01 - Uuh - Ot Area Block 1

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1a

1 23
2
3
4
L
5 22
6
7 8 9 10 11 12 13 14 15 16 17 18
OPERA

MOVEMENT JOINT
TIN G THEA
FUTURE TRE

T
EXPANS

IN
ION 3

JO
NT
K

ME
3 INTENSIVE CARE FACILITIES

E V
MO
CCU (10 BEDS)
LL
FA
D TO
LAI

LA
ID
TO
FA
LL
LL
FA
D TO
LAI

BUILT-IN
SHELVES

LL
FA
D TO

L
FAL
LAI

D TO
LAI
LAI
D TO
FA
LL

2500
3778 3450 3666
1453 1875 2033

450

450

450

450
380

455
3625

1450

1510
4250
FUTURE 450

2950
2060
2360

2500
2600
4700

2800
EXPANS

3150

3190

3200
1200
HIGH/
CABINET

2700
2350

3800
ION 1

4100

4100
HIGH/
11 CABINET

2913
40

900
1050 2400

CABINET
2404 400

HIGH

1200
200
450 2318
2090 2500 3850

1900
1168

4157
2350
1717 932
H

3185
2920 LAI

3482 D TO
FA
LL

2500
450 3200
2872

2500

2500
LL
FA
D TO
LAI

4498

2700
300

3150
2840
1571

1635
1050
VS4 VS4

344
HIGH/
HC PG CABINET

CABINET

CABINET
HIGH/

HIGH/
WORKSHO
P/
CABINET

KTOP
SS WOR
BUILT-IN HIGH
SHELVES CABINET

NC

BUILT-IN
LAID TO FALL LAID TO FALL LEGEND :
SHELVES

HIGH/
CABINET
LAID TO FALL LAID TO FALL

CURTAIN BLIND
G

TABLE
SIDE

TABLE
SIDE
LAID TO FALL LAID TO FALL

CABINET
HIGH
LAI
D TO
FA
LL
CURTAIN WARD

LOCKERS

LOCKERS

SHELF
LAI
D TO
FA
LL

OPERA CURTAIN SUPPORT


TING TH LAID TO FALL

EA TRE LOCKERS
SHELF KEY PLAN :
1700

LOCKERS

TABLE
SIDE
SHELVES
BUILT-IN

WORKSHOP/

TABLE
SIDE
CABINET
L
FAL
D TO
LAI

1700
1900

OP/
CABINET
LAB BEN

WORKSH
CH/

OP/
CABINET

CABINET
WORKSH
VS4 VS4
HC PG

CABINET
HIGH/
75000

F
2950

3889

CABINET
HIGH/
HIGH
CABINET HIGH/

1200 CABINET

3889
1900

2400

1 FUTURE
EXPANS

1497
ION 2 600

2829
2550

S/S STORA
GE RACK

S/S STORA

3829
GE RACK
VS4 VS
4
HC PG

GE RACK
S/S STORA
2700
2950

1800
LOCKERS

LAID TO FALL
GE RACK

4655
S/S STORA

779

56
2
1800

3346
0
129
GE RACK

2256
1609 PEMILIK :
S/S STORA

1359
GE RACK
S/S STORA
GE RACK
S/S STORA

VS4 VS4 2550


HC PG
2950

3889

L
FAL

FAL
D TO

D TO
1200

LAI

LAI
3889 VS1 VS1
GE RACK

HC PG
S/S STORA

GE RACK
250

S/S STORA
2400
1900

D
GE RACK
S/S STORA
GE RACK
S/S STORA

GE RACK
2950

UCSI University Hospital Sdn. Bhd.


S/S STORA

S
LOCKER
BENCH
GE RACK

LAID TO FALL
S/S STORA

LAID TO FALL

1, JALAN MENARA GADING,


S
LOCKER

2575
LAID TO FALL

UCSI HEIGHTS,

LOCKERS
LAID TO FALL
4100 56000 CHERAS, KUALA LUMPUR.

3175
W

BENCH
GE RACK

BENCH

LAID TO FALL
3400 2400 TEL : 03-9102 8880 FAX : 03-9102 3606
S/S STORA

LAID TO FALL
2850
S

LOCKERS
LOCKER

LAID TO FALL

6900 CABINET

1700 ARKITEK :

913
LAID TO FALL LAID TO FALL LAID TO FALL

NURSE STATION
BENCH

1925
LAID TO FALL

3400
C

LOCKERS
VS4 VS4 LAID TO FALL LAID TO FALL LAID TO FALL

LAI
D TO
HC PG

FA
LL
2950

3889 LAID TO FALL LAID TO FALL

1200
3889 6000
2-3.5bar
C/W: 25mm

BENCH
CABINET
5870

3000
BENCH
2-3.5bar

LOCKERS
C/W: 25mm

2-3.5bar

3650
(15 STU)

