Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

ISA 126-108B c8000 Preventive Maintenance and Total Call Procedure

C8000 Total Call Procedure

Customer Name Serial Number


Customer Number Ticket Number
City FSR Name
Telephone Date

Instrument Review Completed


Interview customer for any on-going issues and order parts as necessary.
Note: If the instrument is experiencing ongoing assay imprecision, accuracy issues or there are
service related activities required to be performed (i.e. TSB/ISA’s, etc.), record pertinent
information below and follow up with level 2 support.
Verify Abbott Link connection status & review message history log for issues.
Inspection Procedures Completed
Verify TSB status of instrument.
Verify customer has performed a recent software back-up and current system back-up CD is
available.

Review Maintenance & Message History Logs and advise customer on performance of customer
maintenance procedures and inventory of customer maintenance parts.

The removal and replacement instructions for L/N parts are available on the System Control
Center (SCC) online Operations Manual.

Note: Follow local Service Organization processes if it is necessary to charge customer for LN
parts and/or labor.
Inspect and clean LCW manifold and LCW tank as necessary.

High & Low Concentration Waste Completed


If the c8000 is configured to run HbA1c, replace the HCW peristaltic pump tubing and Tbg., HC
Noz to Peri Pump tubing if last replacement is > 6 months.
• 7-35009685-02 Tubing, Peristaltic Head. See c4000 R&R E8.03 Tubing, Peristaltic
Head
• 7-207178-01 Tbg., HC Noz to Peri Pump (RoHS)

Inspect HCW and LCW external waste tubing & connections. Clean as needed.

Page 1 of 4

ISA-126-108 Rev B, Released - Effective on: 20-Dec-2018 - Confidential - Page 1 of 4


ISA 126-108B c8000 Preventive Maintenance and Total Call Procedure

Inspect external waste pump (if present) tubing & connections. Power off external waste pump
and clean as needed.

Probes & Tubing Completed


If there is evidence of splatter around the wash cup or deck/cover area around the path that the
probe moves, ensure the probe link tubing is secure and carefully inspect the bellow and poppets
of the fluid source for the pipettor.
Probe Wash Internal/External Completed
Replace Inner Probe Wash Pump bellows if last replacement is > 1year or signs of leakage is
observed.
• 2-89055-02 Bellows set, including rod & fitting E7.04 Complete Bellows Set, Probe
Wash Pump
Or
• 2-89054-02 Bellows, bellows only E7.06 Bellow, Probe Wash Pump

Check degasser output for air/bubbles. Drain degasser canister if water is observed in the drain
tubing. Also check sample and reagent syringes for bubbles.
• New Style- ISA 126-079 New Style Degasser Unit; refer to New Canister Draining
• Old Style- P-110 Degasser Cannister Draining

Select System/Maintenance/As needed and perform M&D 2132 Flush Water Lines.

Cuvette Washer Completed


Advise customer on manually cleaning cuvettes per M&D 6310 Clean cuvettes-manually if last
completion is > 6 months. Inspect the cuvette segments for Crystalline build up and clean if
necessary.

Page 2 of 4

ISA-126-108 Rev B, Released - Effective on: 20-Dec-2018 - Confidential - Page 2 of 4


ISA 126-108B c8000 Preventive Maintenance and Total Call Procedure

Inspect Cuvette Washer nozzle tubing for kinks, leaks, debris & discoloration. Replace as
needed.

Inspect cuvette drying tip for chips, discoloration & signs of rubbing (black streak). If observed,
inform customer of issue and advise replacement.

ICT Completed
Inspect the ICT Probe tubing at top of ICT module. Look for collapsed tubing, crimps, clogs,
discoloration and replace as needed.
• 7-93269-01 Tbg, ICT valve NC-ICT Module T0.01 Tbg, ICT valve NC to ICT joint

Select System/Maintenance/As Needed and perform:


• M&D 6063 Flush ICT Module
Verify Instrument Performance Completed
Ensure appropriate Quality Control meets specification and calibrate as necessary.

Information for Level 2 Follow Up

Comments: ___________________________________________________________
___________________________________________________________
___________________________________________________________
___________________________________________________________

Field Engineer Signature: _______________________________________________

Customer Signature: _______________________________________________

Page 3 of 4

ISA-126-108 Rev B, Released - Effective on: 20-Dec-2018 - Confidential - Page 3 of 4


ISA 126-108B c8000 Preventive Maintenance and Total Call Procedure

Part # Description Qty Criteria


01G48-04 Sample Probe 1 Advise customer to replace if last
replacement is > 1year.
01G48-05 Sample Probe Tubing 1 Advise customer to replace if last
replacement is > 1year.
01G47-02 Reagent Probe Tubing 2 Advise customer to replace if last
replacement is > 1year.
01G47-04 C4/c8 RGT PR ROHS 2 Advise customer to replace if last
replacement is > 1 year.
09D36-02 Poppet Valve Set ( Inner probe Wash 2 Advise customer to replace if last
pump, Cuvette wash pump) replacement is > 1year.
09D51-02 Cuvette Drying Tip 1 Advise customer to replace if last
replacement is > 4 months.
09D34-03 WSH CHECK VALVE 1 Advise customer to replace if last
(pkg 4) replacement is > 1year.
09D35-03 ICT CHECK VALVE 2 Advise customer to replace if last
(pkg 2) replacement is > 1year.
09D43-02 Ref/Wash solution Line Filters ( replace 1 Advise customer to replace if last
in all bulk solutions) (pkg 3) replacement is > 1year.
09D42-02 Cuvette Wiper 1 Advise customer to replace if last
replacement is > 1year.

Page 4 of 4

ISA-126-108 Rev B, Released - Effective on: 20-Dec-2018 - Confidential - Page 4 of 4

You might also like