Site Welded Joints Fit Up Record DOC. NO.

Shandong TIEJUN Project: Jhajjar Thermal Power Project W-FITUP-


Electric Power Engineering Client: Jhajjar Power Limited Rev.:0
Company Limited
Subcontractor: Date:
Item: Unit:
Drawing No Speciality: WELDING
S.N. Joint ID Material OD (mm) THK (mm) Accepted Rejected Remark

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Inspected By Subcontractor TIEJUN JPL
Designation
Signature/Date
Site Welded Joints Visual Exam Record DOC. NO.:

Shandong TIEJUN Project: Jhajjar Thermal Power Project W-VISUAL-


Electric Power Engineering Client: Jhajjar Power Limited Rev.:0
Company Limited
Subcontractor: Date:
Item: Unit:
Drawing No Speciality WELDING
OD THK
S.N. Joint ID Material (mm) (mm)
Welder ID Finding Accepted Rejected Remark

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Inspected By Subcontractor TIEJUN JPL
Designation
Signature/Date
Site Welded Joints Welding Record DOC. NO.:

Shandong TIEJUN Project: Jhajjar Thermal Power Project W-WELDING-


Electric Power Engineering Client: Jhajjar Power Limited Rev.:0
Company Limited
Subcontractor: Date:
Item: Unit:
Drawing No Speciality WELDING
OD THK Welding Result of
S.N. Joint ID Material (mm) (mm)
Welder ID
Date
NDT Result
Repair
Remark

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Inspected By Subcontractor TIEJUN JPL
Designation
Signature/Date
Site Welded Joints PWHT Record DOC. NO.:

Shandong TIEJUN Project: Jhajjar Thermal Power Project W-PWHT-


Electric Power Engineering Client: Jhajjar Power Limited Rev.:0
Company Limited
Subcontractor: Date:
Item: Unit:
Drawing No Speciality WELDING
OD THK Hardness
S.N. Joint ID Material (mm) (mm)
Chart NO. PWHT Date
WELD HAZ
Remark

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Inspected By Subcontractor TIEJUN JPL
Designation
Signature/Date
NDT Inspectino Report DOC. NO.:

Shandong TIEJUN Project: Jhajjar Thermal Power Project NDT


Electric Power Engineering Client: Jhajjar Power Limited Rev.:0
Company Limited
Subcontractor: Date:
Item Report No.
Working NDT INSPECTION
Unit Contractor
Procedure REPORT
Description: Material: Thickness/Dia:
Source: Source Strength: S.F.D:
IQI;ASTM Hole/Wire Typ: Sensitivity: Density:
Single/DoubleWall/Panoramic Technique: Film Type:
Exp.Time: Acceptance Standard:
No Segment.N Welder Disposition(repair/
Si.No Film size Findings Date
Joint No o. ID. Accept)

NSD=No Significant Defect, IP=Incomplete Penetration, LF=Lack of fusion, TI=Tungsten Inclusion, BT=Burn
Through, RC=Root Concavity, EP=Excess
Penetration, PM=Process Mark, ,C=Crack, UC=Under Cut, S=Slag, P=Porosity, ACC=Accept, REP=Repair,
RT Retake
Inspected By Subcontractor TIEJUN JPL
Designation
Signature/Date