELEPHONE AND DATA


949 9-Mar-2015 111/AB-T05-0030 1.11 AB 1110-1.11-L14-AB-E-TEL-811230 ME 0 Franco D 23-Mar-2015
SYSTEM TOWER 1 LEVEL 14 OFFICE

AS BUILT TELEPHONE AND DATA


950 9-Mar-2015 111/AB-T05-0031 1.11 AB 1110-1.11-L15-AB-E-TEL-811231 ME 0 Franco D 23-Mar-2015
SYSTEM TOWER 1 LEVEL 15 OFFICE

AS BUILT TELEPHONE AND DATA


951 9-Mar-2015 111/AB-T05-0032 1.11 AB 1110-1.11-L16-AB-E-TEL-811232 ME 0 Franco D 23-Mar-2015
SYSTEM TOWER 1 LEVEL 16 OFFICE

DRAINGE AS BUILT LAYOUT TOWER 1


952 9-Mar-2015 111-AB-M01-0003 1.11 AB 1110-111-L15-AB-P-DRG-111122 ME 2 Franco D 16-Mar-2015
LEVEL 3 OFFICE

DRAINGE AS BUILT LAYOUT TOWER 1


953 9-Mar-2015 111-AB-M01-0004 1.11 AB 1110-111-L15-AB-P-DRG-111123 ME 2 Franco A 16-Mar-2015
LEVEL 4 OFFICE

Page 86 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

DRAINGE AS BUILT LAYOUT TOWER 1


954 9-Mar-2015 111-AB-M01-0005 1.11 AB 1110-111-L15-AB-P-DRG-111124 ME 2 Franco A 16-Mar-2015
LEVEL 5 OFFICE

DRAINGE AS BUILT LAYOUT TOWER 1


955 9-Mar-2015 111-AB-M01-0006 1.11 AB 1110-111-L15-AB-P-DRG-111125 ME 2 Franco D 16-Mar-2015
LEVEL 6 OFFICE

DRAINGE AS BUILT LAYOUT TOWER 1


956 9-Mar-2015 111-AB-M01-0007 1.11 AB 1110-111-L15-AB-P-DRG-111126 ME 2 Franco D 16-Mar-2015
LEVEL 7 OFFICE

DRAINGE AS BUILT LAYOUT TOWER 1


957 9-Mar-2015 111-AB-M01-0008 1.11 AB 1110-111-L15-AB-P-DRG-111127 ME 2 Franco D 16-Mar-2015
LEVEL 8 OFFICE

WATER SUPPLY SYSTEM AS BUILT


958 9-Mar-2015 111-AB-M01-0017 1.11 AB 1110-111-L05-AB-P-WSS-211124 ME 2 Khusro D 11-Mar-2015
LAYOUT TOWER 1 LEVEL 5 OFFICE

WATER SUPPLY SYSTEM AS BUILT


959 9-Mar-2015 111-AB-M01-0018 1.11 AB 1110-111-L06-AB-P-WSS-211125 ME 2 Khusro D 11-Mar-2015
LAYOUT TOWER 1 LEVEL 6 OFFICE

WATER SUPPLY SYSTEM AS BUILT


960 9-Mar-2015 111-AB-M01-0019 1.11 AB 1110-111-L07-AB-P-WSS-211126 ME 2 Khusro D 11-Mar-2015
LAYOUT TOWER 1 LEVEL 7 OFFICE

WATER SUPPLY SYSTEM AS BUILT


961 9-Mar-2015 111-AB-M01-0020 1.11 AB 1110-111-L09-AB-P-WSS-211128 ME 2 Khusro D 11-Mar-2015
LAYOUT TOWER 1 LEVEL 9 OFFICE

WATER SUPPLY SYSTEM AS BUILT


962 9-Mar-2015 111-AB-M01-0021 1.11 AB 1110-111-L10-AB-P-WSS-211129 ME 2 Khusro D 11-Mar-2015
LAYOUT TOWER 1 LEVEL 10 OFFICE

WATER SUPPLY SYSTEM AS BUILT


963 9-Mar-2015 111-AB-M01-0022 1.11 AB 1110-111-L11-AB-P-WSS-211130 ME 2 Khusro D 11-Mar-2015
LAYOUT TOWER 1 LEVEL 11 OFFICE

WATER SUPPLY SYSTEM AS BUILT


964 9-Mar-2015 111-AB-M01-0023 1.11 AB 1110-111-L05-AB-P-WSS-211131 ME 2 Khusro D 11-Mar-2015
LAYOUT TOWER 1 LEVEL 12 OFFICE

Page 87 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

WATER SUPPLY SYSTEM AS BUILT


965 9-Mar-2015 111-AB-M01-0036 1.11 AB 1110-111-L05-AB-P-WSS-211140 ME 1 Khusro D 11-Mar-2015
LAYOUT TOWER 2 LEVEL 5 OFFICE

WATER SUPPLY SYSTEM AS BUILT


966 9-Mar-2015 111-AB-M01-0037 1.11 AB 1110-111-L05-AB-P-WSS-211141 ME 2 Khusro D 11-Mar-2015
LAYOUT TOWER 2 LEVEL 6 OFFICE

WATER SUPPLY SYSTEM AS BUILT


967 9-Mar-2015 111-AB-M01-0038 1.11 AB 1110-111-L05-AB-P-WSS-211142 ME 2 Khusro D 11-Mar-2015
LAYOUT TOWER 2 LEVEL 7 OFFICE

WATER SUPPLY SYSTEM AS BUILT


968 9-Mar-2015 111-AB-M01-0039 1.11 AB 1110-111-L05-AB-P-WSS-211143 ME 2 Khusro D 11-Mar-2015
LAYOUT TOWER 2 LEVEL 8 OFFICE

WATER SUPPLY SYSTEM AS BUILT


969 9-Mar-2015 111-AB-M01-0046 1.11 AB 1110-111-L05-AB-P-WSS-211127 ME 1 Khusro D 11-Mar-2015
LAYOUT TOWER 1 LEVEL 8 OFFICE

HVAC SYSTEM LAYOUT LEVEL 01


970 12-Mar-2015 111-AB-M02-0031 1.11 AB 1110-111-GF-L01-M-VAC-411118 ME 2 Franco C 31-Mar-2015
(MASTER PLAN)

HVAC SYSTEM LAYOUT GROUND


971 12-Mar-2015 111-AB-M02-0083 1.11 AB 1110-111-GF-AB-M-VAC-411115 ME 0 Franco C 31-Mar-2015
FLOOR (MASTER PLAN)

HVAC SYSTEM LAYOUT GROUND


972 12-Mar-2015 111-AB-M02-0084 1.11 AB 1110-111-GF-AB-M-VAC-411116 ME 0 Franco C 31-Mar-2015
FLOOR GROUND FLOOR TOWER 1

HVAC SYSTEM LAYOUT GROUND


973 12-Mar-2015 111-AB-M02-0085 1.11 AB 1110-111-GF-AB-M-VAC-411117 ME 0 Franco C 31-Mar-2015
FLOOR GROUND FLOOR TOWER 2

HVAC SYSTEM LAYOUT LEVEL 1


974 12-Mar-2015 111-AB-M02-0086 1.11 AB 1110-111-L01-AB-M-VAC-411119 ME 0 Franco C 31-Mar-2015
TOWER 1

HVAC SYSTEM LAYOUT LEVEL 2


975 12-Mar-2015 111-AB-M02-0087 1.11 AB 1110-111-GF-L01-M-VAC-411120 ME 0 Franco C 31-Mar-2015
MASTER PLAN

Page 88 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

HVAC SYSTEM LAYOUT LEVEL 1


976 12-Mar-2015 111-AB-M02-0088 1.11 AB 1110-111-GF-L02-M-VAC-411121 ME 0 Franco C 31-Mar-2015
TOWER 3

HVAC SYSTEM LAYOUT LEVEL 2


977 12-Mar-2015 111-AB-M02-0089 1.11 AB 1110-111-GF-L02-M-VAC-411121A ME 0 Franco C 31-Mar-2015
TOWER 1

HVAC SYSTEM LAYOUT LEVEL 2


978 12-Mar-2015 111-AB-M02-0090 1.11 AB 1110-111-GF-L02-M-VAC-411121B ME 0 Franco C 31-Mar-2015
TOWER 2

HVAC SYSTEM LAYOUT LEVEL 03


979 12-Mar-2015 111-AB-M02-0091 1.11 AB 1110-111-L03-AB-M-VAC-411122 ME 0 Franco C 31-Mar-2015
(MASTER PLAN)

HVAC SYSTEM LAYOUT LEVEL 3


980 12-Mar-2015 111-AB-M02-0092 1.11 AB 1110-111-L03-AB-M-VAC-411122A ME 0 Franco C 31-Mar-2015
TOWER 1

HVAC SYSTEM LAYOUT LEVEL 3


981 12-Mar-2015 111-AB-M02-0093 1.11 AB 1110-111-L03-AB-M-VAC-411122B ME 0 Franco C 31-Mar-2015
TOWER 2

HVAC SYSTEM LAYOUT LEVEL 04


982 12-Mar-2015 111-AB-M02-0094 1.11 AB 1110-111-L04-AB-M-VAC-411123 ME 0 Franco C 31-Mar-2015
(MASTER PLAN)

HVAC SYSTEM LAYOUT LEVEL 04


983 12-Mar-2015 111-AB-M02-0095 1.11 AB 1110-111-L04-AB-M-VAC-411123A ME 0 Franco C 31-Mar-2015
TOWER 1

HVAC SYSTEM LAYOUT LEVEL 04


984 12-Mar-2015 111-AB-M02-0096 1.11 AB 1110-111-L04-AB-M-VAC-411123B ME 0 Franco C 31-Mar-2015
TOWER 2

HVAC SYSTEM LAYOUT LEVEL 05


985 12-Mar-2015 111-AB-M02-0097 1.11 AB 1110-111-L05-AB-M-VAC-411124 ME 0 Franco C 31-Mar-2015
(MASTER PLAN)

HVAC SYSTEM LAYOUT LEVEL 05


986 12-Mar-2015 111-AB-M02-0098 1.11 AB 1110-111-L05-AB-M-VAC-411124A ME 0 Franco C 31-Mar-2015
TOWER 1

Page 89 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

HVAC SYSTEM LAYOUT LEVEL 05


987 12-Mar-2015 111-AB-M02-0099 1.11 AB 1110-111-L05-AB-M-VAC-411124B ME 0 Franco C 31-Mar-2015
TOWER 2

HVAC SYSTEM LAYOUT LEVEL 06


988 12-Mar-2015 111-AB-M02-0100 1.11 AB 1110-111-L06-AB-M-VAC-411125 ME 0 Franco C 31-Mar-2015
(MASTER PLAN)

HVAC SYSTEM LAYOUT LEVEL 06


989 12-Mar-2015 111-AB-M02-0101 1.11 AB 1110-111-L06-AB-M-VAC-411125A ME 0 Franco C 31-Mar-2015
TOWER 1

HVAC SYSTEM LAYOUT LEVEL 06


990 12-Mar-2015 111-AB-M02-0102 1.11 AB 1110-111-L06-AB-M-VAC-411125B ME 0 Franco C 31-Mar-2015
TOWER 2