C/W: 25mm

4150
IRON

IRON
STERLIZER

BUILT-IN
Ø GI/CAST

(15 STU)
Ø GI/CAST

LOCKERS
SHELVES
4505
IRON
STEAM

D: 50mm

1550 700 1900


STERLIZER

IRON
Ø GI/CAST
D: 50mm

(15 STU)
Ø GI/CAST
PASS THROUGH

IRON
STEAM

D: 50mm

IRON
STERLIZER

Ø GI/CAST
D: 50mm

Ø GI/CAST
PASS THROUGH
2400

300
A

D: 50mm
STEAM
400V/3Ph/10

STERILIZER
D: 50mm

600
PASS THROUGH
400V/3Ph/10A

300
LOW EQUIPMENT
400V/3Ph/10A

1867
1567
1425
k
a
b
m
.e
atk
a
&
ila
so
a
e
c
ts
i
B-05-10, PLAZA MONT KIARA, NO.2, JALAN KIARA, 50480 KUALA LUMPUR
TEL : +603 - 6201 6068 FAX : +603 - 6201 6069
VS4 VS4
2950

HC PG

LAID TO FALL

LL
PERUNDING REKABENTUK :

FA
TO
ID
LA
2 2700

LAID TO FALL
B TSSU FL1

CUPBOARD

CUPBOARD

CUPBOARD
(Fire Lift)
S/S PACKIN

LL
FA
TO
S/S PACKIN

ID
LA

CUPBOARD

CUPBOARD

CUPBOARD
G STATIO

G STATIO
N

HEAT SEALE

N
R

450
WORKSHOP/
S/S TROLL
EY PAPER

CABINET
DISPEN
SER

VS4 VS4 cmc designworks sdn bhd

1486
S/S PACKIN

HC PG
200
S/S PACKI

2400 \\WAZIR-PC\01-Production\16xx_UCSI HOSPITAL\Architecture Construction\MAY 2016\LOGO CMC.jpg B-05-10, PLAZA MONT KIARA, NO.2, JALAN KIARA,
G STATIO

1000

2983
NG STATIO

50480 KUALA LUMPUR


2950

3889
TEL : +603 - 6201 6068 FAX : +603 - 6201 6069
HEAT SEALE

FUTUR
600

WORKSHOP/
1200

CABINET
3075
R

E EXPA 3889
300
PROJECT TITLE :
NSION S/S TROLL
EY PAPER
DISPENSER

100
4

7864
A O & G /PAEDS WARD
CADANGAN PINDAAN KEPADA PELAN
2400

400
PASS THROU

LULUS - NO. FAIL: MPPD/431/120/2010/01


GH BOX

WASHER
DISINFECTOR

3613
1700
YANG BERTARIKH 16 OGOS 2011 BAGI :
LAID TO FALL
LAID TO FALL LAID TO FALL

2093 LAID TO FALL LAID TO FALL

LAID TO FALL

1350 1794 1794 4425

1913
1794
2950

1170 1170
LAI
D TO

LAID
900
FAL

TO
L

FAL
L

300

300

300

300

300
CADANGAN MEMBINA SEBUAH PUSAT

600

77
1800
PERUBATAN DAN FAKULTI PERUBATAN
1500

1500

1500
1200
SHELF

LAID
TO
FAL
300

3000
L

ULTRASONIC
CLEAN
ER
600 2094 2094
UCSI UNIVERSITI YANG MENGANDUNGI :-

BED HEAD PANEL

BED HEAD PANEL


S/S TRIPLE
BOWL SINKS

4187

BED HEAD PANEL

BED HEAD PANEL


BED HEAD PANEL

BED HEAD PANEL


LAID TO FALL
I) 1 BLOK HOSPITAL 12 TINGKAT
II) 1 BLOK M&E KOMPLEKS 2 TINGKAT
1a III) 1 UNIT PONDOK PENGAWAL

BED HEAD PANEL


BED HEAD PANEL
LAID TO FALL

BED HEAD PANEL


BED HEAD PANEL

BED HEAD PANEL


IV) 1 UNIT PONDOK PERHENTIAN BAS

BED HEAD PANEL

BED HEAD PANEL


BED HEAD PANEL

BED HEAD PANEL


LAID TO FALL LAID TO FALL

LL
FA
TO
ID
LA
1 TSSU LAID TO FALL LAID TO FALL

DI ATAS SEBAHAGIAN LOT 8317,


2
BANDAR SPRINGHILL, MUKIM JIMAH,
3 ENDOSCOPY/DAY MEDICAL-SURGICAL CORRIDOR DAERAH PORT DICKSON, NEGERI
4 3 WARD 1 (PAEDS/O&G) SEMBILAN DARUL KHUSUS.
5 UNTUK TETUAN:
6 UCSI UNIVERSITY HOSPITAL SDN. BHD.
7
8
9 10 11 12 13 14 15 16 17 18

DRAWING TITLE :

WALL SETTING OUT PLAN


2ND FLOOR - BLOCK 1 & 2

SCALE : DATE :
1 : 150 SEP 2020
DRAWN BY : CHECKED BY :
RFD SA

DRAWING NO : REVISION :

FOR CONSTRUCTION UUH / 2ND / B1 & B2 / 01

You might also like