1 DEMOLITION
Demlition limited to necessary walls and Floors as per the
a 1 Item 4,945.00 4,945.00
requirement and disposal to the designated areas.
FINISHES
3 FLOOR FINSIHES
Supply and Installation of 600x600mm Porcelaine tile flooring
a including mortar, glue and grout filling as per the project 93 m2 213.00 19,809.00
requirement
4 WALL FINISHES
Supply and Installation of 100mm gypsum partition using single
a layer 12.5mm regular gypsum board on both sides with stud and 27 m2 173.00 4,671.00
runner including necessary finishing.
5 CEILING FINISHES
Supply and Installation of Decorative gypsum ceiling including
bulkheads, covelights, access panels and painting with necessary
a 107 m2 151.00 16,157.00
G.I metals suspension system as per the 3D and project
requirement.
Project: Refurbishment of Caramel Shop
Client: Caramel
Contractor: Purple Trading & Contracting Company W.L.L
To be Continued
To be Continued
DOORS - CONT'D
Supply and installation of non fire rated wooden doors of size
b 5 Nos 1,380.00 6,900.00
1.00 x 2.20 mtr
c Installation of WC, papper roll dispenser and shut off 1 Item 1,093.00 1,093.00
9 EXTERIOR WORKS
10 MEP WORKS
Supply and Installation of Spot ligths and Linear lights to walls
a 1 Item 23,000.00 23,000.00
and ceiling as per the project requirement and specification