Fire fighting system as built lauout Tower-1


991 14-Mar-2015 111/AB-M03-0032 1.11 AB 1110-111-L03-AB-P-FFS-311122 ME 2 Franco D 6-Apr-2015
L-3 office

HVAC SYSTEM LAYOUT LEVEL 07


992 14-Mar-2015 111-AB-M02-0103 1.11 AB 1110-111-L07-AB-M-VAC-411126 ME 0 Franco C 31-Mar-2015
MASTER PLAN

HVAC SYSTEM LAYOUT LEVEL 07


993 14-Mar-2015 111-AB-M02-0104 1.11 AB 1110-111-L07-AB-M-VAC-411126A ME 0 Franco C 31-Mar-2015
TOWER 1

HVAC SYSTEM LAYOUT LEVEL 07


994 14-Mar-2015 111-AB-M02-0105 1.11 AB 1110-111-L07-AB-M-VAC-411126B ME 0 Franco C 31-Mar-2015
TOWER 2

FIRE FIGHTING SYSTEM LAYOUT


995 14-Mar-2015 111-AB-M03-0068 1.11 AB 1110-111-L08-AB-P-FFS-311127 ME 1 Franco D 2-Apr-2015
TOWER 1 LEVEL 08 OFFICES

FIRE FIGHTING SYSTEM LAYOUT


996 14-Mar-2015 111-AB-M03-0069 1.11 AB 1110-111-L09-AB-P-FFS-311128 ME 1 Franco D 2-Apr-2015
TOWER 1 LEVEL 09 OFFICES

FIRE FIGHTING SYSTEM LAYOUT


997 15-Mar-2015 111-AB-M03-0073 1.11 AB 1110-111-L04-AB-P-FFS-311123 ME 0 Franco D 6-Apr-2015
LEVEL 04 TOWER 1

Page 90 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

FIRE FIGHTING SYSTEM LAYOUT


998 15-Mar-2015 111-AB-M03-0074 1.11 AB 1110-111-L05-AB-P-FFS-311124 ME 0 Franco D 6-Apr-2015
LEVEL 05 TOWER 1

FIRE FIGHTING SYSTEM LAYOUT


999 15-Mar-2015 111-AB-M03-0075 1.11 AB 1110-111-L06-AB-P-FFS-311125 ME 0 Franco D 2-Apr-2015
LEVEL 06 TOWER 1

FIRE FIGHTING SYSTEM LAYOUT


1000 15-Mar-2015 111-AB-M03-0076 1.11 AB 1110-111-L06-AB-P-FFS-311126 ME 0 Franco D 2-Apr-2015
LEVEL 07 TOWER 1

CHILLED WATER PIPING LAYOUT


1001 16-Mar-2015 111-AB-M02-0077 1.11 AB 1110-111-L02-AB-M-CHW-411537 ME 0 Franco D 6-Apr-2015
TOWER-2 LEVEL 2 OFFICE

CHILLED WATER PIPING LAYOUT


1002 16-Mar-2015 111-AB-M02-0078 1.11 AB 1110-111-L03-AB-M-CHW-411538 ME 0 Franco D 5-Apr-2015
TOWER-2 LEVEL 3 OFFICE

CHILLED WATER PIPING LAYOUT


1003 16-Mar-2015 111-AB-M02-0079 1.11 AB 1110-111-L04-AB-M-CHW-411539 ME 0 Franco D 5-Apr-2015
TOWER-2 LEVEL 4 OFFICE

CHILLED WATER PIPING LAYOUT


1004 16-Mar-2015 111-AB-M02-0080 1.11 AB 1110-111-L04-AB-M-CHW-411540 ME 0 Franco D 5-Apr-2015
TOWER-2 LEVEL 5 OFFICE

CHILLED WATER PIPING LAYOUT


1005 16-Mar-2015 111-AB-M02-0081 1.11 AB 1110-111-L06-AB-M-CHW-411541 ME 0 Franco D 5-Apr-2015
TOWER-2 LEVEL 6 OFFICE

CHILLED WATER PIPING LAYOUT


1006 16-Mar-2015 111-AB-M02-0082 1.11 AB 1110-111-L06-AB-M-CHW-411525 ME 0 Franco D 5-Apr-2015
TOWER-1 LEVEL 6 OFFICE

DRAINAGE LAYOUT TOWER 2 LEVEL 4


1007 17-Mar-2015 111/AB-M01-0027 1.11 AB 1110-111-L04-AB-P-DRG-111139 ME 2 Franco D 8-Apr-2015
OFFICE

DRAINAGE LAYOUT TOWER 2 LEVEL 5


1008 17-Mar-2015 111/AB-M01-0028 1.11 AB 1110-111-L05-AB-P-DRG-111140 ME 2 Franco D 8-Apr-2015
OFFICE

Page 91 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

DRAINAGE LAYOUT TOWER 2 LEVEL 6


1009 17-Mar-2015 111/AB-M01-0029 1.11 AB 1110-111-L06-AB-P-DRG-111141 ME 2 Franco D 8-Apr-2015
OFFICE

DRAINAGE LAYOUT TOWER 2 LEVEL 7


1010 17-Mar-2015 111/AB-M01-0030 1.11 AB 1110-111-L07-AB-P-DRG-111142 ME 2 Franco D 8-Apr-2015
OFFICE

CCTV SYSTEM LAYOUT LEVEL 3


1011 17-Mar-2015 111/AB-T01-0001 1.11 AB 1110-111-L03-AB-E-CCTV-811418 EL 1 Franco A 30-Mar-2015
PART A

CCTV SYSTEM LAYOUT LEVEL 3


1012 17-Mar-2015 111/AB-T01-0002 1.11 AB 1110-111-L03-AB-E-CCTV-811419 EL 1 Franco A 30-Mar-2015
PART B

CCTV SYSTEM LAYOUT LEVEL 4


1013 17-Mar-2015 111/AB-T01-0003 1.11 AB 1110-111-L04-AB-E-CCTV-811420 EL 1 Franco A 30-Mar-2015
PART A

CCTV SYSTEM LAYOUT LEVEL 4


1014 17-Mar-2015 111/AB-T01-0004 1.11 AB 1110-111-L04-AB-E-CCTV-811421 EL 1 Franco A 30-Mar-2015
PART B

CCTV SYSTEM LAYOUT LEVEL 5


1015 17-Mar-2015 111/AB-T01-0005 1.11 AB 1110-111-L05-AB-E-CCTV-811422 EL 1 Franco A 30-Mar-2015
PART A

CCTV SYSTEM LAYOUT LEVEL 5


1016 17-Mar-2015 111/AB-T01-0006 1.11 AB 1110-111-L05-AB-E-CCTV-811423 EL 1 Franco A 30-Mar-2015
PART B

CCTV SYSTEM LAYOUT LEVEL 6


1017 17-Mar-2015 111/AB-T01-0007 1.11 AB 1110-111-L06-AB-E-CCTV-811424 EL 1 Franco A 30-Mar-2015
PART A

CCTV SYSTEM LAYOUT LEVEL 6


1018 17-Mar-2015 111/AB-T01-0008 1.11 AB 1110-111-L06-AB-E-CCTV-811425 EL 1 Franco A 30-Mar-2015
PART B

CCTV SYSTEM LAYOUT LEVEL 7


1019 17-Mar-2015 111/AB-T01-0009 1.11 AB 1110-111-L07-AB-E-CCTV-811426 EL 1 Franco A 30-Mar-2015
PART A

Page 92 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

CCTV SYSTEM LAYOUT LEVEL 7


1020 17-Mar-2015 111/AB-T01-0010 1.11 AB 1110-111-L07-AB-E-CCTV-811427 EL 1 Franco A 30-Mar-2015
PART B OFFICE

CCTV SYSTEM LAYOUT LEVEL 9


1021 17-Mar-2015 111/AB-T01-0011 1.11 AB 1110-111-L09-AB-E-CCTV-811430 EL 1 Franco A 30-Mar-2015
PART A

CCTV SYSTEM LAYOUT LEVEL 10


1022 17-Mar-2015 111/AB-T01-0013 1.11 AB 1110-111-L10-AB-E-CCTV-811432 EL 1 Franco A 30-Mar-2015
PART A

CCTV SYSTEM LAYOUT LEVEL 11


1023 17-Mar-2015 111/AB-T01-0014 1.11 AB 1110-111-L11-AB-E-CCTV-811433 EL 1 Franco A 30-Mar-2015
PART A

CCTV SYSTEM LAYOUT LEVEL 12


1024 17-Mar-2015 111/AB-T01-0015 1.11 AB 1110-111-L12-AB-E-CCTV-811434 EL 1 Franco A 30-Mar-2015
PART A

DRAINAGE SERVICES LAYOUT LEVEL


1025 17-Mar-2015 111-AB-M01-0065 1.11 AB 1110-111-L03-AB-P-DRG-111143 ME 1 Franco D 8-Apr-2015
03 OFFICE TOWER 2

DRAINAGE SERVICES LAYOUT LEVEL


1026 17-Mar-2015 111-AB-M01-0125 1.11 AB 1110-111-L03-AB-P-DRG-111138 ME 0 Franco D 8-Apr-2015
03 OFFICE TOWER 2

CHILLED WATER PIPING LAYOUT


1027 17-Mar-2015 111-AB-M02-0106 1.11 AB 1110-111-L02-AB-M-CHW-411521 ME 0 Franco D 8-Apr-2015
TOWER 1 LEVEL 2 OFFICE

CHILLED WATER PIPING LAYOUT


1028 17-Mar-2015 111-AB-M02-0107 1.11 AB 1110-111-L03-AB-M-CHW-411522 ME 0 Franco D 8-Apr-2015
TOWER 1 LEVEL 3 OFFICE

CHILLED WATER PIPING LAYOUT


1029 17-Mar-2015 111-AB-M02-0108 1.11 AB 1110-111-L04-AB-M-CHW-411123 ME 0 Franco D 8-Apr-2015
TOWER 1 LEVEL 4 OFFICE

CHILLED WATER PIPING LAYOUT


1030 17-Mar-2015 111-AB-M02-0109 1.11 AB 1110-111-L05-AB-M-CHW-411124 ME 0 Franco D 8-Apr-2015
TOWER 1 LEVEL 5 OFFICE

Page 93 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

CHILLED WATER PIPING LAYOUT


1031 17-Mar-2015 111-AB-M02-0111 1.11 AB 1110-111-L07-AB-M-CHW-411526 ME 0 Franco D 5-Apr-2015
TOWER 1 LEVEL 7 OFFICE

CHILLED WATER PIPING LAYOUT


1032 17-Mar-2015 111-AB-M02-0112 1.11 AB 1110-111-L08-AB-M-CHW-411527 ME 0 Franco D 5-Apr-2015
TOWER 1 LEVEL 8 OFFICE

CHILLED WATER PIPING LAYOUT


1033 17-Mar-2015 111-AB-M02-0113 1.11 AB 1110-111-L09-AB-M-CHW-411528 ME 0 Franco D 5-Apr-2015
TOWER 1 LEVEL 9 OFFICE

CHILLED WATER PIPING LAYOUT


1034 17-Mar-2015 111-AB-M02-0114 1.11 AB 1110-111-L10-AB-M-CHW-411529 ME 0 Franco D 5-Apr-2015
TOWER 1 LEVEL 10 OFFICE

