Details of the Earth Control Measures are to be designed by Qualified Erosion Control Professional (QECP).
SILT FENCE
30m
SILT FENCE
SECTION X - X
(ma
N.T.S
30m (max)
x)
HOARDING ALONG LOT BOUNDARY
CONSTRUCTION SITE 2.0m (min)
1.5m (min)
AND BARE SURFACE COVERED BY EROSION
CONTROL BLANKET, ETC.
GEOTEXTILE OR COAGULATION
ASSISTANCE MATERIALS OR
EQUIVALENT
X
SECTION Y - Y
X
SEDIMENTATION DETAIL ’A’
BASIN /
N.T.S
STORAGE TANK /
SILO SILT FENCE
)
Treatment System:
ax
(m
INTERMEDIATE SILT TRAP
0m (1) If a site has suitably sized storage pond / tank and treatment
(SEE DETAILED ’A’) 1m Y 3
2
system, the rainfall to be considered is equivalent to 60 mm/m
PAVED
of the construction site.
TREATMENT ACCESS Y
SYSTEM 2
(2) As an illustration, for 0.5 ha (5,000 m ) site, the storage
30m (max)
3
pond / tank should contain a minimum of 300 m and the treatment
3
EXISTING PUBLIC DRAIN EXISTING PUBLIC DRAIN system should have a minimum capacity of 30 m /hr, as outlined in
EXISTING ROAD
(3) Please refer to Earth Control Measures (ECM) website
www.pub.gov.sg/ECM