QUOTATION NO. : 001/LINDE-PKCM/CLG/IX/2023


TO. : PT. LINDE INDONESIA
PROJECT NO. : 61000582
PROJECT NAME : GAN PIPELINE CILEGON

QUOTATION of Instrumentation Works For GAN AUGMENTATION, CILEGON - LOTTE CHEMICALS

QUOTE SERVICE (JASA)


SL Item Description QTY Unit UNIT PRICE TOTAL
(IDR) (IDR)

Fabrication, Painting & Fixing of Instrument supports, canopy fabrication and installation,
A)
calibration, Installation, loop checking, commissioning of following instruments.
a) Fabrication for Instruments Supports & Canopy 10 Unit 4.200.000 42.000.000
1 Pressure transmitters with 2 valve manifold 7 Nos. 6.600.000 46.200.000
2 DP transmitters with 3 valve manifold 3 Nos. 6.600.000 19.800.000
3 Pressure gauge 5 Nos. 6.600.000 33.000.000
4 Temperature Elements Outside Cold box (RTD) with thermowell 4 Nos. 6.600.000 26.400.000
Temperature gauge 2 Nos. 6.600.000 13.200.000

Unloading of panels/JB, shifting to site, Painting, Erection, wiring, tubing and modification (if
B)
needed)

1 Supply & fixing of SS Junction Boxes along with required SS cable glands & SS plugs 4 Nos. 900.000 3.600.000
Fixing of Analyser Panel (600X800X2000) with 1 no. Analyser,sampling system shall be inbuilt inside the panel.
2 However process sample End connection and analyser vent to be done along with the Calibration gas cylinders, 1 No.
cylinder regulators and line regulators. 900.000 900.000
3 Fixing of DCS Panel (1200X800X2200) & 19" rack inside container 1 No. 1.200.000 1.200.000
4 Supply of computer console with CRCA material (600x600x1000) inside container. 1 No. 2.000.000 2.000.000
5 Fixing of computer cabinet with computer accessories 1 Set. 600.000 600.000

Supply of Cables, shifting to site, Megaring, laying, dressing, clamping with pre-fabricated clamps,
C)
glanding, termination, ferruling, Taging , Continuty checking, loop testing of following cables.

1 1 pair x 1.0 sq mm Overall shielded 750 Mtr. 420.000 315.000.000


2 6 pair x 1.0 sq mm Ind & Overall shielded 150 Mtr. 420.000 63.000.000
3 12 pair x 1.0 sq mm Ind & Overall shielded 300 Mtr. 420.000 126.000.000
4 12 pair x 1.0 sq mm Overall shielded 200 Mtr. 420.000 84.000.000
5 1 Triad x 1.0 sq mm Overall shielded 250 Mtr. 420.000 105.000.000
6 9 Triad x 1.0 sq mm Ind & Overall shielded 300 Mtr. 420.000 126.000.000
7 Fiber optic Cable 400 Mtr. 420.000 168.000.000
8 Ethernet Cable 50 Mtr. 420.000 21.000.000
9 3 core x 2.5 sqmm power cable 50 Mtr. 420.000 21.000.000
10 Earthing cable 16sqmm 50 Mtr. 420.000 21.000.000

Tube shifting to site, Cleaning, laying, dressing, clamping with pre-fabricated clamps, termination
D)
with fittings of following tubes.

1 6 mm OD SS tube 150 Mtr. 450.000 67.500.000


2 12 OD SS tube 150 Mtr. 450.000 67.500.000
Supply of Cable Tray, shifting to site, laying, fabrication of bends for following cable trays with tray
E)
cover(as applicable).
1 300 mm width x 70 mm Aluminium tray with cover 100 Mtr. 660.000 66.000.000
2 200 mm width x 40 mm Aluminium tray with cover 100 Mtr. 360.000 36.000.000
3 100 mm width x 40 mm Aluminium tray with cover 200 Mtr. 180.000 36.000.000
4 60 mm width x 40 mm Aluminium tray with cover 50 Mtr. 120.000 6.000.000
Supply, Fabrication and erection of structural steel for instrument support, panel base frame & other
F)
jobs including painting.
1 M S Structural Steel 2 Ton. 50.000.000 100.000.000
2 1" GI Conduit 20 Mtr. 500.000 10.000.000
3 2" GI Conduit 20 Mtr. 500.000 10.000.000
4 2” MS Pipe 20 Mtr. 500.000 10.000.000

TOTAL QUOTATION SERVICES ONLY (JASA PEKERJAAN TANPA MATERIAL) 1.647.900.000

G) Commissioning Assistance per manday basis

1 Instrument Technician 1 Manday 1.800.000 1.800.000


2 Electrician 1 Manday 1.800.000 1.800.000
3 Fitter 1 Manday 900.000 900.000
4 Helper 1 Manday 600.000 600.000

H) Indirect Cost 1 Lot. 500.000.000 500.000.000

NOTE:
1. Price is Franco Cilegon
2. Price is without material (Services only)
3. Prices not include tax.
4. Leadtime of Work : 30 days
5. Term Of Payment : 50% Down payment, 25% Progress and 25% After Finish
6. Price is valid as Total Package as stated on BQ and ordered separately
7. Quotation validity : 30 Days
8. The above price quoted are based on current ex-change rate, duties and taxes.
9. Any change on this will be borned by the customer.
10. Order cancellation is NOT allowed or 50% as cancellation charges will be imposed.
11. Please always state our Order No, Quotation reference & payment terms on your Purchase Order.

Best Regards,
PT. PRIMA KURNIA CILEGON MANDIRI

RIFKI FARADILLAH RIZQI


DIRECTOR