CHILLED WATER PIPING LAYOUT


1035 17-Mar-2015 111-AB-M02-0115 1.11 AB 1110-111-L11-AB-M-CHW-411530 ME 0 Franco D 5-Apr-2015
TOWER 1 LEVEL 11 OFFICE

CHILLED WATER PIPING LAYOUT


1036 17-Mar-2015 111-AB-M02-0116 1.11 AB 1110-111-L12-AB-M-CHW-411531 ME 0 Franco D 5-Apr-2015
TOWER 1 LEVEL 12 OFFICE

CHILLED WATER PIPING LAYOUT


1037 17-Mar-2015 111-AB-M02-0117 1.11 AB 1110-111-L07-AB-M-CHW-411542 ME 0 Franco D 5-Apr-2015
TOWER 2 LEVEL 7 OFFICE

CHILLED WATER PIPING LAYOUT


1038 17-Mar-2015 111-AB-M02-0118 1.11 AB 1110-111-L08-AB-M-CHW-411543 ME 0 Khusro C 16-May-2015
TOWER 2 LEVEL 08 OFFICE

HVAC SYSTEM LAYOUT LEVEL 08


1039 17-Mar-2015 111-AB-M02-0119 1.11 AB 1110-111-L08-AB-M-VAC-411527 ME 0 Franco D 30-Mar-2015
MASTER PLAN

HVAC SYSTEM LAYOUT LEVEL 08


1040 17-Mar-2015 111-AB-M02-0120 1.11 AB 1110-111-L08-AB-M-VAC-41127A ME 0 Franco D 30-Mar-2015
TOWER 1

HVAC SYSTEM LAYOUT LEVEL 08


1041 17-Mar-2015 111-AB-M02-0121 1.11 AB 1110-111-L08-AB-M-VAC-41127B ME 0 Franco D 30-Mar-2015
TOWER 2

Page 94 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

HVAC SYSTEM LAYOUT LEVEL 09


1042 17-Mar-2015 111-AB-M02-0122 1.11 AB 1110-111-L09-AB-M-VAC-411128 ME 0 Franco D 30-Mar-2015
TOWER 1

HVAC SYSTEM LAYOUT LEVEL 10


1043 17-Mar-2015 111-AB-M02-0123 1.11 AB 1110-111-L10-AB-M-VAC-411129 ME 0 Franco D 30-Mar-2015
TOWER 1

HVAC SYSTEM LAYOUT LEVEL 11


1044 17-Mar-2015 111-AB-M02-0124 1.11 AB 1110-111-L11-AB-M-VAC-411130 ME 0 Franco D 30-Mar-2015
TOWER 1

GENERAL ARRANGEMENT AS BUILT


1045 18-Mar-2015 111/AB-G01-0027 1.11 AB 1110-111-LGF-AB-A-01005 PLAN GROUND FLOOR KEY PLAN AR 1 Franco C 26-Mar-2015
SHEET 1 OF 4

GENERAL ARRANGEMENT AS BUILT


1046 18-Mar-2015 111/AB-G01-0028 1.11 AB 1110-111-LGF-AB-A-01005A PLAN GROUND FLOOR PART A SHEET AR 1 Franco C 26-Mar-2015
2 OF 4

GENERAL ARRANGEMENT AS BUILT


1047 18-Mar-2015 111/AB-G01-0029 1.11 AB 1110-111-LGF-AB-A-01005B PLAN GROUND FLOOR PART B SHEET 3 AR 1 Franco C 26-Mar-2015
OF 4

GENERAL ARRANGEMENT AS BUILT


1048 18-Mar-2015 111/AB-G01-0030 1.11 AB 1110-111-LGF-AB-A-01005C PLAN GROUND FLOOR PART C SHEET 4 AR 1 Franco C 26-Mar-2015
OF 4

GENERAL ARRANGEMENT AS BUILT


1049 18-Mar-2015 111/AB-G01-0035 1.11 AB 1110-111-L01-AB-A-01006 AR 1 Franco C 26-Mar-2015
1ST FLOOR KEY PLAN SHEET 1 OF 4

GENERAL ARRANGEMENT AS BUILT


1050 18-Mar-2015 111/AB-G01-0036 1.11 AB 1110-111-L01-AB-A-01006A AR 1 Franco C 26-Mar-2015
1ST FLOOR PART A SHEET 2 OF 4

GENERAL ARRANGEMENT AS BUILT


1051 18-Mar-2015 111/AB-G01-0037 1.11 AB 1110-111-L01-AB-A-01006B AR 1 Franco C 26-Mar-2015
1ST FLOOR PART B SHEET 3 OF 4

GENERAL ARRANGEMENT AS BUILT


1052 18-Mar-2015 111/AB-G01-0038 1.11 AB 1110-111-L01-AB-A-01006C AR 1 Franco C 26-Mar-2015
1ST FLOOR PART C SHEET 4 OF 4

Page 95 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

GENERAL ARRANGEMENT AS BUILT


1053 18-Mar-2015 111/AB-G01-0043 1.11 AB 1110-111-L04-AB-A-01009 PLAN TYP NORTH TOWER 4,11,12TH AR 1 Franco C 26-Mar-2015
FLOOR KEY PLAN SHEET 1 OF 3

GENERAL ARRANGEMENT AS BUILT


1054 18-Mar-2015 111/AB-G01-0044 1.11 AB 1110-111-L04-AB-A-01009A PLAN TYP NORTH TOWER 4,11,12TH AR 1 Franco C 26-Mar-2015
FLOOR PART A SHEET 2 OF 3

GENERAL ARRANGEMENT AS BUILT


1055 18-Mar-2015 111/AB-G01-0045 1.11 AB 1110-111-L04-AB-A-01009B PLAN TYP NORTH TOWER 4,11,12TH AR 1 Franco C 26-Mar-2015
FLOOR PART B SHEET 3 OF 3

GENERAL ARRANGEMENT AS BUILT


1056 18-Mar-2015 111/AB-G01-0046 1.11 AB 1110-111-L05-AB-A-01010 PLAN TYP NORTH TOWER 5,10,14, 16TH AR 1 Franco C 26-Mar-2015
FLOOR KEY PLAN SHEET 1 OF 3

GENERAL ARRANGEMENT AS BUILT


1057 18-Mar-2015 111/AB-G01-0047 1.11 AB 1110-111-L05-AB-A-01010A PLAN TYP NORTH TOWER 5,10,14, 16TH AR 1 Franco C 26-Mar-2015
FLOOR PART A SHEET 2 OF 3

GENERAL ARRANGEMENT AS BUILT


1058 18-Mar-2015 111/AB-G01-0048 1.11 AB 1110-111-L05-AB-A-01010B PLAN TYP NORTH TOWER 5,10,14, 16TH AR 1 Franco C 26-Mar-2015
FLOOR PART B SHEET 3 OF 3

GENERAL ARRANGEMENT AS BUILT


1059 18-Mar-2015 111/AB-G01-0049 1.11 AB 1110-111-LB1-AB-A-01004 PLAN 1ST BASEMENT KEY PLAN AR 1 Franco C 26-Mar-2015
SHEET 1 OF 4

GENERAL ARRANGEMENT AS BUILT


1060 18-Mar-2015 111/AB-G01-0050 1.11 AB 1110-111-LB1-AB-A-01004A PLAN 1ST BASEMENT PART A SHEET 2 AR 1 Franco C 26-Mar-2015
OF 4

GENERAL ARRANGEMENT AS BUILT


1061 18-Mar-2015 111/AB-G01-0051 1.11 AB 1110-111-LB1-AB-A-01004B PLAN 1ST BASEMENT PART B SHEET 3 AR 1 Franco C 26-Mar-2015
OF 4

GENERAL ARRANGEMENT AS BUILT


1062 18-Mar-2015 111/AB-G01-0052 1.11 AB 1110-111-LB1-AB-A-01004C PLAN 1ST BASEMENT PART C SHEET 4 AR 1 Franco C 26-Mar-2015
OF 4

GENERAL ARRANGEMENT AS BUILT


1063 18-Mar-2015 111/AB-G01-0053 1.11 AB 1110-111-LB5-AB-A-01000 PLAN 5TH BASEMENT KEY PLAN AR 1 Franco C 26-Mar-2015
SHEET 1 OF 4

Page 96 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

GENERAL ARRANGEMENT AS BUILT


1064 18-Mar-2015 111/AB-G01-0054 1.11 AB 1110-111-LB5-AB-A-01000A AR 1 Franco C 26-Mar-2015
5TH BASEMENT PART A SHEET 2 OF 4

GENERAL ARRANGEMENT AS BUILT


1065 18-Mar-2015 111/AB-G01-0055 1.11 AB 1110-111-LB5-AB-A-01000B AR 1 Franco C 26-Mar-2015
5TH BASEMENT PART SHEET 3 OF 4

GENERAL ARRANGEMENT AS BUILT


1066 18-Mar-2015 111/AB-G01-0056 1.11 AB 1110-111-LB5-AB-A-01000C AR 1 Franco C 26-Mar-2015
5TH BASEMENT PART C SHEET 4 OF 4

FIRE FIGHTING SYSTEM LAYOUT


1067 18-Mar-2015 111-AB-M03-0033 1.11 AB 1110-111-L03-AB-P-FFS-311138 ME 2 Franco D 2-Apr-2015
LEVEL 03 TOWER 2

FIRE FIGHTING SYSTEM LAYOUT


1068 18-Mar-2015 111-AB-M03-0110 1.11 AB 1110-111-L10-AB-P-FFS-311129 ME 0 Franco D 1-Apr-2015
LEVEL 10 TOWER 1

FIRE FIGHTING SYSTEM LAYOUT


1069 18-Mar-2015 111-AB-M03-0126 1.11 AB 1110-111-L11-AB-P-FFS-311130 ME 0 Franco D 1-Apr-2015
LEVEL 11 TOWER 1

FIRE FIGHTING SYSTEM LAYOUT


1070 18-Mar-2015 111-AB-M03-0127 1.11 AB 1110-111-L04-AB-P-FFS-311139 ME 0 Franco D 2-Apr-2015
LEVEL 04 TOWER 2

FIRE FIGHTING SYSTEM LAYOUT


1071 18-Mar-2015 111-AB-M03-0128 1.11 AB 1110-111-L05-AB-P-FFS-311140 ME 0 Franco D 2-Apr-2015
LEVEL 05 TOWER 2

FIRE ALARM SYSTEM LAYOUT PART-A


1072 18-Mar-2015 111-AB-T07-0033 1.11 AB 1110-111-L04-AB-E-FAS-311123 EL 0 Franco D 8-Apr-2015
LEVEL 4 OFFICE

FIRE ALARM SYSTEM LAYOUT PART-B


1073 18-Mar-2015 111-AB-T07-0033 1.11 AB 1110-111-L04-AB-E-FAS-311124 EL 0 Franco D 8-Apr-2015
LEVEL 4 OFFICE

POWER SERVICE LAYOUT TOWER 1


1074 21-Mar-2015 111/AB-E01-0032 1.11 AB 1110-111-L04-AB-E-PWR-611124 EL 0 Franco D 12-Apr-2015
LEVEL 4 OFFICE

Page 97 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

POWER SERVICE LAYOUT TOWER 1


1075 21-Mar-2015 111/AB-E01-0033 1.11 AB 1110-111-L06-AB-E-PWR-611126 EL 0 Franco D 12-Apr-2015
LEVEL 6 OFFICE

