RENCANA ANGGARAN BIAYA

PAKET PEKERJAAN ELEKTRIKAL


PEMBANGUNAN HOTEL LEEDOON
SURABAYA

HARGA JUMLAH
NO JENIS PEKERJAAN SAT VOLUME
SATUAN ( Rp ) ( Rp )
PEKERJAAN INSTALASI PENERANGAN

I DENAH BASEMENT FLOOR - 1 & - 2

Pekerjaan Penerangan
1 TKO 1 x 36 Watt bh 49 -
2 TL Balk 1 x 18 Watt bh 7 -
3 DL 9 Watt bh 2 -
4 GMS 1 x 18 Watt + bateray bh 2 -
5 Lampu Exit 1 x 8 Watt + batteray bh 1 -
6 Ceilling Exhaust fan Toilet bh 1 -
7 Stop kontak 1 P / 100 VA bh 10 -
8 Saklar 1 gang bh 8 -
9 Saklar 2 gang bh 5 -
10 Saklar 4 gang bh 2 -
11 Saklar hotel bh 4 -
12 Inst. Penerangan NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 61 -
13 Inst. Ceilling fan 1 P - NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 1 -
14 Inst. Stop kontak 1 P - NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 10 -

sub total -

III DENAH 1ST FLOOR

Pekerjaan Penerangan
1 RM 300 2 x 36 Watt bh 13 -
2 RM 300 2 x 36 Watt + bateray bh 3 -
3 TKO 1 x 36 Watt bh 1 -
4 TL Balk 1 x 18 Watt bh 8 -
5 DL 9 Watt bh 6 -
6 DL 18 Watt bh 38 -
7 DL 18 Watt + bateray bh 3 -
8 GMS 1 x 18 Watt + batteray bh 2 -
9 Lampu Exit 1 x 8 Watt + batteray bh 2 -
10 Lampu taman 18 W c/w support pipa dan pondasi bh 12 -
11 Ceilling Exhaust fan Toilet bh 6 -
12 Stop kontak 1 P / 100 VA bh 26 -
13 Saklar 1 gang bh 11 -
14 Saklar 2 gang bh 12 -
15 Saklar 3 gang bh 1 -
16 Saklar hotel bh 4 -
17 Inst. Penerangan NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 76 -
18 Inst. Lampu taman NYFGBY 3 x 2.5 mm2 ttk 12 -
19 Inst. Ceilling fan 1 P - NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 6 -
20 Inst. Stop kontak 1 P - NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 26 -

sub total -

IV DENAH 2ND FLOOR

Pekerjaan Penerangan
1 TKO 1 x 36 Watt bh 7 -
2 TL Balk 1 x 18 Watt bh 14 -

Page 1 of 8
RENCANA ANGGARAN BIAYA
PAKET PEKERJAAN ELEKTRIKAL
PEMBANGUNAN HOTEL LEEDOON
SURABAYA

HARGA JUMLAH
NO JENIS PEKERJAAN SAT VOLUME
SATUAN ( Rp ) ( Rp )
3 DL 9 Watt bh 5 -
4 DL 18 Watt bh 39 -
5 DL 18 Watt + bateray bh 3 -
6 GMS 1 x 18 Watt + batteray bh 4 -
7 Lampu Exit 1 x 8 Watt + batteray bh 1 -
8 Ceilling Exhaust fan Toilet bh 5 -
9 Stop kontak 1 P / 100 VA bh 26 -
10 Saklar 1 gang bh 10 -
11 Saklar 2 gang bh 9 -
12 Saklar 3 gang bh 1 -
13 Saklar hotel bh 4 -
14 Inst. Penerangan NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 73 -
15 Inst. Ceilling fan 1 P - NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 5 -
16 Inst. Stop kontak 1 P - NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 26 -

