MARMUL PROJECTS - QUICK REVIEW

Sr # PO # Project Name remarks

Crossover & RV platform Fabrication need to Expedite TD 10/30/2023


Solar panel vendor mobilization along with material (After RTU panel
delivery)
Confirmation required for pipeline laying under 132 KV line
10 4500936235 Amjad Project Delivery of fabricated spool to be expedited
RTU Panel (ETA - 30-Oct-23), Wi-Max , Level transmitter (ETA - 7-Dec-
23) , PT (ETA - 30-Oct-23) & PG, RV
Required 2 nos of Mechanical crew for MSV-01/02
RV Pit No of RV Pits L B D
Amjad Project 1 13.5 13.5 3.5
1 4.5 4.5 2.5
MML GNR Development Project 1 13.5 13.5 3.5
1 4.5 4.5 2.5
1 4.5 4.5 2.5
Dhiab Project 1 3.5 3.5 2.5
1 4.5 4.5 2.5
Thuleilat North East Project 1 3.5 3.5 2.5
1 4.5 4.5 2.5
Thamoud 1 4.5 4.5 2.5
1 4.5 4.5 2.5
Rahab Wider i9 1 4.5 4.5 2.5
1 4.5 4.5 2.5
Maurid West 1 13.5 13.5 3.5
1 4.5 4.5 2.5
1 4.5 4.5 2.5
16

Civil Mechanical
Slit Trenching Spool Installation
Manual Excavation GRE Installation
Trial Pit Civil Support Crew (10 Days)
Mechanical Excavation RV Installation
Formation Level Str Installation (Roof)
Re Bar Fixing Grouting
Floor Concreting Hydrotest
Re Bar Fixing ReInstatement
Wall Shuttering
Wall Concreting
2023 2024
CuM JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY
637.875 0.3 0.3 0.4
50.625 0.5 0.5
637.875 0.5 0.5
50.625 0.5 0.5
50.625 0.5 0.5
30.625 0.5 0.5
50.625 0.5 0.5
30.625 0.5 0.5
50.625 0.5 0.5
50.625 1
50.625 1
50.625 1
50.625 1
637.875 0.2 0.8
50.625 0.8 0.2
50.625 1
2531.75 1.8 2.8 1.9 1.8 2.7 2.7 2.3

Electrical Instrument
Heat Tracing Panel - Glanding and Termination Civil Trench Excavation - 100 Meters
Vendor Support - Power from Sub Station to Panle Level Transmitter Installation
Alarm Cable Installation
Cable Test + Glanding & Termination + Loop Checking
Vendor Support - Schneider
Civil Dur Crew 1 2 3 4 5 6 7 8 9 10 11
Slit Trenching 4 C1 1 1 1 1
Trial Pit 4 C1 1 1 1 1
Manual Excavation 10 C1 1 1 1
Mechanical Excavation 25 C2 1 1 1
Formation Level 10 C3
Re Bar Fixing 15 C1
Floor Concreting
Re Bar Fixing 12 C1
Wall Shuttering 5 C1
Wall Concreting
Nitocoat Painting 10 M1
Mechanical
Fdn Installation 7 C1
Spool Installation 5 M2
GRE Installation 5 M2
Civil Support Crew (10 Days) 10 C2
RV Installation 3 M2
Str Installation (Roof) 28 M3
Grouting 7 C2
Hydrotest 4 M2
ReInstatement 3 M2
Electrical
Heat Tracing Panel - Glanding and Termination 2 E1
Vendor Support - Power from Sub Station to Panle 7 E1
Instrument
Civil Trench Excavation - 100 Meters 5 C2
Level Transmitter Installation 2 I1
Alarm Cable Installation 2 I1
Cable Test + Glanding & Termination + Loop Checking 1 I1
Vendor Support - Schneider 7 E1
DAYS
12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39

1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

1
40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67

1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1

1 1 1 1 1 1 1 1 1 1

1 1 1 1

1 1 1 1 1 1 1 1 1

1 1 1
68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90

1 1
1 1 1 1 1
1 1 1 1 1
1 1 1 1 1 1 1 1 1 1
1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1
1 1 1 1
1 1 1

1 1
1 1 1 1 1 1 1

1 1
1 1
1 1
1 1
1 1 1 1 1 1 1