POWER SERVICE LAYOUT TOWER 2


1076 21-Mar-2015 111/AB-E01-0034 1.11 AB 1110-111-L04-AB-E-PWR-611140 EL 0 Franco D 12-Apr-2015
LEVEL 4 OFFICE

POWER SERVICE LAYOUT TOWER 2


1077 21-Mar-2015 111/AB-E01-0035 1.11 AB 1110-111-L06-AB-E-PWR-611142 EL 0 Franco D 12-Apr-2015
LEVEL 6 OFFICE

PUBLIC ADDRESS SYSTEM LAYOUT


1078 21-Mar-2015 111/AB-E11-0016 1.11 AB 1110-111-L03-AB-E-PAS-811323 EL 1 Franco D 8-Apr-2015
LEVEL 03 OFFICE TOWER 1

PUBLIC ADDRESS SYSTEM LAYOUT


1079 21-Mar-2015 111/AB-E11-0017 1.11 AB 1110-111-L03-AB-E-PAS-811324 EL 1 Franco D 8-Apr-2015
LEVEL 03 OFFICE TOWER 2

PUBLIC ADDRESS SYSTEM LAYOUT


1080 21-Mar-2015 111/AB-E11-0018 1.11 AB 1110-111-L04-AB-E-PAS-811325 EL 1 Franco D 8-Apr-2015
LEVEL 04 OFFICE TOWER 1

PUBLIC ADDRESS SYSTEM LAYOUT


1081 21-Mar-2015 111/AB-E11-0019 1.11 AB 1110-111-L04-AB-E-PAS-811326 EL 1 Franco D 8-Apr-2015
LEVEL 04 OFFICE TOWER 2

PUBLIC ADDRESS SYSTEM LAYOUT


1082 21-Mar-2015 111/AB-E11-0020 1.11 AB 1110-111-L05-AB-E-PAS-811327 EL 1 Franco D 8-Apr-2015
LEVEL 05 OFFICE TOWER 1

PUBLIC ADDRESS SYSTEM LAYOUT


1083 21-Mar-2015 111/AB-E11-0021 1.11 AB 1110-111-L05-AB-E-PAS-811328 EL 1 Franco D 8-Apr-2015
LEVEL 05 OFFICE TOWER 2

PUBLIC ADDRESS SYSTEM LAYOUT


1084 21-Mar-2015 111/AB-E11-0022 1.11 AB 1110-111-L06-AB-E-PAS-811329 EL 1 Franco D 8-Apr-2015
LEVEL 06 OFFICE TOWER 1

PUBLIC ADDRESS SYSTEM LAYOUT


1085 21-Mar-2015 111/AB-E11-0023 1.11 AB 1110-111-L06-AB-E-PAS-811330 EL 1 Franco D 8-Apr-2015
LEVEL 06 OFFICE TOWER 2

Page 98 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

WATER SUPPLY SYSTEM AS BUILT


1086 21-Mar-2015 111/AB-M01-0015 1.11 AB 1110-111-L03-AB-P-WSS-211122 ME 2 Franco A 18-Apr-2015
LAYOUT TOWER 1 LEVEL 3 OFFICE

WATER SUPPLY SYSTEM AS BUILT


1087 21-Mar-2015 111/AB-M01-0016 1.11 AB 1110-111-L04-AB-P-WSS-211123 ME 2 Franco A 18-Apr-2015
LAYOUT TOWER 1 LEVEL 4 OFFICE

WATER SUPPLY SYSTEM AS BUILT


1088 21-Mar-2015 111/AB-M01-0017 1.11 AB 1110-111-L05-AB-P-WSS-211124 ME 3 Franco A 18-Apr-2015
LAYOUT TOWER 1 LEVEL 5 OFFICE

WATER SUPPLY SYSTEM AS BUILT


1089 21-Mar-2015 111/AB-M01-0018 1.11 AB 1110-111-L06-AB-P-WSS-211125 ME 3 Franco A 18-Apr-2015
LAYOUT TOWER 1 LEVEL 6 OFFICE

WATER SUPPLY SYSTEM AS BUILT


1090 21-Mar-2015 111/AB-M01-0019 1.11 AB 1110-111-L07-AB-P-WSS-211126 ME 3 Franco A 18-Apr-2015
LAYOUT TOWER 1 LEVEL 7 OFFICE

WATER SUPPLY SYSTEM AS BUILT


1091 21-Mar-2015 111/AB-M01-0020 1.11 AB 1110-111-L09-AB-P-WSS-211128 ME 3 Franco A 18-Apr-2015
LAYOUT TOWER 1 LEVEL 9 OFFICE

WATER SUPPLY SYSTEM AS BUILT


1092 21-Mar-2015 111/AB-M01-0021 1.11 AB 1110-111-L10-AB-P-WSS-211129 ME 3 Franco A 18-Apr-2015
LAYOUT TOWER 1 LEVEL 10 OFFICE

WATER SUPPLY SYSTEM AS BUILT


1093 21-Mar-2015 111/AB-M01-0022 1.11 AB 1110-111-L11-AB-P-WSS-211130 ME 3 Franco A 18-Apr-2015
LAYOUT TOWER 1 LEVEL 11 OFFICE

WATER SUPPLY SYSTEM AS BUILT


1094 21-Mar-2015 111/AB-M01-0023 1.11 AB 1110-111-L12-AB-P-WSS-211131 ME 3 Franco A 18-Apr-2015
LAYOUT TOWER 1 LEVEL 12 OFFICE

WATER SUPPLY SYSTEM AS BUILT


1095 21-Mar-2015 111/AB-M01-0046 1.11 AB 1110-111-L08-AB-P-WSS-211127 ME 2 Franco A 18-Apr-2015
LAYOUT TOWER 1 LEVEL 8 OFFICE

FIRE FIGHTING SYSTEM LAYOUT


1096 21-Mar-2015 111/AB-M03-0129 1.11 AB 1110-111-L06-AB-P-FFS-311141 ME 0 Franco D 1-Apr-2015
LEVEL 06 TOWER 2

Page 99 of 120
AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

FIRE FIGHTING SYSTEM LAYOUT


1097 21-Mar-2015 111/AB-M03-0130 1.11 AB 1110-111-L07-AB-P-FFS-311142 ME 0 Franco D 1-Apr-2015
LEVEL 07 TOWER 2

GENERAL ARRANGEMENT AS BUILT


1098 26-Mar-2015 111/AB-G01-0031 1.11 AB 1110-111-L02-AB-A-01007 SECOND FLOOR KEY PLAN SHEET 1 OF AR 1 Franco C 8-Apr-2015
4

GENERAL ARRANGEMENT AS BUILT


1099 26-Mar-2015 111/AB-G01-0032 1.11 AB 1110-111-L02-AB-A-01007A AR 1 Franco C 8-Apr-2015
SECOND FLOOR PART A SHEET 2 OF 4

GENERAL ARRANGEMENT AS BUILT


1100 26-Mar-2015 111/AB-G01-0033 1.11 AB 1110-111-L02-AB-A-01007B AR 1 Franco C 8-Apr-2015
SECOND FLOOR PART B SHEET 3 OF 4

GENERAL ARRANGEMENT AS BUILT


1101 26-Mar-2015 111/AB-G01-0034 1.11 AB 1110-111-L02-AB-A-01007C AR 1 Franco C 8-Apr-2015
SECOND FLOOR PART C SHEET 4 OF 4

GENERAL ARRANGEMENT AS BUILT


1102 26-Mar-2015 111/AB-G01-0039 1.11 AB 1110-111-L03-AB-A-01008 AR 1 Franco C 8-Apr-2015
3RD FLOOR KEY PLAN SHEET 1 OF 4

GENERAL ARRANGEMENT AS BUILT


1103 26-Mar-2015 111/AB-G01-0040 1.11 AB 1110-111-L03-AB-A-01008A AR 1 Franco C 8-Apr-2015
3RD FLOOR PART A SHEET 2 OF 4

GENERAL ARRANGEMENT AS BUILT


1104 26-Mar-2015 111/AB-G01-0041 1.11 AB 1110-111-L03-AB-A-01008B AR 1 Franco C 8-Apr-2015
3RD FLOOR PART B SHEET 3 OF 4

GENERAL ARRANGEMENT AS BUILT


1105 26-Mar-2015 111/AB-G01-0042 1.11 AB 1110-111-L03-AB-A-01008C AR 1 Franco C 8-Apr-2015
3RD FLOOR PART C SHEET 4 OF 4

DRAINGE AS BUILT LAYOUT TOWER 1


1106 26-Mar-2015 111/AB-M01-0009 1.11 AB 1110-111-L15-AB-P-DRG-111128 ME 2 Franco D 18-Apr-2015
LEVEL 9 OFFICE

DRAINGE AS BUILT LAYOUT TOWER 1


1107 26-Mar-2015 111/AB-M01-0010 1.11 AB 1110-111-L15-AB-P-DRG-111129 ME 2 Franco D 18-Apr-2015
LEVEL 10 OFFICE

Page 100 of 120


AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

DRAINGE AS BUILT LAYOUT TOWER 1


1108 26-Mar-2015 111/AB-M01-0011 1.11 AB 1110-111-L15-AB-P-DRG-111130 ME 2 Franco D 18-Apr-2015
LEVEL 11 OFFICE

DRAINGE AS BUILT LAYOUT TOWER 1


1109 26-Mar-2015 111/AB-M01-0013 1.11 AB 1110-111-L15-AB-P-DRG-111133 ME 2 Franco D 18-Apr-2015
LEVEL 14 OFFICE

DRAINGE AS BUILT LAYOUT TOWER 1


1110 26-Mar-2015 111/AB-M01-0014 1.11 AB 1110-111-L15-AB-P-DRG-111134 ME 2 Franco D 18-Apr-2015
LEVEL 15 OFFICE

Water supply system as built layout


1111 29-Mar-2015 111/AB-M01-0034 1.11 AB 1110-111-L03-AB-P-WSS-211138 ME 2 Franco D 6-Apr-2015
Tower-2 Lvl-3 office

Water supply system as built layout


1112 29-Mar-2015 111/AB-M01-0035 1.11 AB 1110-111-L04-AB-P-WSS-211139 ME 2 Franco D 7-Apr-2015
Tower-2 Lvl-4 office

Water supply system as built layout


1113 29-Mar-2015 111/AB-M01-0036 1.11 AB 1110-111-L05-AB-P-WSS-211140 ME 2 Franco D 6-Apr-2015
Tower-2 Lvl-5 office

Water supply system as built layout


1114 29-Mar-2015 111/AB-M01-0037 1.11 AB 1110-111-L06-AB-P-WSS-211141 ME 3 Franco D 6-Apr-2015
Tower-2 Lvl-6 office

Water supply system as built layout


1115 29-Mar-2015 111/AB-M01-0038 1.11 AB 1110-111-L07-AB-P-WSS-211142 ME 3 Franco D 6-Apr-2015
Tower-2 Lvl-7 office

Water supply system as built layout


1116 29-Mar-2015 111/AB-M01-0039 1.11 AB 1110-111-L08-AB-P-WSS-211143 ME 3 Franco D 7-Apr-2015
Tower-2 Lvl-8 office

PUBLIC ADDRESS SYSTEM LAYOUT


1117 30-Mar-2015 111/AB-E11-0024 1.11 AB 1110-111-L07-AB-E-PAS-811331 EL 1 Franco D 9-Apr-2015
LEVEL 07 OFFICE TOWER 1

