Performance Assessment October 2022
Performance Assessment October 2022
1) The number of drug and alcohol tests conducted by the railway operator and/or by its service
provider/s.
162 assessments completed during reporting month. All assessed individuals found fit for work.
During COVID-19 pandemic, breathalyzer device will not be use in the MDDTTS.
0 accident since we have completed 50797 loops from December 30th, 2019, to October 31st, 2022.
0 accident since we have started the trial runs for 52467 loops completed.
4) The number of health/medical assessments conducted including the number of rail safety workers
who have undergone health/medical assessments.
Number of health/medical assessments conducted from January 1 st, 2022, up to October 31st, 2022:
7
5) The length, in kilometres, of track over which the certificate holder has effective management and
control.
Km: from Dec 30th, 2019, to October 31st, 2022: 83933.96 kilometres.
8) The number of employees of the railway operator and its service providers engaged in provision of
railway services.
9) The number of rolling stock, with details of type of rolling stock, available for railway operations: 3
10) Any SMS audit reports (if audit conducted within the reporting months).
Category A: None
Category B: None
Category C: None
12) Investigation reports: - if an investigation report has already been provided then a report reference
number must be provided along with the information from sub-item 11 above.
No investigations were carried out this reporting period.
13) List and details of improvement/prohibition notices issued by either MOTC or other authority having
jurisdiction.
1 notice were issued by SNC Lavalin during the reporting Month.
Notice 104 Procedure to be followed in case of disturbances of any nature in the tram.
14) Number of trams operate per day and per week (planned vs actual). 96.77%
Planned and Actual Deployed Tram
Date Planned Weekly Actual Weekly Remarks
1-Oct-2022 2 2
2-Oct-2022 2 2
3-Oct-2022 2 2
4-Oct-2022 2 2
5-Oct-2022 2 2
6-Oct-2022 2 2
7-Oct-2022 2 14 2 14
8-Oct-2022 2 2
9-Oct-2022 2 2
10-Oct-2022 2 2
11-Oct-2022 2 2
12-Oct-2022 2 2
13-Oct-2022 2 2
14-Oct-2022 2 14 2 14
15-Oct-2022 2 2
16-Oct-2022 2 2
17-Oct-2022 2 2
18-Oct-2022 2 2
19-Oct-2022 2 2
20-Oct-2022 2 2
21-Oct-2022 2 14 2 14
22-Oct-2022 2 2
23-Oct-2022 2 2
24-Oct-2022 2 2
25-Oct-2022 2 2
26-Oct-2022 2 2
27-Oct-2022 2 2
28-Oct-2022 2 14 2 14
29-Oct-2022 2 2
Planned and Actual Deployed Tram
Date Planned Weekly Actual Weekly Remarks
Used one tram due to technical issues of
30-Oct-2022 2 1 two trams: Tram 2 Left door not working,
Tram 3 right door not working.
Used one tram due to technical issues of
two trams: Tram 1 manzanita not charging,
31-Oct-2022 2 6 1 4
Tram 3 both passenger doors are not
working.
Total 62 60
15) Total number of Loops completed & passengers carried during the reporting period
(Including numbers on daily basis).
Sum of Loops / Passengers per Month
Total # Of
loops Tram Passenge Remarks
Year Date 1 2 3
per Deploye r Count
Day d
202 1-Oct 0 48 48 96 2 526
2 92 loops during passenger service (-) 4
2-Oct 0 48 44 92 2 252
loops due to oil leak under frame
92 loops during passenger service + 4
3-Oct 0 48 48 96 2 354 loops during AAGS 2022 – Gala Dinner
- Msheireb Barahat Square VVIP Tour
90 loops during passenger service (-) 6
4-Oct 0 42 48 90 2 291 returned trams to depot due top up of
refrigerant of Tram 2
91 loops during passenger service + 2
loops during Tram 1 speed control
testing by TIG/m, (-) 1 loop due to
5-Oct 24 25 44 93 2 341
switching of the data logger, (-) 2
loops missed during Tram 1 speed
control testing.