sub total -

V DENAH 3RD FLOOR

Pekerjaan Penerangan Selasar


1 TKO 1 x 36 Watt bh 1 -
2 TL Balk 1 x 18 Watt bh 5 -
3 GMS 1 x 18 Watt + batteray bh 4 -
4 DL 18 Watt bh 15 -
5 DL 18 Watt + bateray bh 2 -
6 Lampu Exit 1 x 8 Watt + batteray bh 1 -
7 Stop kontak 1 P / 100 VA bh 5 -
8 Saklar 1 gang bh 1 -
9 Saklar 2 gang bh 5 -
10 Saklar hotel bh 4 -
11 Inst. Penerangan NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 28 -
12 Inst. Stop kontak 1 P - NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 5 -

Pekerjaan Penerangan Guest Room ( 4 unit no 1.2.3. & 4 )


1 Standing lamp 25 VA & stop kontak bh 4 -
2 TL Balk 1 x 18 Watt bh 4 -
3 DL 9 Watt bh 8 -
4 DL 18 Watt + bateray bh 4 -
5 Baret 20 W bh 4 -
6 Lampu dinding 25 W bh 8 -
7 Ceilling Exhaust fan Toilet bh 4 -
8 Stop kontak 1 P / 100 VA bh 12 -
9 Stop kontak 1 P / 100 VA u/ wataer heater bh 4 -
10 Water heater unit 4 -
11 Saklar 1 gang bh 8 -
12 Saklar 2 gang bh 4 -
13 Box panel Guest Room unit 4 -
14 Inst. Penerangan NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 32 -
15 Inst. Ceilling fan 1 P - NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 4 -
16 Inst. Stop kontak 1 P - NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 16 -
17 Power AC kap. 15.400 BTU/H. NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 4 -

Page 2 of 8
RENCANA ANGGARAN BIAYA
PAKET PEKERJAAN ELEKTRIKAL
PEMBANGUNAN HOTEL LEEDOON
SURABAYA

HARGA JUMLAH
NO JENIS PEKERJAAN SAT VOLUME
SATUAN ( Rp ) ( Rp )
Pekerjaan Penerangan Guest Room ( 6 unit no 5.6.7.8.9. & 10 )
1 Standing lamp 25 VA & stop kontak bh 6 -
2 TL Balk 1 x 18 Watt bh 6 -
3 DL 9 Watt bh 12 -
4 DL 18 Watt bh 12 -
5 DL 18 Watt + bateray bh 6 -
6 Baret 20 W bh 6 -
7 Lampu dinding 25 W bh 12 -
8 Ceilling Exhaust fan Toilet bh 6 -
9 Stop kontak 1 P / 100 VA bh 18 -
10 Stop kontak 1 P / 100 VA u/ wataer heater bh 6 -
11 Water heater unit 6 -
12 Saklar 1 gang bh 12 -
13 Saklar 2 gang bh 12 -
14 Box panel Guest Room unit 6 -
15 Inst. Penerangan NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 60 -
16 Inst. Ceilling fan 1 P - NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 6 -
17 Inst. Stop kontak 1 P - NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 24 -
18 Power AC kap. 15.400 BTU/H. NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 1 -

sub total -

VI DENAH 4TH FLOOR

Pekerjaan Penerangan Selasar


1 TKO 1 x 36 Watt bh 1 -
2 TL Balk 1 x 18 Watt bh 5 -
3 GMS 1 x 18 Watt + batteray bh 4 -
4 DL 18 Watt bh 15 -
5 DL 18 Watt + bateray bh 2 -
6 Lampu Exit 1 x 8 Watt + batteray bh 1 -
7 Stop kontak 1 P / 100 VA bh 5 -
8 Saklar 1 gang bh 1 -
9 Saklar 2 gang bh 5 -
10 Saklar hotel bh 4 -
11 Inst. Penerangan NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 28 -
12 Inst. Stop kontak 1 P - NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 5 -

Pekerjaan Penerangan Guest Room ( 4 unit no 1.2.3. & 4 )