PUBLIC ADDRESS SYSTEM LAYOUT


1118 30-Mar-2015 111/AB-E11-0025 1.11 AB 1110-111-L07-AB-E-PAS-811332 EL 1 Franco D 9-Apr-2015
LEVEL 07 OFFICE TOWER 2

Page 101 of 120


AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

PUBLIC ADDRESS SYSTEM LAYOUT


1119 30-Mar-2015 111/AB-E11-0026 1.11 AB 1110-111-L08-AB-E-PAS-811333 EL 1 Franco D 9-Apr-2015
LEVEL 08 OFFICE TOWER 1

PUBLIC ADDRESS SYSTEM LAYOUT


1120 30-Mar-2015 111/AB-E11-0027 1.11 AB 1110-111-L08-AB-E-PAS-811334 EL 1 Franco D 9-Apr-2015
LEVEL 08 OFFICE TOWER 2

PUBLIC ADDRESS SYSTEM LAYOUT


1121 30-Mar-2015 111/AB-E11-0028 1.11 AB 1110-111-L09-AB-E-PAS-811335 EL 1 Franco D 9-Apr-2015
LEVEL 09 OFFICE TOWER 1

PUBLIC ADDRESS SYSTEM LAYOUT


1122 30-Mar-2015 111/AB-E11-0029 1.11 AB 1110-111-L10-AB-E-PAS-811336 EL 1 Franco D 9-Apr-2015
LEVEL 10 OFFICE TOWER 1

PUBLIC ADDRESS SYSTEM LAYOUT


1123 30-Mar-2015 111/AB-E11-0030 1.11 AB 1110-111-L11-AB-E-PAS-811337 EL 1 Franco D 9-Apr-2015
LEVEL 11 OFFICE TOWER 1

PUBLIC ADDRESS SYSTEM LAYOUT


1124 30-Mar-2015 111/AB-E11-0031 1.11 AB 1110-111-L12-AB-E-PAS-811338 EL 1 Franco D 9-Apr-2015
LEVEL 12 TOWER 1

AS BUILT FIRE FIGHTING SYSTEM


1125 5-Apr-2015 111/AB-M03-0134 1.11 AB 1110-111-L08-AB-P-FFS-311143 ME 0 Franco D 6-May-2015
LAYOUT LEVEL 08 TOWER-2

AS BUILT FIRE FIGHTING SYSTEM


1126 5-Apr-2015 111/AB-M03-0135 1.11 AB 1110-111-L12-AB-P-FFS-311131 ME 0 Franco D 6-May-2015
LAYOUT LEVEL 12 TOWER-1

AS BUILT FIRE FIGHTING SYSTEM


1127 5-Apr-2015 111/AB-M03-0136 1.11 AB 1110-111-L14-AB-P-FFS-311133 ME 0 Franco D 6-May-2015
LAYOUT LEVEL 14 TOWER-1

AS BUILT FIRE FIGHTING SYSTEM


1128 7-Apr-2015 111/AB-M03-0137 1.11 AB 1110-111-L15-AB-P-FFS-311134 ME 0 Franco D 6-May-2015
LAYOUT LEVEL 15 TOWER-1

AS BUILT FIRE FIGHTING SYSTEM


1129 7-Apr-2015 111/AB-M03-0138 1.11 AB 1110-111-L16-AB-P-FFS-311135 ME 0 Franco D 6-May-2015
LAYOUT LEVEL 16 TOWER-1

Page 102 of 120


AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

AS BUILT TELEPHONE AND DATA


1130 11-Apr-2015 111/AB-T05-0016 1.11 AB 1110-1.11-L03-AB-E-TEL-811212 EL 1 Franco D 19-Apr-2015
SYSTEM TOWER 1 LEVEL 3 OFFICE

AS BUILT TELEPHONE AND DATA


1131 11-Apr-2015 111/AB-T05-0017 1.11 AB 1110-1.11-L03-AB-E-TEL-811213 EL 1 Franco D 19-Apr-2015
SYSTEM TOWER 2 LEVEL 3 OFFICE

AS BUILT TELEPHONE AND DATA


1132 11-Apr-2015 111/AB-T05-0018 1.11 AB 1110-1.11-L04-AB-E-TEL-811214 EL 1 Franco D 19-Apr-2015
SYSTEM TOWER 1 LEVEL 4 OFFICE

AS BUILT TELEPHONE AND DATA


1133 11-Apr-2015 111/AB-T05-0019 1.11 AB 1110-1.11-L04-AB-E-TEL-811215 EL 1 Franco D 19-Apr-2015
SYSTEM TOWER 2 LEVEL 4 OFFICE

AS BUILT TELEPHONE AND DATA


1134 11-Apr-2015 111/AB-T05-0020 1.11 AB 1110-1.11-L05-AB-E-TEL-811216 EL 1 Franco D 19-Apr-2015
SYSTEM TOWER 1 LEVEL 5 OFFICE

AS BUILT TELEPHONE AND DATA


1135 11-Apr-2015 111/AB-T05-0021 1.11 AB 1110-1.11-L05-AB-E-TEL-811217 EL 1 Franco D 19-Apr-2015
SYSTEM TOWER 2 LEVEL 5 OFFICE

AS BUILT TELEPHONE AND DATA


1136 11-Apr-2015 111/AB-T05-0022 1.11 AB 1110-1.11-L06-AB-E-TEL-811218 EL 1 Franco D 19-Apr-2015
SYSTEM TOWER 1 LEVEL 6 OFFICE

AS BUILT TELEPHONE AND DATA


1137 11-Apr-2015 111/AB-T05-0023 1.11 AB 1110-1.11-L06-AB-E-TEL-811219 EL 1 Franco D 19-Apr-2015
SYSTEM TOWER 2 LEVEL 6 OFFICE

AS BUILT TELEPHONE AND DATA


1138 11-Apr-2015 111/AB-T05-0024 1.11 AB 1110-1.11-L07-AB-E-TEL-811220 EL 1 Franco D 19-Apr-2015
SYSTEM TOWER 1 LEVEL 7 OFFICE

AS BUILT TELEPHONE AND DATA


1139 11-Apr-2015 111/AB-T05-0025 1.11 AB 1110-1.11-L08-AB-E-TEL-811222 EL 1 Franco D 19-Apr-2015
SYSTEM TOWER 1 LEVEL 8 OFFICE

AS BUILT TELEPHONE AND DATA


1140 11-Apr-2015 111/AB-T05-0026 1.11 AB 1110-1.11-L09-AB-E-TEL-811224 EL 1 Franco D 19-Apr-2015
SYSTEM TOWER 1 LEVEL 9 OFFICE

Page 103 of 120


AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

AS BUILT TELEPHONE AND DATA


1141 11-Apr-2015 111/AB-T05-0027 1.11 AB 1110-1.11-L10-AB-E-TEL-811226 EL 1 Franco D 19-Apr-2015
SYSTEM TOWER 1 LEVEL 10 OFFICE

AS BUILT TELEPHONE AND DATA


1142 11-Apr-2015 111/AB-T05-0028 1.11 AB 1110-1.11-L11-AB-E-TEL-811227 EL 1 Franco D 19-Apr-2015
SYSTEM TOWER 1 LEVEL 11 OFFICE

AS BUILT TELEPHONE AND DATA


1143 11-Apr-2015 111/AB-T05-0029 1.11 AB 1110-1.11-L12-AB-E-TEL-811228 EL 1 Franco D 19-Apr-2015
SYSTEM TOWER 1 LEVEL 12 OFFICE

AS BUILT TELEPHONE AND DATA


1144 11-Apr-2015 111/AB-T05-0030 1.11 AB 1110-1.11-L14-AB-E-TEL-811230 EL 1 Franco D 19-Apr-2015
SYSTEM TOWER 1 LEVEL 14 OFFICE

AS BUILT TELEPHONE AND DATA


1145 11-Apr-2015 111/AB-T05-0031 1.11 AB 1110-1.11-L15-AB-E-TEL-811231 EL 1 Franco D 19-Apr-2015
SYSTEM TOWER 1 LEVEL 15 OFFICE

AS BUILT TELEPHONE AND DATA


1146 11-Apr-2015 111/AB-T05-0032 1.11 AB 1110-1.11-L16-AB-E-TEL-811232 EL 1 Franco D 19-Apr-2015
SYSTEM TOWER 1 LEVEL 16 OFFICE

FLOORING AS BUILT PLAN KEY PLAN


1147 13-Apr-2015 111/AB-G01-0061 1.11 AB 1110-111-LB5-AB-A-06000 AR 0 Franco C 19-Apr-2015
5TH BASEMENT -KEY SHEET ( 1 OF 4)

5TH BASEMENT FLOORING AS BUILT


1148 13-Apr-2015 111/AB-G01-0062 1.11 AB 1110-111-LB5-AB-A-06000A AR 0 Franco C 19-Apr-2015
PLAN PART A - SHEET ( 2 OF 4)

5TH BASEMENT FLOORING AS BUILT


1149 13-Apr-2015 111/AB-G01-0063 1.11 AB 1110-111-LB5-AB-A-06000B AR 0 Franco C 19-Apr-2015
PLAN PART B - SHEET ( 3 OF 4)

5TH BASEMENT FLOORING AS BUILT


1150 13-Apr-2015 111/AB-G01-0064 1.11 AB 1110-111-LB5-AB-A-06000C AR 0 Franco C 19-Apr-2015
PLAN PART C - SHEET ( 4 OF 4)

2ND BASEMENT FLOORING AS BUILT


1151 13-Apr-2015 111/AB-G01-0065 1.11 AB 1110-111-LB2-AB-A-06003 AR 0 Franco C 19-Apr-2015
PLAN- - SHEET ( 1 OF 4)

Page 104 of 120


AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

2ND BASEMENT FLOORING AS BUILT


1152 13-Apr-2015 111/AB-G01-0066 1.11 AB 1110-111-LB2-AB-A-06003A AR 0 Franco C 19-Apr-2015
PLAN-PART-A - SHEET ( 2 OF 4)

2ND BASEMENT FLOORING AS BUILT


1153 13-Apr-2015 111/AB-G01-0067 1.11 AB 1110-111-LB2-AB-A-06003B AR 0 Franco C 19-Apr-2015
PLAN-PART-B - SHEET ( 3 OF 4)

2ND BASEMENT FLOORING AS BUILT


1154 13-Apr-2015 111/AB-G01-0068 1.11 AB 1110-111-LB2-AB-A-06003C AR 0 Franco C 19-Apr-2015
PLAN-PART-C - SHEET ( 4 OF 4)

1ST BASEMENT FLOORING AS BUILT


1155 13-Apr-2015 111/AB-G01-0069 1.11 AB 1110-111-LB1-AB-A-06004 AR 0 Franco C 19-Apr-2015
PLAN - SHEET ( 1 OF 4)

1ST BASEMENT FLOORING AS BUILT


1156 13-Apr-2015 111/AB-G01-0070 1.11 AB 1110-111-LB1-AB-A-06004A AR 0 Franco C 19-Apr-2015
PLAN-PART-A - SHEET ( 2 OF 4)

1ST BASEMENT FLOORING AS BUILT


1157 13-Apr-2015 111/AB-G01-0071 1.11 AB 1110-111-LB1-AB-A-06004B AR 0 Franco C 19-Apr-2015
PLAN-PART-B - SHEET ( 3 OF 4)

