WEEKEND ACTIVITY

8-10 SEPTEMBER’23
ISSUE LOCATION PHOTO START FINISH SUBCONT

Replace with temporary cover L13 8 Sept’23 10 Spet’23 KT


and make marking 19.30 10.30

Painting ceiling Male L13 9 Sept’23 9 Sept’23 Pak kitno


6.00-10.00 6.00-10.00
painting L13 male painting ceiling
toilet male toilet L13
ISSUE LOCATION PHOTO START FINISH SUBCONT

Scratch at door panel, Handicap toilet 9 Sept’23 9 August’23 Pak Sukitno


L15 14.30-17.00 14.30-17.00
Apply paint Sanding paper and
painting

Repair capping, previous rectification Sudirman side 9 Sept’23 10 Sept’23 Indalex


result poor L13 8.00-17.00 8.00- 17.00
Check condition Continue
behind of flashing rectification
and rectify

Repair Balcony L30 9 Sept’23 9 Sept’23 KKP


8.00-17.00 8.00-17.00
repair repair
FLOOR STONE CRACK RECTIFICATION

SATURDAY
09.00-17.00
SATURDAY
13.00-17.00

SATURDAY SATURDAY
FRIDAY 09.00-11.30 13.00-17.00
09.00-17.00