PROTECTION RELAY

REF 615

SIGMA POWER SERVICES PTY LTD


www.sigmapowerservices.com.au
info@sigmapowerservices.com.au
T: +61 89 2777 228 | M: +61 428 666 274
PROTECTION RELAY Page 1 of 5

TEST REPORT

Customer Aggreko Job No. SPS-1197


Location Gove Work Order NA
Substation Substation U Date 26/09/2023
Switchboard 22kV Switchgear Panel T2 Feeder

1. DETAILS

GENERAL CHARACTERISTICS
Relay Manufacturer ABB Rated Aux. Voltage 24/60 VDC
Relay Type REF 615 CT Ratio 150/1 A
Serial No. 1VHR91546800 VT Ratio 20kV/200 V
Model No. HBFFAEAGNDC1BNA21G Ground CT Ratio 100/1
Setting Group 1 Software Version PCM 2.11

2. PROTECTION SETTINGS

CURRENT PROTECTION SETTINGS


Time delay
I I>CURVE Characteristics
Element or TMS Type Direction
Setting Setting Angle
Setting
Normal
DPHLPDOC1:1 0.72* In 1 Non-Directional NA NA
Inverse
DPHLPDOC2:2 0.33* In 150 ms Definite Time Directional Reverse 60 Deg
PHIPTOC1:1 2.10* In 600 ms Definite Time Non-Directional NA NA
EFHPTOC1:1 0.5* In 450 ms Definite Time Non-Directional NA NA

3. METERING

PHASE CURRENT METERING


Injected Current (A) Expected Current (A) Displayed Prim. Current on Relay (A) Remarks
R W B G R W B G R W B G
1.00 1.00 1.00 - 150 150 150 - 149.2 149.1 149.1 - Pass
0 0 0 1.00 0 0 0 100 0 0 0 99.1 Pass

VOLTAGE METERING
Injected Voltage (V) Expected Voltage (kV) Displayed Prim. Voltage on Relay (kV) Remarks
R-N W-N B-N R W B R W B
115.5 115.5 115.5 20 20 20 19.89 19.87 19.89 Pass

Tested by: Nagaraj Muthuchamy Reviewed By: Usman Ali


PROTECTION RELAY Page 2 of 5

TEST REPORT

4. PROTECTION TEST RESULTS

PHASE OVERCURRENT PICK UP TEST


CALCULATED PICK UP (A) MEASURED PICK UP (A) TOLERANCE
ELEMENT
L1, L2, L3 L1 L2 L3

DPHLPDOC1:1 0.72 0.73 0.73 0.73 ±5% of Setting plus ±0.02 • INOM A
Secondary
DPHLPDOC2:2 0.33 0.35 0.35 0.35

PHIPTOC1:1 2.1 2.11 2.11 2.11

PHASE OVERCURRENT TIMING TEST


CURRENT INJECTED (A) MEASURED TRIP TIMES (s) Calculated TOLERANCE
ELEMENT Trip Times
L1, L2, L3 L1 L2 L3 (s) ±1.5 Cycles, plus ±4%
(Between 2 and 30
DPHLPDOC1:1 2x = 1.44 10.075 10.075 10.075 10.029 multiples of Pick Up)

DPHLPDOC2:2 0.5 0.165 0.165 0.165 0.150 ±0.5% of setting plus


±1/4 cycle
PHIPTOC1:1 2.2 0.626 0.626 0.626 0.600

DIRECTIONAL TEST
Phase Expected Angle Operating Angle
ELEMENT Direction Remarks
Deg Deg

L1 220 deg to 20 deg 222 deg to 19 deg Reverse Pass

DPHLPDOC2:2 L2 100 deg to 260 deg 102 deg to 258 deg Reverse Pass

L3 340 deg to 140 deg 342 deg to 138 deg Reverse Pass

EARTHFAULT PICK UP TEST


ELEMENT CALCULATED PICK UP (A) MEASURED PICK UP (A) TOLERANCE

±5% of setting plus ±0.02 • INOM A


EFHPTOC1:1 0.5 0.52
secondary

EARTHFAULT TIMING TEST

Calculated
ELEMENT CURRENT INJECTED (A) MEASURED TRIP TIMES (s) Trip Times TOLERANCE
(s)
±1.5 Cycles, plus ±4%
EFHPTOC1:1 1 0.461 0.450 (Between 2 and 30
multiples of Pick Up)

Tested by: Nagaraj Muthuchamy Reviewed By: Usman Ali


PROTECTION RELAY Page 3 of 5

TEST REPORT

5. FINAL CHECKS

FINAL CHECKS
Relay final setting applied ☒ CT Links Closed ☒
Relay Settings read back ☒ CT Shorts removed ☒
All test equipment removed ☒ VT Supply restored ☒
As tested stickers applied to relay ☒ All Trip links closed ☒
Reset all flags/latches ☒ All Wiring and Contacts in good condition ☒

6. COMMENTS

Observations & Comments


1 All the test results are satisfactory, and the protection relay is in serviceable condition.
Disturbance Recorder operating mode changed from saturation to overwrite. Previous saturation mode setting can only
2
record up to 35 faults.
Residual Current measurement (Io) High alarm and warning stage changed from 20% to 120% and 40% to 140%
3
respectively to avoid nuisance in events recorder.
4 Earth switch status is coming reverse in relay binary input.

Tested by: Nagaraj Muthuchamy Reviewed By: Usman Ali


PROTECTION RELAY Page 4 of 5

TEST REPORT

7. VISUAL INSPECTION

Visual Photos

Panel Identification Nameplate Data

Tested by: Nagaraj Muthuchamy Reviewed By: Usman Ali


PROTECTION RELAY Page 5 of 5

TEST REPORT

Rear view of Relay CT/VT Terminal

Tested by: Nagaraj Muthuchamy Reviewed By: Usman Ali