1ST BASEMENT FLOORING AS BUILT


1158 13-Apr-2015 111/AB-G01-0072 1.11 AB 1110-111-LB1-AB-A-06004C AR 0 Franco C 19-Apr-2015
PLAN-PART-C - SHEET ( 4 OF 4)

3RD FLOOR FLOORING AS BUILT


1159 13-Apr-2015 111/AB-G01-0073 1.11 AB 1110-111-L03-AB-A-06008 AR 0 Franco C 19-Apr-2015
PLAN - SHEET ( 1 OF 4)

3RD FLOOR FLOORING AS BUILT


1160 13-Apr-2015 111/AB-G01-0074 1.11 AB 1110-111-L03-AB-A-06008A AR 0 Franco C 19-Apr-2015
PLAN PART A - SHEET ( 2 OF 4)

3RD FLOOR FLOORING AS BUILT


1161 13-Apr-2015 111/AB-G01-0075 1.11 AB 1110-111-L03-AB-A-06008B AR 0 Franco C 19-Apr-2015
PLAN PART B - SHEET ( 3 OF 4)

13TH FLOOR FLOORING AS BUILT


1162 13-Apr-2015 111/AB-G01-0076 1.11 AB 1110-111-L13-AB-A-06018 AR 0 Franco C 19-Apr-2015
PLAN KEY PLAN - SHEET ( 1 OF 3)

Page 105 of 120


AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

13TH FLOOR FLOORING AS BUILT


1163 13-Apr-2015 111/AB-G01-0077 1.11 AB 1110-111-L13-AB-A-06018A AR 0 Franco C 19-Apr-2015
PLAN PART A - SHEET ( 2 OF 3)

13TH FLOOR FLOORING AS BUILT


1164 13-Apr-2015 111/AB-G01-0078 1.11 AB 1110-111-L13-AB-A-06018B AR 0 Franco C 19-Apr-2015
PLAN PART B - SHEET ( 3 OF 3)

Water supply system as built layout


1165 13-Apr-2015 111/AB-M01-0034 1.11 AB 1110-111-L03-AB-P-WSS-211138 ME 3 Franco A 12-May-2015
Tower-2 Lvl-3 office

Water supply system as built layout


1166 13-Apr-2015 111/AB-M01-0035 1.11 AB 1110-111-L04-AB-P-WSS-211139 ME 3 Franco A 12-May-2015
Tower-2 Lvl-4 office

Water supply system as built layout


1167 13-Apr-2015 111/AB-M01-0036 1.11 AB 1110-111-L05-AB-P-WSS-211140 ME 3 Franco A 12-May-2015
Tower-2 Lvl-5 office

Water supply system as built layout


1168 13-Apr-2015 111/AB-M01-0037 1.11 AB 1110-111-L06-AB-P-WSS-211141 ME 4 Franco A 12-May-2015
Tower-2 Lvl-6 office

Water supply system as built layout


1169 13-Apr-2015 111/AB-M01-0038 1.11 AB 1110-111-L07-AB-P-WSS-211142 ME 4 Franco A 12-May-2015
Tower-2 Lvl-7 office

Water supply system as built layout


1170 13-Apr-2015 111/AB-M01-0039 1.11 AB 1110-111-L08-AB-P-WSS-211143 ME 4 Franco A 12-May-2015
Tower-2 Lvl-8 office

AS BUILT FIRE FIGHTING SYSTEM


1171 13-Apr-2015 111/AB-M03-0139 1.11 AB 1110-111-L02-AB-P-FFS-311121 ME 0 Franco D 15-Jun-2015
LAYOUT LEVEL 02 TOWER-1

AS BUILT FIRE FIGHTING SYSTEM


1172 13-Apr-2015 111/AB-M03-0140 1.11 AB 1110-111-L02-AB-P-FFS-311137 ME 0 Franco D 15-Jun-2015
LAYOUT LEVEL 02 TOWER-2

AS BUILT FIRE FIGHTING SYSTEM


1173 18-Apr-2015 111/AB-M03-0141 1.11 AB 1110-111-L13-AB-P-FFS-311132 ME 0 Franco D 15-Jun-2015
LAYOUT LEVEL 13 TOWER-1

Page 106 of 120


AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

FIRE FIGHTING SYSTEM LAYOUT


1174 21-Apr-2015 111/AB-M03-0142 1.11 AB 1110-111-RFA-AB-P-FFS-311136 ME 0 Franco D 15-Jun-2015
LEVEL 17 ROOF FLOOR

FIRE FIGHTING SYSTEM LAYOUT


1175 21-Apr-2015 111/AB-M03-0143 1.11 AB 1110-111-L01-AB-P-FS-311119 ME 0 Franco D 15-Jun-2015
LEVEL 1-TOWER -01

FIRE FIGHTING SYSTEM LAYOUT


1176 21-Apr-2015 111/AB-M03-0144 1.11 AB 1110-111-L01-AB-P-FS-311120 ME 0 Franco D 15-Jun-2015
LEVEL 1-TOWER -02

WATER SUPPLY SYSTEM AS BUILT


1177 28-Apr-2015 111-SD-M01-0024 1.11 AB 1110-111-L14-AB-P-WSS-211133 ME 2 Franco A 12-May-2015
LAYOUT TOWER 1 LEVEL 14 OFFICE

WATER SUPPLY SYSTEM AS BUILT


1178 28-Apr-2015 111-SD-M01-0025 1.11 AB 1110-111-L15-AB-P-WSS-211134 ME 2 Franco A 12-May-2015
LAYOUT TOWER 1 LEVEL 15 OFFICE

WATER SUPPLY SYSTEM AS BUILT


1179 28-Apr-2015 111-SD-M01-0026 1.11 AB 1110-111-L16-AB-P-WSS-211135 ME 2 Franco A 12-May-2015
LAYOUT TOWER 1 LEVEL 16 OFFICE

FIRE FIGHTING SYSTEM LAYOUT -


1180 30-Apr-2015 111/AB-M03-0145 1.11 AB 1110-111-LB5-AB-P-FS-105001 ME 0 Franco C 11-Jun-2015
TOWER -02 BASEMENT-5

CMU ASBUILT GENERAL SECTION AND


1181 3-May-2015 111/AB-G01-0079 1.11 AB 1110-111-L00-AB-A-16055 DETAILS (SHEET 1 OF 4)
AR 0 Franco A 6-May-2015

CMU ASBUILT GENERAL SECTION AND


1182 3-May-2015 111/AB-G01-0080 1.11 AB 1110-111-L00-AB-A-16056 DETAILS (SHEET 2 OF 4)
AR 0 Franco A 6-May-2015

CMU ASBUILT GENERAL SECTION AND


1183 3-May-2015 111/AB-G01-0081 1.11 AB 1110-111-L00-AB-A-16057 DETAILS (SHEET 3 OF 4)
AR 0 Franco A 6-May-2015

CMU ASBUILT GENERAL SECTION AND


1184 3-May-2015 111/AB-G01-0082 1.11 AB 1110-111-L00-AB-A-16058 DETAILS (SHEET 4 OF 4)
AR 0 Franco A 6-May-2015

Page 107 of 120


AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

GYPSUM BOARD CEILING AS BUILT


1185 3-May-2015 111/AB-G01-0083 1.11 AB 1110-111-L00-AB-A-16037 DETAILS (SHEET 1 OF 4 )
AR 0 Franco C 10-May-2015

GYPSUM BOARD CEILING AS BUILT


1186 3-May-2015 111/AB-G01-0084 1.11 AB 1110-111-L00-AB-A-16038 DETAILS (SHEET 2 OF 4 )
AR 0 Franco C 10-May-2015

GYPSUM BOARD CEILING AS BUILT


1187 3-May-2015 111/AB-G01-0085 1.11 AB 1110-111-L00-AB-A-16039 DETAILS (SHEET 3 OF 4 )
AR 0 Franco C 10-May-2015

GYPSUM BOARD CEILING AS BUILT


1188 3-May-2015 111/AB-G01-0086 1.11 AB 1110-111-L00-AB-A-16040 DETAILS (SHEET 4 OF 4 )
AR 0 Franco C 10-May-2015

FLOORING DETAILS AS BUILT DRAWING


1189 3-May-2015 111/AB-G01-0087 1.11 AB 1110-111-L00-AB-A-16049 (SHEET 1 OF 3)
AR 0 Franco C 7-May-2015

FLOORING DETAILS AS BUILT DRAWING


1190 3-May-2015 111/AB-G01-0088 1.11 AB 1110-111-L00-AB-A-16050 (SHEET 2 OF 3)
AR 0 Franco C 7-May-2015

FLOORING DETAILS AS BUILT DRAWING


1191 3-May-2015 111/AB-G01-0089 1.11 AB 1110-111-L00-AB-A-16051 (SHEET 3 OF 3)
AR 0 Franco C 7-May-2015

GROUND FLOOR FLOORING ASBUILT PLAN


1192 3-May-2015 111/AB-G01-0090 1.11 AB 1110-111-L00-AB-A-06005 -KEY PLAN SHEET 1 OF 4
AR 0 Franco C 7-May-2015

GROUND FLOOR FLOORING ASBUILT PLAN


1193 3-May-2015 111/AB-G01-0091 1.11 AB 1110-111-L00-AB-A-06005 A -PART A SHEET 2 OF 4
AR 0 Franco C 7-May-2015

GROUND FLOOR FLOORING ASBUILT PLAN


1194 3-May-2015 111/AB-G01-0092 1.11 AB 1110-111-L00-AB-A-06005 B -PART B SHEET 3 OF 4
AR 0 Franco C 7-May-2015

GROUND FLOOR FLOORING ASBUILT PLAN


1195 3-May-2015 111/AB-G01-0093 1.11 AB 1110-111-L00-AB-A-06005 C -PART C SHEET 4 OF 4
AR 0 Franco C 7-May-2015

Page 108 of 120


AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

FIRST FLOOR FLOORING ASBUILT PLAN -


1196 3-May-2015 111/AB-G01-0094 1.11 AB 1110-111-L01-AB-A-06006 KEY PLAN SHEET 1 OF 4
AR 0 Franco C 7-May-2015

FIRST FLOOR FLOORING ASBUILT PLAN -


1197 3-May-2015 111/AB-G01-0095 1.11 AB 1110-111-L01-AB-A-06006 A PART A SHEET 2 OF 4
AR 0 Franco C 7-May-2015

FIRST FLOOR FLOORING ASBUILT PLAN -


1198 3-May-2015 111/AB-G01-0096 1.11 AB 1110-111-L01-AB-A-06006 B PART B SHEET 3 OF 4
AR 0 Franco C 7-May-2015

FIRST FLOOR FLOORING ASBUILT PLAN -


1199 3-May-2015 111/AB-G01-0097 1.11 AB 1110-111-L01-AB-A-06006 C PART C SHEET 4 OF 4
AR 0 Franco C 7-May-2015

SECOND FLOOR FLOORING ASBUILT PLAN


1200 3-May-2015 111/AB-G01-0098 1.11 AB 1110-111-L02-AB-A-06007 -KEY PLAN SHEET 1 OF 4
AR 0 Franco C 10-May-2015