1 Standing lamp 25 VA & stop kontak bh 4 -
2 TL Balk 1 x 18 Watt bh 4 -
3 DL 9 Watt bh 8 -
4 DL 18 Watt + bateray bh 4 -
5 Baret 20 W bh 4 -
6 Lampu dinding 25 W bh 8 -
7 Ceilling Exhaust fan Toilet bh 4 -
8 Stop kontak 1 P / 100 VA bh 12 -
9 Stop kontak 1 P / 100 VA u/ wataer heater bh 4 -
10 Water heater unit 4 -
11 Saklar 1 gang bh 8 -
12 Saklar 2 gang bh 4 -
13 Box panel Guest Room unit 4 -
14 Inst. Penerangan NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 32 -
15 Inst. Ceilling fan 1 P - NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 4 -

Page 3 of 8
RENCANA ANGGARAN BIAYA
PAKET PEKERJAAN ELEKTRIKAL
PEMBANGUNAN HOTEL LEEDOON
SURABAYA

HARGA JUMLAH
NO JENIS PEKERJAAN SAT VOLUME
SATUAN ( Rp ) ( Rp )
16 Inst. Stop kontak 1 P - NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 16 -
17 Power AC kap. 15.400 BTU/H. NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 4 -

Pekerjaan Penerangan Guest Room ( 6 unit no 5.6.7.8.9. & 10 )


1 Standing lamp 25 VA & stop kontak bh 6 -
2 TL Balk 1 x 18 Watt bh 6 -
3 DL 9 Watt bh 12 -
4 DL 18 Watt bh 12 -
5 DL 18 Watt + bateray bh 6 -
6 Baret 20 W bh 6 -
7 Lampu dinding 25 W bh 12 -
8 Ceilling Exhaust fan Toilet bh 6 -
9 Stop kontak 1 P / 100 VA bh 18 -
10 Stop kontak 1 P / 100 VA u/ wataer heater bh 6 -
11 Water heater unit 6 -
12 Saklar 1 gang bh 12 -
13 Saklar 2 gang bh 12 -
14 Box panel Guest Room unit 6 -
15 Inst. Penerangan NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 60 -
16 Inst. Ceilling fan 1 P - NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 6 -
17 Inst. Stop kontak 1 P - NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 24 -
18 Power AC kap. 15.400 BTU/H. NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 6 -

sub total -

VII DENAH 5TH FLOOR

Pekerjaan Penerangan Selasar


1 TKO 1 x 36 Watt bh 1 -
2 TL Balk 1 x 18 Watt bh 5 -
3 GMS 1 x 18 Watt + batteray bh 4 -
4 DL 18 Watt bh 15 -
5 DL 18 Watt + bateray bh 2 -
6 Lampu Exit 1 x 8 Watt + batteray bh 1 -
7 Stop kontak 1 P / 100 VA bh 5 -
8 Saklar 1 gang bh 1 -
9 Saklar 2 gang bh 5 -
10 Saklar hotel bh 4 -
11 Inst. Penerangan NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 28 -
12 Inst. Stop kontak 1 P - NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 5 -

Pekerjaan Penerangan Guest Room ( 10 unit no 1.2.3.4.5.6.7.8.9 & 10 )


1 Standing lamp 25 VA & stop kontak bh 10 -
2 TL Balk 1 x 18 Watt bh 10 -
3 DL 9 Watt bh 20 -
4 DL 18 Watt bh 20 -
5 DL 18 Watt + bateray bh 10 -
6 Baret 20 W bh 10 -
7 Lampu dinding 25 W bh 20 -
8 Ceilling Exhaust fan Toilet bh 10 -
9 Stop kontak 1 P / 100 VA bh 30 -
10 Stop kontak 1 P / 100 VA u/ wataer heater bh 10 -
11 Water heater unit 10 -

