1TB01005-005C17-HAH-MAT-ME-0002-C0-Material Submittal For LSS Skid 2
1TB01005-005C17-HAH-MAT-ME-0002-C0-Material Submittal For LSS Skid 2
AMA-CN-FRM-0018
Policy Construction Revision 00
Material Information
Material Description
Material Submittal for Life Support System – Skid 2
(One item only per Form)
As per Specification Alternative
1TB01005-005C17-HAH-XX-XX-SDW- ME-
10001
Drawing Reference BOQ Ref. No.
1TB01005-005C17-HAH-XX-XX-SDW- ME-
10002
Specification Reference 1TB01005-005C17- SPC-ME-0001 Standards, BS, DIN BIS
Manufacturer/Supplier
Company Name Advanced Aquarium Technologies Locally Manufactured
Address 14 Kerryl Street, Kunda Park Qld. Australia
Local Agent Other Details
Program Date 31 March 2023
Expected Arrival Date 31 March 2023
(Material Required on Site) (on Site)
Contractor’s
Engineer’s - Comments
Comments:
Status Code
Page 1 of 1
Project : 5216396 | AMAALA TB-RSMLI
Client : AMAALA
Contractor : HASCO
Atkins Comments
Date of comments : 07/02/2023
Submittal Type : Material Submittal
Workflow No. : WF-001042
Submittal Ref. No. : 1TB01005-005C17-HAH-MAT-ME-0002 C0
Subject : Material Submittal for Life Support System – Skid 2
Mechanical Comments:
1. The Material submittal is approved subject to the compliance of the below mentioned comments.
2. Contractor submitted the document as Material submittal. However, the submitted document is
only technical data copied from the Technical Specification.
3. Contractor is requested to submit the document as a Material submittal incorporating all the
sections required for a Material Submittal complying to the Project standard. (Including all
certificates such as system test certificate, ISO certification, SASO, company profile etc.)
4. Contractor shall ensure LSS, Skid-2 system comply to the required water filtration and
temperature controls to achieve the required level of functional performance complying to the
design intend as detailed in Employer’s Requirements.
5. The system shall ensure the required water extraction, treatment, re-circulation, and disposal.
6. It is Contractor’s responsibility to comply Coral farming raceway & lighting systems as per the
design intend.
CHECKED BY: GA
APPROVED BY: JL Ch'd Remark In'
LSS ID 2
PIPE STANDARD: TBC LSS Description Indoor Coral Raceway System
ELECTRICAL STANDARD No. of Exhibits 4
Single Phase: (v) 230 Gross Volume (m3) 4.90
Three Phase: (v) 400 Net Volume (m3) 4.90
Hertz: (Hz) 60 Design Flow Rate (m3/hr) 12.00
Mins per turnover
Water Type Saltwater
Max (°C) 28
Min (°C) 26
AAT SKID UNIT AAT - SKID 2
Estimated Total Power (INC 20% BUFFER) (kW) 6.5
AUX1 QTY 4
Auxiliary Pumps 1 AUX1 FR (L/s) 2.5 PANTA RHEI HYDRO WIZARD ECM42 (0.033kW, 100-240 V~, 50/60Hz)
Auxiliary Pumps
(AUX1) AUX1 TDH (m) 0.6
AUX1 Est (kW) 0.04
TS Opt' YES
Temp Sensor
Model (TS) SIN-P202
ORP ORP Opt' NO
PS Opt' NO
Pressure Sensor
Pump PS QTY -
FM Opt' NO
Flow Meter
FM QTY -
Secondary
FS Opt' YES
Equipment Flow Switch
FS QTY 2
pH Probe pH Opt' YES
Ultrasonic Level ULS Opt' YES
Sensor ULS QTY 1
FLS Opt' YES
Float Level Switch
FLS QTY 2
Ozone Gas Detection O3D Opt' NO
CHECKED BY: GA
APPROVED BY: JL Ch'd Remark In'
LSS ID 3
PIPE STANDARD: TBC LSS Description Animal Rescue System - Indoor
ELECTRICAL STANDARD No. of Exhibits 3
Single Phase: (v) 230 Gross Volume (m3) 4.16
Three Phase: (v) 400 Net Volume (m3) 4.16
Hertz: (Hz) 60 Design Flow Rate (m3/hr) 17.10
Mins per turnover
Water Type Saltwater
Max (°C) 28
Min (°C) 26
AAT SKID UNIT AAT - SKID 3
Estimated Total Power (INC 20% BUFFER) (kW) 8.1
TS Opt' YES
Temp Sensor
Model (TS) SIN-P202
ORP ORP Opt' NO
PS Opt' NO
Pressure Sensor
Pump PS QTY -
FM Opt' NO
Flow Meter
FM QTY -
Secondary
FS Opt' YES
Equipment Flow Switch
FS QTY 2
pH Probe pH Opt' YES
Ultrasonic Level ULS Opt' YES
Sensor ULS QTY 1
FLS Opt' YES
Float Level Switch
FLS QTY 2
Ozone Gas Detection O3D Opt' NO
CHECKED BY: GA
APPROVED BY: JL Ch'd Remark In'
LSS ID CS
PIPE STANDARD: TBC LSS Description New SW Treatment/Transfer system.