SECOND FLOOR FLOORING ASBUILT PLAN


1201 3-May-2015 111/AB-G01-0099 1.11 AB 1110-111-L02-AB-A-06007 A -PART A SHEET 2 OF 4
AR 0 Franco C 10-May-2015

SECOND FLOOR FLOORING ASBUILT PLAN


1202 3-May-2015 111/AB-G01-0100 1.11 AB 1110-111-L02-AB-A-06007 B -PART B SHEET 3 OF 4
AR 0 Franco C 10-May-2015

SECOND FLOOR FLOORING ASBUILT PLAN


1203 3-May-2015 111/AB-G01-0101 1.11 AB 1110-111-L02-AB-A-06007 C -PART C SHEET 4 OF 4
AR 0 Franco C 10-May-2015

2ND-8TH FLOOR ACCESSIBLE


1204 11-May-2015 111/AB-G01-0102 1.11 AB 1110-111-L00-AB-A-09002A RESTROOM AS BUILT PLANS AND AR 0 Karim C 16-May-2015
SECTIONS SHEET 1 OF 2

2ND-8TH FLOOR ACCESSIBLE


1205 11-May-2015 111/AB-G01-0103 1.11 AB 1110-111-L00-AB-A-09002B RESTROOM AS BUILT PLANS AND AR 0 Karim C 16-May-2015
SECTIONS SHEET 2 OF 2

MALE RESTROOM B01 LEVEL G. A,


1206 11-May-2015 111/AB-G01-0104 1.11 AB 1110-111-L00-AB-A-09004A FLOORING CEILING AS BUILT PLAN AR 0 Karim C 16-May-2015
SHEET (1 OF 3)

Page 109 of 120


AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

MALE RESTROOM B01 LEVEL


1207 11-May-2015 111/AB-G01-0105 1.11 AB 1110-111-L00-AB-A-09004B INTERIOR SECTIONAL AS BUILT AR 0 Karim C 16-May-2015
ELEVATION SHEET 2 OF 3

MALE RESTROOM B01 LEVEL AS


1208 11-May-2015 111/AB-G01-0106 1.11 AB 1110-111-L00-AB-A-09004C AR 0 Karim C 16-May-2015
BUILT TYPE DETAILS SHEET 3 OF 3

TYPE 2-12, 14-16 FLOOR FEMALE


RESTROOM AS ABUILT ENLARGED
1209 11-May-2015 111/AB-G01-0107 1.11 AB 1110-111-L00-AB-A-09010A AR 0 Karim C 18-May-2015
PLAN, SECTION AND DETAILS, NORTH
TOWER 1 OF 2
TYPE 2-12, 14-16YH FLOOR FEMALE
RESTROOM AS ABUILT ENLARGED
1210 11-May-2015 111/AB-G01-0108 1.11 AB 1110-111-L00-AB-A-09010B AR 0 Karim C 18-May-2015
PLAN, SECTION AND DETAILS, NORTH
TOWER 2 OF 2
TYPE 2-12, 14-16YH FLOOR FEMALE
RESTROOM AS ABUILT ENLARGED
1211 11-May-2015 111/AB-G01-0109 1.11 AB 1110-111-L00-AB-A-09011B AR 0 Karim C 18-May-2015
PLAN, SECTION AND DETAILS, NORTH
TOWER 2 OF 2

GENERAL DETAILS AS BUILT


1212 11-May-2015 111/AB-G01-0110 1.11 AB 1110-111-L00-AB-A-09011C BATHROOM ACCESSORIES AR 0 Karim C 18-May-2015
INSTALLATION

TYPE L02-L08 FLOOR FEMALE


RESTROOM AS BUILT ENLARGED
1213 11-May-2015 111/AB-G01-0111 1.11 AB 1110-111-L00-AB-A-09013A AR 0 Karim C 16-May-2015
PLAN, SECTION AND DETAILS AT
SOUTH TOWER 1 OF 2
TYPE L02-L08 FLOOR FEMALE
RESTROOM AS BUILT ENLARGED
1214 11-May-2015 111/AB-G01-0112 1.11 AB 1110-111-L00-AB-A-09013B AR 0 Karim C 16-May-2015
PLAN, SECTION AND DETAILS AT
SOUTH TOWER 2 OF 2
TYPE L02-L08TH FLOOR MALE
RESTROOM AS BUILT ENLARGED
1215 11-May-2015 111/AB-G01-0113 1.11 AB 1110-111-L00-AB-A-09014A AR 0 Karim C 17-May-2015
PLAN, SECTION AND DETAILS AT
SOUTH TOWER 1 OF 2
TYPE L02-L08TH FLOOR MALE
RESTROOM AS BUILT ENLARGED
1216 11-May-2015 111/AB-G01-0113 1.11 AB 1110-111-L00-AB-A-09014B AR 0 Karim C 17-May-2015
PLAN, SECTION AND DETAILS AT
SOUTH TOWER
TYPE L02-L12, L14-L16TH FLOOR MALE
RESTROOM AS BUILT ENLARGED
1217 11-May-2015 111/AB-G01-0115 1.11 AB 1110-111-L00-AB-A-09011A AR 0 Karim C 18-May-2015
PLAN, SECTION AND DETAILS AT
SOUTH TOWER 1 OF 2

Page 110 of 120


AS Built Drawing Submittal Log 1.11
Legends: A: Approved B: Approved As Noted C: Revise & Submit D: Rejected O/S: Outstanding with DAR

12-Feb-1900 E: Receipt for acknowledgement

Received Parcel App Returned


Reg No: SBG Submittal No. Drawing Number Subject Discipline Rev Forward to
Date No. Status Date to SBG

FIRE FIGHTING SYSTEM LAYOUT


1218 11-May-2015 111/AB-M03-0146 1.11 AB 1110-111-B4-AB-P-FS-105004 ME 0 Franco C 11-Jun-2015
BASEMENT 04 (MASTER PLAN)

FIRE FIGHTING SYSTEM LAYOUT


1219 11-May-2015 111/AB-M03-0147 1.11 AB 1110-111-B4-AB-P-FS-105002 ME 0 Franco C 11-Jun-2015
BASEMENT 04 TOWER 1

FIRE FIGHTING SYSTEM LAYOUT


1220 11-May-2015 111/AB-M03-0148 1.11 AB 1110-111-B4-AB-P-FS-105003 ME 0 Franco C 11-Jun-2015
BASEMENT 04 TOWER 2

FIRE FIGHTING SYSTEM LAYOUT


1221 18-May-2015 111/AB-M03-0149 1.11 AB 1110-111-B3-AB-P-FS-105007 ME 0 Franco C 8-Jun-2015
MASTER PLAN BASEMENT 03

FIRE FIGHTING SYSTEM LAYOUT


1222 18-May-2015 111/AB-M03-0150 1.11 AB 1110-111-B3-AB-P-FS-105005 ME 0 Franco C 8-Jun-2015
MASTER PLAN BASEMENT 03 TOWER 1

FIRE FIGHTING SYSTEM LAYOUT


1223 18-May-2015 111/AB-M03-0151 1.11 AB 1110-111-B3-AB-P-FS-105006 ME 0 Franco C 8-Jun-2015
MASTER PLAN BASEMENT 03 TOWER 2

1224 26-May-2015 111-AB-M02-0064 1.11 AB 1110-111-LB5-AB-M-P-102001 HVAC PIPING LAYOUT BASEMENT 5 ME 1 Khusro C 11-Jun-2015

AS-BUILT FIRE FIGHTING SYSTEM


1225 2-Jun-2015 111/AB-M03-0070 1.11 AB 1110-111-LB2-AB-P-PL-105008 LAYOUT TOWER 1 BASEMENT LEVEL ME 1 Khusro C 21-Jun-2015
02

AS-BUILT FIRE FIGHTING SYSTEM


1226 2-Jun-2015 111/AB-M03-0071 1.11 AB 1110-111-LB2-AB-P-PL-105009 LAYOUT TOWER 2 BASEMENT LEVEL ME 1 Khusro C 21-Jun-2015
02

AS-BUILT FIRE FIGHTING SYSTEM


1227 2-Jun-2015 111/AB-M03-0072 1.11 AB 1110-111-LB2-AB-P-PL-105010 LAYOUT MASTER PLAN BASEMENT ME 1 Khusro C 21-Jun-2015
LEVEL 02

Page 111 of 120


Received Parcel
Reg No: SBG Submittal No.
Date No.
Received Parcel
Reg No: SBG Submittal No.
Date No.

336 28-May-2014 AB-S03-0283 1.11 AB

337 28-May-2014 AB-S03-0284 1.11 AB

338 28-May-2014 AB-S03-0285 1.11 AB

339 28-May-2014 AB-S03-0286 1.11 AB

340 28-May-2014 AB-S03-0287 1.11 AB

341 28-May-2014 AB-S03-0288 1.11 AB

342 28-May-2014 AB-S03-0289 1.11 AB

343 28-May-2014 AB-S03-0290 1.11 AB

344 28-May-2014 AB-S03-0291 1.11 AB

345 28-May-2014 AB-S03-0292 1.11 AB

346 28-May-2014 AB-S03-0293 1.11 AB

347 28-May-2014 AB-S03-0294 1.11 AB

348 28-May-2014 AB-S03-0295 1.11 AB

349 28-May-2014 AB-S03-0296 1.11 AB

350 28-May-2014 AB-S03-0297 1.11 AB

351 28-May-2014 AB-S03-0298 1.11 AB


352 28-May-2014 AB-S03-0299 1.11 AB

353 28-May-2014 AB-S03-0300 1.11 AB

354 28-May-2014 AB-S03-0301 1.11 AB

355 28-May-2014 AB-S03-0302 1.11 AB

356 28-May-2014 AB-S03-0303 1.11 AB

357 28-May-2014 AB-S03-0304 1.11 AB

420 25-Jun-2014 111/AB-S03-0359 1.11 AB

421 25-Jun-2014 111/AB-S03-0360 1.11 AB

422 25-Jun-2014 111/AB-S03-0361 1.11 AB

423 25-Jun-2014 111/AB-S03-0362 1.11 AB

424 25-Jun-2014 111/AB-S03-0363 1.11 AB

425 25-Jun-2014 111/AB-S03-0364 1.11 AB

426 25-Jun-2014 111/AB-S03-0365 1.11 AB

427 25-Jun-2014 111/AB-S03-0366 1.11 AB

428 25-Jun-2014 111/AB-S03-0367 1.11 AB

429 25-Jun-2014 111/AB-S03-0368 1.11 AB

430 25-Jun-2014 111/AB-S03-0369 1.11 AB

431 25-Jun-2014 111/AB-S03-0370 1.11 AB

432 25-Jun-2014 111/AB-S03-0371 1.11 AB

433 25-Jun-2014 111/AB-S03-0372 1.11 AB

434 25-Jun-2014 111/AB-S03-0373 1.11 AB


435 25-Jun-2014 111/AB-S03-0374 1.11 AB

436 25-Jun-2014 111/AB-S03-0375 1.11 AB

437 25-Jun-2014 111/AB-S03-0376 1.11 AB

438 25-Jun-2014 111/AB-S03-0377 1.11 AB

439 25-Jun-2014 111/AB-S03-0378 1.11 AB

440 25-Jun-2014 111/AB-S03-0379 1.11 AB

441 25-Jun-2014 111/AB-S03-0380 1.11 AB

442 25-Jun-2014 111/AB-S03-0381 1.11 AB

443 25-Jun-2014 111/AB-S03-0382 1.11 AB

444 25-Jun-2014 111/AB-S03-0383 1.11 AB

445 2-Jul-2014 111/AB-S03-0322 1.11 AB

446 2-Jul-2014 111/AB-S03-0323 1.11 AB

447 2-Jul-2014 111/AB-S03-0324 1.11 AB


673 16-Sep-2014 111/AB-S02-0500 1.11 AB
842 18-Dec-2014 111/AB-M01-0036 1.11 AB
1374 6-Sep-2015 111/AB-G01-0035 1.11 AB