Page 4 of 8
RENCANA ANGGARAN BIAYA
PAKET PEKERJAAN ELEKTRIKAL
PEMBANGUNAN HOTEL LEEDOON
SURABAYA

HARGA JUMLAH
NO JENIS PEKERJAAN SAT VOLUME
SATUAN ( Rp ) ( Rp )
12 Saklar 1 gang bh 20 -
13 Saklar 2 gang bh 20 -
14 Box panel Guest Room unit 10 -
15 Inst. Penerangan NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 100 -
16 Inst. Ceilling fan 1 P - NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 10 -
17 Inst. Stop kontak 1 P - NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 40 -
18 Power AC kap. 15.400 BTU/H. NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 10 -

sub total -

VIII DENAH 6TH - 17TH, 20TH - 21TH FLOOR (TYPICAL 14 LANTAI)

Pekerjaan Penerangan Selasar


1 TKO 1 x 36 Watt bh 14 -
2 TL Balk 1 x 18 Watt bh 70 -
3 GMS 1 x 18 Watt + batteray bh 56 -
4 DL 18 Watt bh 210 -
5 DL 18 Watt + bateray bh 28 -
6 Lampu Exit 1 x 8 Watt + batteray bh 14 -
7 Stop kontak 1 P / 100 VA bh 70 -
8 Saklar 1 gang bh 14 -
9 Saklar 2 gang bh 70 -
10 Saklar hotel bh 56 -
11 Inst. Penerangan NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 392 -
12 Inst. Stop kontak 1 P - NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 70 -

Pekerjaan Penerangan Guest Room ( 10 unit no 1.2.3.4.5.6.7.8.9 & 10 )


1 Standing lamp 25 VA & stop kontak bh 140 -
2 TL Balk 1 x 18 Watt bh 140 -
3 DL 9 Watt bh 280 -
4 DL 18 Watt bh 280 -
5 DL 18 Watt + bateray bh 140 -
6 Baret 20 W bh 140 -
7 Lampu dinding 25 W bh 280 -
8 Ceilling Exhaust fan Toilet bh 140 -
9 Stop kontak 1 P / 100 VA bh 420 -
10 Stop kontak 1 P / 100 VA u/ wataer heater bh 140 -
11 Water heater unit 140 -
12 Saklar 1 gang bh 280 -
13 Saklar 2 gang bh 280 -
14 Box panel Guest Room unit 140 -
15 Inst. Penerangan NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 1400 -
16 Inst. Ceilling fan 1 P - NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 140 -
17 Inst. Stop kontak 1 P - NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 560 -
18 Power AC kap. 15.400 BTU/H. NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 140 -

sub total -

XIII DENAH 18TH FLOOR

Pekerjaan Penerangan Selasar


1 TKO 1 x 36 Watt bh 1 -
2 TL Balk 1 x 18 Watt bh 5 -
3 GMS 1 x 18 Watt + batteray bh 4 -
4 DL 18 Watt bh 15 -
5 DL 18 Watt + bateray bh 2 -

Page 5 of 8
RENCANA ANGGARAN BIAYA
PAKET PEKERJAAN ELEKTRIKAL
PEMBANGUNAN HOTEL LEEDOON
SURABAYA

HARGA JUMLAH
NO JENIS PEKERJAAN SAT VOLUME
SATUAN ( Rp ) ( Rp )
6 Lampu Exit 1 x 8 Watt + batteray bh 1 -
7 Stop kontak 1 P / 100 VA bh 5 -
8 Saklar 1 gang bh 1 -
9 Saklar 2 gang bh 5 -
10 Saklar hotel bh 4 -
11 Inst. Penerangan NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 28 -
12 Inst. Stop kontak 1 P - NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 5 -