ELECTRICAL STANDARD No. of Exhibits 1
Single Phase: (v) 230 Gross Volume (m3) 25.13
Three Phase: (v) 400 Net Volume (m3) 25.13
Hertz: (Hz) 60 Design Flow Rate (m3/hr) 23.50
Mins per turnover N/A
Water Type Saltwater
Max (°C) 28
Min (°C) 26
AAT SKID UNIT N/A
Estimated Total Power (INC 20% BUFFER) (kW) 11.3
TS Opt' YES
Temp Sensor
Model (TS) SIN-P202
ORP ORP Opt' NO
PS Opt' YES
Pressure Sensor
Pump PS QTY 3
FM Opt' YES
Flow Meter
FM QTY 1
Secondary
FS Opt' YES
Equipment Flow Switch
FS QTY 3
pH Probe pH Opt' YES
Ultrasonic Level ULS Opt' YES
Sensor ULS QTY 1
FLS Opt' YES
Float Level Switch
FLS QTY 2
Ozone Gas Detection O3D Opt' NO
Total of Exhibits Weights Freshwater Potable water Supply Model (HP/HEX) Estimated Total Power
No. of Design Flow mins per AAT SKID
LSS ID LSS Description Technical Net Volume Water Type Min (°C) Max (°C) Dry Operational Supply (post Saltwater Supply (Fractionator (INC 20% BUFFER) (kW)
Exhibits 2 3 Rate (m3/hr) turnover UNIT HP Size
Area (m ) (m ) (kg) (kg) treatment) washdown) Excl' lighting
1 Outdoor Coral Raceway System 4 11.5 4.9 12.0 24.5 Saltwater 26 28 AAT - SKID 2 600 1400 1l/s @ 1-2bar 1.5l/s (DN40 branch) 1l/s @ 1-2bar ENV-HP-85HC [8.5 kW] 6.47
2 Indoor Coral Raceway System 4 11.5 4.9 12.0 24.5 Saltwater 26 28 AAT - SKID 2 600 1400 1l/s @ 1-2bar 1.5l/s (DN40 branch) 1l/s @ 1-2bar ENV-HP-85HC [8.5 kW] 6.47
3 Animal Rescue System - Indoor 3 4.6 4.2 17.1 14.6 Saltwater 26 28 AAT - SKID 3 660 1800 1l/s @ 1-2bar 1.5l/s (DN40 branch) 1l/s @ 1-2bar ENV-HP-85HC [8.5 kW] 8.09
CS New SW Treatment/Transfer system. 1 12.6 25.1 23.5 N/A Saltwater 26 28 N/A 1000 1700 2-3l/s 40m3/day to 170m3/day 1l/s @ 1-2bar ENV-HP-145HC [14.5kW] 11.28
End-User requested inclusion of flow through operation for Exh.3.1 thru 3.3 (LSS-3_Animal
Rescue). Given each of these tanks has a demand of 1.6l/s, provision of this flow rate (in full)
requires dedicated saltwater supply line to each tank (revised on Central Services system).
Aditionally increases the daily Saltwater demand from 40m3/day to 170m3/day.