1376 6-Sep-2015 111/AB-G01-0036 1.11 AB

1378 6-Sep-2015 111/AB-G01-0037 1.11 AB

1380 6-Sep-2015 111/AB-G01-0038 1.11 AB


Drawing Number Subject Discipline Rev

Drawing Number Subject Discipline Rev

LEVEL 04,5,6 NORTH WALLS


1110-111-L02-AB-S-4069 REINFORCEMENT SECTION ST 0
ELEVATION .
LEVEL 04,5,6 NORTH WALLS
1110-111-L02-AB-S-4070 REINFORCEMENT SECTION ST 0
ELEVATION . Sheet 3
LEVEL 04,5,6 NORTH WALLS
1110-111-L02-AB-S-4071 REINFORCEMENT SECTION ST 0
ELEVATION .
LEVEL 04,5,6 NORTH WALLS
1110-111-L02-AB-S-4072 REINFORCEMENT SECTION ST 0
ELEVATION .
LEVEL 07,8,9,10,11 NORTH coreWALLS
1110-111-L02-AB-S-4074 REINFORCEMENT SECTION ST 0
ELEVATION .
LEVEL 07,8,9,10,11 NORTH coreWALLS
1110-111-L02-AB-S-4085 REINFORCEMENT SECTION ST 0
ELEVATION .
LEVEL 07,8,9,10,11 NORTH CORE
1110-111-L02-AB-S-4086 WALLS REINFORCEMENT SECTION ST 0
ELEVATION .SHEET 3
LEVEL 07,8,11 NORTH CORE WALLS
1110-111-L02-AB-S-4087 REINFORCEMENT SECTION ST 0
ELEVATION .
LEVEL 07,8,11 NORTH CORE WALLS
1110-111-L02-AB-S-4088 REINFORCEMENT SECTION ST 0
ELEVATION .
LEVEL12,13,14 NORTH CORE WALLS
1110-111-L02-AB-S-4100 REINFORCEMENT SECTION ST 0
ELEVATION .
LEVEL12,13,14 NORTH CORE WALLS
1110-111-L02-AB-S-4101 REINFORCEMENT SECTION ST 0
ELEVATION .
LEVEL12,13,14 NORTH CORE WALLS
1110-111-L02-AB-S-4102 REINFORCEMENT SECTION ST 0
ELEVATION SHEET 5
LEVEL12,13,14 NORTH CORE WALLS
1110-111-L02-AB-S-4103 REINFORCEMENT SECTION ST 0
ELEVATION
LEVEL15,16,17 NORTH CORE WALLS
1110-111-L02-AB-S-4106 REINFORCEMENT SECTION ST 0
ELEVATION
LEVEL15,16,17 NORTH CORE WALLS
1110-111-L02-AB-S-4107 REINFORCEMENT SECTION ST 0
ELEVATION
LEVEL15,16,17 NORTH CORE WALLS
1110-111-L02-AB-S-4108 REINFORCEMENT SECTION ST 0
ELEVATION SHEET 6
IST BASMENT FLOOR COLUMN
1110-111-L02-AB-S-3053 ST 0
DETAILS SHEET 2
COLUMN DETAILS FROM BASMENT 03
1110-111-L02-AB-S-3041 ST 0
TO B1 LEVEL SHEET 3 OF 5
COLUMN DETAILS FROM BASMENT 03
1110-111-L02-AB-S-3042 ST 0
TO B1 LEVEL SHEET 4 OF 5
COLUMN DETAILS FROM BASMENT 03
1110-111-L02-AB-S-3043 ST 0
TO B1 LEVEL SHEET 5 OF 5
COLUMN DETAILS FROM BASMENT 3
1110-111-L02-AB-S-3044 ST 0
TO BASMENT 1 SHEET 1 OF 6
NORTH WALLS DETAILS FROM 3RD
1110-111-L02-AB-S-4016 BASMENT UP TO GROUND LEVEL ST 0
SHEET 1 OF 2
LEVEL 04 NORTH CORE WALLS
1110-111-L04-AB-S-4058 ST 0
REINFORCEMENT LAYOUT
LEVEL 04, LEVEL 05, LEVEL 06 SOUTH
1110-111-L04-AB-S-4074 CORE WALLS REINFORCEMENT ST 0
SECTIONAL ELEVATION
LEVEL 04, LEVEL 05, LEVEL 06 SOUTH
1110-111-L04-AB-S-4075 CORE WALLS REINFORCEMENT ST 0
SECTIONAL ELEVATION
LEVEL 04, LEVEL 05, LEVEL 06 SOUTH
1110-111-L04-AB-S-4076 CORE WALLS REINFORCEMENT ST 0
SECTIONAL ELEVATION
LEVEL 04, LEVEL 05, LEVEL 06 SOUTH
1110-111-L04-AB-S-4077 CORE WALLS REINFORCEMENT ST 0
SECTIONAL ELEVATION
LEVEL 04, LEVEL 05, LEVEL 06 SOUTH
1110-111-L04-AB-S-4078 CORE WALLS REINFORCEMENT ST 0
SECTIONAL ELEVATION
LEVEL 04, LEVEL 05, LEVEL 06 SOUTH
1110-111-L04-AB-S-4079 CORE WALLS REINFORCEMENT ST 0
SECTIONAL ELEVATION
LEVEL 05 NORTH CORE WALLS
1110-111-L05-AB-S-4067 ST 0
REINFORCEMENT LAYOUT
LEVEL 05 SOUTH CORE WALLS
1110-111-L05-AB-S-4073 ST 0
REINFORCEMENT LAYOUT
LEVEL 06 SOUTH CORE WALLS
1110-111-L06-AB-S-4080 ST 0
REINFORCEMENT LAYOUT
LEVEL 06 NORTH CORE WALLS
1110-111-L06-AB-S-4082 ST 0
REINFORCEMENT LAYOUT
LEVEL 07 SOUTH CORE WALLS
1110-111-L07-AB-S-4081 ST 0
REINFORCEMENT LAYOUT
LEVEL 07 NORTH CORE WALLS
1110-111-L07-AB-S-4083 ST 0
REINFORCEMENT LAYOUT
LEVEL 07, LEVEL 08, LEVEL 09 SOUTH
1110-111-L07-AB-S-4091 CORE WALLS REINFORCEMENT ST 0
SECTIONAL ELEVATION
LEVEL 07, LEVEL 08, LEVEL 09 SOUTH
1110-111-L07-AB-S-4092 CORE WALLS REINFORCEMENT ST 0
SECTIONAL ELEVATION
LEVEL 07, LEVEL 08, LEVEL 09 SOUTH
1110-111-L07-AB-S-4093 CORE WALLS REINFORCEMENT ST 0
SECTIONAL ELEVATION
LEVEL 07, LEVEL 08, LEVEL 09 SOUTH
1110-111-L07-AB-S-4094 CORE WALLS REINFORCEMENT ST 0
SECTIONAL ELEVATION
LEVEL 07, LEVEL 08, LEVEL 09 SOUTH
1110-111-L07-AB-S-4095 CORE WALLS REINFORCEMENT ST 0
SECTIONAL ELEVATION
LEVEL 07, LEVEL 08, LEVEL 09 SOUTH
1110-111-L07-AB-S-4096 CORE WALLS REINFORCEMENT ST 0
SECTIONAL ELEVATION
LEVEL 08 SOUTH CORE WALLS
1110-111-L08-AB-S-4090 ST 0
REINFORCEMENT LAYOUT
LEVEL 09 SOUTH CORE WALLS
1110-111-L09-AB-S-4097 ST 0
REINFORCEMENT LAYOUT
LEVEL 11 & LEVEL 12 (TYPICAL)
1110-111-L11-AB-S-4105 NORTH CORE WALLS ST 0
REINFORCEMENT LAYOUT
LEVEL 12, LEVEL 13 & LEVEL 14
NORTH CORE WALLS
1110-111-L12-AB-S-4104 ST 0
REINFORCEMENT SECTIONAL
ELEVATION
LEVEL 13 NORTH CORE WALLS
1110-111-L13-AB-S-4098 ST 0
REINFORCEMENT LAYOUT
LEVEL 14 UP TO LEVEL 16 (TYPICAL)
1110-111-L14-AB-S-4099 NORTH CORE CORE WALLS ST 0
REINFORCEMENT LAYOUT
;LEVEL 1,2 COLUMN DETAILS
1110-111-L01-AB-S-3080 ST 1
C29,C29A,C60,C30,C31,C32, SHEET 7.
LEVEL 00 , L01 COLUMN DETAILS
1110-111-L01-AB-S-3081 ST 1
C64,C65,C66 SHEET 8.
LEVEL 01 , L02 COLUMN DETAILS C93 ,
1110-111-L01-AB-S-3082 ST 1
C94 SHEET 8.
1110-111-L12-AB-S-3147 ST 0
1110-111-L05-AB-P-WSS-211140 Water supply system as built layout Tower- ME 1
GENERAL ARRANGEMENT AS BUILT
1110-111-L01-AB-A-01006 AR 0
1ST FLOOR KEY PLAN SHEET 1 OF 4
GENERAL ARRANGEMENT AS BUILT
1110-111-L01-AB-A-01006A AR 0
1ST FLOOR PART A SHEET 2 OF 4
GENERAL ARRANGEMENT AS BUILT
1110-111-L01-AB-A-01006B AR 0
1ST FLOOR PART B SHEET 3 OF 4
GENERAL ARRANGEMENT AS BUILT
1110-111-L01-AB-A-01006C AR 0
1ST FLOOR PART C SHEET 4 OF 4
App Returned
Forward to Remarks
Status Date to SBG
App Returned
Forward to Remarks
Status Date to SBG

Jameel O/S

Jameel O/S

Jameel O/S

Jameel O/S

Jameel O/S

Jameel O/S

Jameel O/S

Jameel O/S

Jameel O/S

Jameel O/S

Jameel O/S

Jameel O/S

Jameel O/S

Jameel O/S

Jameel O/S

Jameel O/S
Jameel O/S

Jameel O/S

Jameel O/S

Jameel O/S

Jameel O/S

Jameel O/S

Jameel O/S

Jameel O/S

Jameel O/S

Jameel O/S

Jameel O/S

Jameel O/S

Jameel O/S

Jameel O/S

Jameel O/S

Jameel O/S

Jameel O/S

Jameel O/S

Jameel O/S

Jameel O/S

Jameel O/S
Jameel O/S

Jameel O/S

Jameel O/S

Jameel O/S

Jameel O/S

Jameel O/S

Jameel O/S

Jameel O/S

Jameel O/S

Jameel O/S

Jameel O/S

Jameel O/S

Jameel O/S
Jameel O/S
Franco O/S
Karim O/S

Karim O/S

Karim O/S

Karim O/S

You might also like