Page 6 of 8
RENCANA ANGGARAN BIAYA
PAKET PEKERJAAN ELEKTRIKAL
PEMBANGUNAN HOTEL LEEDOON
SURABAYA

HARGA JUMLAH
NO JENIS PEKERJAAN SAT VOLUME
SATUAN ( Rp ) ( Rp )
Pekerjaan Penerangan
1 Standing lamp 25 VA & stop kontak bh 10 -
2 TL Balk 1 x 18 Watt bh 10 -
3 DL 9 Watt bh 20 -
4 DL 18 Watt bh 20 -
5 DL 18 Watt + bateray bh 10 -
6 Baret 20 W bh 10 -
7 Lampu dinding 25 W bh 20 -
8 Ceilling Exhaust fan Toilet bh 10 -
9 Stop kontak 1 P / 100 VA bh 30 -
10 Stop kontak 1 P / 100 VA u/ wataer heater bh 10 -
11 Water heater unit 10 -
12 Saklar 1 gang bh 20 -
13 Saklar 2 gang bh 20 -
14 Box panel Guest Room unit 10 -
15 Inst. Penerangan NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 100 -
16 Inst. Ceilling fan 1 P - NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 10 -
17 Inst. Stop kontak 1 P - NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 40 -
18 Power AC kap. 15.400 BTU/H. NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 10 -

sub total -

XIV DENAH 19TH FLOOR

Pekerjaan Penerangan Selasar


1 TKO 1 x 36 Watt bh 1 -
2 TL Balk 1 x 18 Watt bh 5 -
3 GMS 1 x 18 Watt + batteray bh 4 -
4 DL 18 Watt bh 15 -
5 DL 18 Watt + bateray bh 2 -
6 Lampu Exit 1 x 8 Watt + batteray bh 1 -
7 Stop kontak 1 P / 100 VA bh 5 -
8 Saklar 1 gang bh 1 -
9 Saklar 2 gang bh 5 -
10 Saklar hotel bh 4 -
11 Inst. Penerangan NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 28 -
12 Inst. Stop kontak 1 P - NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 5 -

Pekerjaan Penerangan
1 Standing lamp 25 VA & stop kontak bh 10 -
2 TL Balk 1 x 18 Watt bh 10 -
3 DL 9 Watt bh 20 -
4 DL 18 Watt bh 20 -
5 DL 18 Watt + bateray bh 10 -
6 Baret 20 W bh 10 -
7 Lampu dinding 25 W bh 20 -
8 Ceilling Exhaust fan Toilet bh 10 -
9 Stop kontak 1 P / 100 VA bh 30 -
10 Stop kontak 1 P / 100 VA u/ wataer heater bh 10 -
11 Water heater unit 10 -
12 Saklar 1 gang bh 20 -
13 Saklar 2 gang bh 20 -
14 Box panel Guest Room unit 10 -
15 Inst. Penerangan NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 100 -

Page 7 of 8
RENCANA ANGGARAN BIAYA
PAKET PEKERJAAN ELEKTRIKAL
PEMBANGUNAN HOTEL LEEDOON
SURABAYA

HARGA JUMLAH
NO JENIS PEKERJAAN SAT VOLUME
SATUAN ( Rp ) ( Rp )
16 Inst. Ceilling fan 1 P - NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 10 -
17 Inst. Stop kontak 1 P - NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 40 -
18 Power AC kap. 15.400 BTU/H. NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 10 -

sub total -

XV DENAH TOP FLOOR

Pekerjaan Penerangan
1 TKO 1 x 36 Watt bh 6 -
2 TL Balk 1 x 18 Watt bh 7 -
3 TG / GMS 1 x 18 Watt + batteray bh 2 -
4 Stop kontak 1 P / 100 VA bh 3 -
5 Saklar 1 gang bh 2 -
6 Saklar 2 gang bh 2 -
7 Saklar hotel bh 2 -
8 Inst. Penerangan NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 15 -
9 Inst. Stop kontak 1 P - NYM 3 x 2,5 mm2 + PVC kond. 20 mm ttk 3 -

sub total -

TOTAL PEK. PENERANGAN -