93 loops during passenger service + 3
6-Oct 44 47 5 96 2 606 loops during Tram 3 speed control
testing by TIG/m
7-Oct 32 0 32 64 2 792
95 loops during passenger service (-) 1
8-Oct 22 33 40 95 2 527 loop due to switching of the data
logger
91 loops during passenger service'(-) 1
loop due to switching of the data
9-Oct 29 22 40 91 2 320
logger
(-) 4 loops due to ill driver
93 loops during passenger service (-) 2
10- loop due to switching of the data
38 7 48 93 2 382
Oct logger, (-1) preparing the tram 1 for
exit
95 loops during passenger service (-) 1
11-
40 26 29 95 2 320 loop due to switching of the data
Oct logger
95 loops during passenger service (-) 1
12-
40 16 39 95 2 44 loop due to switching of the data
Oct logger
13- 29 26 40 95 2 516 95 loops during passenger service (-) 1
Sum of Loops / Passengers per Month
Total # Of
loops Tram Passenge Remarks
Year Date 1 2 3
per Deploye r Count
Day d
loop due to switching of the data
Oct
logger
14-
32 0 32 64 2 1001
Oct
95 loops during passenger service (-) 1
15-
29 26 40 95 2 693 loop due to switching of the data
Oct logger
95 loops during passenger service (-) 1
16-
44 37 14 95 2 506 loop due to switching of the data
Oct logger
17-
48 48 0 96 2 397
Oct
95 loops during passenger service (-) 1
18-
48 47 0 95 2 306 loop due to LPG replacement of Tram
Oct 2
19-
48 48 0 96 2 313
Oct
20-
48 41 7 96 2 488
Oct
21-
32 32 0 64 2 766
Oct
22-
48 0 48 96 2 577
Oct
23-
33 23 40 96 2 500
Oct
24-
48 19 29 96 2 581
Oct
89 loops during passenger service (+)
1 loop during VIP tour Hyatt Hotels
25-
37 29 24 90 2 494 Appreciation customer event at Park
Oct Hyatt Doha (-)6 loops Passenger
service suspended due to VIP tour
58 loops during passenger service (-)
26-
36 0 22 58 2 322 38 loops due to passenger service
Oct suspended due Drill requested by MOI
27- 92 loops during passenger service (-)4
46 46 0 92 2 813
Oct loops due to traffic jam
28 loops during passenger service (-)
28-
10 18 0 28 2 592 36 loops due to Bollard Testing/ Al
Oct Kahraba Street decoration
29-
48 48 0 96 2 709
Oct
56 loops during passenger service (-)
40 loops due to the door issue of the
30-
56 0 0 56 1 408 two trams, Tram 3 both passenger
Oct door not working & Tram 1 left door
issue
31- 0 44 0 44 1 421 44 loops during passenger service, (-)
Oct 40 loops due to the issue of the two
trams, Tram 1 manzanita issue, Tram 3
Sum of Loops / Passengers per Month
Total # Of
loops Tram Passenge Remarks
Year Date 1 2 3
per Deploye r Count
Day d
both passenger door not working, (-)
12 loops due to tram service
suspension due to Elegancia work on
going into alignment
Total
Loops/Passen 98 89
761 2644 60 15458
gers per 9 4
Month
16) Total Yearly Loops by Tram
Sum of
Tram # Years
Loops
2017 30
2018 253
2019 551
1
2020 2665
2021 5055
2022 6519
1 Total 15073
2018 47
2019 340
2 2020 3562
2021 9771
2022 8266
2 Total 21986
2018 9
2019 529
3 2020 3058
2021 4918
2022 6894
3 Total 15408
Grand Total 52467
18) Number and extent of service interruptions/ disturbances/ re-routing (if any).
Hazard Classification (# of
Observations Month / Loops 2021 2022
Month)
Classification NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT
Violation 0.15 0.12 0.13 0.14 0.08 0.04 0.06 0.05 0.07 0.07 0.04 0.07
Vehicle obstruction 0.01 0.02 0.00 0.00 0.03 0.03 0.02 0.02 0.01 0.01 0.00 0.01
Obstruction on the tracks 0.00 0.00 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
General observation 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Construction worker &
Equipment within 5 - feet from
the tracks 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
No streetlights 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Pedestrian crossing marks not
visible 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
No Security guard on duty 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
No Lights at the station 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Traffic signalization issue 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Water within 5 - feet from the
tracks 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Pedestrians touching the body of
the tram 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Hazard Classification (# of Observations Month /
Loops Month)
0.16
0.14
0.12
0.10
0.08
0.06
0.04
0.02
0.00
NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT
2021 2022
Violation
Vehicle obstruction
General observation
No street lights
The following 3 charts provide the detail of the 3 hazards with highest grand total numbers registered.
Hazard Classification (# of Observations Month /
Hazard Classification (# Month)
Loops of Observations Month /
0.20
Loops Month)
0.04
0.15
0.10
0.03
0.05
0.02
0.00
0.01 NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT
2021 2022
0.00
NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT
Violation
Vehicle obstruction
0.01
0.00
NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP OCT
Year 2022
Month Name October
Locations Count of traffic violations Remarks
Junction 5 67
Station 6 24
Junction 4 17
Junction 2 14
Junction 1 14
Junction 14 11
Junction 15A 9
Junction 13 5
Station 7 3
Junction 9 3
Qsar Suhaim street 3
Junction 3 1
FGL Entrance 1
Junction 11 1
Junction 7 1
Junction 6 1
Grand Total 175
In the following picture are marked the location of 2 junctions and 1 station with highest numbers of
traffic violations in the reporting month.
As observed in the previous table and picture, Junction 5, Station 6 and Junction 4 respectively,
presented the highest numbers of traffic violations.
23) Variation observed on the tram system (driving rules, SOP’s, protocols)
0 during the reporting Month.